Stevedoring & Related Terminal Services
Performance Work Statement
RFP Attachment 01
Military Operations Terminal – 842nd Transportation Battalion
SDDC Alaska Anchorage, Alaska
4 August 2015
Stevedoring & Related Transportation Services Performance Work Statement
TABLE OF CONTENTS
Section Section Topic Page
1.0 Background & Scope 2
2.0 Security 2
3.0 Safety 5
4.0 Contract Administration 5
5.0 Contractor General Requirements 6
6.0 Terminal Specific Requirements 9
Contractor Performance Requirements 21 Appendix A Regulations, Publications, & Forms 22 Appendix B Glossary of Terms 25 Appendix C List of Acronyms & Abbreviations 42
1.1 BACKGROUND & SCOPE
1.2 Background-Military Surface Deployment and Distribution Command (SDDC), headquartered at Scott AFB, IL is a major U.S. Army Command and a vital component of the U.S. Transportation Command. Since its establishment in 1965, SDDC has played a vital role in our nation’s defense by providing support to every war, major contingency, training exercise and humanitarian relief operation where our military forces have been deployed.
1.3 Scope-Stevedoring and Related Terminal Services
1.3.1. The Contractor shall provide stevedoring and related terminal services and management services in connection with the receipt, processing, and/or loading/discharging of cargo via all conveyances as designated by the Contracting Officer or Contracting Officer’s Representative (COR). The Contractor shall provide sufficient qualified labor, gear and equipment and materials to satisfy the scope of this contract, and make every effort to rectify any shortfall, for which the Contractor will be paid at the applicable commodity or man-hour rates as designated in Section B – Schedule of Services in this contract as requested by the COR.
1.4 Ground Rules and Constraints
1.4.1 Persons Excluded from the Premises-The Contractor shall not allow a person that has been banned by any authority from the premises to have access to terminal facilities, equipment, or other material related to terminal operations.
1.4.2 Persons with Restricted Duties-The Contractor shall not allow a person restricted by any authority from certain equipment or areas to operate that equipment or enter those areas.
2.1 SECURITY
2.2 The overall performance classification of this PWS is Unclassified.
2.3 Security Related to Personnel-If the Government notifies the Contractor that the employment or the continued employment of any Contractor employee is prejudicial to the interests or endangers the security of the United States of America, the Contractor shall make any changes necessary in the appointment(s).
2.4 Personnel working IAW this PWS who do not require IA administrative privileges/ system monitoring capability but do require access to Non-Secure Internet Protocol Router Network (NIPRNET) applications, must successfully complete a National Agency Check with Inquiries (NACI). Favorable NACI investigation results must be posted in the Joint Personnel Adjudication System (JPAS) before a contractor is allowed access to the NIPRNET.
2.5. Personnel not requiring a NACI investigation but require access to the port are required to obtain a Transportation Workers Identification Card (TWIC). TWIC card are issued from TWIC processing centers in port areas IAW mandatory dates provided from the Captain of the port
2.6 Once the contract is awarded, names of the contractor employees needing a CAC to specifically access and use Government automated systems i.e. Cargo and Billing System (CAB) as required by the Government, will be submitted to SDDC for vetting through JPAS to ensure investigative and clearance requirements have been obtained before the start date of the contract. This will be completed prior to the Contracting Officer’s Representative (COR) / Trusted Agent (TA) submission of contractor employees’ names for the Common Access Card(s) (CAC) in the DoD Trusted Associate Sponsorship System (TASS). If a contractor’s employee does not have the appropriate investigative or security clearance requirement the contractor’s employee will be denied the ability to work in support of this PWS and will not be loaded into the TASS. Contractor employees will be loaded in TASS and will have an expiration date on their CAC for the initial contract period. Upon approval of each option period a new CAC will be issued with new dates for the subsequent option period only.
2.6.1 The contractor shall ensure the roles/privileges assigned to contractor employees on the Government computing platforms are limited to the roles/privileges essential to that individual’s performance of his/her assignments. These roles/privileges can be limited or revoked by the Government for any reason.
2.7 Cyber Security
2.7.1 Handling and Protection of Non-Public Information
In performance of this contract, the contractor may have access to DOD information. The contractor agrees (a) to use and protect such information from unauthorized disclosure IAW Department of Defense (DOD) Instruction 8582.0 l:
Security of Unclassified DOD Information on Non-DOD Information Systems; (b) to use and disclose such information only for the purpose of performing this contract and to not use or disclose such information for any personal or commercial purpose; (c) to comply with other current Federal and DOD information protection and reporting requirements for specified categories of information (e.g., medical, proprietary, critical program information (CPI), personally identifiable information, export controlled); (d) to obtain permission of the Government Requiring Activity before disclosing/discussing such information with a third party;(e) to return and/or electronically purge, upon Government request, any DOD information no longer required for contractor performance; and (f) to advise the Contracting Officer (CO) and/or Contracting Officer's Representative (COR) of any unauthorized release of such information.
To provide adequate security, the contractor shall implement information systems security in its project, enterprise, or company-wide unclassified information technology system(s) that may have DOD information resident on or transiting through them. The information systems security program shall implement, at a minimum, the specified National Institute of Standards and Technology (NIST) Special Publication (SP) 800-53 security controls identified in Attachment 6a.
