ATTACHMENT_1_-_OCONUS_PWS_Revised.pdf
PDF 196 KB Posted
- Attached to
- OCONUS Responder Support Camp (RSC) Federal contract opportunity
- Solicitation number
- HSFE80-16-R-0004
About this file
The purpose of this amendment is to update the Performance Work Statement with disability accessible requirements.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Buy_American_Certificate_52.225-2.pdf | ||
| HSFE80-16-R-0004_Amendment_000003.pdf | ||
| Attachment_8_-_Identification_Card_Standard_Template.pdf | ||
| OCONUS_RSC_RFP_000002.pdf | ||
| HSFE80-16-R-0004_OCONUS_Questions_and_Responses_FINAL.pdf | ||
| Amendment_000002.pdf | ||
| Amendment_000001.pdf | ||
| Attachment_6_-_Past_Performance_Supplemental_Comment_Form.docx | DOCX document | |
| ATTACHMENT_1_-_OCONUS_PWS_FINAL.pdf | ||
| Attachment_6_-_Past_Performance_Questionnaire.docx | DOCX document | |
| OCONUS_RSC_RFP.pdf | ||
| Attachment_2_-_QASP.docx | DOCX document | |
| Attachment_3_-_Pricing_Template_.xlsx | XLSX spreadsheet | |
| Attachment_7_-_Subcontracting_Plan_Review_Checklist.pdf | ||
| Attachment_5_-_Scenarios.docx | DOCX document | |
| ATTACHMENT_4_-_Wage_Determinations.pdf | ||
| DRAFT_OCONUS_PWS.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HSFE80-16-R-0004
PERFORMANCE WORK STATEMENT
OUTSIDE THE CONTINENTAL UNITED STATES
RESPONDER SUPPORT CAMP (OCONUS RSC)
SERVICES
C.1 BACKGROUND
The Department of Homeland Security (DHS)/Federal Emergency Management Agency’s (FEMA) mission is to support our citizens and first responders to ensure that as a nation we work together to build, sustain, and improve our capability to prepare for, protect against, respond to, recover from and mitigate all hazards.
One of FEMA’s responsibilities is to ensure the effectiveness of emergency response personnel in responding to emergencies and disasters. Types of disasters and emergencies that could happen in the continental United States (CONUS), as well as outside the continental United States (OCONUS) locations include, but are not limited to, hurricanes, floods, earthquakes, cyclones, tornadoes, blizzards, acts of terrorism, tsunamis, and avalanches.
C.2 OBJECTIVE
To support this mission, FEMA is soliciting for services for disability accessible OCONUS Responder Support Camp(s) (OCONUS RSC) in which to stage responders, other authorized personnel, and assets deployed for occurrences, or events, requiring a federal government response in OCONUS locations, including U.S. states, territories and commonwealths. The OCONUS RSC contract will be used by FEMA, or by other federal agencies through FEMA, consistent with the specific authorities of the agency utilizing the contract’s services. During OCONUS disaster situations or other events, federal, state and local responders may need a place that provides shelter, food, and additional basic needs. The OCONUS RSC contract will be used by those responding to federal disaster or emergency needs, or any other situation where FEMA or an agency working through FEMA needs an OCONUS RSC solution. FEMA shall be able to call upon those contractors awarded contracts under this acquisition, to provide OCONUS RSC services in the following locations: Alaska, Hawaii, American Samoa, Guam, and the Commonwealth of the Northern Marianas, the Commonwealth of Puerto Rico, and the U.S.
Virgin Islands.
C.3 SCOPE
The scope of this Performance Work Statement (PWS) includes providing disability accessible OCONUS RSC services inclusive of OCONUS RSC housing solutions, mobilizations, site preparation, installation, OCONUS RSC management and operations, and demobilizations as set forth herein and in task orders. The contractor shall provide all necessary labor, supervision, equipment, tools, materials, fuel, supplies and transportation, except as stated in this paragraph, necessary to provide the items and services described herein and set forth in subsequent task order (s). For the purposes of this PWS, vendor provided transportation is defined as all necessary vendor provided/contracted resources required to transport contractor personnel, equipment and supplies to a suitable aerial port of embarkation (APOE), or sea port of embarkation (SPOE); completion of required load planning;
providing/securing required material handling equipment as required to on-load/off-load aircraft/ships/barges; suitable air/sealift to move personnel, equipment and supplies from the APOE/SPOE to suitable aerial ports of debarkation (APOD), or sea ports of debarkation (SPOD) and resources required to transport contractor personnel, equipment and supplies to locations as specified in the associated task order. At the government’s discretion and as part of the task order process, the government may elect to provide transportation services for large scale events. For the purposes of this PWS, government provided transportation includes, including airlift/sealift from the designated APOEs/SPOEs, to designated APODs/SPODs and material handling equipment/equipment operators at designated APOEs/SPOEs/APODs/SPODs OCONUS RSC.
The contractor shall have the capability to house government and other disaster first responder personnel, based on the following regional requirements:
FEMA Region 2 (Commonwealth of Puerto Rico & U.S. Virgin Islands) – (5) simultaneous OCONUS RSCs, each housing up to 100 personnel simultaneously or one OCONUS RSC housing up to 3,000 personnel. Minimum occupancy is 50 personnel.
FEMA Region 9 (Hawaii, Guam, Commonwealth of the Northern Marianas, American Samoa) - For Hawaii, (4) simultaneous OCONUS RSCs for u p to 1,000 persons each, or (2) simultaneous OCONUS RSCs for Guam and the Commonwealth of the Northern Marianas, or (1) OCONUS RSC for American Samoa housing up to 300 personnel. Minimum occupancy is 50 personnel.
