Amendment 1_Attachment 2 PWS.pdf
PDF 551 KB Posted
- Solicitation number
- HT940726QE005
- Issued by
-
Defense Health Agency
About this file
This is a Performance Work Statement for commercial kitchen exhaust system and ceiling cleaning services at the 88th Medical Group, Wright-Patterson Air Force Base, Ohio, issued by the Defense Health Agency on August 10, 2026.
The contract covers a base year (August 10, 2026 – August 9, 2027) plus four one-year option periods extending through August 9, 2031. Services are to be performed Monday through Friday, 0600-1600 hours, excluding 11 federal holidays, at Building 830, 4881 Sugar Maple Drive, Wright-Patterson AFB, Ohio 45433. The contractor must furnish all personnel, equipment, supplies, tools, and materials to perform the work in compliance with OSHA, The Joint Commission, FDA Food Code, and NFPA standards. Monthly tasks include manual wipe-down cleaning of four kitchen hoods (Hood #1, Hood #2, Grill Hood, and Pizza Hood) and Stage 1 Grease Extractor cleaning. Bi-annual services (every six months) include cleaning the kitchen exhaust duct to bare metal and cleaning the main kitchen ceiling (2,509.15 square feet). The contractor must also inspect hood filters monthly and clean or replace them bi-annually at the contractor's cost, with replacement filters included in the fixed price. All cleaning must reach bare metal per NFPA 96 standards, and the contractor must place a service label in the kitchen after completion. The contractor must designate a Contract Manager within five business days of award, provide NFPA 96 certification for all technicians, maintain a minimum of five years of corporate experience in commercial kitchen exhaust cleaning, and provide emergency and daily operations contact phone numbers. The government retains the right to inspect and require re-performance of non-conforming services at no additional cost. All invoices must be submitted through Wide Area Workflow (WAWF).
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 2 Questions and Answers.pdf | ||
| Q and A.pdf | ||
| Attachment 5.pdf | ||
| Amendment 1_Attachment 3 - Pricing Sheet.xlsx | XLSX spreadsheet | |
| Amendment 1_Attachment 1 COMBINED SYNOPSIS.pdf | ||
| Attachment 4-Wage Determination.pdf | ||
| Attachment 2 PWS.pdf | ||
| Attachment 1 COMBINED SYNOPSIS.pdf | ||
| Attachment 3 - Pricing Sheet.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Department of Defense Defense Health Agency
Performance Work Statement
Commercial Kitchen Exhaust System and Ceiling Cleaning Services
88th Medical Group at Wright-Patterson AFB, OH
10 August 2026
PART 1: GENERAL INFORMATION
1.1. Description of Services
This is a non-personal services contract. The contractor shall provide all personnel, equipment, supplies, transportation, tools, materials, and supervision necessary to perform commercial kitchen exhaust system and ceiling cleaning services as defined in this Performance Work Statement (PWS). The contractor shall provide services that conform to the most recent applicable standards from the Occupational Safety and Health Administration (OSHA), The Joint Commission (TJC), the Food and Drug Administration (FDA) Food Code, and the National Fire Protection Association (NFPA).
1.2. Background
The 88th Medical Group Nutritional Medicine Flight operates dining services for inpatients, outpatients, staff, and visitors. To ensure operational readiness, maintain a safe and sanitary environment, and prevent fire hazards, a comprehensive cleaning and maintenance program is required for the kitchen exhaust systems.
1.3. Scope
The contractor shall provide qualified personnel and all necessary resources to perform cleaning of the kitchen hoods, ducts, exhaust fans, and ceilings for the Nutritional Medicine Flight. The contractor shall accomplish all services to the standards specified in this contract.
1.4. Period of Performance (PoP)
The period of performance consists of one base year and four (4) one-year option periods.
Base Year: 10 August 2026 – 09 August 2027
Option Year 1: 10 August 2027 – 09 August 2028
Option Year 2: 10 August 2028 – 09 August 2029
Option Year 3: 10 August 2029 – 09 August 2030
Option Year 4: 10 August 2030 – 09 August 2031
1.5. Place and Hours of Performance
1.5.1. Place of Performance
The work shall be performed in the Nutritional Medicine Flight kitchen, located in Building 830, 4881 Sugar Maple Dr, Wright-Patterson Air Force Base, Ohio, 45433.
1.5.2. Hours of Operation
The contractor’s normal hours of business shall be Monday through Friday, from 0600 to 1600, excluding Federal holidays. Services may be required outside of normal operating hours to minimize disruption to kitchen operations and shall be coordinated with the facility points of contact (POCs).
1.5.3. Federal Holidays
Contractor services are not required on the following Federal holidays:
New Year’s Day
Martin Luther King, Jr.’s Birthday
Washington’s Birthday
Memorial Day
Juneteenth National Independence Day
Independence Day
Labor Day
Columbus Day
Veterans Day
Thanksgiving Day
Christmas Day
1.6. Contractor Identification
Contractor personnel shall possess and wear an identification badge displaying their name and the company name at all times while on the installation.
PART 2: CONTRACTOR REQUIREMENTS
2.1. Contract Manager
The contractor shall designate a Contract Manager in writing to the Contracting Officer within five (5) business days of contract award. The Contract Manager or a designated alternate shall be available during normal duty hours to meet with government personnel and shall have full authority to act for the contractor on all matters relating to the daily operation of this contract.
2.2. Contractor Employees & Qualifications
2.2.1. Special Qualifications
Technicians performing cleaning and inspection services must be trained and certified in kitchen exhaust cleaning in accordance with NFPA 96 standards.