2.7.2 Incident Handling
2.7.2.1 Reporting Requirements
The contractor shall provide an initial incident report to the Defense Cyber Crime Center (DC3) as soon as possible upon discovery of any suspected cyber intrusion events on the contractor's (or its subcontractors) unclassified information system(s) or network(s) where DOD information is resident or transiting. The initial incident report shall be provided even if some details are not yet available, with follow-on detailed reporting to DC3 within 72 hours.
Reportable cyber intrusion events include the following:
a. A cyber intrusion event involving possible data exfiltration, manipulation or unauthorized disclosure of any DOD information resident on or transiting the contractor's (or its subcontractors') unclassified information systems or networks;
b. Intrusion activities that allow unauthorized access to the contractor's unclassified information system(s) or networks(s) on which DOD information is resident or transiting.
2.7.2.2 Incident Report Content
The incident report shall include, at a minimum, the following information:
a. Data Universal Numbering System (DUNS).
b. Contract numbers affected unless all contracts by the company are affected.
c. Facility CAGE code if the location of the event is different than the prime Contractor location.
d. Point of contact if different than the POC recorded in the System for Award Management (address, position, telephone, email).
e. Contracting Officer point of contact (address, position, telephone, email).
f. Contract clearance level.
g. Name of subcontractor and CAGE code if this was an incident on a subcontractor network.
h. DOD programs, platforms or systems involved.
i. Location(s) of compromise.
j. Date incident discovered.
k. Type of compromise (e.g., unauthorized access, inadvertent release, other).
l. Description of technical information compromised.
m. Any additional information relevant to the information compromise.
2.7.2.3 Incident Report Submission
The contractor will submit unclassified incident reports to DC3 via the Defense lndustrial Base Network (DIBNet) Portal (http://dibnet.dod.mil).
2.7.2.4 Incident Response Coordination
In the event of an intrusion or potential intrusion, the contractor agrees to allow follow-on actions by the Government to further characterize and evaluate the suspect activity. The contractor acknowledges that damage assessments might be necessary to ascertain intruder methodology and identify systems compromised as a result of the intrusion.
Contractor acknowledges that in certain cases a complete forensic analysis might be necessary to ascertain intruder methodology and identify systems compromised as a result of the intrusion. Once an intrusion is identified, the contractor agrees to take all reasonable and appropriate steps to preserve any and all evidence, information, data, logs, electronic files and similar type information (reference N IST Special Publication 800-61: Computer Security Incident Handling Guide, (current version)) related to the intrusion for subsequent forensic analysis so that an accurate and complete damage assessment can be accomplished by the Government. The contractor is not required to maintain an organic forensic capability, but must ensure data is preserved (e.g. removing an affected system, while still powered on, from the network meets the intent of this requirement) and all actions documented until forensic analysis can be performed by the Government or mutually agreed upon third party (e.g., Federally Funded Research and Development Center (FFRDC), commercial security contractor, etc.). Any follow-on actions shall be coordinated with the contractor via the CCOR.
2.7.2.5 Information Sharing
The Government may use and disclose reported information (e.g., information regarding threats, vulnerabilities, incidents, or best practices) that does not include contractor attribution information at its discretion to assist entities in protecting information or information systems (e.g., threat information products, threat assessment reports); provided that such use or disclosure is otherwise authorized in accordance with applicable statutes, regulations, and policies.
2.7.2.6 Confidentiality and Non-Attribution Statement
The Government shall take reasonable steps, by controlled access and need-to-know procedures, to protect against public release of attribution information of the contractor. The Government may use and disclose reported information that includes attribution information only on a need-to-know basis to authorized persons for cyber security and related purposes (e.g. in support of forensic analysis, incident response, compromise or damage assessments, law enforcement, counter intelligence, threat reporting, and trend analysis). The Government may disclose attribution information to support contractors that are supporting the Government's cyber security and related activities if the support contractor is subject to legal confidentiality requirements that prevent any further use or disclosure of the attribution information.
The Government agrees to consider available exemption s of the Freedom of Information Act to protect against disclosure of attribution information of the contractor to unauthorized persons. Within a reasonable period necessary to perform an analysis after completion of the assessment, all contractor proprietary information or third party proprietary information in the possession of the Government as a result of the assessment will be destroyed unless other disposition is agreed upon in writing by the Parties or is required by law, Executive Order or regulation.
2.7.2.7 Law Enforcement/Counterintelligence
In the event of a known or potential intrusion, the contractor shall consent to responding counterintelligence or law enforcement investigative agency requests to apply forensic analysis tools to contractor information systems affected by the intrusion, including monitoring tools, imaging tools, and any other techniques that the agency seeks to apply to effectively analyze the intrusion. The contractor shall allow the responding counterintelligence and/or law enforcement investigative agency to image affected systems, including systems containing proprietary information. Nothing in this contract shall limit the ability to conduct law enforcement or counterintelligence activities, or other activities in the interest of the Government.