FEMA Region 10 (Alaska) (5) simultaneous OCONUS RSCs, each housing up to 1,000 persons simultaneously, or one OCONUS RSC housing up to 2,000 persons. Minimum occupancy is 50 personnel.
Contractor services include:
• OCONUS Responder Support Camp (OCONUS RSC) design
• Mobilization
• Site Preparation
• Installation and maintenance of all contractor provided equipment
• All services necessary to effectively and efficiently manage and operate the OCONUS RSC
• Demobilization
The contractor shall house all authorized OCONUS RSC occupants in disability accessible facilities with, but not limited to, tents with leveled plywood floors (or equivalent), modular units, or other solutions such as barges, ships or other means capable of meeting all applicable design loads for wind, snow, seismic, flood, extreme temperatures, extreme humidity, and other potential hazards. All housing solutions shall be equipped with air conditioning and heating (HVAC) to meet all environmental conditions and capability of maintaining the interior temperature between 68 and 72 degrees Fahrenheit as well as providing bedding, meal services, kitchen, dining hall, limited recreation facilities, operations center, medical unit, refrigerated trucks, shower units, hand wash units, potable (drinking) water, water purification and manifold distribution systems, toilets, on-site manifold distribution of black and grey water and
Associated on-site sanitation systems, complete laundry service, trash removal and dumpster service, industrial generators, light towers, identification cards, fencing and barricades.
C.4 RESPONDER SUPPORT HOUSING CAPACITY
The Contractor shall have the capability to construct/provide the OCONUS RSC to meet the minimum and maximum capacities as specified in C.3. OCONUS RSC population or occupancy is defined as the number of individuals actually lodging at the OCONUS RSC. The Government does not guarantee that the OCONUS RSC will be fully occupied to meet the OCONUS RSC maximum capacity. OCONUS RSC occupancy or population may change significantly over the duration of the task order. The National Contracting Officer’s Representative (COR) and Task Order COR will give the Contractor 24-hour notice prior to any changes in the estimated OCONUS RSC population. The National COR and Task Order COR may only adjust OCONUS RSC populations to levels within the OCONUS RSC minimum and maximum capacity, listed in C.3. The Contractor must be capable of scaling the OCONUS RSC size up or down in population increments of 25 within 24-hours and 100 occupants within 72 hours of notification.
C.5 HOURS OF OCONUS OPERATIONS
OCONUS RSC hours of operation are 24 hours a day, seven days a week.
C.6 COMMUNICATION
The Contractor shall ensure that accessible communications are established and maintained throughout the provisioning of OCONUS RSC support services between personnel and the Government.
C.7 GENERAL INFORMATION
The Contractor shall be capable of establishing and maintaining an OCONUS RSC within disaster-impacted areas within the following time constraints:
Vendor Provided Trans (Capability to house responders)
Government Provided Trans (Ready to load at
APOE/SPOE)
Government Provided Trans (Capability to house responders after APOD/SPOD off load)
FEMA
Region 2
72 hrs after task order award
36 hrs after task order award
48 hrs after task order award
FEMA
Region 9
96 hrs after task order award
36 hrs after task order award
48 hrs after task order award
FEMA
Region
96 hrs after task order award
36 hrs after task order award
48 hrs after task order award
Additionally, the contractor shall have the capability for early- phasing, if requested in the task order, to provide partial OCONUS RSC support (i.e. sleeping, feeding, i.e. commercial ready to eat meals, medical, and sanitation) for 100 personnel 36 hours after task order award.
The Contractor shall staff the OCONUS RSC with a team of trained specialists to professionally set-up, operate and manage the OCONUS RSC. At a minimum these include the four key personnel 1) OCONUS RSC Manager, 2) Quality Assurance Manager, 3) Nurse, and 4) Food Service Manager, as well as any additional staff needed to manage and operate the OCONUS RSC. Examples of additional staff includes but is not limited to: staff to check-in and check-out personnel (occupants and authorized visitors) entering and exiting the RSC; food service workers; maintenance workers and cleaning staff.
The Contractor shall have the capability of modular expansion or reduction in blocks of 25 personnel within 24- hours’ notice based on changing mission needs and OCONUS RSC population, not to exceed the maximum RSC capacity. The Contractor shall have sufficient equipment readily available for rapid deployment as well as preventive maintenance programs to ensure optimum equipment readiness levels at all times.
As required, the Contractor shall have the capability to provide engineering, environmental baseline, site design and phasing analysis to assist in effective planning and use of the OCONUS RSC site.
C.8 GOVERNMENT FURNISHED PROPERTY/EQUIPMENT/SERVICES
As necessary for OCONUS RSC facilities, the Government will furnish land and be responsible for the site lease for the OCONUS RSC. The site conditions for an OCONUS RSC may vary significantly. All site selection/property/equipment and services shall comply with all Federal disability accessibility requirements. OCONUS RSC Security will be provided by the Government. The Government reserves the right to provide any other equipment or services to support OCONUS RSC operations. Any other Government furnished equipment or services shall be set forth in the task order.
C.9 CONTRACTOR FURNISIHED EQUIPMENT AND SUPPLIES
To the maximum extent practical, the Contractor will furnish all other supplies, equipment and personnel. The Contractor will comply with environmental purchasing regulations and Presidential Executive Order 13423 when acquiring products and services used in performance of the OCONUS RSC contract. Specifically the Contractor will acquire bio-based, environmentally preferable, energy-efficient, water-efficient, and recycled-content products, and use paper of at least 30 percent post-consumer fiber content. For more information, visit http://www.biopreferred.gov/BioPreferred/, http://www.epa.gov/epawaste/conserve/tools/cpg/index.htm and http://www.epa.gov/epp/.
