Attachment 13 Facilities Layout Information
View the file
Other files for this federal contract opportunity
Show all 37
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Training Operations and Support
Services – COBRATF
Attachment 13
COBRATF Facilities Layout and Information
Note:
D
L'.J
CINERAT R
BUILDING
MAINTENANCE
BUILDING
RESTROOMS
This drawing is for graphical representation only. Do not use this drawing for construction or estimation purposes. Arly contructor doing work on this building must provide field verification of all utilities, and oduol building layout
CODLING
TD\./ER
IBj
D D
ULIJ
NORTHVILLE
TRAINING
VENUE
-llf" r:c=J ~ LJ x (/) w 0... _J >--< Q_ _J
TOXIC AGENT
TRAINING
BUILDING
D
D
DEPARTMENT OF HOMELAND SECURITY
CENTER FOR DOMESTIC PREPAREDNESS
61 RESPONDER DRIVE
ANNISTON, AL 36205
256.847 .2142
DATE:
SCALE:
VERSION:
DRAWN BY:
CHECKB>BY:
APPROVED BY:
AD MIN
I BUILDING
' ''l ~, •. '·.•: ", ...... ·~ .
712412001 COBRA TRAINING FACILITY REVISIONS:
CUSTOM DATE: COMMENTS:
CURR9JT COBRA TF
B. Ke-JT 801 WALT PHILLIPS DRIVE
ANNISTON, AL 36205
COBRA Training Facility
DEPARTMENT OF HOMELAND SECURITY
CENTER FOR DOMESTIC PREPAREDNESS
61 RESPONDER DRIVE
ANNISTON, AL 36205
256.847.2142
Building Design and Condition Report:
COBRA Training Area-Guard House-Building 801-A
Gross Area 389 SF Year Built 2004 Site Acres Current Repair Cost $0.00 Replacement Cost $40,329
FCI 0.00%
Facility Description: This facility is a single story building, 389 Square Foot located between the parking area and the Administration Building on the COBRA Training Facility in Anniston Alabama. The building was constructed in 1986 and there have been no major additions.
1 Substructure The building rests on a slab-on-grade foundation that is not showing any signs of settlement or deterioration.
2 Shell The structure is brick veneer on CMU bearing walls. Roof construction is light weight concrete on steel deck. Exterior windows are steel sash with thermo pane glass. Exterior doors are hollow core metal in metal frames. Because of security features the entrances do not comply with ADA requirements.
3 Interiors Interior partition walls are painted CMU and drywall. Interior doors are hollow core metal in metal frames. Fittings include graphics, security pass-thru glass, toilet accessories, and shelving in fair to good condition. Toilet configuration and accessories are adequate but do not comply with ADA requirements. Floor finishes are primarily vinyl tile and ceramic tile in good condition. Ceiling finishes are acoustic panels in fair to good condition.
4 Plumbing Fixtures are original and in fair condition. Domestic water distribution is copper with cast iron waste in fair to good condition. Rainwater drain system is primarily gutters and downspouts. Domestic hot water is provided by an electric, wall hung water heater.
5 HVAC Heating and cooling is provided by packaged heat pumps in good condition. Fresh air is provided primarily by infiltration. Restroom ventilation is provided by a window and a small ceiling fan and appears adequate.
6 Electrical The electrical service is fed from the training building and is 277/480 Volt, 3 phase to a main distribution panel. Power distribution is copper, 3 wire grounded and is adequate. Lighting is primarily fluorescent with some incandescent and light levels appear adequate. Emergency power and light are present; exit signs are properly placed and illuminated.
COBRA Training Area-Administrative Building 801-B
Gross Area 15,376 SF Year Built 1986 Site Acres 37.1 Current Repair Cost $799,902 Replacement Cost $2,512,762
FCI 31.83%
Facility Description: The facility is a one story building 15,376 sq.ft. located on a 37.1 acres site close to the I 20 Interstate in Anniston Alabama. The building was constructed in 1986 and had a new roof installed in 2003.