3.0 SAFETY
3.1 The Contractor must comply with applicable international, federal, state, local, installation and SDDC Transportation Battalion safety and fire regulations. The Contactor must establish and maintain a written effective and comprehensive safety program. The Contractor will support the SDDC battalion’s Emergency Disaster Plan.
The Contractor must acquire, maintain, and require the use of safety equipment, personal protective equipment and devices necessary to protect employees on the installation, port, and on the vessel.
The Contractor is responsible for enforcement and monitoring of applicable international, federal, state, local installation safety and fire regulations. Deviations or failure to comply with applicable safety rules may be documented by any government worker and reported to the COR for formal advisement and corrections to the Contractor lead or designated safety representative. Discrepancies will be logged within the defined quality performance process.
3.1.1 The Government will make available driver training for Government vehicles and related processes/procedures and the Contractor shall coordinate with local labor to attend the Government provide training so that sufficient pools of operators are available to operate Government vehicles, within a port as required.
Government vehicles may include, but is not limited to, all classes of Trucks, Stryker vehicles, Heavy Equipment Transporters (HETS), Mine Resistant Ambush Protective (MRAP) vehicles and Armored Tracked vehicles. Labor shall participate and Contractor shall be compensated at man-hour rates.
3.1.2 The Government at times may have field service representatives or vendor training onsite for new models entered into the Army inventory. The Contractor shall coordinate with the COR for approval to have cargo operators attend this available training. The Contractor shall be compensated at Man-Hour rates contained in the Schedule B for the time his labor attends training.
3.1.3 The Contractor shall ensure that personnel operating Government Vehicles possess a valid civilian driver’s license issued by a State, District of Columbia, or U.S. possession.
3.1.4 The Contractor will develop and implement a written sustainment training program. This will be accomplished for each option year. Sustainment training is periodic driver training conducted to maintain a high level of driver skill proficiency and to prevent drivers from acquiring poor driving habits. The Contractor shall be compensated at Man- Hour rates contained in the Schedule B for the time his labor attends training. The Contractor shall submit actual invoices for costs associated with this training, and proof of the sustainment training, to the COR for the Contracting Officer and COR approval before any payment is authorized. Proof of sustainment training shall also be kept by the Contractor.
3.1.5 The Contractor will establish a remedial training program for drivers or operators who have had driver at-fault accidents or traffic violations, misused equipment, or otherwise demonstrated a need for additional training on military vehicles or equipment. The COR may identify individuals that need remedial training. This training will be directed towards identifying and correcting individual weaknesses. Remedial training will be conducted at no cost to the government.
3.1.6 All Contractor personnel who operate U.S. Government or Contractor furnished vehicles laden with hazardous material, to include munitions, shall possess an approved license with HAZMAT endorsement.
Additionally, the Contractor will provide on the DA Form 348 information reflecting HAZMAT certification.
3.1.6.1. The Contractor shall provide a qualified point of contact for HAZMAT handling
3.1.6.2. Ammunition and Explosives laden material handling equipment (MHE) or vehicles will not be used during operator training at any time.
3.1.7 The Contractor shall provide the COR with a list of names each day for those drivers who are assigned to handle specialized vehicles, HAZMAT, or ammunition laden cargo per operation. The list will include a statement from the Contractor verifying that the individuals performing these driving functions comply with AR 600-55. The Government reserves the right to stop contractor personnel at any time to verify their qualifications against the approved list of personnel scheduled to perform these functions. Personnel found to be in non-compliance will be removed from the handling of this cargo and the incident will be reported to the Contracting Officer and will be submitted in the monthly performance report.
3.2 Safety Briefings-The Contractor shall conduct and document safety briefings for all workers at each shift change and must brief new workers as any new labor is added. The safety briefings conducted by the contractor, as it relates to the type of operation (e.g. truck, rail, vessel, yard, crane, etc.), at minimum must meet OSHA regulatory guidance and include the following basic information:
*Overall General Safety Requirements
Work tasks to be performed Responsibilities - who reports unsafe conditions and to whom Injury and property damage reporting procedures Required PPE for personnel on the terminal Designated smoking areas
Emergency procedures - phone numbers, evacuation routes/procedures, rally locations, accountability Location of emergency equipment - fire extinguishers, PFDs Weather/temperature conditions Communication - signals, flagman duties, radios, no cell phones etc.
Walking/Tripping Hazards Pedestrian and traffic movement Gangway Safety Person in water - prevention, recovery and survival
*Traffic Safety Driver distractions Use of Seat Belts Pier specific vehicle procedures - lights, keys, mirrors etc.
Speed limits – pier, yard, railcar and vessel Parking locations Traffic Flow Use of ground guides when moving (ramp/backing/stow) Rail crossings
*Task/terminal Specific (as applicable) Terminal and yard configurations, distinctive characteristics Safe equipment operation - MHE, vehicles (verify trained/certified/licensed) Safe explosives handling procedures - (verify trained/certified/licensed) Safe Rail operations - 3 step protection, right of way Ladder Safety Use of fall protection Safe lashing procedures Unusual loads
3.2.1 The Government will conduct safety briefings when necessary, and per local Commander guidance, during which time the labor will be on standby detention time. The Government safety briefing will include information as prescribed in 3.2 based on the type of operation, and any other necessary terminal or Command related safety information.