C.10 SAFETY STANDARDS
The OCONUS RSC shall be kept in compliance with applicable OSHA rules in 29 CFR Part 1926 & 29 CFR 1910, specifically 29 CFR 1910.142 Environmental Protection Agency (EPA) regulations outlined in 40 CFR and all other local, state and federal regulatory standards and conditions for safety and health and environmental management.
C.11 CODE ADHERENCE/COMPLIANCE REPORT
The Contractor is responsible for adherence to applicable federal, state, territorial, commonwealth and local regulations and laws. This includes but is not limited to all local, state, territorial and commonwealth Occupational Safety Health and Environmental Management Department regulations, the 2006 International Building Code, 2006 International Fire Code – Chapter 24 and NFPA 101 – Life Safety Code for the occupancies being constructed and the Federal disability accessibility requirements included under the Rehabilitation Act of 1973, as amended. FEMA will support the Contractor’s efforts to http://www.biopreferred.gov/BioPreferred/ http://www.epa.gov/epawaste/conserve/tools/cpg/index.htm http://www.epa.gov/epp/ expedite the permit process responsible for obtaining all required permits prior to OCONUS RSC acceptance. The contractor shall notify the contracting officer and COR immediately if the circumstances raise any concerns about the contractor’s ability to obtain the necessary permits. In addition, throughout all phases of the responder support OCONUS RSC lifecycle, the contractor shall comply with all applicable local, State, territorial, commonwealth and Federal rules and regulations associated with the operation of OCONUS RSC support systems and operate within the conditions of any permits obtained or applied for. This includes, but is not limited to, the operation of potable water systems, wastewater treatment systems; collection, storage, and d i sposa l of hazardous and regulated waste; and collection and disposal of solid waste.
The Contractor shall be responsible for meeting manufacturer recommended installation specifications.
The con t rac to r shall perform a local code review of the jurisdictional area where the OCONUS RSC is located and implement any requirements determined to be more stringent than the National Codes indicated in this Performance Work Statement. A written compliance report shall be provided to the Government upon completion of this code review within 7 days of the task order award (See C.19 Item 2 Contract Data Requirement List (CDRL)).
C.12 INDIVIDUALS WITH DISABILITIES
As a ‘model employer’, the Federal Government employs significant numbers of individuals with disabilities. The Contractor shall be responsible for providing accessibility as required under the Rehabilitation Act of 1973 (RA), as amended. Contractor is required to ensure equal physical, programmatic and communication access. The contractor must also have in place a process for emergency response personnel to request a reasonable modification.
C.13 REQUIREMENTS
C.13.1 CONTRACTOR STAFFING
The contractor’s staff shall be comprised of multi-disciplined personnel operating around the clock while the OCONUS RSC is in operation. Staff shall be appropriately trained and equipped to operate in locations mentioned in C.3. Staff sizing shall be dependent on the size and scope of the OCONUS RSC operation and shall be sufficient to ensure that the OCONUS RSC is managed efficiently and effectively. Whenever practical, displaced citizens, including those with disabilities, shall be given the first opportunities for employment within the OCONUS RSC, assuming skills and capabilities are pertinent for the open positions. Staff sizing, skills and capabilities with comply with the requirements for meeting reasonable accommodations requirements. The Contractor shall have the capability to provide engineering, site design and phasing analysis to assist in effective planning and use of the OCONUS RSC site. The contractor and its staff shall adhere to federal privacy laws, including the Privacy Act of 1974. All contractors’ personnel shall be able to pass a background check in accordance with the FEMA Contractor Eligibility and Personal Identification Verification (PIV) Process, (DHS Clause 3052-204.71). (**NOTE: Prior to OCONUS RSC acceptance, contractor(s) shall be authorized to perform services as stated under the Section C.4 “Responder Support OCONUS RSC Housing Capacity” in the event that the screenings are not complete).
C.13.2 SITE LAYOUT PLAN
The Contractor shall provide with each task order proposal: disability accessible site specific design plans; OCONUS RSC site requirements and layout in accordance with the OCONUS RSC site spacing provided by the Government (See C.19 item 5 Contract Data Requirement List (CDRL)).
C.13.3 TRANSITION PLAN
The contractor shall provide a transition plan (See C.19 Item 4 Contract Data Requirement List (CDRL)) with the task order proposal to ensure a smooth transition from task order award to full OCONUS RSC operational status (phase-in). The transition plan for the phase-in period shall include, at a minimum:
mobilization; site preparation; transition with exis t ing OCONUS RSC contractor (if necessary);
contractor employee training and orientation; assessment of potential security risks; and assumption of full operational responsibility. A site specific transition plan shall be submitted w i t h the task order proposal. A similar plan shall be provided for phase-out seven days prior to the OCONUS RSC closing.
C.13.4 EQUIPMENT INVENTORY LIST
The Contractor shall have the capability to provide assets that can be expanded and reduced based on mission needs and OCONUS RSC population. The Contractor shall provide an Equipment Inventory Report weekly (See C.19 item 1 Contract Data Requirement List (CDRL)) to the Contracting Officer (CO), National COR, and Task Order COR. The Equipment Inventory Report shall include all equipment used to erect and operate the OCONUS RSC. The report shall state if the equipment is owned/leased. The Contractor shall have sufficient equipment available for rapid deployment and preventive maintenance programs to ensure optimum equipment readiness levels at all times.
