AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
12. Accounting and Appropriation Data (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
(X) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc). SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED
16A. NAME AND TITLE OF SIGNER (Type or print)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
BY
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer
NSN 7540-01-152-9070
PREVIOUS EDITION UNUSABLE
Created using PerForm Pro software.
A. The purpose of this amendment is to update the clause dates listed on pages I-1 through I-23.
B. Updates to the applicable clauses are highlighted by a solid black line in the right hand margin. Remove page I-1 through I-23 of Part II Section I and replace with the attached page I-1 through I-23.
HTC711-10-R-C001
01/Jul/2010
X
24/Nov/2010
Samuel N. Newberry (618) 220-7104
HTC711
19/Nov/20100004
X
USTRANSCOM/TCAQ-CP
508 Scott Drive Scott AFB, IL 62225-5357
X
See Schedule
SOLICITATION NO: HTC711-10-R-C001-0004
I-1
PART II - CONTRACT CLAUSES
SECTION I - CONTRACT CLAUSES
I-1. FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998) FAR
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be addressed electronically at this address: http://farsite.hill.af.mil/
I-2. The following clauses are incorporated by reference:
FAR
NUMBER CLAUSE TITLE DATE
52.202-1 DEFINITIONS JUL 2004
52.203-3 GRATUITIES APR 1984
52.203-5 COVENANT AGAINST CONTINGENT FEES APR 1984
52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE SEP 2006
GOVERNMENT
52.203-7 ANTI-KICKBACK PROCEDURES OCT 2010
52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS JAN 1997
FOR ILLEGAL OR IMPROPER ACTIVITY
52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER JAN 1997
ACTIVITY
52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN OCT 2010
FEDERAL TRANSACTIONS
52.203-13 CONTRACTOR CODE OF BUSINESS ETHICS AND CONDUCT APR 2010
52.204-2 SECURITY REQUIREMENTS AUG 1996
52.204-7 CENTRAL CONTRACTOR REGISTRATION APR 2008
52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER JUL 2010
SUBCONTRACT AWARDS
52.209-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN SEP 2006
SUBCONTRACTING WITH CONTRACTORS DEBARRED,
SUSPENDED, OR PROPOSED FOR DEBARMENT
52.215-2 AUDIT AND RECORDS - NEGOTIATION OCT 2010
52.215-8 ORDER OF PRECEDENCE--UNIFORM CONTRACT FORMAT OCT 1997
52.215-10 PRICE REDUCTION FOR DEFECTIVE COST OR PRICING DATA OCT 2010
52.215-12 SUBCONTRACTOR COST OR PRICING DATA OCT 2010
52.215-15 PENSION ADJUSTMENTS AND ASSET REVERSIONS OCT 2010
52.215-18 REVERSION OR ADJUSTMENT OF PLANS FOR JUL 2005
POST RETIREMENT BENEFITS (PRB) OTHER THAN PENSIONS
52.215-19 NOTIFICATION OF OWNERSHIP CHANGES OCT 1997
52.219-8 UTILIZATION OF SMALL BUSINESS CONCERNS (DEVIATION) MAY 2004
52.219-9 SMALL BUSINESS SUBCONTRACTING PLAN OCT 2010
ALT II OCT 2010
52.219-16 LIQUIDATED DAMAGES – SUBCONTRACTING PLAN JAN 1999
52.222-1 NOTICE TO THE GOVERNMENT OF LABOR DISPUTES FEB 1997
52.222-3 CONVICT LABOR JUN 2003
52.222-21 PROHIBITION OF SEGREGATED FACILITIES FEB 1999
52.222-26 EQUAL OPPORTUNITY MAR 2007
52.222-29 NOTIFICATION OF VISA DENIAL JUN 2003
52.222-35 EQUAL OPPORTUNITY FOR SPECIAL DISABLED VETERANS, OCT 2010
VETERANS OF THE VIETNAM ERA, AND OTHER ELIGIBLE
VETERANS
52.222-36 AFFIRMATIVE ACTION FOR WORKERS WITH DISABILITIES OCT 2010
I-2
FAR
NUMBER CLAUSE TITLE DATE
52.222-37 EMPLOYMENT REPORTS ON SPECIAL DISABLED SEP 2010
VETERANS, VETERANS OF THE VIETNAM ERA, AND OTHER
ELIGIBLE VETERANS
52.222-41 SERVICE CONTRACT ACT OF 1965 NOV 2007
NOTE: The applicable wage determinations are included as
Attachment 5a, 5b and 5c.
