Question and Answers 4.15.2011.docx
DOCX document 56 KB Posted
- Solicitation number
- HSFEHQ-11-R-0041
About this file
All Questions with Answers received from potential offers regarding the Pre-solicitation Notice -
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 12 Deliverables.docx | DOCX document | |
| Attachment 14 119-7-1 Personal Property Manual | — | |
| Attachment 8 Shelter Inspection.docx | DOCX document | |
| Attachment 4 DHS Handbook.docx | DOCX document | |
| Attachment 3 PAPER INSPECTION FORM 031408.xlsx | XLSX spreadsheet | |
| Attachment 9a 009-0-3 Declaration and Release Form English former 90-69B.pdf | ||
| Attachment 13 Matrix.docx | DOCX document | |
| Attachment 10 Standards for Correction - Jan 2010.docx | DOCX document | |
| Attachment 6 PRIVACY AWARENESS TRAINING.docx | DOCX document | |
| Attachment 5 a Customer Satisfaction Survey .doc | DOC document | |
| Attachment 7 IHP Inspection Guidelines.docx | DOCX document | |
| Attachment 9b 009-0-4 Declaration and Release form Spanish former 90-69C.pdf | ||
| Attachment 5 B Customer Satisfaction Survey Spanish.docm | DOCM document | |
| Attachment 12 Deliverables 3.21.11.docx | DOCX document | |
| PWS as of 3.21.11.docx | DOCX document | |
| Attachment 12 Deliverables 3.21.11.docx | DOCX document | |
| PWS as of 3.21.11.docx | DOCX document |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFI – HSFEHQ-11-R-0041
VENDOR QUESTIONS – APRIL 11-2011
| 1 |
| Who is the incumbent contractor? |
Partnership for Response & Recovery –PaRR LLC and Alltech, Inc.
| 2 |
| Does FEMA plan to issue a full draft RFP prior to the final release? |
No, next release will be a final RFP NOT A DRAFT
| 3 |
| Sector - Is FEMA still considering awards where contractors are assigned to a specific geographic region or will all cover FEMA’s entire area of responsibility? |
No, FEMA will award two Contracts for CONUS and OCONUS
| 4 |
| How many contract awards does the FEMA expect to make? |
Two
| 5 |
| The pre-solicitation notice states task orders will be issued on a firm-fixed-price and cost reimbursable |
basis; Can FEMA provide a general description of what type of work is contemplated to be firm-fixed-price and what type of work is expected to cost-reimbursable?
Cost reimbursable i.e., government acquired equipment, fixed price i.e. per inspection cost
| 6 |
| Does FEMA plan to issue a task order to address the considerable non-disaster requirements described in the draft PWS, e.g. preparedness, training, security, quality certifications, reports, etc.? |
No, Task Orders are disaster specific
| 7 |
| Draft documents issued by FEMA in 2010 contained language that required all personnel to be direct-hire employees vs. temporarily contracted. Is this requirement no longer necessary? |
This will be Contractor discretion for direct hire or temporary contracted
| 8 |
| The notice on FBO includes the draft PWS and Attachment 12. Will the government be releasing draft versions of other attachments? |
Final version will be posted at RFP
| 9 |
| How many houses, locations and is this to H.Q.S. standard inspections? |
Number of Inspections completed under the current contract 1,516,745 throughout CONUS and OCONUS. Inspections are performed using FEMA standards.
| 10 |
| Does a contractor have to be ISO certified to be considered responsive to the bid or can ISO certification be obtained after award? |
No, however, ISO registration must occur by the end of the base year Reference PWS Section C.5
| 11 |
| Will all employees and inspectors be required to submit an SF85P/e-quip to be allowed to perform under the contract? |
All employees and inspectors must have a favorable adjudication prior to working on any Task Order. Adjudication procedures are with FEMA Security for edits and will be in the final PWS.
| 12 |
| Are all inspectors expected or required to be employees of the contractor? |
Decision will be made by the contractor and not by FEMA
| 13 |
| Does FEMA intend for this contract to be performance based? If so what are the incentives for superior performance and disincentives for under perform. |
Part A - Yes
Part B – Quality Assurance Surveillance Plan has not been finalized at this time.