C.13.5 DAILY LOGS
The contractor shall maintain daily OCONUS RSC logs (See C.19 Item 3 Contract Data Requirement List (CDRL)). Copies of the logs shall be made available to the CO/ National COR/Task Order COR and FEMA OCONUS RSC Coordinator. Daily logs shall include, but not be limited to:
• Daily occupancy counts;
• Summary of any technical direction provided by the National COR/Task Order COR and contractor action taken;
• Results of water testing samples (when tested);
• Summary of the daily menu;
• Number of meals served per day;
• Any billeting issues;
• Number, type, and severity of medical incidents; and
• Summary of any significant OCONUS RSC daily laundry services, cleaning of shower facilities, janitorial
Daily log must be signed by the National COR Task Order COR and the Contractor OCONUS RSC Manager. The Contractor’s employees, including sub-contracted employees, shall not be included in occupancy, meal or laundry counts for billing purposes, but shall be included as a separate category in the daily OCONUS RSC summary repor t s to aid the OCONUS RSC
Coordinator in the event of an emergency or evacuation situation.
C.13.6 MEDICAL PLAN
The Contractor shall develop and maintain OCONUS RSC specific medical plans (See C.19 Item 8 Contract Data Requirement List (CDRL)) to be submitted with the task order proposal that include OCONUS RSC processes and procedures in the event of an emergency that the RSC medical staff cannot handle. The plan shall include but not be limited to the medical aid station staffing plan, identification of local medical facilities, transportation routes and other information.
C.14. MOBILIZATION
C.14.1 RESPONDER SUPPORT CAMP MOBILIZATION
OCONUS RSC setup shall be completed to the OCONUS RSC capacity set forth in the task order. If required in the task order, the c on t r a c t o r shall phase in partial OCONUS RSC support (sleeping, feeding, medical and sanitation) as listed in C.7, General Information.
Changes to accommodate increases or decreases in OCONUS RSC population and associated services (within the limits of the OCONUS RSC capacity set forth in the task order) shall be completed within 24 hours after notice or as directed by the CO. Any changes to exceed OCONUS RSC capacity set forth in the task order must be approved by the Contracting Officer and must be completed within 72 hours of notice provided by the Contracting Officer.
C.14.2 SITE DESIGN
The Contractor shall provide with each task order proposal, disability accessible site specific design plans (See C.19 Item 6 Contract Data Requirement List (CDRL)). The plans shall address site requirements and layout in accordance with the OCONUS RSC site spacing provided by the Government. The Contractor shall implement storm water erosion controls in accordance with federal, state, and local regulations including but not limited to: obtaining permits, performing all necessary site improvements, and restoring the site to meet or exceed original site conditions.
C.14.3 SITE PREPARATION
The Contractor shall perform all work necessary for site evaluation, preparation, installation and use. The Contractor shall make the site ready for placement of all contractor and Government provided equipment, personnel and assets. Depending on the site, the contractor shall perform all necessary site improvements to ensure positive drainage, expand site capacities, create disability accessible parking and common areas and perform selective clearing and grubbing in accordance with all f ede ra l , state and local environmental regulations. Additionally, the Contractor shall follow all EPA Storm Water Best Management Practices found at http://cfpub.epa.gov/npdes/stormwater/menuofbmps/index.cfm. For example, on a sloped site, the ground may be graded to allow water to drain away from the structures, while on a level site, the facilities m a y need to be elevated to ensure that water drains around them. The Contractor shall be responsible for designing and prepar ing the OCONUS RSC site sufficient to establish positive drainage that ensures that the OCONUS RSC remains dry at all times and that pools of water do not settle and stagnate in the OCONUS RSC area. The Contractor shall maintain OCONUS RSC grounds on a periodic basis to include brush clearing, grass and brush cutting.
http://cfpub.epa.gov/npdes/stormwater/menuofbmps/index.cfm
The Contractor shall meet requirements based on the National Environmental Policy Act (NEPA), National Historic Preservation Act (NHPA), Endangered Species Act (ESA), Executive Order 11988:
Floodplain Management, Executive Order 12898: Environmental Justice, and other environmental planning and historic preservation laws by following the conditions established through FEMA’s environmental and historic preservation (EHP) review. These conditions shall be established by FEMA’s staff at task order award based on the unique characteristics of each site. These include:
• Complying with mitigation measures to reduce the impact to the environment as established by the EHP review (e.g. use of silt fences to reduce sedimentation, use of construction best management practices to reduce air quality issues, appropriate handling, disposition, remediation, or containment of hazardous materials in the project area, etc.).
• Acquiring applicable Federal, State, or local environmental permits required for the project (e.g. Storm Water Pollution Prevention Permit [SWPPP], National Pollution Discharge Elimination System [NPDES] permit, construction permits, Clean Water Act Section 404 for fill, etc.).
• Immediate cease of work and notification to FEMA Regional Environmental Officer (REO) and CO if potential archeological resources are discovered during construction and ground disturbance work.
C.15 OCONUS RSC SET-UP
C.15.1 BILLETING
The Contractor shall provide billeting for the personnel assigned to the OCONUS RSC. Billeting shall be provided in disability accessible commercially available climate controlled facilities which include floors, doors, lights, sleeping beds/cots, accessible smoke alarms and alerting systems and fire extinguishers in accordance with all applicable OSHA 29 CFR 1910 and 29 CFR 1926 standards and requirements. All billeting facilities shall be installed in accordance with local codes, 2006 International Building Code, 2006 International Fire Code – Chapter 24 and NFPA 101 – Life Safety Code – Chapter 28, New Dormitories. Such billeting shall be fully installed and ready for occupancy within 72 hours of task order award unless directed otherwise on a task order specific basis. Changes to accommodate increases or decreases in OCONUS RSC population must be authorized through written modification by the Contracting Officer and shall be completed within 24 hours af t e r notice provided by the National COR/Task Order COR.