3.3 Operation of Equipment- Equipment operated by the Contractor for use during operations on any S&RTS Terminal must be maintained and operated IAW applicable Federal / State laws and regulations, OSHA, Army, port, and terminal regulations, directives, instructions and pamphlets. Damage to cargo or injury related to the use of non-compliant equipment or improper use of equipment will result in immediate non-use of that Contractor’s equipment until the Contractor takes corrective action. The Contractor must notify the COR when equipment is made compliant.
3.4 The Contractor shall immediately notify the COR of any incident of dropped cargo, accident or incident which results in damage to cargo or property, release of HAZMAT, injury or death to personnel during or arising from performance under this contract.
3.4.1 In all instances where a reportable accident (that meets the minimum criteria IAW DA PAM 385-40 for ground Class A–D accidents) or incident occurs, the Contractor shall submit a full written report to the COR within 24 hours utilizing the U.S. Army Abbreviated Ground Accident Report (AGAR) (DA Form 285-AB-R). The Contractor shall assist the Government during any investigation of an accident or serious incident. Accidents that do not meet the minimum criteria will be reported to the COR IAW Terminal Section 6 requirements.
3.4.1.1. The contractor shall submit documentation to the COR explaining qualification and task training for each contract employee involved in the incident/accident.
3.4.1.2. The contractor shall submit all maintenance records for contractor supplied equipment involved in the incident/accident.
3.4.2. The Contractor shall assist the Government during any investigation of an accident or serious incident.
3.4.2.1. After an accident or serious incident occurs, the Contractor will secure the location, preserve critical evidence and allow government personnel access to the location, evidence and contractor employed witnesses.
Operations will not resume until cleared with the COR.
4.1 CONTRACT ADMINISTRATION
4.2 Detention, Minimum Time, Differentials
4.2.1 Detention and minimum time, computed to the nearest 5 minute multiple, are payable to the contractor, in lieu of commodity or extra labor (XL) rates specified elsewhere in this contract, at the applicable man-hour rates, subject to the following:
4.2.2 When detention occurs during a commodity operation, the Contractor shall absorb each detention of fifteen
(15) minutes or less. The government shall pay the Contractor at detention rates for persons or gangs, including clerks and equipment operators (drivers) for each detention in excess of fifteen minutes including the first fifteen minutes thereof.
4.2.2.1 Detention shall not be authorized for any part of a gang that is not required on commodity operations or when certain classes of labor on commodity operations are required to stand by because of another class of labor performing a commodity operation. For example, commodity vessel load is inclusive of loading and lashing cargo.
Gangs conducting the load & lash are inclusive of each other under one commodity rate; therefore, drivers or lashers during the process of load and lash may be waiting for the other to perform or complete their job. Neither party will be placed on detention while the other is performing commodity work.
4.2.2.2 Whenever detention occurs prior to or during extra labor operations, the Government shall pay the Contractor on a detention rate basis for the time of each detention. In the event part of a gang is required to perform an extra labor operation, the balance of the gang standing by shall be paid for at detention rates. In the event certain classes of labor are required to standby because of another class of labor performing an extra labor operation, such certain classes of labor shall be paid at detention rates.
4.2.2.3 In accordance with applicable collective bargaining agreements, minimum time shall be payable to the Contractor when work fails to materialize or when work is completed prior to the minimum time and shall not be payable (i) for checkers working in conjunction with longshoremen until completion of the longshoreman commodity activity; and (ii) for any part of a gang not required on a commodity activity. For example, rail unload operation is inclusive of unlash and unload of cargo under one commodity rate. Lashers finish the unlash portion are still on commodity until the drivers are complete with unload and stage to point of rest. During rail load, after drivers complete the load, they remain on commodity until lashers have completed all lashing. While one portion of the gang is on commodity, all are listed as commodity.
4.2.2.4 The Contractor must obtain pre approval to work overtime authorized by the COR.
4.2.2.5 Contract Labor Reporting-The contractor shall provide as requested by the COR a daily time keeper personnel log book for verification of labor services provided for the day’s operations to use for reconciliation. The breakout will include total quantity by class of service.
4.3 RESERVED
4.4 Training and Contingency Operations- The Government reserves the right to conduct training and contingency operations for Department of Defense personnel during a scheduled or contingency load or discharge for any vessel operation and related terminal operations. The Contracting Officer or COR will advise the Contractor when such training or contingency operation is scheduled; such notification will be provided to the Contractor as soon as it is known but NLT 48 hours prior to training, contingency or special operation mission. During these training/special operation events, the Contractor shall provide, when requested by the COR, sufficient qualified labor to support DoD personnel during these operations. Such labor, to include operators, flagmen, lashers, mechanic or headers when requested, will be compensated at the man-hour rates established in Section B – Schedule of Rates.
5.1 CONTRACTOR GENERAL REQUIREMENTS
5.2 General duties and requirements of the Contractor are defined within this section. Duties and requirements specific to the particular terminal(s) within the scope of this contact are further defined in Section 6.0 -Terminal Specific Requirements.