| 14 |
| Will the solicitation notice include the number of contracts to be awarded? |
Yes
| 15 |
| In light of the federal government budget constraints and the high cost of readiness associated with these contracts, does FEMA anticipate awarding more than two contracts? |
No
| 16 |
| Will FEMA provide copies of the Automated Construction Estimator (ACE) software and documentation to interested bidders? |
FEMA will post a power point presentation for ACE software
| 17 |
| In the May 2010 draft Item C.1.5 included language about FEMA considering “alternative software for the residential damage data collection process. The contractor should expect 1 year lead time to integrate their software into the government owned system; therefore, ACE will be available during the first 12 months for use by the vendor.” All of that language is completely gone now. Does that mean there is no longer an intent to discontinue use of ACE? |
Software development has been removed from the PWS; FEMA is in the process of software development to move ACE to a mobile platform
| 18 |
| Does FEMA intend to use ACE for the duration of the Housing Inspection Services contract? |
FEMA has plans to migrate ACE software from a Windows environment for sometime in the future. ACE will still be in the current format, but changes or a rewrite may take place over the duration of the contract.
| 19 |
| On page 5, the opening paragraph refers to “other means approved by FEMA (e.g. inspector manned phone banks, aerial imagery, or tax data). If such verification processes were to be utilized would a separate Task Order be issued to cover the costs of these activities? |
Request (manned phone banks/registration intake) outside of the disaster housing inspection process will be covered under a separate Task Order for Technical Assistance C.6.9
| 20 |
| On page 5, states “the data collected includes but is not limited to:…tarp inspections”. Can you enumerate what “tarp inspections” consist of and would they be subject to a separate Task Order? |
Tarp inspections will be removed on solicitation documents
| 21 |
| On page 5, states “the data collected includes but is not limited to:…sweep inspections”. Can you enumerate what “sweep inspections” consist of and would they be subject to a separate Task Order? |
Sweep inspections include registering the survivor on site, recording 9 to 12 answers as they pertain to disaster registration then performing a complete disaster housing inspection during a single site visit.
| 21 |
| How many contracts is FEMA planning to issue? |
Two
| 23 |
| Will the contractors be assigned different regional areas of responsibility? |
No
| 24 |
| Does FEMA plan to assign contractors to different sectors? |
No
| 25 |
| Discuss background and approach. It does not discuss whether the selected contractors will have national coverage or specific geographic regions? The previous draft PWS dated 4/19/10 had the contract split into four geographic regions with a designated contractor for each region. |
Each contractor will be expected to provide national coverage, as well as OCONUS.
| 26 |
| Will Attachment 1 be provided? |
Attachment #1 will be PWS
| 27 |
| Approach of the Draft Performance Work Statement (PWS) dated 19 April 2010 described using the sector approach for executing the Housing Inspection Services program via four regional contract awards. FEMA staff also addressed this approach during the FEMA HIS Industry day briefing. The updated (21 March 2011) PWS has no references to the sector approach or four awards. Has FEMA decided to drop the four sector/four contractor approach to execution? |
Yes
| 28 |
| ACRONYMNS and DEFINITIONS includes the term “Double Damage”. How do double damage situations impact the current inspection? |
When it is known that a previous federally declared Individual Assistance declaration has occurred within the same geographical area within a 12 month period, the inspector must ask the applicant if they applied in the previous declaration. Example; a furnace was damaged in a previous event and the furnace had not been repaired. During the next event the item would not be recorded. A comment would be made “furnace not repaired from DR-XXX. The objective is to only record damage related to the event under which the inspector is performing inspections for the current task order.
| 29 |
| Will FEMA provide the CMHIS QMS to help ensure the contractor’s QMS fully captures the required interactions? |
CM&HIS QMS will not be provided. The contractor is expected to apply their QMS as it relates to the contract requirements designed to meet each threshold and objective.
| 30 |
| Given the cost associated with obtaining and maintaining ISO 9001certification, has FEMA considered requiring ISO 9001 compliance as lower cost alternative? |
No, certification is required
| 31 |
| Can FEMA provide a list of ISO standards they may be considering for exclusion? This could have an impact on pricing. |
No
| 32 |
| This requires independent ISO certification by the end of the base year. The contract deliverables summary table in attachment 12 states that the draft plan shall be completed within 12 months of contract award. Please clarify that the base year is equivalent to 12 months after award, and the draft QMS plan is due with the proposal. |
Base year (12 months) begins on day of award. Draft QMS shall be provided with proposal for review, certification 12 months from that date.
