Attachment 13 Facilities Layout Information

View the file

Other files for this federal contract opportunity

Other files attached to CDP COBRATF Training Operations and Support Services, newest first.
File Type Posted
HSFE20-15-R-0021_A00001.pdf PDF
HSFE20-15-R-0021_A00001_Site_Visit_Vendor_Attendance_List.pdf PDF
HSFE20-15-R-0021_A00001_Q A___1.pdf PDF
Attachment_30_CDP_Radiation_Safety_Program.pdf PDF
Attachment_8_List_of_Deliverables.pdf PDF
Attachment_3_DoL_SCA_Wage_Determination_2005-2001_Rev_14.pdf PDF
Attachment_2_QASP.pdf PDF
Attachment_17_Protective_Clothing_and_Equipment_Operations.pdf PDF
Attachment_22_Air_Monitoring_Plan.pdf PDF
Attachment_14_Laboratory_Operations.pdf PDF
Attachment_20_COBRATF_Student_Load_Exhibit.pdf PDF
Attachment_35_Safe_Handling_Storage_and_Use_of_Gas_Cylinders.pdf PDF
Attachment_7_CERP_Guidelines.pdf PDF
Attachment_19_Air_Monitoring_SOPs.pdf PDF
Attachment_34_COBRATF_Biosafety_Manual_for_BSL_2_Areas.pdf PDF
Attachment_1_TOSS_Performance_Work_Statement_3-23-15.pdf PDF
Attachment_26_Chemical_Hygiene_Plan.pdf PDF
Attachment_32_COBRATF_Quality_Manual.pdf PDF
Attachment_24_CDP_Safety_Plan_(COBRATF).pdf PDF
Attachment_16_Chemicals_Management.pdf PDF
HSFE20-15-R-0021_FINAL.pdf PDF
Attachment_28_Workplace_Safety_and_Health_Policy.pdf PDF
Attachment_27_CDP_Heat_and_Cold_Stress_Plan.pdf PDF
Attachment_6_Workplace_Attire_Policy.pdf PDF
Attachment_21Technical_Library_Index.pdf PDF
Attachment_15_Chem_Surety_Program_Standards_Document.pdf PDF
Attachment_33_COBRATF_Quality_Management_Procedure.pdf PDF
Attachment_29_Accident-Incident_Reporting_Procedures.pdf PDF
Attachment_31_Safety_Control_Operations.pdf PDF
Attachment_9_EOP_COOP_Plan.pdf PDF
Attachment_5_Visitor_Access_Policy.pdf PDF
Attachment_25_DuoDote_Auto_Injector.pdf PDF
Attachment_12_Vehicle_Management_Procedures.pdf PDF
Attachment_10_Incident_Management_Manual.pdf PDF
Attachment_18_Training_Operation_Support_Procedures.pdf PDF
Attachment_23_Air_Monitoring_Quality_Control_Plan.pdf PDF
Attachment_11_TOSS_GFE.pdf PDF
Show all 37

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Training Operations and Support

Services – COBRATF

Attachment 13

COBRATF Facilities Layout and Information

Note:

D

L'.J

CINERAT R

BUILDING

MAINTENANCE

BUILDING

RESTROOMS

This drawing is for graphical representation only. Do not use this drawing for construction or estimation purposes. Arly contructor doing work on this building must provide field verification of all utilities, and oduol building layout

CODLING

TD\./ER

IBj

D D

ULIJ

NORTHVILLE

TRAINING

VENUE

-llf" r:c=J ~ LJ x (/) w 0... _J >--< Q_ _J

TOXIC AGENT

TRAINING

BUILDING

D

D

DEPARTMENT OF HOMELAND SECURITY

CENTER FOR DOMESTIC PREPAREDNESS

61 RESPONDER DRIVE

ANNISTON, AL 36205

256.847 .2142

DATE:

SCALE:

VERSION:

DRAWN BY:

CHECKB>BY:

APPROVED BY:

AD MIN

I BUILDING

' ''l ~, •. '·.•: ", ...... ·~ .