All billeting facilities shall be installed in accordance with referenced codes and manufacturers approved engineering data. All structure engineering data shall be maintained on file in the project site office. Air movement within structures shall be in accordance with ANSI Z.4.1.4. Billeting shall be segregated by gender (i.e. male and female).If tents are provided for billeting, they shall typically be one of two types: pole tents or frame tents. Pole tents shall comply with the California Fire Code, GA217 for Flame Retardancy and NFPA 701 Flame Retarding Fabric Requirements and 2006 International Fire Code – Chapter 24. Pole tents shall be rated to meet the wind loading requirements contained in Chapter 6 of the ANSI/ASCE 7-05 Minimum Design Loads for Buildings and Other Structure, for the location selected.
Frame tents shall be rated to meet design loading requirements contained in ANSI/ASCE 7-10 Minimum Design Loads for Buildings and Other Structures, for the location selected as follows: wind loads contained in Chapters 26 – 31; Snow loads contained in Chapter 7; Seismic loads contained in Chapters 11-23; Flood loads contained in Chapter 5. The provisions of ANSI/ASCE 7-05 may also be used following the associated chapters; Chapter 6 for wind; Chapter 7 for snow; Chapters 11 – 23 for seismic; and Chapter 5 for flood. Structures shall meet or exceed: the OSHA 29 CFR 1910, 29 CFR 1926, all locally adopted building code regulations or the provisions of the 2009, or 2006, editions of the International Building Code; Chapter 24 of the 2009, or the 206, editions of the International Fire Code; and the NFPA 101 – Life Safety Code – for occupancies constructed.
For privacy and to accommodate 24/7 work schedules, windows are required to be able to close.
Flooring shall be in compliance with OSHA 29 CFR 1910.142
Accessible flooring shall be placed within all interior portions to provide a firm level working or living area. Prior to placing floors on the ground, an entomology service shall be utilized to eliminate potential bug or insect hazards. Periodic screenings and repeat applications shall be provided as needed to ensure inactivity. (However, if pests become a problem, the contractor is responsible for getting rid of them). Additional pest control programs shall be put in place where applicable and in accordance with OSHA 29 CFR 1910 and other applicable federal, state and local standards and requirements.
Lighting shall be provided at a rate of at least 20 foot candles and shall be placed on timers for blackout times to accommodate sleep schedules. All lights shall be National Electric Code (NEC) and Underwriters Laboratories (UL) listed for outdoor and wet conditions. Egress and emergency lighting shall be provided per 2006 International Fire Code, section 2403.
Standard accessible charging stations for electrical devices such as cellular phones and laptops shall be provided throughout the sleeping quarters to accommodate at least 20% of occupancy.
Fire Extinguishers shall be provided for each individual structure and sized appropriately for its occupancy and rated for Type ABC fires. Special areas such as kitchens may require other rated type extinguishers appropriate for their specific location.
Accessible sleeping cots or beds shall be provided for all occupants. If cots are used, they shall be constructed of nylon and aluminum or equivalent and have a minimum 300 lb. capacity. If beds are used, then new mattresses shall be Standard Twin 36"W x 75"L x 6"H, or larger, with inner-springs or coils. Foam mattresses may be substituted if approved in advance by the Contracting Officer. Pillow, blanket, sheets and pillow cases shall be provided with each cot or bed. Cots shall be placed in compliance with all applicable OSHA 29 CFR 1910 and 29 CFR 1926 standards and requirements.
The Contractor shall be required to provide sleeping bags or other items in the event the set billeting area temperatures are not maintained due to power failure, etc. Cots must meet all FEMA accessible design features.
Each occupant shall be provided with a personal storage box and lock (combination or key). The storage box/locker should be a minimum capacity of 4 cubic feet and with dimensions that allow it to be easily stored under or beside their bed.
C.15.2 ADMINISTRATIVE AREAS
The Contractor shall provide administrative areas equipped with internet access. If possible, these areas shall be within tented facilities or office trailers. These areas shall be used to house the Contractor’s OCONUS RSC management and the Task Order COR and representatives operations. The number of government personnel shall be determined at the TO level. These shall also be the locations for in-processing and out-processing of OCONUS RSC inhabitants and OCONUS RSC information boards.
The Contractor shall provide secure containers where security can discharge (clear) their weapons in any of the main areas throughout the OCONUS RSC.
C.15.3 SECURITY
Separate Security Housing outside the general population may be required but shall be identified in each Task Order Proposal Request (TOPR).
C.15.4 FENCING AND BARRICADES
The Contractor shall provide fencing and barricades around the perimeter of terrestrial OCONUS RSCs as set forth in the task order. The Contractor shall also provide fencing and barricades around areas which are “off limits” to occupants. Fencing and barricades are required within 36hours for “phased” setup timeframes, and 72 hours for the rest of the initial setup timeframe. This is to ensure the health and safety of occupants. Fences, barriers, and implemented separation mechanisms shall comply with federal, state, commonwealth, territorial, and other local regulation as applicable. Building codes, and regulations, as well as any applicable FEMA security requirements as defined by the Joint Field Office (JFO) Security Officer. All fences or barriers shall comply as a minimum with requirements set forth in UFAS or the Americans with Disabilities Act or other federal, state, commonwealth, territorial and or the local requirements. For non-terrestrial solutions such as barges or ships, the Contractor shall provide fencing and barricades to secure the entrance of the RSC.
C.15.5 COVERED WALKWAYS
Depending upon the location of the disaster covered walkways may be required. If covered, it must be in compliance with the National Fire Protection association NFPA, 101 “Life Safety Code”, International Building Code (IBC) 200 and American Society of Civil Engineers (ASCE) 7-05.