| 33 |
| On page 11, reference is made to audits FEMA will undertake and lists 3 areas for examination. In addition, will FEMA audit the Contractor’s compliance with all applicable rules, regulations, and Federal, State and Local laws covering all aspects of the business operations? |
FEMA will audit those processes identified in the QMS relating to the product and associated requirements.
| 34 |
| What is the frequency of these audits? Is the frequency prescribed in the CMHIS QMS? |
Monthly, Quarterly & Annually
| 35 |
| Please clarify the intent of the statement that “The inspector personnel shall not be an employee or under contract to multiple Housing Inspection prime contractors for the duration of the contract.” Is it meant to preclude inspectors from being employed or under contract simultaneously to more than one prime contractor? |
Yes
| 36 |
| Figure 1 – Example Organizational Structures appears to show thirteen |
(13) distinct positions. The text referring to the figure states “FEMA’s contract partners shall have the following key positions…” May some of the functions be combined under the same position and may contractors propose alternative organizational structures?
The example indicates the need for the contractor to have an organization structure suitable to manage their Quality Management System and share that structure as part of their QMS with FEMA. Key personnel must be identified.
| 37 |
| Should a material corrective action be identified as part of the post-award discussion, will FEMA allow this action to be re-priced? |
No
| 38 |
| Is it expected that the cost to the Contractor for its personnel on board during Transition will be covered in the Transition task order? |
Yes
| 39 |
| In the event a new disaster occurs during the transition period and/or phase in, will the contractor phasing-out be deployed and reimbursed under a task order issued during the transition period, or will the contractor phasing-in receive the deployment task order if it has sufficient staff trained at the time deployment is needed? |
The incumbents will be tasked to perform inspection task orders during the 90 day phase in period unless recommendation for early release is submitted to the CO by the COTR for concurrence.
| 40 |
| “During the phase in period the Contractor shall become familiar with test/training requirements in order to commence full performance of services on the contract start date”. Is there a difference between the “Award Date” (see Section C.6.2.2 Phase In) and the “Start Date”. If so what is the difference? |
Award Date, will correct in the solicitation
| 41 |
| Please clarify the intent of the statement that “…the Contractor shall have personnel on board, at no additional cost to the government, Up to 90 days phase in/phase out periods.” |
The statement is intended to explain that FEMA expects a fully operational and prepared contractor at the end of the transition period, which would include all staff. FEMA will not provide additional funding. The PWS will be reworded to make the statement clearer.
| 42 |
| Can the government clarify how transition will be handled? In particular, what it means by this sentence in Section C.6.2, "To minimize any decreases in productivity and to prevent possible negative impacts on additional services, the Contractor shall have personnel on board, at no additional cost to the government, Up to 90 days phase in/phase out periods." |
The statement is intended to explain work returned by an incumbent will be reassigned to the next contractor. FEMA expects a fully operational and prepared contractor at the end of the transition period, which would include all staff. FEMA will not provide additional funding. FEMA will not absorb cost associated with the reassignment of open work. The PWS will be reworded to make the statement clearer.
| 43 |
| To make sure each Contractor is evaluated based on an equal playing field; will FEMA be providing scenarios for contractors to price in the proposal? |
To Be Determined
| 44 |
| Does FEMA have minimum requirements for workforce benefits and retention? If none exist, how will the responses be evaluated and scored with respect to this criterion? |
To Be Determined
| 45 |
| Can FEMA elaborate on what they consider to be appropriate methods or practices to meet workforce retention under a program that is dependent on a part-time workforce that is used on an occasional basis? |
Ability to meet contract requirements; FEMA will not make the decision on Vendor decision on workforce.
| 46 |
| Will FEMA fund workforce retention programs? |
FEMA is looking for affordable proposals that will provide a sufficient work force to perform at any performance level for this contract.
| 47 |
| Section C.6.4 refers to staff and inspectors as “employees” in several subsections. What is FEMA”s position on the use of “independent contractors” as inspection, management, or support staff under this contract? |
FEMA expects all contract requirements to be met; employees and independent contractors will be vendor decision.