52.222-50 COMBATING TRAFFICKING IN PERSONS FEB 2009
52.223-6 DRUG-FREE WORKPLACE MAY 2001
52.224-1 PRIVACY ACT NOTIFICATION APR 1984
52.224-2 PRIVACY ACT APR 1984
52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES JUN 2008
52.225-19 CONTRACTOR PERSONNEL IN A DESIGNATED OPERATIONAL AREA MAR 2008
OR SUPPORTING A DIPLOMATIC OR CONSULAR MISSION OUTSIDE
THE UNITED STATES
52.226-1 UTILIZATION OF INDIAN ORGANIZATIONS AND INDIAN-OWNED JUN 2000
ECONOMIC ENTERPRISES
52.227-1 AUTHORIZATION AND CONSENT DEC 2007
52.227-2 NOTICE AND ASSISTANCE REGARDING PATENT AND DEC 2007
COPYRIGHT INFRINGEMENT
52.227-6 ROYALTY INFORMATION APR 1984
52.228-3 WORKERS' COMPENSATION INSURANCE APR 1984
(DEFENSE BASE ACT)
52.228-4 WORKERS' COMPENSATION AND WAR-HAZARD APR 1984
INSURANCE OVERSEAS
52.228-5 INSURANCE--WORK ON A GOVERNMENT INSTALLATION JAN 1997
52.229-3 FEDERAL, STATE, AND LOCAL TAXES APR 2003
52.229-6 TAXES--FOREIGN FIXED-PRICE CONTRACTS JUN 2003
52.230-2 COST ACCOUNTING STANDARDS OCT 2010
52.230.3 DISCLOSURE AND CONSISTENCY OF COST ACOUNTING PRACTICES OCT 2008
52.230-6 ADMINISTRATION OF COST ACCOUNTING STANDARDS JUN 2010
52.232-4 PAYMENTS UNDER TRANSPORTATION CONTRACTS AND APR 1984
TRANSPORTATION-RELATED SERVICES CONTRACTS
52.232-8 DISCOUNTS FOR PROMPT PAYMENT FEB 2002
52.232-9 LIMITATION ON WITHHOLDING OF PAYMENTS APR 1984
52.232-11 EXTRAS APR 1984
52.232-17 INTEREST OCT 2010
52.232-18 AVAILABILITY OF FUNDS APR 1984
52.232-23 ASSIGNMENT OF CLAIMS JAN 1986
ALTERNATE I APR 1984
52.232-25 PROMPT PAYMENT OCT 2008
Subparagraph (a)(.3)(iv)is changed to read: Description, quantity, unit of measure, unit price, and extended price of supplies delivered or services performed. (Note: For certain CLINS, as specified, in the contract, the contractor shall round invoiced amounts to the nearest whole dollar amount).
52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER OCT 2003
-- CENTRAL CONTRACTOR REGISTRATION
52.233-1 DISPUTES JUL 2002
ALTERNATE I DEC 1991
52.233-3 PROTEST AFTER AWARD AUG 1996
52.237-2 PROTECTION OF GOVERNMENT BUILDINGS, EQUIPMENT, APR 1984
AND VEGETATION
52.242-13 BANKRUPTCY JUL 1995
I-3
FAR
NUMBER CLAUSE TITLE DATE
52.243-1 CHANGES--FIXED-PRICE AUG 1987
ALTERNATE IV APR 1984
52.244-6 SUBCONTRACTS FOR COMMERCIAL ITEMS OCT 2010
52.245-1 GOVERNMENT PROPERTY JUN 2007
52.245-9 USE AND CHARGES AUG 2010
52.246-25 LIMITATION OF LIABILITY - SERVICES FEB 1997
52.247-5 FAMILIARIZATION WITH CONDITIONS APR 1984
52.247-12 SUPERVISION, LABOR, OR MATERIALS APR 1984
52.247-21 CONTRACTOR LIABILITY FOR PERSONAL INJURY AND/OR APR 1984
PROPERTY DAMAGE
52.247-27 CONTRACT NOT AFFECTED BY ORAL AGREEMENT APR 1984
52.247-63 PREFERENCE FOR U.S.-FLAG AIR CARRIERS JUN 2003
52.248-1 VALUE ENGINEERING OCT 2010
52.249-2 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT MAY 2004
(FIXED-PRICE)
52.249-8 DEFAULT (FIXED-PRICE SUPPLY AND SERVICE), ALT I APR 1984
DEFENSE
FAR SUP
NUMBER CLAUSE TITLE DATE
252.201-7000 CONTRACTING OFFICER'S REPRESENTATIVE DEC 1991
252.203-7000 REQUIREMENTS RELATING TO COMPENSATION OF FORMER JAN 2009
DOD OFFICIALS
252.203-7001 PROHIBITION ON PERSONS CONVICTED OF FRAUD OR OTHER DEC 2008
DEFENSE-CONTRACT-RELATED FELONIES
252.203-7002 REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER JAN 2009
RIGHTS
252.204-7000 DISCLOSURE OF INFORMATION DEC 1991
252.204-7003 CONTROL OF GOVERNMENT PERSONNEL WORK PRODUCT APR 1992
252.204-7004 ALTERNATE A, CENTRAL CONTRACTOR REGISTRATION SEP 2007
252.204-7005 ORAL ATTESTATION OF SECURITY RESPONSIBILITIES NOV 2001
252.205-7000 PROVISION OF INFORMATION TO COOPERATIVE DEC 1991
AGREEMENT HOLDERS
252.209-7004 SUBCONTRACTING WITH FIRMS THAT ARE OWNED OR DEC 2006
CONTROLLED BY THE GOVERNMENT OF A TERRORIST
COUNTRY
252.215-7000 PRICING ADJUSTMENTS DEC 1991
252.215-7002 COST ESTIMATING SYSTEM REQUIREMENTS DEC 2006
252.219-7003 SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS) OCT 2010
252.222-7000 RESTRICTIONS ON EMPLOYMENT OF PERSONNEL MAR 2000
The blank in Para (a), line 2 is completed as follows: HAWAII/ALASKA
252.223-7002 SAFETY PRECAUTIONS FOR AMMUNITION AND EXPLOSIVES MAY 1994
252.223-7003 CHANGE IN PLACE OF PERFORMANCE-- DEC 1991
AMMUNITIONS AND EXPLOSIVES
252.223-7004 DRUG-FREE WORK FORCE SEP 1988
252.223-7006 PROHIBITION ON STORAGE AND DISPOSAL OF TOXIC AND APR 1993
HAZARDOUS MATERIALS
252.225-7031 SECONDARY ARAB BOYCOTT OF ISRAEL JUN 2005
252.225-7042 AUTHORIZATION TO PERFORM APR 2003
I-4
DEFENSE
FAR SUP
NUMBER CLAUSE TITLE DATE
252.225-7043 ANTITERRORISM/FORCE PROTECTION POLICY FOR DEFENSE MAR 2006
CONTRACTORS OUTSIDE THE UNITED STATES
The blank in paragraph (d) is completed as follows:
USTRANSCOM/TCJ3-FP Commercial: (618) 229-7711/
252.225-7798 PREFERENCE FOR PRODUCTS OR SERVICES FROM CENTRAL ASIA, NOV 2009
PAKISTAN OR THE SOUTH CACASUS (DEVIATION)
252.225-7799 REQUIREMENT FOR PRODUCTS OR SERVICES FROM CENTRAL ASIA, NOV 2009
PAKISTAN OR THE SOUTH CACASUS (DEVIATION)
252.231-7000 SUPPLEMENTAL COST PRINCIPLES DEC 1991
252.243-7001 PRICING OF CONTRACT MODIFICATIONS DEC 1991
252.243-7002 REQUESTS FOR EQUITABLE ADJUSTMENT MAR 1998
I-3. FAR 52-209-8 – UPDATES OF INFORMATION REGARDING RESPONSIBILITY MATTERS (APR
2010)
(a) The Contractor shall update the information in the Federal Awardee Performance and Integrity Information System (FAPIIS) on a semi-annual basis, throughout the life of the contract, by entering the required information in the Central Contractor Registration database at http://www.ccr.gov (see 52.204-7).