5.3 Contractor services will cover the full spectrum of ocean terminal operations to include discharge and load of vessels, vessel stage/call forward areas including designated areas/facilities for washing and/or fumigation.
Vessels anticipated are Large Medium Speed Roll On/Roll Off (LMSR), Fast Sealift Ships (FSS), MARAD/Ready Reserve Fleet (RRF), Military Sealift Command (MSC) Controlled or Charted Vessels, Maritime Prepositioned Ships, Cape Class Vessels, Barges, U.S. Army and Navy vessels, car carrier vessels, combined container/Ro-Ro vessels as well as other vessel types and classes. The Contractor must be capable of handling multiple and simultaneous vessel, operations at each terminal as described in this contract’s Area of Responsibility (AOR).
Contractor will handle various classes of supply to include Ammunition, Hazardous Material, sensitive, controlled, and general DoD cargo.
5.4 The Contractor will inspect for damage and discrepancies and immediately report these items to the COR.
The contractor shall report any damage caused by the contractor, to cargo or vessel, immediately to the COR
5.5 The Contractor shall communicate to the COR any labor shortfalls immediately, and make every effort to rectify the shortfall.
5.6 The Contractor shall provide a dedicated manager to serve as a single point of contact for interface with the government during all daily operations; this includes management presence at away ports during terminal operations as described in Section 6.1 Area of Responsibility.
5.7 The Contractor shall provide a single point of contact on-site for each operation for each shift to the COR.
This individual must have decision-making authority and shall act as the central point of contact. During vessel operations, the Contractor must have stevedore oversight for all gang activity onboard vessels and in staging yards.
If any delay of operation is as a result of stevedore absence on deck or in the staging yard; the delay will be at the Contractor’s expense.
5.8 The Contractor shall participate in daily operations meetings and shall participate in other meetings regarding vessel load or unload as required. The Contractor shall order labor, material, and equipment based upon agreement with the COR.
5.9 The Contractor shall compare Government reports to Contractor documents and identify discrepancies and recommend reconciliations to the COR.
5.10 The Contractor shall provide a certified point of contact for HAZMAT cargo handling IAW CFR49 Part 172.704(d)
5.11 The Contractor shall acquire and maintain access, and submit man-hour input, to the Transportation Financial Management System-MTMC (TFMS-M), or its future replacement system, for labor operations within seven (7) days following the billing activity.
5.12 The Contractor shall establish a w r i t t e n Quality Control Inspection Plan (QCIP) which will emphasize quality control over all contract requirements. The Quality Control Inspection Plan will contain a Quality Control Inspection Checklist (QCIC) which, at a minimum, will contain all elements of the Performance Requirements Summary (PRS).
5.13 Out of Pocket (OOP) Expenses- As related to the support of transportation and cargo and terminal operations, upon the request and approval of the COR, the Contractor shall provide specialized equipment (examples: floating crane, scissor lifts, generators, light sets, etc.) and supplies reimbursed by the Government at actual costs. Vendor receipt must be provided for reimbursement. Types of supplies include, but not limited to, lumber, placards, straps, shackles, tie wire, clips, fuel for military cargo and GFE (other than commodity operation) and banding material. The Contractor will also provide 3rd party services related to the support of transportation and terminal operations such as port-a-lets used in the operational area and crane orders for extra labor operations .
5.13.1 Out-of-Pocket Expenses involve reimbursement of actual payment made by the Contractor to a third party as substantiated by submission of the paid invoice. Out-of-pocket expenses will be reimbursed only for mission related services and/or material identified on order forms by the OO.
5.13.2 For the purpose of purchasing supplies/non-durable goods, the Contractor shall obtain approval from the on-site COR for each item requested. Any purchases above the threshold of $3,000.00 shall be at the written approval of the Contracting Officer.
5.14 Stevedoring and Related Terminal Services (Import)
5.14.1 The Contractor will prepare the vessel for discharge to include the unlashing and physical removal of cargo from the vessel. Inclusive of the vessel discharge commodity rate, the Contractor shall discharge and document cargo (to include capturing linked, nested, and secondary items) of inbound cargo IAW with the agreed upon Discharge Plan and stage in accordance with the agreed upon Staging Plan (e.g. by type and destination) within time frame established at the cargo meeting between the Contractor and the Contracting Officer’s Representative (COR).
The Contractor shall handle multiple classes of cargo including sensitive, classified, HAZMAT cargo and Reefers in accordance with discharge and stage plan and IAW current applicable regulations. Any changes must be approved through the COR.
5.14.1.1 At the operations meeting held prior to the start of each vessel operation, the COR will confirm with the Contractor the mutually agreed upon timeframe for the safe and efficient completion of discharge of the vessel. Vessel operation completion timeframes will be determined based on such factors as cargo volume, stow factors, RDD, cargo mix and vessel type being worked.