| 48 |
| “The inspector personnel shall not be an employee or under contract to multiple Housing Inspection prime contractors for the duration of the contract." Will FEMA be maintaining a central repository of inspector personnel across all contractors? This would allow the contractor to validate that an individual is not working for another vendor also. |
FEMA will maintain a central repository regarding background adjudication. Contractors have the responsibility for tracking their staff.
| 49 |
| Is FEMA willing to fund an inspector retention program in the form of a “retention CLIN”? |
If the offeror presents such a package and/or any other inspector retention package that are based on a cost factor, that cost would be in their cost volume. However, the details of the package need to be identified in their proposals. FEMA wants to know the detail of that piece in order to evaluate the effectiveness to provide inspector staffing in large quantities and in short time frames to meet the production requirements.
| 50 |
| Would FEMA consider changing this requirement to limit inspectors to working for only one contractor during any given disaster deployment? |
No. However, if the contractor can demonstrate how this is not in the best interest of FEMA, further consideration will be examined.
| 51 |
| Since the issue seems to be inspector workforce availability during large events, would FEMA allow a two-tiered pricing model (consistent with attachment 13) that would provide for increased inspector compensation for atypical disaster sizes? |
The contractors will be responsible for compensation structure.
| 52 |
| Define what is meant by field inspection staff members. Do you mean field office supervisors and support staff or the inspectors? |
All
| 53 |
| If this structure and staffing mix is not the best approach to accomplishing the PWS and performance metrics, will Contractors be held to performance standards impacted by this staffing and organization? |
The example indicates the need for the contractor to have an organization structure suitable to manage their Quality Management System and share that structure as part of their QMS to FEMA. Key personnel must be identified. The structure provided is an example and the contractors have flexibility. The contractors will be held to the performance standards.
| 54 |
| Can Contractors propose a structure that it feels will be less costly and/or more in line with its delivery approach? |
Yes with explanation and duties identified. FEMA will need to approve
| 55 |
| Will FEMA provide position descriptions for the Key labor categories it requires? |
No. The contractor shall address in the QMS for staffing. Within a proposal, titles with definition, responsibilities, level of authority should be clearly defined.
| 56 |
| Please clarify the statement that “all employees undergo a background vetting process that includes.” Is it’s FEMA’s intent for this requirement to also apply to home office support personnel, or is this applicable only to inspectors and field personnel? |
Everyone working on the HIS Contract is required to undergo a background vetting process.
| 57 |
| What is the “Agency’s criteria” by which personnel will or will not be deemed suitable? |
Will be provided at Solicitation
| 58 |
| What is the “Agency’s criteria” that apply to contractor’s having the |
ability to grant access control credentials utilizing electronic verification and biometric authentication in near real-time.
Will be provided at Solicitation
| 59 |
| C.6.4.1 in the first paragraph, uses the term “sub-contractor”. If FEMA will allow “independent contractors” to be used in place of “employees” will they be considered sub contractors and be subject to the same requirements regarding insurance, licensing, etc. |
All requirements apply
| 60 |
| Is the referenced background vetting process the same as the current clearance process that is administered by FEMA HQ Security involving both the preliminary two-week fingerprint adjudication and the extended OPM e-QIP review? |
Security will provide details in RFP
| 61 |
| Inspectors are not currently required to carry this type of id, since they do not work in DHS/FEMA facilities. Will traditional picture id cards be acceptable for field inspectors? If not, will FEMA please provide details for the biometric and electronic verification requirements for the inspector badges? |
Details will be provided during the solicitation
| 62 |
| Will there be a preparedness task order? If so, will training be a billable cost and have its own CLIN? |
Part 1 = Yes.
Part 2 = Vendor will address training and cost in the proposal
| 63 |
| Contractor responsible for schedule delays beyond its reasonable control that are due to delays in background checks, receipt of necessary data/government property, etc. to perform? |
Documentation and Control of these processes are part of the QMS and will provide the CO a factual back ground on the specific details of the delays that are without a doubt beyond the Contractor’s control. The contractor is expected to have a ready workforce at all times. It is FEMA’s responsibility to work with the contractors to meet our obligations.
| 64 |
| Please clarify the intent of having the contractor “determining the potential number of inspections per task order via other information gathering methods (e.g. |
performing their own disaster assessments within the affected area).” How will this information be used? When does FEMA anticipate the contractor will conduct their assessments, e.g. before or after issuance of a task order?