1 Substructure The buildings rest on slab-on-grade foundations that are not showing signs of settlement or damage. The building does not have a basement.
2 Shell The superstructure is concrete frame. Floor construction is slab on grade. Roof construction is metal pan with lightweight fill. The exterior enclosure is comprised of walls of, CMU block. Water intrusion through the exterior wall is causing decalcification on the interior surfaces. Recommend investigation by a Professional Engineer to remedy this problem. Exterior windows are steel sash with fixed double pane. Exterior doors are hollow metal steel. Roofing is typically pitched with single ply membrane in good condition. Entrances do comply with ADA requirements.
3 Interiors Interior construction partition wall types typically include painted CMU with some drywall. Walls in the training bays are deck walls sealed at all junctions. Interior doors are generally hollow core metal doors, metal frames. Doors to the Training Bays are gas tight metal in sealed metal frames. Interior fittings include graphics, lockers, toilet accessories, shelving, handrails, toilet partitions in fair condition.
Toilet configurations and accessories are adequate and do comply with ADA requirements. Interior graphics and/or signage are adequate and do not appear to comply with ADA requirements. The interior wall finishes are typically painted CMU, tile, drywall generally in good condition. Floor finishes in common areas are typically, ceramic tile, vinyl composition tile and they are in good condition .Floor finishes in training bays are painted concrete. Ceiling finishes in common are typically suspended acoustical panels, 2x2, which are in good condition.
COBRA Training Area-Building 801-C
Gross Area 28,630 SF Year Built 1986 Site Acres 37.1 Current Repair Cost $1,208,907 Replacement Cost $5,147,136
FCI 23.49%
Facility Description: The facility is a two story building 28,630 sq.ft. located on a 37.1 acres site close to the I 20 Interstate in Anniston Alabama. The building was constructed in 1986 and had a new roof installed in 2003.
1 Substructure The buildings rest on slab-on-grade foundations that are not showing signs of settlement or damage. The building does not have a basement.
2 Shell The superstructure is concrete frame. Floor construction is slab on grade. Roof construction is metal pan with lightweight fill. The exterior enclosure is comprised of walls of CMU block. There appears to be a decalcification problem due to moisture. Exterior windows are steel sash with fixed double pane. Exterior doors are hollow metal steel. Roofing is typically pitched with single ply membrane in good condition. Entrances do comply with ADA requirements.
3 Interiors Interior construction partition wall types typically include painted CMU and some drywall. Walls in the Training Bays are deck walls sealed at all junctions. While the use of vinyl siding to cover the moisture intrusion on the CMU walls presents an appealing appearance, it presents a potential health issue. Recommend investigation by Professional Engineer to determine cause and provide a long term solution to the intrusion problem. Interior doors are generally hollow core metal doors, metal frames. Doors in the Training Bays are hermetic sealed. Interior fittings include graphics, lockers, toilet accessories, shelving, handrails, toilet partitions in fair condition. Toilet configurations and accessories are adequate but do not comply with ADA requirements. Interior graphics and/or signage are adequate but do not appear to comply with ADA requirements. The interior wall finishes are typically painted CMU, tile, drywall generally in good condition. Floor finishes in common areas are typically, ceramic tile, vinyl composition tile and they are in good condition .Floor finishes in training Bays are pained concrete. Ceiling finishes in common are typically suspended acoustical panels, 2x2, which are in good condition.
4 Conveying The building does not include conveying equipment.
5 Plumbing Fixtures are original and appear to be in good condition. Domestic water distribution is copper and is in good condition. Sanitary waste system is cast iron in good condition. Rain water system is a combination of roof drains and gutters with downspouts in good condition.
6 HVAC Heating is provided by gas fired boilers located in the incinerator building. Cooling is supplied by two York chillers that have been converted to R-123. Some modifications are needed to comply with the use of a Class 1B refrigerant. The heating/cooling distribution system is a 4-pipe system using air handlers, fan coil units and terminal units. Fresh air is supplied by air handling units. Roof mounted exhaust fans are installed in bathrooms and ventilation is adequate. Controls and instrumentation are pneumatic, digital and manual and are centrally controlled by an energy management system. The system balancing appears to be in good condition.