C.15.6 MEDICAL UNITS
The Contractor shall provide a medical unit staffed with, at a minimum, medical personnel certified in Advance Cardiac Life Support (ACLS) procedures 24 hours a day, 7 days a week, unless directed otherwise by the CO. The medical unit shall be licensed in the location they have been requested to establish the camp in. The Medical Unit shall be equipped to provide basic care for minor illness and injury; this shall include dispensing of common over the counter medications. Medical conditions that the medical unit must be prepared to respond to include but are not limited to frostbite, hypothermia, heat stroke and other conditions brought on by extreme temperature conditions. Medical personnel shall provide medical services to occupants and contractor employees 24 hours a day, seven days a week.
The Contractor shall immediately notify the agency point of contact of any occupant injuries or illnesses requiring any level of documentation and shall forward completed forms (to include all required information on the accident or illness, i n c l u d i n g medical documentation, fund code and type of hire (Ex: DAE, DTE, NDMS, etc.) to FEMA management via the agency’s point of contact within 24 hours of the notice to the Agency.
C.15.7 AUTOMATIC EXTERNAL DEFIBRILLATORS (AED)
Automatic External Defibrillators (AED) shall be placed in all areas of assembly (i.e., dining facility, Morale Welfare and Recreation (MWR), billeting). AEDs shall be located in proximity to the main entrance door and be marked with a large predominate sign.
C.15.8 RESTROOM FACILITIES
The Contractor shall provide disability accessible portable restroom facilities with flushing toilets at each OCONUS RSC to ensure compliance with all applicable OSHA 29 CFR 1910 and 29 CFR 1926 standards and requirements and all other federal, state and local applicable requirements. These units shall be designed and certified for use by the Portable Sanitation Association International. All units shall be fully serviced at least once daily, or more frequently as the site capacity requires or if directed by the National COR/Task Order COR. All waste water shall be collected with vacuum trucks and transported offsite and disposed at permitted treatment facilities. When available, public utilities shall be utilized.
Facilities shall be positioned, or the entrance to facilities shall be screened, to ensure privacy and prevent individuals walking by from seeing into the facility. The restrooms facilities shall be segregated by gender (i.e. male and female).
C.15.9 MOBILE SHOWER FACILITIES
The Contractor shall provide disability accessible mobile shower facilities to ensure compliance at a minimum with OSHA 29 CFR 1910 and 29 CFR 1926 as well as UFAS standards. Facilities shall be positioned, or the entrance to facilities shall be screened, to ensure privacy and prevent individuals walking by from seeing into the facility. Shower facilities shall have individual stalls, sinks with mirrors and outlets for hairdryers and shaving equipment shall be provided. Units shall have hot and cold water and shall be serviced with an American Society of Mechanical Engineers (ASME) rated propane water heater and an anti-scald valve for user safety. Heated water shall be provided at a minimum of 101 degrees Fahrenheit. Hand wash facilities shall be provided at OCONUS RSC to meet OCONUS RSC population demand. All showers and sink facilities shall be sanitized twice daily with a disinfecting solution. The shower facilities shall be segregated by gender (i.e. male and female).
C.15.10 LAUNDRY FACILITIES
The Contractor shall provide d i s a b i l i t y a c c e s s i b l e laundry services and shall ensure that clean, fresh linens and towels are available daily upon request by each occupant. This includes all towels for showers, bedding and any linens for the dining facility. These basic services shall be provided to all OCONUS RSC occupants and shall be included in the daily contract price.
A drop and fold service for OCONUS RSC occupants’ personal laundry shall be available for daily drop-off and pick-up. Laundry shall be done separately and individually for sanitation concerns. Drop off and pick-up service for OCONUS RSC occupants shall be provided with a maximum 24 hour turn-around time and service shall be included in base price.
The Contractor is also authorized to provide self-pay drop off and pick-up laundry service to authorized holders of OCONUS RSC Non- Occupant Visitor Identification cards. This service must be provided on a self-pay basis and the Contractor shall accept payment directly from the authorized OCONUS RSC visitors. No costs associated with providing this service shall be passed on to
FEMA.
C.15.11 MORALE WELFARE AND RECREATION (MWR)
The Contractor may be required to provide an accessible MWR facility, separate from the sleeping area.
This requirement is not required within the timelines listed in C.2.0; however when required, it must be established within 72 hours after the setup of the OCONUS RSC. This facility needs to be able to
Maintain a 10% capacity rate based on increase and decrease in OCONUS RSC population. This area shall have lights, power, HVAC and flooring. This area shall also have tables and chairs for reading and doing personal paperwork. The area shall have television and movie capabilities and seating for inhabitants to relax. The contractor shall provide:
• TVs with DVD players—there is no set number or size, but there must be enough so that personnel can watch TV.
• Closed Caption ready TVs.
• Internet access—can be wired or wireless—though wireless can service more users, the signal must be strong enough to keep a good connection.
• Standard charging stations for equipment like cell phones and laptops shall be provided throughout the MWR to accommodate at least 10% of occupancy.
• Numerous magazines, newspapers, books, and games (Adult Content Prohibited).
• Refrigerators and microwaves commensurate with OCONUS RSC capacity.
• Provide exercise equipment limited to treadmill and elliptical machine
• Provide gathering of tables and chairs for occupants socializing
C.15.12 HAND-WASHING STATIONS
The Contractor shall furnish sufficient hand-washing stations at each entrance to the dining area for personnel to use prior to entering and shall furnish sufficient hand-washing stations near restroom and billeting facilities in accordance with 29 CFR 1910 or 29 CFR 1926 requirements. Personnel shall not have to wait in line for more than five minutes to use a hand-washing station. The Contractor is responsible to ensure that the hand wash stations are disability accessible and remain stocked with water (hot and/or cold), hand soap and paper towels throughout the dining period. Hand sanitizing stations may be used in addition to hand- washing stations.