Contractor should assess the situation and determine the appropriate number of personnel to respond to an event. The contractors should not rely on the FEMA provided information, although FEMA will provide an estimate. The contractor may not use a low or high FEMA estimate of the potential number of inspections to complete as a means for non-performance or cost associated with over staffing for the response. The contractor should assess the event and staff appropriately.
| 65 |
| Under what circumstances does FEMA anticipate initiating the “Autodetermination” function? Has this been done in the past; on which disasters; and for what |
duration? What are FEMA’s expectations for the contractor’s quality control personnel, e.g. remain on the task order in standby modes, or disengage until Auto-determinations are discontinued? How much advanced notice does FEMA anticipate providing before contractor reviews are to be reinstated?
Auto-determination is typically the result of aged inspections that have gone beyond the aging threshold that have been complted by the vendor and have not yet been forwarded to FEMA to assist the applicants only then will FEMA consider autodetermination. This has been done for very short periods of time in large catastrophic events but has been a rare exception. As to the disposition of staff, that is to be determined by the contractor. The contractors will still be held to quality standards in the event of auto-d deactivated. FEMA will work with the contractors prior to deactivation.
| 66 |
| Section C.6.8.1 says “The Contractor shall perform inspections of residences via electronic means at the damaged residence using Government furnished equipment and software.” But then C.6.16 says “The Contractor is authorized to acquire or manufacture equipment for use in the performance of this contract meeting FEMA specifications.” Is FEMA willing to pay for the software/equipment directly? |
Equipment CLIN line will be added for contractor acquired equipment and must have prior approval before purchase. FEMA will not pay a vendor directly.
| 67 |
| Will FEMA provide a detailed inventory of Government-furnished equipment and software with the final RFP? |
FEMA will provide hardware specifications for the government acquired equipment. Inventory of current equipment will be provided to awardees.
| 68 |
| Please define and identify the required deliverables for a fully documented no contact. |
No Contact is the completion status assigned an inspection where the inspector is unable to make any contact with the applicant, after making three documented attempts. These attempts can be phone calls or site visits. The inspector must comment on the three attempts, explaining the method used to attempt contact and the time it occurred. The attempts should occur on different days and different times of the day. An exterior only inspection will be performed, a photo is required and post the dwelling. The Habitability call is based on damages recorded and relocate will be “no”. Once the inspector has exhausted these efforts, the case is sent from the inspector’s pad back to a queue that is maintained by the staff who make further efforts to contact the applicant, including mailing the applicant a letter, phone calls, and email. The inspection cannot be returned to FEMA prior to 14 days from the time it was issued to the inspector. If 14 days have expired and there is still no contact with the applicant, the inspection is returned to FEMA as a No Contact.
| 69 |
| The temporary locations of the shelter applicants are not known to the contractors or inspectors until inspection appointments are scheduled. How does FEMA intend to flag and distribute inspection assignments for shelter applicants? |
Shelter list will be made available to the contractor when applicable from FEMA. Other outreach methods may be required and disaster specific as needed.
| 70 |
| Will FEMA be providing pricing guidelines for this activity as a separate CLIN since this is a new requirement? |
No pricing guidelines, CLINS will be determined
| 71 |
| Section J, Attachment 7, “IHP Inspection Guidelines” does not describe the sweep inspection process. Will FEMA provide the assistance and detailed direction referenced in this section? |
Are the proposers expected to roll this additional cost into their per inspection price?
Part 1 =Yes
Part 2 = Sweep inspections will be a separate CLIN
| 72 |
| Under what circumstances and how frequently does FEMA anticipate |
the use of Geospatial Inspections? How will these services be requested by FEMA; and what specifications will be used to define successful delivery?
Part 1 = Removed from PWS for RFP.