The training bays are served by special filtration systems located in 4479 to provide ventilation and contain specialty gases used for disaster training.
7 Fire Protection The building has a fire sprinkler system. Fire extinguishers and cabinets are distributed near fire exits and corridors
8 Electrical The electrical service is fed from a pad mounted, pole mounted transformer that delivers 277/480 V., 3-phase, 4-wire power to a main panel. Power distribution wiring is typically copper 3 wire grounded and is adequate. Additional power is needed to address planned future use of the facility. Lighting and branch wiring is typically 3 wire grounded serving a combination of surface-mounted and pendent-mounted fluorescent and some incandescent. Illumination is generally adequate.
Emergency power and lighting are present and exit signs are present at exit doors and near stairways and are typically illuminated.
9 Communications and Security
The fire alarm system consists of audible/strobe annunciators in common spaces, interior corridors, etc. and appears to comply with ADA requirements. The system is activated by pull stations and/or smoke detectors and is monitored at the guard shack. The telephone and data systems are separate and do not include dedicated closets or cabinets that are inadequately secured and cooled. The building includes an internal security system that is actuated by contact, infrared, and optical devices and is centrally monitored at the guard shack.
10 Other Electrical Systems
The building has two 500kW emergency generators. The building does have a dedicated grounding system and does not have a lightning protection system.
11 Equipment and Furnishings
The building does include fixed laundry, laboratory, and specialty medical equipment that is in good condition. The building does include fixed casework, window treatment, floor grilles and furnishings that are in good condition.
12 Upgrades Completed
2014 – Locker Room Shower Renovation $8000.00 2014 – Repipe New Water Heaters $5,000.00 2014 - Bridgeport PAC System Wire Upgrade $18,340.00 2014 – Safety Control Upgrade $10,000.00 2014 – Bay 7 Observation Deck Renovation $5,000.00 2014 – Purchased Snow Removal Equipment for Gators $6,000.00 2014 – Post 5 Guard House Upgrade $10,000.00
13 Projected Work 2015 – Cold Lab HVAC Upgrade $TBD
Building Design and Condition Report:
COBRA Incinerator Building 801-D
Gross Area 6,000 SF Year Built 1986 Site Acres 37.1 Current Repair Cost $14,144 Replacement Cost $1,016,776
FCI 1.39%
Facility Description: This slab on grade, steel frame, metal wall building houses the high temperature incinerator, autoclaves, hot water boilers and associated auxiliary equipment.
COBRA Operations and Maintenance Building 801-E
Gross Area 7,188 SF Year Built 1986 Site Acres 37.1 Current Repair Cost $158,936 Replacement Cost $610,114
FCI 26.05%
Facility Description: The facility is a one story building with a mezzanine 7,188 sq.ft. located on a 37.1 acres site close to the I 20 Interstate in Anniston Alabama. The building was constructed in 1986.
1 Substructure The buildings rest on slab-on-grade foundations that are not showing signs of settlement or damage. The building does not have a basement.
2 Shell The superstructure is concrete frame. Floor construction is slab on grade. Roof construction is metal pan with lightweight fill. The exterior enclosure is comprised of walls of, CMU block. Exterior windows are steel sash with fixed single pane. Exterior doors are hollow metal steel. Roofing is typically pitched with single ply membrane in good condition. Entrances do comply with ADA requirements.
3 Interiors Interior construction partition wall types typically include painted CMU with some drywall. Interior doors are generally hollow core metal doors, metal frames.
Interior fittings include graphics, lockers, toilet accessories, shelving, handrails, and toilet partitions in fair condition. Toilet configurations and accessories are adequate but do not comply with ADA requirements. Interior graphics and/or signage are inadequate and do not appear to comply with ADA requirements. The interior wall finishes are typically painted CMU, tile, drywall generally in good condition. Floor finishes are typically, concrete, vinyl composition tile and they are in fair condition. Ceiling finishes are typically plaster/wood which are in good condition.