C.15.13 POWER AND HVAC
The Contractor shall provide power and HVAC as required to power the requirements of the OCONUS RSC. Available site utilities shall be specified in each task order. Temporary power and HVAC, when needed, shall be provided via mobile diesel generators and heating and cooling units sized to support the facility as required. Units shall be self-contained, and mobile and over the road transportable. Units shall be sound attenuated with noise levels rated at no higher than 69 dBA and a reasonable distance from the billeting to allow for proper sleep of OCONUS RSC occupants. Panels and transformers shall be placed as required by the site configuration. Distribution shall be provided with cam lock connectors and sized to applications. GFCI outlet boxes shall be placed throughout the facility as design requires. Wherever cabling crosses roadways or pedestrian areas, cable ramps shall be used for safety and protection. All electrical equipment shall be UL Listed and rated for NEMA 3R and 4 applications. Electrical systems shall be installed to NEC standard (National Electrical Codes) by licensed electrical personnel. When Required, HVAC shall be provided for all structures in sufficient capacities to meet different environmental conditions. All mobile HVAC units shall be operated on a digital thermostat control.
C.15.14 ENVIRONMENTAL CONTROL
The Contractor shall ensure that all facilities within the OCONUS RSC are equipped with reverse cycle (Heat and A/C) Environmental Control Units (ECUs) or comparable environmental control system capable of maintaining the ambient temperature inside the facilities at 72 +/-5 degrees Fahrenheit at all times.
C.16 OCONUS RSC OPERATIONS
C.16.1 PHOTO IDENTIFICATION CARDS
The Contractor shall furnish identification cards for all OCONUS RSC occupants and non-occupants requiring entry into the OCONUS RSC. Please see Section J for the standard format that shall be used when awarded a task order. (See C.19 Item 7 Contract Data R e q u i r em e n t List (CDRL)).
The Occupant Identification Card shall be used to access lodging, OCONUS RSC facilities, meals, and laundry services. The Occupant Identification Card shall be clearly distinctive from other categories of identification cards.
Non-Occupant Identification cards shall also be provided to authorized, non-occupant OCONUS RSC visitors and shall allow these authorized visitors access to the OCONUS RSC dining and laundry on a self-pay for services basis. The Non-Occupant Identification Card shall be clearly distinctive from other categories of identification cards.
All Contractor employees, including sub-contractors, shall have identifiable markings on their outer clothing displayed at all times. Contractor Identification badges shall display their name and photograph identifying they are employees of the Contractor which shall be visible at all times. These ID badges shall be clearly distinctive from other categories of ID badges stating “Under Contract to FEMA”. FEMA Security shall have a badge machine at the OCONUS RSC to issue badges to contractor personnel that have background checks and fingerprints completed on file. (**NOTE:
Contractor workers building the OCONUS RSC shall need badges at all times; this requirement applies to work performed even prior to full acceptance of OCONUS RSC site).
C.16.2 MEAL SERVICES AND DINING FACILITY
The Contractor shall provide a dining facility at each OCONUS RSC which shall meet or exceed OSHA 29 CFR 1910, 29 CFR 1926, and 2006 International Fire Code – Chapter 26 and NFPA 101 – Life Safety Code – Chapter 12 -New Assembly occupancy. Hours of operation will be specified at the task order level.
Contractor shall provide food preparation services capable of providing meals per feeding sufficient to meet OCONUS RSC occupancy levels. All meals may be prepared in accordance with the Army 14 Day Menu program (or equivalent like NIFC Mobile Food Services contract http://www.fs.fed.us/fire/contracting/index.htm) and may be enhanced based on individual chef specialties and skills. The Contractor shall prepare three meals per day (Breakfast, Lunch and Dinner).
Lunch meals shall be prepared as “take- away” bagged meals or hot boxed meals. Dinners shall be hot meals. The Contractor shall accommodate various dietary needs, including but not limited to vegetarian, vegan, kosher, halal or other dietary menu needs. Vegetarian meals shall at a minimum be prepared for the Ovo- Lacto vegetarian classification level and shall consist of the same quantities and items as regular meals with the exception that no meat, fish, or poultry shall be included. Non-meat protein substitutes shall be used in vegetarian sack lunches in lieu of meat, fish or poultry.
Snacks: Hot coffee, tea, bottled water and assorted snacks shall be made available twenty-four hours per day.
http://www.fs.fed.us/fire/contracting/index.htm) http://www.fs.fed.us/fire/contracting/index.htm)
Food supplies shall be staged in appropriate storage equipment, dry vans or refrigerated/freezer trailers until prepared. Meal counts for each meal shall be provided to the National COR/Task Order COR on a daily basis. The Contractor shall provide a dining facility adequate to feed the OCONUS RSC population within a four hour window or within a schedule as agreed to by the Contracting Officer via the National COR/ Task Order COR. The dining facility shall have adequate seating capacity to accommodate a minimum of 1/3 the OCONUS RSC occupancy level.
The Contractor shall ensure that all personnel entering or working in food preparation and/or serving areas shall be in compliance with local and State Health Codes and Regulations (i.e., wearing hairnets or disposable hats, washing hands, etc.). The Contractor shall ensure that food is prepared, stored, served and disposed of in accordance with all local, state and federal requirements and is subject to inspections from applicable public health personnel. Single-use, food-grade gloves shall be worn when serving meals.
The Contractor shall ensure that each Mobile Food Service Unit Manager and Supervisory Cook has a current Certificate of Completion for food service management, handling, and sanitation training.