Part 2 = To be determined. If done under HIS contract it will be addressed as separate SOW with CLIN
| 73 |
| "Geospatial analysis provided by the Contractor will supplement and enhance the traditional field Quality Control inspection process. In large events, FEMA and the Contractor can increase the volume of Quality Control using this technology in order to validate the traditional ground inspection performed by the Contractor." Can FEMA further elaborate on how geospatial quality control inspections would review a manual inspection done by an inspector? Would FEMA expect geospatial quality control inspections to be detailed in the contractor's quality management system (QMS)? |
Removed and will be addressed as separate SOW with Clin
| 74 |
| Paper inspections - Can we assume that the additional time and effort to meet this requirement is included in the per inspection rate? |
Inspection time should take about the same, but there is an effort required to manage the process and enter the data. The cost associated with the effort of entering data will be a CLIN and separated.
| 75 |
| Because this involves significant next-day shipping costs, how will FEMA reimburse the contractor? |
Cost should be identified in proposal for both CONUS and OCONUS equipment delivery.
| 76 |
| How long will the Contractor be required to electronically |
warehouse photographs?
What are plans for disposition of the photographs after that period?
Life of the contract.
To be determined.
| 77 |
| Will FEMA provide a separate CLIN for development, monitoring, and management of 24/7/365 access photo catalog? |
No, cost should be identified in proposal
| 78 |
| Please clarify the statement that “is it the Contractor’s responsibility to provide all transportation required for this joint QC effort.” What type of transportation is |
anticipated?
Car, truck, sport utility large enough to carry 2 to 3 people, equipment safely.
| 79 |
| Will FEMA’s QC staff have restrictions on their availability to participate in joint QC efforts? Should we assume they are only available 8 hours per day? |
Dependant on disaster activity
| 80 |
| The requirement specifies a point reduction for errors in $50 increments; is the ACE software capable of providing this level of accuracy for the full range of damage |
assessments?
No, this may be addressed in the contractors QC plan.
| 81 |
| Do all withdrawn/inaccessible applicants need to be contacted or is the percentage to be proposed by the bidder? |
Yes, reference Inspection Guidelines
| 82 |
| Please clarify the last sentence of the first paragraph, specifically, is this referring to “field” costs or all task order costs, such as those associated with management, |
administration, quality control, close out, etc.?
When Technical Assistance proposals are received, the price proposed should encompass all cost associated with the Task Order requirements.
| 83 |
| Section C.6.11 states “Labor rates for registration intake services shall be in line with FEMA RI labor rates”. Will FEMA be issuing DOL Wage Determinations for registration intake and inspector employees? |
The RI labor rate is equivalent to a GS-7 The Inspector rate is equivalent to a GS-9 However, the contractor should verify the rates.
| 84 |
| Will FEMA’s comparable labor rates include OH and G&A and fringe benefits? |
The RI labor rate is at a GS 7- $20.29 an hour. When needed, historical data indicates that we have had the contractor to supply 250 agents for about a 60 day period for this effort. Quantity and location is dependent on the need.
| 85 |
| Does this mean the Contractor will stop work on the termination date, therefore not incurring any more costs? |
48 hour notice will be given to the stop work
| 86 |
| Will RI be fixed price or cost reimbursable or Time-and-Material? |
Cost Reimbursable validation required
| 87 |
| Should we assume that we cannot use inspectors for the Registration Intake effort? |
FEMA expects the contractor to meet the requirements of both RI and Inspections.
| 88 |
| Are RI agents held to the same security requirements (fingerprint and e-QIP clearance) as the inspector workforce? |
Yes.
| 89 |
| Since this could require clearing thousands of RI agents prior to an event, how will these costs be reimbursed? |
CLIN items will be identified.
| 90 |
| Would FEMA consider exceptions to this requirement for these (and other) applicant driven delays? |
The Contractor’s QMS should address how they intend to handle this process for FEMA to approve and measure.
| 91 |
| In FEMA’s large event model (Attachment 13), where completed/returned inspections will not meet the 5-day performance requirement, will FEMA waive this turnaround time requirement? |
To be determined.
| 92 |
| Section C.6.13.2 describes the contents of the Operational Report. One item is Photo audit process and findings, not just exterior and interior photo audit, photo audit to support water level if required and HRR call." Can the government provide more details on the photo audit process? |
Verification, photos taken support Habitability call, water levels, and damages recorded. The objective is to have the photos, in part, validate the damage to the dwelling.
