AMENDMENT 0002 HT94102Q2057.pdf
PDF 377 KB Posted
- Solicitation number
- HT941025Q2057
- Issued by
-
Defense Health Agency
About this file
This document is Amendment 0002 to Solicitation HT941025Q2057 for Uninterruptible Power Supply (UPS) and Data Center Refresh for Naval Medical Center San Diego. The amendment addresses two Requests for Information (RFIs) from potential vendors regarding technical specifications. The first RFI clarifies the UPS redundancy configuration, with the government confirming a requirement for a Parallel N+1 configuration. The second RFI addresses UPS scalability, with the government maintaining a firm requirement for UPS systems pre-configured and scalable up to 250kW with a 45-minute runtime. Vendors are instructed to acknowledge all amendments when submitting quotes, and all other terms and conditions of the original solicitation remain unchanged.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AMENDMENT 0003 HT94102Q2057.pdf | ||
| AMENDMENT 0001 HT94102Q2057.pdf | ||
| Attachment 3 - PPQ NMCSD UPS.docx | DOCX document | |
| Attachment 4 - Quote Sheet NMCSD UPS.xlsx | XLSX spreadsheet | |
| Attachment 2 - Experience Project Data Sheet NMCSD UPS.docx | DOCX document | |
| Attachment 1 - SOW NMCSD UPS.pdf | ||
| HT941025Q2057 CSS NMCSD UPS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT 0002
DATE: 22 Aug 2025
SUBJ: SOLICITATION HT941025Q2057, UNINTERRUPTIBLE POWER SUPPLY
AND DATA CENTER REFRESH FOR NAVAL MEDICAL CENTER SAN DIEGO
1. The purpose of this amendment is to answer questions or request for information (RFI) for subject solicitation:
1. RFI # 1. UPS Redundancy Configuration. Section 2 (Description of Supplies, Item 0001) specifies: “Provide redundant (N+1) UPSs and PDUs configuration.”
Could you please confirm whether the Government’s intent is: Parallel N+1 configuration, or 2N configuration (A-side and B-side independent UPS systems).
GOV’T RESPONSE #1: The Government requires Parallel N+1 configuration as stated in the SOW.
2. RFI # 2. UPS Scalability Requirement. The same section further specifies: “UPSs pre-configured and scalable up to 250kW with 45-minute runtime.” Our technical partners have noted that their proposed solution is scalable up to 200kW maximum. Could you confirm whether 250kW scalability is a firm requirement, or if a 200kW maximum frame would still be considered acceptable if all other performance requirements are met?
GOV’T RESPONSE #2: The Government requires scalable up to 250kW. “UPSs pre-configured and scalable up to 250kW with 45-minute runtime,” as stated in the SOW, is a firm requirement.
2. All other terms and conditions remain unchanged.
NOTE: QUOTES SUBMITTAL SHALL INCLUDE QUOTER ACKNOWLEDGMENT
OF ALL AMENDMENTS TO THIS SOLICITATION.