(b)
(1) The Contractor will receive notification when the Government posts new information to the Contractor’s record.
(2) The Contractor will have an opportunity to post comments regarding information that has been posted by the Government. The comments will be retained as long as the associated information is retained, i.e., for a total period of 6 years. Contractor comments will remain a part of the record unless the contractor revises them.
(3) With the exception of the Contractor, only Government personnel and authorized users performing business on behalf of the Government will be able to view the Contractor’s record in the system. Public requests for system information will be handled under Freedom of Information Act procedures, including, where appropriate, procedures promulgated under E.O. 12600.
I-4. FAR 52.216-18 – ORDERING (OCT 1995)
(a) Any supplies and services to be furnished under this contract shall be ordered by issuance of delivery orders or task orders by the individuals or activities designated in the Schedule. Such orders may be issued from 1 Jan 2011 through 30 Sep 2011, or 31 Mar 12 if the contract is extended in accordance with 52.217-8 or the period of CRAF activation plus 6 months if applicable.
(b) All delivery orders or task orders are subject to the terms and conditions of this contract. In the event of conflict between a delivery order or task order and this contract, the contract shall control.
(c) If mailed, a delivery order or task order is considered “issued” when the Government deposits the order in the mail. Orders may be issued orally, by facsimile, or by electronic commerce methods only if authorized in the Schedule.
I-5. FAR 52.216-19 -- ORDER LIMITATIONS (OCT 1995)
(a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than $3,000, the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.
I-5
(b) Maximum order. The Contractor is not obligated to honor --
(1) Any order for a single item in excess of $4,000,000 (max single route value)
(2) Any order for a combination of items in excess of $600,000,000 (max task order amount) or
(3) A series of orders from the same ordering office within 5 days that together call for quantities exceeding the limitation in subparagraph (b)(1) or (2) of this section.
(c) If this is a requirements contract (i.e., includes the Requirements clause at subsection 52.216-21 of the Federal Acquisition Regulation (FAR)), the Government is not required to order a part of any one requirement from the Contractor if that requirement exceeds the maximum-order limitations in paragraph (b) of this section.
(d) Notwithstanding paragraphs (b) and (c) of this section, the Contractor shall honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within 5 days after issuance, with written notice stating the Contractor’s intent not to ship the item (or items) called for and the reasons. Upon receiving this notice, the Government may acquire the supplies or services from another source.
I-6. FAR 52.216-22 -- INDEFINITE QUANTITY (OCT 1995)
(a) This is an indefinite-quantity contract for the supplies or services specified, and effective for the period stated, in the Schedule. The quantities of supplies and services specified in the Schedule are estimates only and are not purchased by this contract.
(b) Delivery or performance shall be made only as authorized by orders issued in accordance with the Ordering clause.
The Contractor shall furnish to the Government, when and if ordered, the supplies or services specified in the Schedule up to and including the quantity designated in the Schedule as the “maximum.” The Government shall order at least the quantity of supplies or services designated in the Schedule as the “minimum.”
(c) Except for any limitations on quantities in the Order Limitations clause or in the Schedule, there is no limit on the number of orders that may be issued. The Government may issue orders requiring delivery to multiple destinations or performance at multiple locations.
(d) Any order issued during the effective period of this contract and not completed within that period shall be completed by the Contractor within the time specified in the order. The contract shall govern the Contractor’s and Government’s rights and obligations with respect to that order to the same extent as if the order were completed during the contract’s effective period; provided, that the Contractor shall not be required to make any deliveries under this contract after 30 Sep 11, or 31 Mar 12 if the contract is extended in accordance with 52.217-8 or the period of CRAF activation plus 6 months if applicable.
I-7. FAR 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)
The Government may require continued performance of services for a maximum of six (6) months and the USTRANSCOM Uniform Rate for FY11 shall apply. In the event the Government exercises this option, prices shall be determined in accordance with paragraph B-3. This option may be exercised more than once, but the total extension of performance hereunder shall not exceed six (6) months. The Contracting Officer may exercise the option by written notice to the Contractor not later than 30 days prior to expiration of the contract.