5.14.1.2. The Contractor will not be held accountable for delays in vessel operations resulting from circumstances not within the control or responsibility of the Contractor. Factors known to affect productivity may include: weather;
reserve augmentation; vessel condition and cargo condition. The chart below contains estimated vessel timelines for completion of discharge of fully loaded vessels as follows; discharge hours may or may not be continuous:
VESSEL TYPE DISCHARGEWORK HOURS
FSS (using shipboard crane) 56 FSS (using port crane) 48
BREAKBULK 72
LMSR (NON-PREPO) 72
RORO 48
CONTAINER SHIP 48
MPS 72
MPS/MAERSK 96
99669696
5.14.2 The Contractor shall conduct a reconciliation/validation of the cargo discharged.
5.14.3 The Contractor shall return vessel lashing gear to its proper place (lashing bins and wall racks) and will clean contractor debris, including broom sweeping, prior to vessel departure.
5.15 Stevedoring and Related Terminal Services (Export)
5.15.1 The Contractor shall load cargo on the vessel from its place of rest to point of stow aboard vessel in accordance with the approved vessel pre-stow plan furnished by the Government and within the time frame established at cargo meeting between the Contractor and the COR. The Contractor shall handle all multiple classes of cargo including sensitive, classified, HAZMAT and Reefer Cargo IAW the pre-stow plan. The contractor shall secure cargo IAW SDDC TEA Reference 55-22, Marine Lifting and Lashing. The Contractor shall coordinate all vessel activity with the COR, the vessel master/chief mate, and when applicable with the Military Sealift Command (MSC) representative. The Contractor shall receive and review expected cargo list and pre-stow plan for accuracy and efficiency of vessel operations and report discrepancies, issues or concerns to the COR
5.15.1.1 At the operations meeting held prior to the start of each vessel operation, the COR will confirm with the Contractor the mutually agreed upon timeframe for the safe and efficient completion of loading of the vessel.
Vessel operation completion timeframes will be determined based on such factors as cargo volume, stow factors, RDD, cargo mix and vessel type being worked.
5.15.1.2 The Contractor will not be held accountable for delays in vessel operations resulting from circumstances not within the control or responsibility of the Contractor. Factors known to affect productivity may include: weather;
reserve augmentation; vessel condition and cargo condition. The chart below contains estimated vessel timelines for completion of discharge of fully loaded vessels as follows; discharge hours may or may not be continuous:
VESSEL TYPE LOAD WORK HOURS
FSS (using shipboard crane) 72 FSS (using port crane) 60
BREAKBULK 96
LMSR(NON-PREPO) 96
RORO 48
CONTAINER SHIP 48
MPS 96
MPS/MAERSK 120
5.15.2 The Contractor shall provide documentation using load list and scanner/ PDA that reflects the correct stow location, pay, nested, linked, secondary loads(as requested) and condition of the loaded cargo.
5.15.3 For vessel load and vessel discharge the Government will:
-Provide command and control as Single Port Operator/Manager for SDDC Operations.
-Identify specialized, unique military equipment requiring special handling and coordinate for handling this equipment as required.
-Maintain log book/record of events/time for all operations.
-Provide reports to the Contractor as specified within this contract.
-Compare contractor furnished reports with the Government reports, identify further discrepancies and reconcile them with the Contractor.
-Identify the COR to oversee contract operations.
-Provide a qualified point of contact for HAZMAT.
-Provide ICODES pre-stow plans as specified within this contract NLT 48 hours for review with a revised copy provided NLT 24 hours prior to operation.
-Utilize GATES or system of record to document movement of cargo.
-Provide scanners (PDA), tally sheets or Military Shipping Label (MSL) as applicable to the Contractor.
-Process contractor activity pay into GATES or system of record NLT 48 hours after receipt of documentation;
delays to GATES processing may occur due to frustrated cargo records.
-As applicable to type of operations, provide a discharge report; manifest; cargo load list; GATES on hand report;
pre-stow plan for vessel load; staging requirements; and when provided, a final stow plan for vessel discharge, to the Contractor
-Assist to resolve cargo discrepancies such as overages, shortages and Hazardous Material (HAZMAT) documentation.
-Provide input on special handling requirements to include staging of HAZMAT; sensitive; classified cargo and Refrigerated containers.
-Provide training on scanners (PDA) and Government Documentation System(s), when applicable.
6.0 TERMINAL SPECIFIC REQUIREMENTS (IMPORT/ EXPORT)
6.1 Scope
This contract covers the handling of Department of Defense (DoD) sponsored export and import cargo for SDDC units at the Ports of Anchorage, Valdez and Seward, during the execution of this contract. The Contractor must be capable of working multiple vessels simultaneously at multiple ports between the hours of 0700-2300.
The Contractor will be conducting ammunition operations, container operations, load-on load-off (LOLO) operations and roll-on roll-off (RORO) operations. (Add) The Port of Valdez is the only port authorized by the DoD to ship and receive ammunition in Hazardous Class 1.1, 1.2 and 1.3. The Port of Anchorage, Valdez and Seward during the execution of this contract are authorized by the DoD to ship and receive only general cargo, hazardous material, and munitions identified as Hazardous Class 1.4 shipments.
6.1.1 The Contractor must provide all labor and equipment necessary for vessel operations under this
Delivery Order, and the cost of such labor and equipment shall be included in the appropriate commodity rates.