| 93 |
| “Air cards for mobile communications shall be used as an optional method of communicating data from the field. The Government shall not provide these devices”. Are there any other equipment items the Government will not furnish or pay for their use? |
Language removed now reads: The contractor shall provide mobile communication systems such as Broadband Access Cards or other mobile communication devices to include optional methods of communicating data from the field to FEMA if broadband systems are not available. The Government shall not provide these devices
| 94 |
| Will FEMA consider applying the same standard regarding replacement of equipment to contractors that it applies to FEMA and DHS staff? |
No – the contractors are accountable for all contractor acquired property.
| 95 |
| Please clarify what is meant by “The contractor-owned inventory management system must be robust with multiple query capabilities. |
Effective control and accountability. Additionally, must be electronic.
| 96 |
| PII - In order for the contractors to price these monitoring costs FEMA will need to provide details for the requirements for monitoring. |
Privacy Office will determine the need for PII protection. Vendors for these actions are on GSA schedule.
| 97 |
| Please clarify the “penalties” related to safeguarding Personal Identifiable Information. |
To be determined
| 98 |
| Please clarify the paragraphs related to “119-7-1 Personal Property Manual (Interim) 10-20-2010 CHAPTER 7 – CONTRACT PROPERTY.” |
Will be an attachment in the RFP
| 99 |
| Can the government clarify which systems are subject to DHS Security requirements? Is it only systems that connect to FEMA systems? Is it any system with FEMA content such as inspection photos, GFE inventory, or PII data? |
Systems connecting to & supporting the inspection process connected or transmitting to any government owned server. (PII, equipment)
| 100 |
| Section C.6.16 references Attachment 11 as the specifications for the ACE NEMIS and the Government’s system for remote communications. I saw a host of other attachments, but Attachment 11 is not currently provided. Can you provide that attachment as well? |
Hardware specifications will be provided during the Solicitation (ATT-11)
| 101 |
| In the Quality Management System Section on page 1, in the list of audit areas in paragraph 4, Number 4 states “The contractor shall maintain a 1.25% error rate for each inspection task”. Are the current Contractors meeting an error rate of 1.25% and if not what is their error rate? |
The language will be adjusted to the measurement of 2.50%
| 102 |
| Quality Management System, page 1 – If FEMA issues a FCOR and the Contractor can |
demonstrate that there was no error, will FEMA reimburse the Contractor for the cost of that reexamination?
No, but FEMA Task Monitors will partner with the contractor on correction errors.
| 103 |
| Quality Management System, page 1 – Can FEMA expand on the requirement to maintain a 1.25% error rate for each inspection task order? How and when will the final error rate be established? What are the consequences for an error rate above or below 1.25%? |
Error rate is established during the QASP evaluation at the close of the Task Order. Financial disincentive will be applied if the error rate is above 2.50% of all inspections completed within a task order. The 2.5% is the not to exceed threshold.
| 104 |
| Transition, page 2 – Please clarify the intent of the “operational preparedness audit.” How will it |
be conducted and what elements of measurement will be used? What are the consequences of not meeting, or exceeding, this requirement?
Audit intent is for FEMA to determine if the contractors has addressed and can deliver all FEMA requirements. Measurements will appear in the QASP.
| 105 |
| Transition, page 2 – What criteria will be used to determine approval of the contractor’s customer |
service and community needs sensitivity training curricula, implementation, and follow up plan?
TBD. This should be included in the contractors QMS plan to be evaluated and approved, they should describe in detail what steps and processes would be taken and could be easily documented for validation
| 106 |
| Transition, page 2 – What criteria will be used to determine approval of the inspector training |
curricula and schedule?
TBD This should be included in the contractors QMS plan to be evaluated and approved, they should describe in detail what steps and processes would be taken and could be easily documented for validation
| 107 |
| Transition, page 2 – What criteria will be used to determine approval of the security plan? |
FEMA Security. TBD
| 108 |
| Transition, page 2 – What criteria will be used to determine approval of the HSPD-12 compliant |
implementation/management plan?