2.2.2. Prior Experience
The contractor shall have a minimum of five (5) years of corporate experience in cleaning commercial kitchen exhaust systems.
2.2.3. Appearance and Conduct
Contractor employees shall present a neat, clean, and professional appearance. Jeans are permitted if clean and without holes. Personnel must wear appropriate headgear (e.g., cap, hair net) while working in the kitchen.
2.2.4. Conflict of Interest
The contractor shall not employ any person who is an employee of the U.S. Government if such employment would create a conflict of interest.
2.3. Safety
The contractor shall perform all work in a safe manner, with specific emphasis on ladder safety and working in high locations. The contractor shall comply with all applicable OSHA regulations and WPAFBI 32-2001, Fire Prevention.
2.4. Security
The contractor is responsible for the storage and safekeeping of all tools and materials.
Contractor personnel will be escorted by a government staff member while in the facility and must complete any facility access requirements prior to the start of work.
2.5. Contractor Furnished Resources
Except for items specifically stated as Government-furnished, the contractor shall furnish all items required to perform the services in this contract.
PART 3: SPECIFIC TASKS
3.1. General
The primary objective is to inspect and clean the kitchen exhaust system to bare metal in accordance with NFPA 96 and to clean the kitchen ceiling. The contractor shall protect all kitchen equipment from contamination during the cleaning process and restore the work area to its original condition upon completion.
3.2. Cleaning Procedures
3.2.1. System Protection
Before starting work, the contractor shall cover all surfaces (grills, ovens, fryers, etc.) below the exhaust system with a suitable protective material.
3.2.2. System Cleaning
The contractor shall clean all hoods, grease removal devices, fans, ducts, and other appurtenances to bare metal. After cleaning, the system shall not be coated with any powder or other substance. All access covers and panels shall be removed for cleaning and securely replaced upon completion.
3.2.3. Ceiling Cleaning
The ceiling shall be cleaned using non-abrasive, food-safe cleaners that meet NFPA and OSHA standards.
3.2.4. Reporting
The contractor shall report any worn, frayed, or defective system components to the facility POC. The contractor shall not attempt to perform repairs.
3.2.5. Labeling
After cleaning, the contractor shall place a label within the kitchen indicating the date of service and the name of the service company, as required by NFPA 96.
3.2.6. Hood Filter Inspection, Cleaning, and Replacement
The contractor shall inspect the hood filters monthly for Hood #1, Hood #2, Grill Hood, Pizza Hood, and the Stage 1 Grease Extractor. Based on the results of each inspection and the condition of the filters, the contractor shall clean or replace the filters on a bi-annual basis (every six (6) months). The contractor shall determine, based on filter condition, whether cleaning or replacement is required at each six-month interval. All replacement filters shall be furnished by the contractor and shall be compatible with the existing hood and grease-extractor equipment.
Removed grease, debris, and any discarded filters shall be disposed of by the contractor in accordance with applicable federal, state, and local regulations. For pricing purposes, the contractor shall assume bi-annual filter replacement; the cost of replacement filters shall be included in the contractor's fixed price.
3.3. Technical Exhibit: Cleaning Schedule & Scope
Area Item Method Frequency Dimensions Linear Feet
Ductwork
Main Kitchen Hoods
Hood #1 Hood #2 Grill Hood Pizza Hood
Manual Wipe Down
1 X Month 31′ × 16′ 31′ × 16′ 9′ × 9.5′ 3′ × 3.5′
4′ × 3′ 4′ × 3′ 20″ × 20″ 10″ × 10″
Grease Extractor
Stage 1 Grease Extractor
Manual Clean
1 X Month N/A N/A N/A
Inspect, Clean, or
Hood #1, Hood #2, Grill Hood, Inspect monthly;
clean or replace
Inspect:
Monthly · Clean/Replace:
Bi-Annual (6-
N/A N/A N/A
Area Item Method Frequency Dimensions Linear Feet
Ductwork
Replace Filters
Pizza Hood, Stage 1 Grease Extractor based on filter condition
Month Increments)
Kitchen Exhaust Duct
Duct, Interior, and Roof Exhaust Fan
Clean and Inspect to Bare Metal
Bi-Annual (6-Month Increments)
N/A N/A N/A
Main Kitchen Ceiling
Ceiling Surface
Manual Wipe Down
Bi-Annual (6-Month Increments)
2,509.15 Sq Ft
N/A N/A
PART 4: PERFORMANCE & QUALITY
4.1. Performance Requirements Summary (PRS)
Performance Objective
Performance Standard
Performanc e Threshold
Method of Surveillance
Remedy of Failure
PRS#1: Kitchen Exhaust System Cleaning
All hoods, devices, ducts, and other appurtenances shall be cleaned to bare metal to ensure maximum fire protection.
100% in accordance with NFPA 96 standards.
Visual surveillance by the Nutritional Medicine Flight representative before/during/aft er contractor’s performance and validated customer complaints received by the Contracting Officer.
Re-performance within mutually acceptable timeframe between Government and contractor.
4.2. Quality Control
The contractor shall maintain records of all cleaning and inspections performed. These records shall be made available to the Government throughout the contract performance period.
4.3. Inspection and Acceptance
In accordance with FAR 52.212-4, the Government has the right to inspect services for acceptance. The Government may require re-performance of non-conforming services at no increase in contract price.
4.4. Invoicing
All invoices shall be submitted through Wide Area Workflow (WAWF) and must reflect all work accomplished during the service period.
PART 5: POINTS OF CONTACT
5.1. Contractor Point of Contact
The contractor shall provide an emergency contact phone number and a daily operations contact phone number for troubleshooting and service calls.
File details come from the government source that posted it. Updated .