I-8. FAR 52.222.42 STATEMENT OF EQUIVALENT RATES FOR FEDERAL HIRES (MAY 1989)
In compliance with the Service Contract Act of 1965, as amended, and the regulations of the Secretary of Labor (29 CFR Part 4), this clause identifies the classes of service employees expected to be employed under the contract and states the wages and fringe benefits payable to each if they were employed by the contracting agency subject to the provisions of 5 U.S.C. 5341 or 5332.
This Statement is for Information Only:
It is not a Wage Determination
I-6
Employee Class Monetary Wage -- Fringe Benefits
General Schedule: Gate Agent GS-06 Step 1/$17.85 per hour
General Schedule: Lead Gate Agent GS-07 Step 1/$19.83 per hour
General Schedule: Supervisory Gate Agent GS-08 Step 1/$21.96 per hour
General Schedule: First Pilot GS-11 Step 1/$27.51 per hour
General Schedule: Co-Pilot GS-10 Step 1/$25.04 per hour
General Schedule: Flight Dispatcher GS-07 Step 1/$18.59 per hour
General Schedule: Second Officer/Flight Engineer GS-09 Step 1/$22.74 per hour
I-9. FAR 52.222-99 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR
RELATIONS ACT (DEVIATION 2010-O0013) (JUN 2010)
(a) During the term of this contract, the Contractor shall post a notice, of such size and in such form, and containing such content as prescribed by the Secretary of Labor, in conspicuous places in and about its plants and offices where employees covered by the National Labor Relations Act engage in activities relating to the performance of the contract, including all places where notices to employees are customarily posted both physically and electronically, in the languages employees speak, in accordance with 29 CFR 471.2 (d) and (f).
(1) Physical posting of the employee notice shall be in conspicuous places in and about the Contractor’s plants and offices so that the notice is prominent and readily seen by employees who are covered by the National Labor Relation Act and engage in activities related to the performance of the contract.
(2) If the Contractor customarily posts notices to employees electronically, then the Contractor shall also post the required notice electronically by displaying prominently, on any website that is maintained by the Contractor and is customarily used for notices to employees about terms and conditions of employment, a link to the Department of Labor’s website that contains the full text of the poster. The link to the Department’s website, as referenced in (b)(3) of this section, must read, “Important Notice about Employee Rights to Organize and Bargain Collectively with Their Employers.”
(b) This required notice, printed by the Department of Labor, may be–
(1) Obtained from the Division of Interpretations and Standards, Office of Labor-Management Standards, U.S.
Department of Labor, 200 Constitution Avenue, NW, Room N-5609, Washington, DC 20210, (202) 693-0123, or from any field office of the Office of Labor-Management Standards or Office of Federal Contract Compliance Programs;
(2) Provided by the Federal contracting agency, if requested];
(3) Downloaded from the Office of Labor-Management Standards web site at www.dol.gov/olms/regs/compliance/EO13496; or
(4) Reproduced and used [as] exact duplicate copies of the Department of Labor’s official poster.
(c) The required text of the Employee Notification referred to in this clause is located at Appendix A, Subpart A, 29 CFR part 471.
(d) The Contractor shall comply with all provisions of the Employee Notice and related rules, regulations, and orders of the Secretary of Labor.
(e) In the event that the Contractor does not comply with the requirements set forth in paragraphs (a) through (d) of this clause, this contract may be terminated or suspended in whole or in part, and the Contractor may be suspended or
I-7 debarred in accordance with 29 CFR 471.14 and FAR Subpart 9.4. Such other sanctions or remedies may be imposed as are provided by 29 CFR Part 471, which implements E.O. 13496 or as otherwise provided by law.
(f) Subcontracts. (1) The Contractor shall include the substance of this clause, including this paragraph (f), in every subcontract that exceeds $10,000 and will be performed wholly or partially in the United States, unless exempted by the rules, regulations, or orders of the Secretary of Labor issued pursuant to section 3 of Executive Order 13496 of January 30, 2009, so that such provisions will be binding upon each subcontractor.
(2) The Contractor shall not procure supplies or services in a way designed to avoid the applicability of Executive Order 13496 or this clause.
(3) The Contractor shall take such action with respect to any such subcontract as may be directed by the Secretary of Labor as a means of enforcing such provisions, including the imposition of sanctions for non compliance.
(4) However, if the Contractor becomes involved in litigation with a subcontractor, or is threatened with such involvement, as a result of such direction, the Contractor may request the United States, through the Secretary of Labor, to enter into such litigation to protect the interests of the United States.
I-10 FAR 52.223-11 OZONE-DEPLETING SUBSTANCES (MAY 2001)
(a) Definition. “Ozone-depleting substance,” as used in this clause, means any substance the Environmental Protection Agency designates in 40 CFR Part 82 as--
(1) Class I, including, but not limited to, chlorofluorocarbons, halons, carbon tetrachloride, and methyl chloroform; or
(2) Class II , including, but not limited to hydrochlorofluorocarbons.
(b) The Contractor shall label products which contain or are manufactured with ozone-depleting substances in the manner and to the extent required by 42 U.S.C. 7671j (b), (c), and (d) and 40 CFR Part 82, Subpart E, as follows:
Warning
Contains (or manufactured with, if applicable) *_______, a substance(s) which harm(s) public health and environment by destroying ozone in the upper atmosphere.
* The Contractor shall insert the name of the substance(s).