C.16.3 MEAL PAYMENT
The Contractor is also authorized to provide meals to authorized holders of OCONUS RSC Non-Occupant Visitor Identification cards. These meals must be provided on a self-pay basis and the Contractor shall accept payment directly from the authorized OCONUS RSC visitors. No costs associated with providing this service shall be passed on to FEMA.
C.16.4 SANITATION INSPECTIONS
In addition to evaluations by the National COR/ Task Order COR, FEMA Safety, Health and Medical Readiness (SHMR) HMR representatives shall have access to the kitchen and dining area(s) to check for compliance with sanitation standards as required by local, state and federal regulations. This access shall be provided prior to the commencement of operations and randomly throughout the operation of the facilities.
The cleanliness of each space and related equipment shall be measured by means of the Food Service Sanitation Ordinance and Code, Part V of the Food Service Sanitation Manual, U.S. Public Health Service Publication 934 (1965) and all other applicable federal, state and local standards and requirement. When a food establishment exceeds critical violation limits, the establishment may be shut down until required sanitation standards are restored. The Contractor shall be responsible for any and all costs associated with closure due to the Contractor’s failure to maintain acceptable sanitation standards. The Contractor must have a plan in place to immediately mitigate deficiencies (e.g. remove food) upon notification of violation of regulations and completely remedy the situation within 24 hours.
C.16.5 ABLUTION
The Contractor shall provide potable water supply, shower facilities, hand wash stations, laundry facilities, portable flushing toilet/restroom units, and wastewater collection systems at each OCONUS RSC. All water supply equipment shall be rated for potable water supply in accordance with ANSI/NSF 42, 53, & 61 standards and applicable EPA and state and local regulations for potable water. Water systems shall be operated in accordance with all federal, state and local standards and requirements. Water Quality samples shall be obtained as required by the EPA and analyzed at a state certified lab for compliance with Safe Drinking Water Act requirements. All water testing reports shall be provided to FEMA for review as soon as results are received.
C.16.6 WASTE WATER
The Contractor shall ensure that wastewater from showers, laundry, hand-washing stations, restroom/toilet facilities and kitchen facilities and any other source shall be collected into pump stations and pumped to storage tanks. All on-site waste water shall be collected. Vacuum trucks shall maintain a service schedule to remove the wastewater from the tanks and transport offsite to dispose of at a permitted treatment facility. The collection and use of gray-water for on-site purposes may be permitted if au thorized by local authorities and implemented via a contract modification. Use of Containerized On-Site Waste Water Systems may be used if authorized by Contracting Officer through the National COR/Task Order COR. When available, public utilities shall be utilized.
C.16.7 SOLID WASTE COLLECTION AND DISPOSAL (DUMPSTERS)
The Contractor shall provide all necessary solid waste collection and disposal for the OCONUS RSC in accordance, EPA 40 CFR 243 and any additional state, and local regulations at least once per day. OCONUS RSC Contractors shall establish recycling programs in accordance with Presidential Executive Order 13423 and have a goal to recycle 35% of waste generated from OCONUS RSC operations. Items recycled must include at a minimum the following:
• Toner cartridges
• Batteries
• Scrap metal
• Fluorescent light bulbs
• Paper (white paper, mixed paper, newspaper)
• Cardboard
• Aluminum
• Wood pallets
• Plastic
• Glass
C.16.8 JANITORIAL SERVICES
The Contractor shall provide janitorial services for all components of the OCONUS RSC. All sleeping areas shall be cleaned once daily or more frequently if needed. The kitchen and dining facility shall be cleaned and sanitized after each meal. In the event that meals are eaten in shifts, the Contractor facility shall be cleaned after each shift. Cleaning and janitorial services should be performed sufficiently to keep the OCONUS RSC professionally clean and sanitary at all times.
Products and all other items used to furnish these services shall be compliant with that stated in Section C.9 “Contractor F u r n i s h e d Equipment and Supplies.”
C.17 OCONUS DEMOBILIZATION
The Contractor shall develop and present a demobilization plan to the appropriate personnel within 14 days of occupation of site (See C.19 Item 9 Contract Data Requirement List (CDRL)). The
Contractor shall demobilize the OCONUS RSC within seven days of notice, or as negotiated, by the Contracting Officer.
All associated costs for time and travel from the disaster incident after OCONUS RSC demobilization must be incorporated in the overall demobilization costs.
C.17.1 SITE RESTORATION
The Contractor shall demobilize the OCONUS RSC, clean the site, grade soil (if required), remove/dispose of all garbage and used materials and return the site to its original condition, minus reasonable wear and tear within seven days of the demobilization notice. The Contractor shall meet any special conditions established in the EHP review process for the return of the site to its original condi t ions .
C.17.2 UNSCHEDULED EMERGENCY DEMOBILIZTION
The Contractor shall have the capability to demobilize outside of harm’s way for immediate redeployment when a threatening situation puts the OCONUS RSC or responders at risk. The Contractor shall be capable of removing assets within 12 hours after receiving CO notification.
C.18 TRAINING
Two personnel from each contractor shall travel to and participate in a FEMA-sponsored conference every year. The conference shall be no more than four days long and is anticipated to be held in the National Capital Region; however, the exact time and location is TBD.
C.19 CONTRACT DATA REQUIREMENT LIST (CDRL)
The Contractor shall prepare the deliverables below and submit them to the entities specified in the chart:
Deliverable Item
PWS
REF.
TYPE WHAT TO INCLUDE HOW
OFTEN/WHEN
TO WHO
1 C.3.4 Equipment Inventory Report
All equipment (itemized used to erect and operate the
OCONUS RSC
Whether the equipment is owned/leased
Weekly CO, Administering Contracting Officer (ACO), National COR, and Task Order
COR
2 C.2.5 Written Compliance Report
Compliance with…