About this file
Atch 3 - Minimum Productivity Standards
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Oman_SRTS_QA_Supp.2_28Feb17.pdf | ||
| HTC711-17-R-R005_Amend_0003_28Feb17.pdf | ||
| Atch_2_Oman_Schedule_of_Rates_Rev.3_27Feb17.xlsx | XLSX spreadsheet | |
| Oman_SRTS_QA_Supplement_28Feb17.pdf | ||
| Atch_2_Oman_Schedule_of_Rates_Rev.2_27Feb17.xlsx | XLSX spreadsheet | |
| HTC711-17-R-R005_Amend_0002_27Feb17.pdf | ||
| Atch_2_Oman_Schedule_of_Rates_Rev.1_21Feb17.xlsx | XLSX spreadsheet | |
| Oman_SRTS_QA_FINAL_21Feb17.pdf | ||
| HTC711-17-R-R005_Amend_0001_21Feb17.pdf | ||
| Atch_1_Oman_SRTS_PWS_FINAL_Rev.1_21Feb17.pdf | ||
| Oman_S&RTS_Preproposal_Conference_Info_&_Agenda.pdf | ||
| HTC711-17-R-R005_Oman_S&RTS_RFP_25Jan17.pdf | ||
| Atch_1_Oman_SRTS_PWS_FINAL_29Nov16.pdf | ||
| Atch_2_Oman_Schedule_of_Rates_29Nov16.xlsx | XLSX spreadsheet | |
| Atch_4_Stevedoring_Invoicing_Instruction_(Final)_29Nov16.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Line Item
Commodi ty
Number Commodity Name Unit of Measure
LINE
ITEM
COMMO
DITY
NUMBER
COMMODITY NAME UNIT OF
MEASURE
01A General Cargo / Breakbulk Cargo / Palletized Cargo (Quadcon/Tricon/Bicon) EA $0.00 -$ $0.00 -$ 01B General Cargo Loose Cargo EA 05-A Vehicles up to 10 Metric ton EA 05-B Vehicles 10 Metric ton up to 40 Metric ton EA 05-C Vehicles over 10 Metric ton EA
06 06 Aircraft Unboxed EA 07-A Hazardous / Explosive / Ammo Cargo Breakbulk EA $0.00 -$ $0.00 -$ 07-B Hazardous / Explosive / Ammo Cargo Containerized EA $0.00 -$ $0.00 -$
09 09-A-A Container 20FT / 40FT EA $0.00 -$ $0.00 -$ 09-A-B Container with Ammunition EA
MINIMUM PRODUCTIVITY
RATE / HOUR
MINIMUM PRODUCTIVITY
RATE / HOUR
MINIMUM PRODUCTIVITY
RATE / HOUR
MINIMUM PRODUCTIVITY
RATE / HOUR
1 Pc 1 Pc
OMAN
L
EXPORT LOADING VESSELS SCHEDULE 1A
FROM LAND TRANSPORT FROM QUAY/SHED
LOLO RORO
OPERATIONAL TOW AWAY
C KA
3 Pcs 4 Pcs
1 Pc 2 Pcs 3 Pcs
2 Pcs 4 Pcs 6 Pcs4 Pcs
3 Pcs 2 Pcs
1 Pc
MINIMUM PRODUCTIVITY RATES ‐ OMAN
6 Pcs
NOTE: The productivity rates for the following commodity functions are the minimum levels acceptable to meet mission schedules for S&RTS in Omanr. By submitting a proposal your company is certifying it is able to meet these minimum productivity rates. Higher productivity rates are acceptable.
4 Pcs
6 Pcs 4 Pcs 4 Pcs6 Pcs
6 Pcs 8 Pcs
6 Pcs 4 Pcs 14 Pcs 10 Pcs
2 Pcs
Atch 3 Oman S&RTS 29 November 2016
LINE
ITEM
COMMOD
ITY
NUMBER
COMMODITY NAME
UNIT OF
MEASUR
E 01A General Cargo / Breakbulk Cargo / Palletized Cargo (Quadcon/Tricon/Bicon) EA 01B General Cargo Loose Cargo EA 05-A Vehicles up to 10 Metric ton EA 05-B Vehicles 10 Metric ton up to 40 Metric ton EA 05-C Vehicles over 10 Metric ton EA
06 06 Aircraft Unboxed EA 07-A Hazardous / Explosive / Ammo Cargo Breakbulk EA 07-B Hazardous / Explosive / Ammo Cargo Containerized EA
09 09-A-A Container 20FT / 40FT EA 09-A-B Container with Ammunition EA
1 Pc
6 Pcs 4 Pcs
4 Pcs 4 Pcs6 Pcs
6 Pcs
K
MINIMUM PRODUCTIVITY
RATE / HOUR
MINIMUM PRODUCTIVITY
RATE / HOUR
8 Pcs
2 Pcs 3 Pcs 4 Pcs
4 Pcs
1 Pc 2 Pcs 3 Pcs
10 Pcs 4 Pcs 3 Pcs
2 Pcs 4 Pcs
IMPORT UNLOADING VESSELS SCHEDULE 1B
LOLO
6 Pcs
6 Pcs
L
RORO
TO LAND TRANSPORT
2 Pcs
8 Pcs
MINIMUM PRODUCTIVITY RATES ‐ OMAN
NOTE: The productivity rates for the following commodity functions are the minimum levels acceptable to meet mission schedules for S&RTS in Omanr. By submitting a proposal your company is certifying it is able to meet these minimum productivity rates. Higher productivity rates are acceptable.