I-11. FAR 52.250-1 INDEMNIFICATION UNDER PUBLIC LAW 85-804 (APR 1984)
a. “Contractor's principal officials," as used in this clause, means directors, officers, managers, superintendents, or other representatives supervising or directing--
(1) All or substantially all of the Contractor's business;
(2) All or substantially all of the Contractor's operations at any one plant or separate location in which this contract is being performed; or
(3) A separate and complete major industrial operation in connection with the performance of this contract.
b. Under Public Law 85-804 (50 U.S.C. 1431-1435) and Executive Order 10789, as amended, and regardless of any other provisions of this contract, the Government shall, subject to the limitations contained in the other paragraphs of this clause, indemnify the Contractor against--
I-8
(1) Claims (including reasonable expenses of litigation or settlement) by third persons (including employees of the Contractor) for death; personal injury; or loss of, damage to, or loss of use of property;
(2) Loss of, damage to, or loss of use of Contractor property, excluding loss of profit; and
(3) Loss of, damage to, or loss of use of Government property, excluding loss of profit.
c. This indemnification applies only to the extent that the claim, loss, or damage
(1) arises out of or results from a risk defined in this contract as unusually hazardous or nuclear and
(2) is not compensated for by insurance or otherwise.
Any such claim, loss, or damage, to the extent that it is within the deductible amounts of the Contractor's insurance, is not covered under this clause. If insurance coverage or other financial protection in effect on the date the approving official authorizes use of this clause is reduced, the Government's liability under this clause shall not increase as a result.
d. When the claim, loss, or damage is caused by willful misconduct or lack of good faith on the part of any of the Contractor's principal officials, the Contractor shall not be indemnified for--
(1) Government claims against the Contractor (other than those arising through subrogation); or
(2) Loss or damage affecting the Contractor's property.
e. With the Contracting Officer's prior written approval, the Contractor may, in any subcontract under this contract, indemnify the subcontractor against any risk defined in this contract as unusually hazardous or nuclear. This indemnification shall provide, between the Contractor and the subcontractor, the same rights and duties, and the same provisions for notice, furnishing of evidence or proof, and Government settlement or defense of claims as this clause provides. The Contracting Officer may also approve indemnification of subcontractors at any lower tier, under the same terms and conditions. The Government shall indemnify the Contractor against liability to subcontractors incurred under subcontract provisions approved by the Contracting Officer.
f. The rights and obligations of the parties under this clause shall survive this contract's termination, expiration, or completion. The Government shall make no payment under this clause unless the agency head determines that the amount is just and reasonable. The Government may pay the Contractor or subcontractors, or may directly pay parties to whom the Contractor or subcontractors may be liable.
g. The Contractor shall--
(1) Promptly notify the Contracting Officer of any claim or action against, or any loss by, the Contractor or any subcontractors that may be reasonably expected to involve indemnification under this clause;
(2) Immediately furnish to the Government copies of all pertinent papers the Contractor receives;
(3) Furnish evidence or proof of any claim, loss, or damage covered by this clause in the manner and form the
Government requires; and
(4) Comply with the Government's directions and execute any authorizations required in connection with settlement or defense of claims or actions.
h. The Government may direct, control, or assist in settling or defending any claim or action that may involve indemnification under this clause.
I-12. DEFINITION OF UNUSUALLY HAZARDOUS RISK
I-9
a. Definitions:
(1) "Civil Reserve Air Fleet (CRAF) Mission" means the provision of airlift services under this contract (1) ordered pursuant to authority available because of the activation of CRAF or (2) directed by Commander, United States Transportation Command (TCCC) or his successor for missions substantially similar to or in lieu of those ordered pursuant to formal CRAF activation.
(2) "Airlift Services" means all services (passenger, cargo, or medical evacuation) and anything the contractor is required to do in order to conduct or position the aircraft, personnel, supplies, and equipment for a flight and return.
Airlift Services include ground related services supporting CRAF missions. Airlift Services do not include any services involving any persons or things which, at the time of the event, act, or omission giving rise to a claim, are directly supporting commercial business operations unrelated to a CRAF mission objective.
(3) "War risks" means risks of:
(a) War, invasion, acts of foreign enemies, hostilities (whether declared or not), civil war, rebellion, revolution, insurrection, martial law, military or usurped power, or attempt at usurpation of power.
(b) Any hostile detonation of any weapon of war employing atomic or nuclear fission and/or fusion or other like reaction or radioactive force or matter.
(c) Strikes, riots, civil commotions, or labor disturbances related to occurrences under subparagraph (1) above.
(d) Any act of one or more persons, whether or not agents of a sovereign power, for political or terrorist purposes and whether the loss or damage resulting there from is accidental or intentional, except for ransom or extortion demands
(e) Any malicious act or act of sabotage, vandalism, or other act intended to cause loss or damage.
(f) Confiscation, nationalization, seizure, restraint, detention, appropriation, requisition for title or use by or under the order of any Government (whether civil or military or de facto) or public or local authority.
(g) Hijacking or any unlawful seizure or wrongful exercise of control of the aircraft or crew (including any attempt at such seizure or control) made by any person or persons on board the aircraft or otherwise, acting without the consent of the insured.
