Attachment_3_-_Technical_Capability_Asset_Martix_(6_Feb_13).xlsx
XLSX spreadsheet 13 KB Posted
- Attached to
- National Afghan Trucking II (NATII)
- Solicitation number
- HTC711-13-R-R002
About this file
Attachment 3 - Technical Capability Asset Matrix- for NAT II Solicitation
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table 1
| CLIN | Description | USG Minimum Quantity Per Contractor | Total Minimum Quantity by Proposed by Offeror | Qty Contractor Owned | |
| Assets | Qty Subcontractor |
Provided Assets
| SUITE 1 | |||
| SUBCLIN XX01AA BULK FUELS | 5,000 Gallon Tanker | 50 | |
| 10,000 Gallon Tanker | 30 | ||
| TOTAL SUITE 1 SUBCLIN XX01AA BULK FUELS | 80 | ||
| SUITE 2 |
SUBCLIN XX01AB
| DRY CARGO | 20' Flatbed Truck (FBT) | 130 | |
| 40' Flatbed Truck (FBT) | 250 | ||
| Refrigerated Truck (RT) | 10 | ||
| Freezer Truck (FT) | 10 | ||
| 20' Container (non-refrigerated) | 45 | ||
| 40' Container (non-refrigerated) | 25 | ||
| 20' Converted HMMWV Container | 5 | ||
| 20' Refrigerated Container (Reefer) | 5 | ||
| TOTAL SUITE 2 SUBCLIN XX01AB DRY CARGO | 480 | ||
| SUITE 3 | |||
| SUBCLIN XX01AC HEAVY CARGO | 20' Lowboy Trailer | 10 | |
| 30' Lowboy Trailer | 35 | ||
| 40' Lowboy Trailer | 120 | ||
| 40' Heavy Equipment Transport (Super Lowboy) | 10 | ||
| TOTAL SUITE 3 SUBCLIN XX01AC HEAVY CARGO | 175 | ||
| Note 1: Required minimums do not include contractor assets down for maintenance. Contractors shall ensure assets are maintained in a condition which meets contract requirements and ensures minimum number of contractor assets are available (total of on-mission and available for mission must equal total proposed minimum per day throughout the life of the contract). | |||
| Note 2: Solicitation Attachment 3 will be incorporated into the resultant contract. | |||
| Note 3: Offerors must attach an asset list (prime and sub-contractor) which covers all assets proposed to substantiate ability to meet minimum daily requirement. | |||
| Note 4: The total from the Contractor Owned Assets added to the Subcontractor Provided Assets must be equal to or greater than the quantity reflected in the "Total Minimum Quantity Proposed by Offeror" column. |
&"Times New Roman,Bold" ATTACHMENT 3
ASSET CAPABILITY MATRIX
SOLICITATION HTC711-13-R-R002
National Afghan Trucking II (NAT II)
Page &P
6 FEB 13
File details come from the government source that posted it. Updated .