Exception: Whenever extra labor is required and/or authorized, the Contractor will be compensated for labor under the applicable man-hour schedule and equipment rates outlined in this Delivery Order.
6.1.2 The Contractor shall be responsible for all services associated with the receipt of cargoes released by the shipping company including, but not limited to: clerking, checking, and moving in and around the staging area and/or loading on outbound conveyances.
6.2 Ground Rules, Training and Contingency Operations
The Government reserves the right to conduct training and contingency operations for U.S. Army personnel during a scheduled or contingency load or discharge for any vessel operation. The Contracting Officer or COR/ACOR will advise the Contractor when such training or contingency operation is scheduled. Notification will be provided to the Contractor as soon as known, but should be provided at least seven (7) calendar days prior to the scheduled start of a normal Government operation, or as soon as possible for contingencies. During these training/special events, the Contractor shall, when requested by the COR, provide sufficient qualified labor as required to support vessel loading or discharge operations and related terminal operations.
6.3 Personnel. Contractor shall provide personnel information on all personnel as requested by the PCO if such personnel are utilized.
6.3.1 Compliance. The contractor shall ensure compliance with DFARS 252.225-7040 (e) and any applicable regulations, security and force protection requirements.
6.3.2 Labor Laws. The contractor shall ensure compliance with all applicable US Department of Labor laws.
6.3.3 Documentation. Contractor shall ensure that all employees have the appropriate licenses, installation access badges, and the Transportation Workers Identification Credential (TWIC).
6.3.3.1 Contractor personnel selected to operate Government vehicle(s) must possess a valid State driver’s license.
In addition, the Contractor must provide documented proof of training and endorsement for the type of vehicle(s) for which contractor personnel are qualified to operate. All personnel handling HAZ MAT should have HAZ MAT endorsements on their state drivers licenses.
6.3.4 Personnel Screening. Contractor shall screen all employees to ensure they do not have criminal records within the US, and if FN, within their home country. Prior US military personnel shall be screened for military service criminal offenses.
6.3.4.1 Screening will be used to complement the badging process and enhance force protection measures through document examination; verification; and biographical and security interviews. Refusal to be screened will result in the applicant’s access being denied or terminated.
6.3.4.2 Once the screening process is complete for an applicant, the screening cell will forward the packet with recommendation concerning that applicant’s suitability for access. Any derogatory information may result in the applicant’s access being denied or terminated. Applicants who have been denied access due to derogatory information may file an appeal to the Contracting Officer for review.
6.3.4.3 The Contractor shall not employ any person under this contract who is simultaneously an employee of the United States Government.
6.3.4.3.1 Medical Screening
Not applicable as this only applies to contractor deploying overseas in support of military operations.
6.3.4.3.2 Employee Training and Certification
The Contractor's employees shall have all training and certificates required by US, state, and local authority laws and applicable industry regulations for operating and handling Contractor furnished equipment, and Government vehicles.
6.3.4.4 The Government will provide contractor employee driver’s training on government-owned vehicles and issue each contractor an OF 346 at the conclusion of the training. This training will include but not limited to Stryker vehicles and related safety procedures. The Contractor will coordinate through their local labor channels to ensure that their employees support this Government training program, which is necessary to maintain a sufficient pool of qualified government owned vehicle operators at the Alaska ports. Vehicle training will consist of vehicle ingress and egress, securing of hatches and doors, driving features and gear operations, engine cautionary features, engine starting, warm up and operating hydraulic gears, general safety precautions in operating the vehicle, proper parking technique and engine shut down procedures. The ITO will maintain each contractors DA 346, which will be coordinated through the COR/ACOR. The contractor will be required to maintain a copy of all employees’ driver training records (DA form 348). During periods of training, the contractor will be compensated under the man-hour schedule of rates outlined in this Delivery Order.
6.3.5 Management Onsite. The contract manager or alternate shall be on site at all times during port handling and cargo distribution operations. At any other time, i.e. outside cargo operations, the contract manager or designated alternate shall be physically available or on call to the COR/ACOR, within one (1) hour.
6.4 Hours of Operation The Contractor may be required to perform the services described in this PWS between the hours of 0700-2300, seven (7) days per week, three hundred sixty five (365) days per year to include all official holidays. In the case of Government caused delays, Contractor personnel will be compensated accordingly.
6.4.1 Start time. The Contractor shall identify at that time any necessary deviation that will impact operational start time. Equipment positioning and set-up will take place prior to operational start time.
6.4.2 The Contractor may be required to organize Contractor labor into working shifts as requested by the
COR/ACOR.
6.4.3 If the Contractor, for any reason, is unable to perform the services required, he shall immediately notify the COR/ACOR.
6.5 Contractor Furnished Facilities, Supplies/Services and Equipment. Except for those items or services specifically stated in this PWS, the Contractor shall furnish everything required to perform this mission according to all its terms and applicable contract provisions.
6 .6 Facilities
6.6.1.1 Staging Area. When requested, Contractor will request exclusive use of hard stand (permanent surface) to be used as staging area in the port from the local port authority. The Contractor will request from the local port authority an agreed upon number of days advance notice to make the area free from commercial cargo, commercial traffic, obstacles, or trash. The Government will not pay for handling any commercial cargo and/or obstacles that need to be removed for the staging of government cargo. The staging area shall be broom cleaned prior to the start of operations and after completion of operations.