(h) The discharge or detonation of a weapon or hazardous material while on the aircraft as cargo or in the personal baggage of any passenger.
b. For the purpose of the contract clause entitled "Indemnification Under Public Law 85-804 (APR 1984)," it is agreed that all war risks resulting from the provision of airlift services for a CRAF mission in accordance with the contract are unusually hazardous risks, and shall be indemnified to the extent that coverage for such risks is not reasonably available under Chapter 443 of the Federal Aviation Act or other insurance, because such insurance has been canceled, has applicable exclusions, or has been determined by the Government to be prohibitive in cost. The Government's liability to indemnify the contractor shall not exceed that amount for which the contractor commercially insures under its established policies of insurance, which are maintained by the FAA.
c. Indemnification of risks involving the operation of aircraft, as discussed above, is limited to claims or losses arising out of events, acts, or omissions involving the operation of an aircraft for airlift services for a CRAF mission, from the time that aircraft is withdrawn from the contractor's regular operations (commercial, DOD, or other activity unrelated to airlift services for a CRAF mission) until it is returned for regular operations. Indemnification with regard to other contractor personnel or property utilized or services rendered in support of CRAF missions is limited to claims or losses arising out of events, acts, or omissions occurring during the time the first prepositioning of personnel, supplies and equipment to support the first aircraft of the contractor used for airlift services for a CRAF
I-10 mission is commenced until the timely removal, as determined by the Contracting Officer, of such personnel, supplies and equipment after the last such aircraft is returned for regular operations.
d. Indemnification is contingent upon the contractor maintaining, if available, non-premium insurance under Chapter 443 of the Federal Aviation Act and normal commercial insurance, as required by this contract or other competent authority. Indemnification for losses covered by a contractor self-insurance program shall only be on such terms as incorporated in this contract by the Contracting Officer in advance of such a loss.
I-13 DFARS 252.204-7008 EXPORT-CONTROLLED ITEMS (APR 2010)
(a) Definition. “Export-controlled items,” as used in this clause, means items subject to the Export Administration Regulations (EAR) (15 CFR Parts 730-774) or the International Traffic in Arms Regulations (ITAR) (22 CFR Parts 120-130). The term includes:
(1) “Defense items,” defined in the Arms Export Control Act, 22 U.S.C. 2778(j)(4)(A), as defense articles, defense services, and related technical data, and further defined in the ITAR, 22 CFR Part 120.
(2) “Items,” defined in the EAR as “commodities”, “software”, and “technology,” terms that are also defined in the EAR, 15 CFR 772.1.
(b) The Contractor shall comply with all applicable laws and regulations regarding export-controlled items, including, but not limited to, the requirement for contractors to register with the Department of State in accordance with the ITAR. The Contractor shall consult with the Department of State regarding any questions relating to compliance with the ITAR and shall consult with the Department of Commerce regarding any questions relating to compliance with the
EAR.
(c) The Contractor's responsibility to comply with all applicable laws and regulations regarding export-controlled items exists independent of, and is not established or limited by, the information provided by this clause.
(d) Nothing in the terms of this contract adds, changes, supersedes, or waives any of the requirements of applicable Federal laws, Executive orders, and regulations, including but not limited to—
(1) The Export Administration Act of 1979, as amended (50 U.S.C. App.2401, et seq.);
(2) The Arms Export Control Act (22 U.S.C. 2751, et seq.);
(3) The International Emergency Economic Powers Act (50 U.S.C. 1701, et seq.);
(4) The Export Administration Regulations (15 CFR Parts 730-774);
(5) The International Traffic in Arms Regulations (22 CFR Parts 120-130);
and
(6) Executive Order 13222, as extended;
(e) The Contractor shall include the substance of this clause, including this paragraph (e), in all subcontracts.
I-14. TRANSFARS 5552.204-9000 NOTIFICATION OF GOVERNMENT SECURITY ACTIVITY AND
VISITOR GROUP SECURITY AGREEMENTS (APRIL 2007)
This contract contains a DD Form 254, DOD Contract Security Classification Specification, and requires performance at a government location in the U.S. or overseas. Prior to beginning operations involving classified information on an installation identified on the DD Form 254, the contractor shall take the following actions:
(a) At least thirty days prior to beginning operations, notify the security police activity shown in the distribution block of the DD Form 254 as to:
I-11
(1) The name, address, and telephone number of this contract company’s representative and designated alternate in the U.S. or overseas area, as appropriate;
(2) The contract number and military contracting command;
(3) The highest classification category of defense information to which contractor employees will have access which must coincide with the level of classification granted to the company and cage code located in the Joint Personnel Adjudication System (JPAS);
(4) The installations in the U.S. (in overseas areas, identify only the APO number(s)) where the contract work will be performed;
(5) The date contractor operations will begin on base in the U.S. or in the overseas area;
(6) The estimated completion date of operations on base in the U.S. or in the overseas area; and,
(7) Any changes to information previously provided under this clause.
This requirement is in addition to visit request procedures contained in DOD 5220.22-M, National Industrial Security Program Operating Manual.
(b) Prior to beginning operations involving classified information on an installation identified on the DD Form 254 where the contractor is not required to have a facility security clearance, the contractor shall enter into a Visitor Group Security Agreement (or understanding) with the installation commander to ensure that the contractor’s security procedures are properly integrated with those of the installation. As a minimum, the agreement shall identify the security actions that will be performed:
(1) By the installation for the contractor, such as providing storage and classified reproduction facilities, guard services, security forms, security inspections under DOD 5220.22-M, classified mail services, security badges, visitor control, and investigating security incidents; and
(2) Jointly by the contractor and the installation, such as packaging and addressing classified transmittals, security checks, internal security controls, and implementing emergency procedures to protect classified material.
I-15. TRANSFARS 5552.216-9001 ECONOMIC PRICE ADJUSTMENT BASED ON ACTUAL COST OF
FUEL – AIRLIFT (FEB 2009) ALT II (FEB 2009)
In order to protect the contractor and the government from significant market fluctuations in the price of fuel, an adjustment will be made based on actual costs incurred. Adjustments will be made as indicated below.