Building Design and Condition Report:
COBRA Water Tower Building 801-F
Gross Area 900 SF Year Built 1986 Site Acres 37.1 Current Repair Cost $10,950 Replacement Cost $631,537
FCI 1.73%
Facility Description: Water tower, foundations, pumps and equipment.
COBRA Generator Building 4489
Gross Area 1,200 SF Year Built 2006 Site Acres 37.1 Current Repair Cost $0.00 Replacement Cost $942,560
FCI 0.00%
Facility Description: This slab-on-grade, metal wall, steel frame structure houses the new emergency generator.
Building Design and Condition Report:
COBRA Dress Out Building 4487
Gross Area 1,800 SF Year Built 2004 Site Acres 37.1 Current Repair Cost $0.00 Replacement Cost $117,051
FCI 0.00%
Facility Description: This building was constructed by Contractor in 2004 and is used as a dress out building and classroom.
Building Design and Condition Report:
COBRA Northville Buildings 4490-4494
Gross Area 4,600 SF Year Built 2000 Site Acres 37.1 Current Repair Cost $3,555 Replacement Cost $193,593
FCI 1.84%
Facility Description: The Northville Training Venue consists of five buildings of CMU walls, concrete slab, wood frame construction used for response training. The buildings have no mechanical services. Four buildings are approximately 800 Sq.Ft each with the center building of approximately 1200 Sq.Ft.
COBRA Post 5 Entry Control Point
Gross Area 600 SF Year Built 2004 Site Acres 37.1 Current Repair Cost 0% Replacement Cost $75,000.00
FCI 0%
Facility Description: The Entry Control Point Building consist of 600
SF.
Continued Work 2015 - Ongoing security upgrade to Entry Control Point, Project Description: upgrade barricade electrical, electronic, and mechanical controls.
Building Design and Condition Report:
Parking COBRA
Gross Area 505,296 SF Year Built 1986 Renovated 1998 Current Repair Cost 37.1 Replacement Cost $5,854
FCI $1,773,806
0.33%
Parking Lot
Surface Parking is available on-site. There is sufficient parking capacity for the occupants where 4 out of 119 are handicap spaces and path to building entrances does not comply with ADA requirements. Parking striping is in fair condition. Landscaping is indigenous, in good condition and is not irrigated. Drainage is generally adequate and is handled by surface discharge and area drains. Concrete sidewalks immediately adjacent to the facility are in fair condition with a few cracked/settled sections. There appears to be adequate site lighting for vehicular and pedestrian night traffic. The water supply is provided from the campus distribution system and appears to be in good condition. Fire water is provided from a campus fire water distribution system. The sanitary sewer system includes a lift station that delivers waste to the campus sanitary main system and appears to be in good condition. Storm water removal is provided by the campus storm water system.