712412001 COBRA TRAINING FACILITY REVISIONS:

CUSTOM DATE: COMMENTS:

CURR9JT COBRA TF

B. Ke-JT 801 WALT PHILLIPS DRIVE

ANNISTON, AL 36205

COBRA Training Facility

DEPARTMENT OF HOMELAND SECURITY

CENTER FOR DOMESTIC PREPAREDNESS

61 RESPONDER DRIVE

ANNISTON, AL 36205

256.847.2142

Building Design and Condition Report:

COBRA Training Area-Guard House-Building 801-A

Gross Area 389 SF Year Built 2004 Site Acres Current Repair Cost $0.00 Replacement Cost $40,329

FCI 0.00%

Facility Description: This facility is a single story building, 389 Square Foot located between the parking area and the Administration Building on the COBRA Training Facility in Anniston Alabama. The building was constructed in 1986 and there have been no major additions.

1 Substructure The building rests on a slab-on-grade foundation that is not showing any signs of settlement or deterioration.

2 Shell The structure is brick veneer on CMU bearing walls. Roof construction is light weight concrete on steel deck. Exterior windows are steel sash with thermo pane glass. Exterior doors are hollow core metal in metal frames. Because of security features the entrances do not comply with ADA requirements.

3 Interiors Interior partition walls are painted CMU and drywall. Interior doors are hollow core metal in metal frames. Fittings include graphics, security pass-thru glass, toilet accessories, and shelving in fair to good condition. Toilet configuration and accessories are adequate but do not comply with ADA requirements. Floor finishes are primarily vinyl tile and ceramic tile in good condition. Ceiling finishes are acoustic panels in fair to good condition.

4 Plumbing Fixtures are original and in fair condition. Domestic water distribution is copper with cast iron waste in fair to good condition. Rainwater drain system is primarily gutters and downspouts. Domestic hot water is provided by an electric, wall hung water heater.

5 HVAC Heating and cooling is provided by packaged heat pumps in good condition. Fresh air is provided primarily by infiltration. Restroom ventilation is provided by a window and a small ceiling fan and appears adequate.

6 Electrical The electrical service is fed from the training building and is 277/480 Volt, 3 phase to a main distribution panel. Power distribution is copper, 3 wire grounded and is adequate. Lighting is primarily fluorescent with some incandescent and light levels appear adequate. Emergency power and light are present; exit signs are properly placed and illuminated.

COBRA Training Area-Administrative Building 801-B

Gross Area 15,376 SF Year Built 1986 Site Acres 37.1 Current Repair Cost $799,902 Replacement Cost $2,512,762

FCI 31.83%

Facility Description: The facility is a one story building 15,376 sq.ft. located on a 37.1 acres site close to the I 20 Interstate in Anniston Alabama. The building was constructed in 1986 and had a new roof installed in 2003.

1 Substructure The buildings rest on slab-on-grade foundations that are not showing signs of settlement or damage. The building does not have a basement.

2 Shell The superstructure is concrete frame. Floor construction is slab on grade. Roof construction is metal pan with lightweight fill. The exterior enclosure is comprised of walls of, CMU block. Water intrusion through the exterior wall is causing decalcification on the interior surfaces. Recommend investigation by a Professional Engineer to remedy this problem. Exterior windows are steel sash with fixed double pane. Exterior doors are hollow metal steel. Roofing is typically pitched with single ply membrane in good condition. Entrances do comply with ADA requirements.

3 Interiors Interior construction partition wall types typically include painted CMU with some drywall. Walls in the training bays are deck walls sealed at all junctions. Interior doors are generally hollow core metal doors, metal frames. Doors to the Training Bays are gas tight metal in sealed metal frames. Interior fittings include graphics, lockers, toilet accessories, shelving, handrails, toilet partitions in fair condition.