OMAN
MINIMUM PRODUCTIVITY
RATE / HOUR
1 Pc 1 Pc
MINIMUM PRODUCTIVITY
RATE / HOUR
16 Pcs
TO QUAY/SHED OPERATIONAL TOW AWAY
A C
LINE
ITEM
COMMO
DITY
NUMBER
COMMODITY NAME UNIT OF
MEASURE
01A General Cargo / Breakbulk Cargo / Palletized Cargo (Quadcon/Tricon/Bicon) EA 01B General Cargo Loose Cargo EA 05-A Vehicles up to 10 Metric ton EA 05-B Vehicles 10 Metric ton up to 40 Metric ton EA 05-C Vehicles over 10 Metric ton EA
06 06 Aircraft Unboxed EA 07-A Hazardous / Explosive / Ammo Cargo Breakbulk EA 07-B Hazardous / Explosive / Ammo Cargo Containerized EA $0.00 -$ $0.00 -$ $0.00 -$
09 09-A-A Container 20FT / 40FT EA $0.00 -$ $0.00 -$ $0.00 -$ 09-A-B Container with Ammunition EA $0.00 -$
MINIMUM PRODUCTIVITY
RATE / HOUR
K L
MINIMUM PRODUCTIVITY
RATE / HOUR
3 Pcs
2 Pcs 4 Pcs 6 Pcs
1 Pc
6 Pcs 6 Pcs 8 Pcs
6 Pcs
4 Pcs
1 Pc
MINIMUM PRODUCTIVITY
RATE / HOUR
14 Pcs 6 Pcs
1 Pc2 Pcs 2 Pcs
MINIMUM PRODUCTIVITY RATES ‐ OMAN
NOTE: The productivity rates for the following commodity functions are the minimum levels acceptable to meet mission schedules for S&RTS in Omanr. By submitting a proposal your company is certifying it is able to meet these minimum productivity rates. Higher productivity rates are acceptable.
OMAN
3 Pcs
OPERATIONAL TOW AWAY
A
LOLO RORO
FROM LAND TRANSPORT
EXPORT UNLOADING TRUCKS / RECEIPT SCHEDULE 1C
Commodi ty
Number Commodity Name Unit of
Measure
LINE
ITEM
COMMOD
ITY
NUMBER
COMMODITY NAME
UNIT OF
MEASUR
E
QTY UNIT
PRICE TOTAL
01A General Cargo / Breakbulk Cargo / Palletized Cargo (Quadcon/Tricon/Bicon) EA $0.00 -$ $0.00 -$ $0.00 -$ 01B General Cargo Loose Cargo EA 05-A Vehicles up to 10 Metric ton EA $0.00 -$ 05-B Vehicles 10 Metric ton up to 40 Metric ton EA $0.00 -$ 05-C Vehicles over 10 Metric ton EA
06 06 Aircraft Unboxed EA 07-A Hazardous / Explosive / Ammo Cargo Breakbulk EA $0.00 -$ $0.00 -$ $0.00 -$ 07-B Hazardous / Explosive / Ammo Cargo Containerized EA $0.00 -$ $0.00 -$ $0.00 -$
09 09-A-A Container 20FT / 40FT EA $0.00 -$ $0.00 -$ $0.00 -$ 09-A-B Container with Ammunition EA $0.00 -$
1 Pc
6 Pcs
MINIMUM PRODUCTIVITY
RATE / HOUR
TO LAND TRANSPORT TO QUAY/SHED OPERATIONAL TOW AWAY
C
6 Pcs
6 Pcs
K
2 Pcs 4 Pcs
16 Pcs 8 Pcs
6 Pcs 8 Pcs
2 Pcs 3 Pcs 4 Pcs
MINIMUM PRODUCTIVITY RATES ‐ OMAN
NOTE: The productivity rates for the following commodity functions are the minimum levels acceptable to meet mission schedules for S&RTS in Omanr. By submitting a proposal your company is certifying it is able to meet these minimum productivity rates. Higher productivity rates are acceptable.