(a) Economic price adjustment (EPA) pursuant to this clause is limited to changes in the contractor’s cost for fuel only.
(b) Allowable fuel adjustments will be made upward or downward only when the price of fuel varies by more than one cent per gallon from the pegged rate established in the Uniform Rates and Rules.
(1) When the average price per gallon paid by the contractor is greater than the pegged price established in the Uniform Rates and Rules, the government will reimburse the contractor the difference between the price paid and the pegged price.
(2) When the average price per gallon paid by the contractor is below the pegged price established in the Uniform Rates and Rules, the contractor will reimburse the government the difference between the price paid and the pegged price. Under these circumstances, the contracting officer will issue a demand letter and funds will be reimbursed as directed.
I-12
(c) The fuel adjustment process shall be in accordance with Attachment 1 of this contract, Performance Work Statement, Appendix 3.
I-16. TRANSFARS 5552.216-9003 USTRANSCOM TASK AND DELIVERY ORDER OMBUDSMAN (JUNE
2009)
In accordance with FAR 16.505(b)(6), the individual identified below is designated as the USTRANSCOM Task and Delivery-Order Ombudsman. The ombudsman is an independent official designated to review contractor complaints and to ensure contractors are afforded a fair opportunity to be considered, consistent with the procedures in the contract. Consulting the ombudsman does not relieve the contractor from performance requirements in the contract, nor alter or postpone any timelines for any other processes. Interested parties should first address their concerns, issues, disagreements, and/or recommendations to the contracting officer for resolution. If resolution cannot be made by the contracting officer, concerned parties may contact:
Deputy Director, Acquisition Business Operations Telephone Number: 618-220-7076 FAX: 618-220-7959
I-17. TRANSFARS 5552.223-9001 HEALTH AND SAFETY ON GOVERNMENT INSTALLATIONS (APRIL 2007)
(a) In performing work under this contract on a Government installation, the contractor shall:
(1) Comply with the specific health and safety requirements established by this contract;
(2) Comply with the health and safety rules of the Government installation that concern related activities not directly addressed in this contract;
(3) Take all reasonable steps and precautions to prevent accidents and preserve the health and safety of contractor and Government personnel performing or in any way coming in contact with the performance of this contract; and
(4) Take such additional immediate precautions as the contracting officer may reasonably require for health and safety purposes.
(b) The contracting officer may, by written order, direct Air Force Occupational safety and Health (AFOSH) Standards and/or health/safety standards as may be required in the performance of this contract and any adjustments resulting from such direction will be in accordance with the Changes clause of this contract.
(c) Any violation of these health and safety rules and requirements, unless promptly corrected as directed by the contracting officer, shall be grounds for termination of this contract in accordance with the Default clause of this contract.
I- 18. TRANSFARS 5552.242-9000 COMMON ACCESS CARDS (CACs) FOR CONTRACTOR
PERSONNEL (AUG 2008)
(a) When contractor performance is required on government installation(s)/location(s), contractors shall ensure Common Access Cards (CACs) are obtained by all contract or subcontract employees who meet one or both of the following criteria:
(1) Require long-term logical access to Department of Defense computer networks and systems in either:
(i) the unclassified environment; or
(ii) the classified environment where authorized by governing security directives.
I-13
(2) Perform work on a long-term basis, which requires the use of a CAC for installation entry control or physical access to facilities and buildings.
(b) Contractors and their employees shall use the following procedures to obtain CACs:
(1) Contractors shall provide a listing of their employees that will require a CAC to the contracting officer. The listing will contain the following information in order for a CAC application to be created in the Contractor Verification System (CVS): last, middle, and first names; Social Security Number; Date of Birth; email address; the contract number; and the contract end date. The contracting officer will provide a copy of the list to the government representative in the local organization designated to authorize issuance of contractor CACs (i.e., Trusted Agent (TA)). The TA will then create a CAC application in the Contractor Verification System (CVS.)
(2) Once the TA has created the CAC application, a temporary login/password will be generated in CVS. The TA will notify each contractor employee when his/her application is created and will securely distribute the login/password to that contractor employee. Each contractor employee will then enter the CVS web site using the temporary login/password and complete the CAC application and submit it back to the TA.
(3) If contractor employees will not require access to classified information, each contactor employee will be required to complete either the Questionnaire for Non-Sensitive Positions (SF85), located at www.opm.gov/forms/pdf_fill/SF85.pdf, or the Questionnaire for Public Trust Positions (SF85P) and submit fingerprint cards (FD-258) to the USTRANSCOM contracting officer who will verify each employee and then forward the documents to the Security Services Center for processing. The questionnaires and fingerprint cards will be forwarded by the Security Services Center personnel to OPM who will conduct a National Agency Check with written Inquiries (NACI) background investigation. Before the TA approves the CAC application in CVS, the TA must verify that a background investigation has either been opened or completed by OPM, or adjudicated by the Air Force Central Adjudication Facility (AFCAF), as shown in the Joint Personnel Adjudication System (JPAS).
(4) If contractor employees will require access to classified information, the contractor’s company Facility Security Officer processes the Questionnaire for National Security Positions (SF86) and the fingerprint cards (FD-258) and submits them directly to the Defense Industrial Security Clearance Office (DISCO). Before the TA approves the CAC application in CVS, the TA must verify that a background investigation has been either opened or completed by OPM, or adjudicated by DISCO, as shown in JPAS.