FEMA Security. TBD
| 109 |
| Will the cost of these contract deliverables be covered in the transition task order? These costs need to be included in the price proposals. |
For this contract, all costs associated with operation, preparedness and inspections will require an itemization of the content. A total disclosure of what makes up cost for these CLINS will be required.
| 110 |
| The background clearance process is very labor intensive and requires the contractor to use older government roll and print scanning equipment. Will the final RFP provide details about FEMA’s role in the background process plan including FEMA security’s average turnaround time for contractor submitted documents, so the contractors can effectively price these services? |
Yes, details are being worked out and will be available at solicitation
| 111 |
| Mandatory Performance Requirements, page 3 – Given the upper boundary of twenty (20) thousand inspections per day, how large does FEMA expect each contractor’s cadre of cleared and trained inspectors to be? |
An average inspector should be able to perform an estimated 6-8 inspections per day throughout the life of the Task Order. The Full Rate of Production is 20,000 for any individual task order or multiple concurrent task orders. The contractor shall provide the number, but will be held accountable for performance and non-performance.
| 112 |
| Will the government be providing any GFE or will everything be contractor provided? What would be GFE? In the Inspection Task Order Performance section of Attachment 12, it states, "The Contractor shall furnish all personnel, facilities, equipment, material, supplies, and services, data connection devices such as air cards and otherwise do all things necessary to, or incident to, performing and providing the following items of work identified in Section C.1, Statement of Work." Later in Attachment 12, there is an entire section on Government Furnished Property. Specs will be provided by the Government and there will be a CLIN for contractor acquired equipment. |
Specs will be provided by the Government and there will be a CLIN for contractor acquired equipment.
| 113 |
| In the Quality Control section of Attachment 12, it states, "The Contractor shall implement an inspection scoring matrix that provides a 0 to 100 scoring system based on the accuracy of the inspection for real and personal property verification, reflect the quality of critical data field entries, and customer service criteria.". Will FEMA dictate the passing score on the above scale? Or is this something the contractor will propose with FEMA concurrence as part of the QMS. |
FEMA will approve the passing score
| 114 |
| The temporary locations of the shelter applicants are not known to the contractors or inspectors until inspection appointments are scheduled. How does FEMA intend to flag and distribute inspection assignments for shelter applicants? |
Contractor will receive shelter location lists and work with FEMA regarding the names of applicants located in shelters
| 115 |
| Will FEMA require non-inspector registration intake (RI) staff to facilitate shelter inspections? If so, will they be subject to the same security requirements as inspectors? |
Everyone having access to PII data must meet security requirements
| 116 |
| Will FEMA be providing pricing guidelines for shelter inspections as a separate CLIN since this is a new requirement? |
FEMA would expect the inspection price to be the same. However, FEMA realizes there are other task that takes place to accomplish the process. When FEMA activates shelter inspections it will be a CLIN. FEMA does reserve the right to prioritize some shelter inspections without activating the shelter inspection process.
| 117 |
| Will the contractors be issued an RI task order whenever shelter inspections are required? |
If this shelter inspection requirement is different from RI tasking, will FEMA provide the equipment (e.g. telephones, computers and air cards) for the non-inspector staff?
No shelters inspections coincide with regular inspections.
No contractor will be responsible for the process and equipment needed.
| 118 |
| Because of the unknown nature of shelter requirements, would FEMA consider providing a sample scenario for contractor pricing comparison? |
TBD
| 119 |
| Should the list of errors in attachment 10 be included in the contractors’ inspection scoring matrix? YES What are the other corrections, in addition to those listed in attachment 10 that should be included in the contractors’ inspection scoring matrix? |
Part 1 = Yes Part 2 = Others could be admin errors, example = not following Inspection guidelines or Addendums
| 120 |
| The PWS also requires independent ISO certification by the end of the base year, the contract deliverables summary table in attachment 12 states that the draft plan shall be completed within 12 months of contract award. Please clarify that the base year is equivalent to 12 months after award, and the draft QMS plan is due with the proposal. |
Base year begins date of award and last for 12 months from the date of award. Draft QMS is due with the proposal ISO certified QMS by the end of the Base Period.
| 121 |
| Is there a minimum threshold level at which a Contractor may be considered as non-responsive in its proposal submission? |
Not meeting the per day production for one or multiple disasters.
| 122 |
| Evaluating the various threshold levels that will be proposed by the Contractor may prove to be difficult. Will FEMA consider establishing a baseline so that the approaches and pricing offered by the contractors will be based on a common metric? |
The price proposed is firm fixed price IDIQ with a 20,000 per day structure
| 123 |
| Will there be parameters established that determine at what point FEMA may conduct unlimited joint QCs? |
No, FEMA reserves the right to perform unlimited QC’s
File details come from the government source that posted it. Updated .