RFQ_QUESTIONS_AND_ANSWERS_Round_2.pdf
PDF 62 KB Posted
- Attached to
- Rotterdam, Netherlands S&RTS Federal contract opportunity
- Solicitation number
- HTC711-18-Q-R018
About this file
Q&A's Round 2
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFQ_QUESTIONS_AND_ANSWERS_Round_4.pdf | ||
| Amendment_4.pdf | ||
| Attachment_1_-_PWS_-_Amend_4.pdf | ||
| Attachment_2-SOR_-_Amend_4.xlsx | XLSX spreadsheet | |
| Attachment_2-SOR_-_Amend_3.xlsx | XLSX spreadsheet | |
| Amendment_3.pdf | ||
| RFQ_QUESTIONS_AND_ANSWERS_Round_3.pdf | ||
| RFQ_Letter_Amendment_2.pdf | ||
| Amendment_2-Rotterdam.pdf | ||
| Attachment_2-SOR_-_updated.xlsx | XLSX spreadsheet | |
| Amendment_1-Rotterdam.pdf | ||
| RFQ_QUESTIONS_AND_ANSWERS.pdf | ||
| Attachment_2-SOR_-_updated.xlsx | XLSX spreadsheet | |
| Attachment_1_-_PWS.pdf | ||
| Attachment_3_-_RFQ_Information_Sheet_.docx | DOCX document | |
| Attachment_5_-_Addendums_to_52.212-1_&_52.212-2.docx | DOCX document | |
| Attachment_4-_Technical_Worksheet.docx | DOCX document | |
| RFQ-Rotterdam.pdf | ||
| RFQ_letter.docx | DOCX document |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFQ QUESTIONS AND ANSWERS (ROUND 2)
HTC711‐18‐Q‐R018 Rotterdam, Netherlands
10. QUESTION: Can you amend the Schedule of Rates to include an estimate for minimum, average and maximum assumed storage and staging, in order to incorporate cost of clearing the storage and staging areas?
ANSWER: The Schedule of Rates will not be revised. Please refer to RFQ Attachment 1 – PWS which states the following:
PWS Section 6.12.2.5 The Contractor shall provide exclusive use of up to 120,000 square meters of hard stand for use as staging area in the terminal. This staging area shall have direct access to RO/RO and LO/LO berths and shall possess a railhead. These berths and the railhead shall be fixed, inseparable infrastructure on the facility. The Contractor shall make ready the 120,000 square meters at their own expense.
And
6.12.4 Warehousing.
6.12.4.1 The Contractor shall provide 8,000 square meters warehouse space to accommodate DOD sponsored cargo, supplies, materials, and equipment. The facility shall be capable of working in all weather conditions. The Contractor shall make ready the 8,000 square meters at their own expense