Building Number and Description
Building # Description 4478 Pump House 4479 Post 5 4480 Guard House 4481 Admin Building 4482 Training Building 4483 Incinerator Pad 4484 O&M Building 4485 ID Filter Pad 4486 Water Tower 4487 Dress Out Bldg 4488 Warehouse 4489 Generator #1 4490 Northville Building #1 (Dr. Office) 4491 Northville Building #2 (Photo Lab/Pet Store) 4492 Northville Building #3 (2-Story Building) 4493 Northville Building #4 (Athletic Goods/Cell Phone) 4494 Northville Building #5 (Food Court) 4495 Parking Lot 4496 Northville Building #6 (Firehouse) 4497 Diesel Dike 4498 Waste Water Dike 4499 Northville 4500 1000 Meter Gate 4501 Power Substation 4502 Lift Station (Sewer System)
COBRATF Cobra Training Facility
MAJOR EQUIPMENT BY BUILDING NUMBER
Equipment by Building # Description 4478-BFV Backflow Valve 4478-EWH Electric Wall Heater 4478-M1 Motor 1 4478-M2 Motor 2 4478-P1 Pump 1 4478-P2 Pump 2 4479-AC AC Unit
4479-HWH Hot Water Heater (Post 5) 4479-SG1 Slide Gate 1 4479-SG2 Slide Gate 2 4479-SG3 Slide Gate 3 4479-SG4 Slide Gate 4 4479-SG5 Slide Gate 5 4480-AC AC Unit 4481-AC1 AC Unit 1 4481-AC2 AC Unit 2 4481-AC3 AC Unit 3 4481-AC4 AC Unit 4 4481-AC5 AC Unit 5 (Window Unit) 4482-AC1 Air Compressor -1 4482-AC2 Air Compressor -2 4482-AC3 Air Compressor -3 4482-ACL AC Unit (Lab)
4482-ACMC AC Unit (MINICAMS) 4482-ACMR AC Unit (Med Room) 4482-ACSC AC Unit (Safety Control) 4482-AH1 Air Handler -1
4482-AH10 Air Handler -10 4482-AH12 Air Handler -12
4482-AH13 AIR HANDLER 13
4482-AH14 Air Handler -14 4482-AH5 Air Handler -5 4482-AH8 Air Handler -8 4482-AH9 Air Handler -9 4482-BAM Breathing Air Machine
4482-CHILLER1 Chiller -1 4482-CHILLER2 Chiller -2
4482-CT Cooling Tower 4482-GEN2 Generator -2 4482-LRF Lab Refrigerator 4482-SG Slide Gate 4483-AC1 Auto Clave -1 4483-AC2 Auto Clave -2
4483-COND Condensate System 4483-DEAERATOR DeAerator System
4483-FAN1 Fan -1 (Anderson 2000) 4483-FAN2 Fan -2 (Combustion Air Blower)
4483-FAN3 Fan -3 (Pyrolizer Air Blower) 4483-INC Incinerator System (including main boiler) 4483-MCC MCC Room w/ HVAC on Roof 4483-PB1 Package Boiler -1 4483-PB2 Package Boiler -2 4483-PB3 Boiler #3 - Big Boiler
4483-SCRUB Scrubber System 4484-BH Backhoe
4484-DLIFT Dynalift 4484-FLD Forklift (Diesel) 4484-FLE Forklift (Electric)
4484-LEASE Lease Truck 4484-ML Manlift 4485-AC AC Unit
4485-ACSC N/A
4485-BAY1-2 Filter Pad Bank Bays 1 & 2 4485-BAY3-4 Filter Pad Bank Bays 3 & 4 4485-BAY5-6 Filter Pad Bank Bays 5 & 6 4485-BAY7 Filter Pad Bank Bay 7 4485-DOFF Filter Pad Bank Doff
4485-EIDMOTOR Emergency ID Motor on DOFF ID Filter Pad Bank 4485-HC Filter Pad Bank Hot Corridor 4485-HL Filter Pad Bank Hot Laundry
4485-LAB Filter Pad Bank Lab 4485-MC Filter Pad Bank Mask Check
4485-PBAM N/A
4486-ML Mechanical Level 4486-SP Sump Pump (Automatic) 4487-AC AC Unit
4489-PBAM Red Breathing Air Machine 4491-AC AC Unit (Window Unit) 4496-FT1 Firetruck -1 (Ford Pumper) 4496-FT2 Firetruck -2 (American LaFrance) 4497-DT Diesel Tank 4498-CT Caustic Tank
4498-NPWT Non-Potable Water Tank 4498-WWT Waste Water Tank
4500-SG Slide Gate 4501-T1 Transformer 1 4501-T2 Transformer 2 4502-AB Alarm Bell 4502-LF1 Level Float 1 4502-LF2 Level Float 2 4502-LF3 Level Float 3 4502-LF4 Level Float 4 4502-MCC Motor Control Cabinet 4502-P1 Pump 1
4502-P2 Pump 2 4502-WL Warning Light