(5) Once the TA has approved the CAC application, the TA will inform the contractor employee to proceed to the nearest CAC issuance workstation (usually located within the local Military Personnel Flight (MPF)) with two forms of picture identification. CAC issuance workstation personnel will then issue the CAC.
(c) While visiting or performing work on government installation(s)/location(s), contractor employees shall wear or prominently display the CAC as required by the governing local policy.
(d) During the performance period of the contract, the contractor, or contractor employee as appropriate, shall:
(1) Within 7 working days of any changes to the listing of the contract personnel authorized a CAC, provide an updated listing to the contracting officer who will provide the updated listing to the TA (who will create new CAC applications or revoke those for employees no longer performing on the contract as appropriate);
(2) As part of security out-processing, or when no longer performing on the specific contract for which the CAC was approved, return their CAC to either their TA, the USTRANSCOM Security Services Center personnel; or to a designated USTRANSCOM representative.
(3) Report lost or stolen CACs immediately to the TA, the USTRANSCOM Security Services Center, or to a designated USTRANSCOM representative.
(e) Within 7 working days following completion/termination of the contract, return all CACs issued to contractor employees to the TA, the USTRANSCOM Security Services Center, or to a designated USTRANSCOM
I-14 representative.
(f) Failure to comply with these requirements may result in withholding of final payment.
(g) For OCONUS contracts, in addition to the above procedures, contractor employees requiring a Geneva Convention category on their CAC will be required to complete DD Form 1172-2, Application for Department of Defense Common Access Card DEERS Enrollment. This form shall be submitted to/approved by the contracting officer and then be presented to the CAC issuance workstation personnel in conjunction with the CVS application for CAC issuance.
I-19. TRANSFARS 5552.247-9000 AIR SAFETY (APRIL 2007)
(a) Contractor is obligated to comply with generally accepted standards of airmanship, training, and maintenance practices and procedures. Contractor must also satisfy Department of Defense (DOD) quality and safety requirements as described in 32 CFR Part 861, Section 861.4. In addition, contractor shall comply with all provisions of applicable statutes, tenders of service, and contract terms as such may affect flight safety, as well as with all applicable Federal Aviation Administration (FAA) Regulations, Airworthiness Directives, Orders, rules, and standards promulgated under the Federal Aviation Act of 1958, as amended. Compliance with published standards may not, standing alone, constitute compliance with generally accepted standards of airmanship, training, or maintenance.
(b) The cleanliness and orderliness of an aircraft, including the visible components and surfaces thereof affect the ability to inspect an aircraft, may be valid indicators of the overall maintenance level of an aircraft, and may have a direct effect on the security and confidence of passengers. Therefore, contractor's failure to keep and maintain all such components and surfaces of the aircraft used in performance of this contract clean, orderly, and in good state of repair may be deemed a failure to comply with generally accepted standards of maintenance to the extent the failure goes beyond mere cosmetic or housekeeping deficiencies and relates in some manner to confidence in the safety, maintenance, or airworthiness of the aircraft.
(c) Should the government determine that any of the following conditions exist, it may suspend or place in temporary nonuse status contractor's further performance of airlift transportation services for the DOD:
(1) Contractor's failure to meet any of the obligations imposed by the preceding two paragraphs.
(2) Involvement of one of contractor's aircraft in a serious or fatal accident, incident, or operational occurrence (regardless of whether or not such aircraft is being used in the performance of this contract).
(3) Any other condition that affects the safe operation of contractor's flights hereunder.
(d) Such suspension shall be accomplished pursuant to the Department of Defense Commercial Air Transportation Quality and Safety Review Program (32 CFR Part 861), which is hereby incorporated in this contract by reference, or any procedures that supersede same which may be adopted by the Commander (United States Transportation Command) from time to time. The suspension procedures, including the temporary nonuse, reinstatement and appeals processes, set out therein, are binding, final, and conclusive. In no event shall suspension or temporary nonuse proceedings, regardless of outcome, give rise to any liability on the part of the government.
(e) Suspension or temporary nonuse hereunder resulting in unavailability of contractor aircraft to perform service under this contract shall be treated as failure to maintain authorization to engage in air transportation under the clause of the contract “Requirement for Authorization to Engage in Air Transportation.”
I-20. TRANSFARS 5552.247-9001 REQUIREMENT FOR AUTHORIZATION TO ENGAGE IN AIR
TRANSPORTATION (AUG 2007)
(a) This contract is conditioned upon the Contractor (if the contractor is a team arrangement, applies to each team member) being an air carrier and holding a Certificate of Public Convenience and Necessity issued under Section 401 of the Federal Aviation Act (FAA of 1958, as amended), or otherwise authorized by the Department of Transportation (DOT) to engage in direct air transportation services, holding an Air Carrier's Operating Certificate issued by the FAA
I-15 under Part 121 of the Federal Aviation Regulations (14 CFR 121) for airlift operated by the offeror, and participating in the CRAF, if applicable. Furthermore, the Contractor shall not be in a suspension or temporary nonuse status in accordance with clause 5552.247-9000, “AIR SAFETY.”
(b) If at any time during the performance period of this contract the contractor is not in compliance with the requirements of paragraph (a) above, including, but not limited to, instances when the certificate demonstrating compliance with paragraph a above is (i) suspended by the pertinent regulatory body for any period of time even though the effect of the suspension is stayed pending review by a court of competent jurisdiction, (ii) canceled or revoked in its entirety by the pertinent regulatory body even though the effect of the cancellation or revocation is stayed pending review by a court of competent jurisdiction, or…