6.6.1.1.1 Performance Objective No. 31– The Contractor shall arrange for clean staging or pier space, to include covered storage, if requested by the Government.
6.6.1.1.2 Performance Objective No. 32 – The Contractor shall reposition and document moved equipment when requested by the COR/ACOR.
Performance Measures: Performance Standards:
Load Tally List Record accurate information for the cargo;
five percent (5%) max allowable deviation of documentation discrepancies
6.6.1.2. Storage Facilities. When requested, the Contractor shall provide adequate in-transit open/closed storage facilities. When requested by the COR/ACOR, the Contractor shall cover cargo placed in open storage with serviceable waterproof tarpaulins.
6.6.1.3. Warehouse Space. When requested, the Contractor shall provide sufficient warehouse and open storage space as required to accommodate the Government DoD-sponsored cargo, supplies, material, and equipment. The facility shall be capable of all-weather operations.
6.6.2 Supplies/Services
The Contractor shall provide the following items/services to include, but not limited to:
a) Life Support. The Contractor shall ensure that all contracted employees are provided basic life support essentials; i.e., latrines and washing facilities, shaded break area, during all operations. The U S Government is not responsible for supplying food or water to contracted employees.
b) Trash Disposal Service. Refuse containers, each one capable of holding eight point five (8.5) cubic meters of storage space, with daily emptying service.
Communication/Audiovisual Services. Unrestricted access to telephone service and wired internet service during all missions.
c) Portable Latrines. Portable latrines shall be installed at the ports of Anchorage, Seward and Valdez during missions.. Replenishment of toilet paper, soap (or antibacterial gels) and paper towels will be done on a daily basis. The Contractor shall be responsible for cleaning services of the latrines, at least, three times a week. Contractor will be paid OOP.
d) Hand Held Radios. T w o Hand held radios for two-way communication within the port area.
e) Mobile Light Sets. Mobile light sets at the time and location requested by the COR/ACOR. Contractor shall be responsible for maintaining and fueling all mobile light sets to ensure all light sets are operational at all times. Contractor will be paid OOP. Fuel for mobile light sets will be paid OOP.
h) Tarpaulins. Serviceable, water-proven tarpaulins to cover United States Government cargo placed in open storage, if required.
i) Documentation. The Contractor shall ensure that all documentation received and required for the accounting of cargo and freight is accurately prepared.
6.6.2.1 Equipment. With the exception of equipment specified as Government furnished, the Contractor must furnish all gear and equipment required to perform all services under this contract.
6.6.3.2.2 When performing extra labor services, the Contractor shall supply and maintain all necessary equipment.
6.6.3.3 Equipment operated on the terminal must be maintained and operated IAW applicable US laws, regulation, OSHA, and local port authority regulations.
6.6.3.4 When necessary, the Contractor shall, at no additional cost to the Government, transport his own gear and equipment within the port area to/from where needed.
6.6.3.5. The U.S. Government reserves the right to use military personnel or Third Party-contracted drivers.
Training and certification of drivers will be provided by the U.S. Government at no cost to the Contractor.
6.6.3.6 Removal of Contractor’s Equipment and Supplies
Within three (3) working days after expiration date of the contract, the Contractor must remove from the premises all equipment and supplies belonging to the contractor. If removal has not been accomplished within three (3) working days the Government will remove them from the premises at the Contractor’s expense.
6.7 Specific Tasks
6.7.1 General. The Contractor shall perform the specific tasks mentioned herein in the Ports of Anchorage, Valdez, Seward, and any other port identified by the PCO during the execution of this contract, in a manner consistent with the best commercial practices. Any work started before, and not completed by, the expiration of this contract shall be governed by the terms and conditions of this contract, unless otherwise requested by the Contracting Officer.
6.7.1 Planning Operations. The Contractor shall perform adequate advanced planning to ensure an efficient and economical operation. These plans shall include all aspects of the operation to ensure the Contractor provides required manpower, equipment and resources to perform the operation. Planning shall include, but not be limited to:
allocation of laborers and estimated time of completion, port storage plan, pre-stow plans for export shipments, vessel discharge plan for import shipments. An operation meeting shall be held on an as needed basis, for the purpose of finalizing planning information.
6.7.2 For vessel load, SDDC, and the Contractor’s on-site manager shall meet with the Chief Mate to review the pre-stow plan and set up work procedures for vessel load operations. For vessel discharges, the same personnel have to meet to discuss the discharge and to coordinate the operation.
6.7.2.1 For vessel discharge, the Contractor’s on-site manager shall meet daily with the Government to review vessel documents and to set up work procedures for vessel discharge operations. The Contractor will furnish labor with sufficient ship, dock, yard personnel and equipment to load and/or discharge vessels in a safe, expeditious and timely manner. The Contractor will furnish foremen and supervisory personnel with the knowledge and ability to execute vessel load and discharge operations in accordance with the plans and documents provided.
6.7.3 The Contractor’s on-site manager will attend the daily Cargo Operations Meeting…