OMAN
1 Pc
IMPORT LOADING TRUCKS / DISPOSITION SCHEDULE 1D
LOLO RORO
1 Pc
MINIMUM PRODUCTIVITY
RATE / HOUR
MINIMUM PRODUCTIVITY
RATE / HOUR
A L
2 Pcs 3 Pcs
Commodi ty
Number Commodity Name Unit of
Measure
LINE
ITEM
COMMOD
ITY
NUMBER
COMMODITY NAME UNIT OF
MEASURE
01A General Cargo / Breakbulk Cargo / Palletized Cargo (Quadcon/Tricon/Bicon) EA $0.00 -$ $0.00 -$ 01B General Cargo Loose Cargo EA 05-A Vehicles up to 10 Metric ton EA $0.00 -$ $0.00 -$ 05-B Vehicles 10 Metric ton up to 40 Metric ton EA $0.00 -$ $0.00 -$ 05-C Vehicles over 10 Metric ton EA $0.00 -$ $0.00 -$
06 06 Aircraft Unboxed EA 07-A Hazardous / Explosive / Ammo Cargo Breakbulk EA $0.00 -$ $0.00 -$ 07-B Hazardous / Explosive / Ammo Cargo Containerized EA $0.00 -$ $0.00 -$ $0.00 -$ $0.00 -$
09 09-A-A Container 20FT / 40FT EA $0.00 -$ $0.00 -$ $0.00 -$ $0.00 -$ 09-A-B Container with Ammunition EA
C
MINIMUM PRODUCTIVITY
RATE / HOUR
3 Pcs
STUFFING/UNSTUFFING SCHEDULE 1E
STUFFING UNSTUFFING OPERATIONAL TOW AWAY
ROROLOLO
MINIMUM PRODUCTIVITY
RATE / HOUR
A
1 Pc 2 Pcs
PRODUCTIVITY RATE PRODUCTIVITY RATE
1 Pc 1 Pc
MINIMUM PRODUCTIVITY RATES ‐ OMAN
NOTE: The productivity rates for the following commodity functions are the minimum levels acceptable to meet mission schedules for S&RTS in Omanr. By submitting a proposal your company is certifying it is able to meet these minimum productivity rates. Higher productivity rates are acceptable.
OMAN
6 Pcs 4 Pcs
30 Pcs 3 Pcs
20 Pcs 2 Pcs
2 Pcs
2 Pcs
LK
4 Pcs 6 Pcs
2 Pcs
Commodi ty
Number Commodity Name Unit of
Measure
LINE
ITEM
COMMOD
ITY
NUMBER
COMMODITY NAME UNIT OF
MEASURE
01A General Cargo / Breakbulk Cargo / Palletized Cargo (Quadcon/Tricon/Bicon) EA $0.00 -$ 01B General Cargo Loose Cargo EA $0.00 -$ 05-A Vehicles up to 10 Metric ton EA 05-B Vehicles 10 Metric ton up to 40 Metric ton EA 05-C Vehicles over 10 Metric ton EA
06 06 Aircraft Unboxed EA 07-A Hazardous / Explosive / Ammo Cargo Breakbulk EA $0.00 -$ 07-B Hazardous / Explosive / Ammo Cargo Containerized EA $0.00 -$
09 09-A-A Container 20FT / 40FT EA $0.00 -$
K
LOLO
L
MINIMUM PRODUCTIVITY
RATE / HOUR
MINIMUM PRODUCTIVITY
RATE / HOUR
TOW AWAYDIFFERENT AREAS IN PORT
10 Pcs
2 Pcs
MINIMUM PRODUCTIVITY
RATE / HOUR
6 Pcs
6 Pcs 10 Pcs
4 Pcs 6 Pcs
12 Pcs
2 Pcs
10 Pcs 20 Pcs
2 Pcs
MINIMUM PRODUCTIVITY
RATE / HOUR
3 Pcs
6 Pcs 4 Pcs05
6 Pcs 4 Pcs
MINIMUM PRODUCTIVITY RATES ‐ OMAN
NOTE: The productivity rates for the following commodity functions are the minimum levels acceptable to meet mission schedules for S&RTS in Omanr. By submitting a proposal your company is certifying it is able to meet these minimum productivity rates. Higher productivity rates are acceptable.
OMAN
TRANSFER OF CARGO WITH IN PORT SCHEDULE 1F
LOCAL DRAYAGE AREA OPERATIONAL
A F
RORO
20 Pcs 10 Pcs
1 Pc 1 Pc
12 Pcs 6 Pcs
10 Pcs