Toilet configurations and accessories are adequate and do comply with ADA requirements. Interior graphics and/or signage are adequate and do not appear to comply with ADA requirements. The interior wall finishes are typically painted CMU, tile, drywall generally in good condition. Floor finishes in common areas are typically, ceramic tile, vinyl composition tile and they are in good condition .Floor finishes in training bays are painted concrete. Ceiling finishes in common are typically suspended acoustical panels, 2x2, which are in good condition.

COBRA Training Area-Building 801-C

Gross Area 28,630 SF Year Built 1986 Site Acres 37.1 Current Repair Cost $1,208,907 Replacement Cost $5,147,136

FCI 23.49%

Facility Description: The facility is a two story building 28,630 sq.ft. located on a 37.1 acres site close to the I 20 Interstate in Anniston Alabama. The building was constructed in 1986 and had a new roof installed in 2003.

1 Substructure The buildings rest on slab-on-grade foundations that are not showing signs of settlement or damage. The building does not have a basement.

2 Shell The superstructure is concrete frame. Floor construction is slab on grade. Roof construction is metal pan with lightweight fill. The exterior enclosure is comprised of walls of CMU block. There appears to be a decalcification problem due to moisture. Exterior windows are steel sash with fixed double pane. Exterior doors are hollow metal steel. Roofing is typically pitched with single ply membrane in good condition. Entrances do comply with ADA requirements.

3 Interiors Interior construction partition wall types typically include painted CMU and some drywall. Walls in the Training Bays are deck walls sealed at all junctions. While the use of vinyl siding to cover the moisture intrusion on the CMU walls presents an appealing appearance, it presents a potential health issue. Recommend investigation by Professional Engineer to determine cause and provide a long term solution to the intrusion problem. Interior doors are generally hollow core metal doors, metal frames. Doors in the Training Bays are hermetic sealed. Interior fittings include graphics, lockers, toilet accessories, shelving, handrails, toilet partitions in fair condition. Toilet configurations and accessories are adequate but do not comply with ADA requirements. Interior graphics and/or signage are adequate but do not appear to comply with ADA requirements. The interior wall finishes are typically painted CMU, tile, drywall generally in good condition. Floor finishes in common areas are typically, ceramic tile, vinyl composition tile and they are in good condition .Floor finishes in training Bays are pained concrete. Ceiling finishes in common are typically suspended acoustical panels, 2x2, which are in good condition.

4 Conveying The building does not include conveying equipment.

5 Plumbing Fixtures are original and appear to be in good condition. Domestic water distribution is copper and is in good condition. Sanitary waste system is cast iron in good condition. Rain water system is a combination of roof drains and gutters with downspouts in good condition.

6 HVAC Heating is provided by gas fired boilers located in the incinerator building. Cooling is supplied by two York chillers that have been converted to R-123. Some modifications are needed to comply with the use of a Class 1B refrigerant. The heating/cooling distribution system is a 4-pipe system using air handlers, fan coil units and terminal units. Fresh air is supplied by air handling units. Roof mounted exhaust fans are installed in bathrooms and ventilation is adequate. Controls and instrumentation are pneumatic, digital and manual and are centrally controlled by an energy management system. The system balancing appears to be in good condition.

The training bays are served by special filtration systems located in 4479 to provide ventilation and contain specialty gases used for disaster training.

7 Fire Protection The building has a fire sprinkler system. Fire extinguishers and cabinets are distributed near fire exits and corridors

8 Electrical The electrical service is fed from a pad mounted, pole mounted transformer that delivers 277/480 V., 3-phase, 4-wire power to a main panel. Power distribution wiring is typically copper 3 wire grounded and is adequate. Additional power is needed to address planned future use of the facility. Lighting and branch wiring is typically 3 wire grounded serving a combination of surface-mounted and pendent-mounted fluorescent and some incandescent. Illumination is generally adequate.

Emergency power and lighting are present and exit signs are present at exit doors and near stairways and are typically illuminated.

9 Communications and Security

The fire alarm system consists of audible/strobe annunciators in common spaces, interior corridors, etc. and appears to comply with ADA requirements. The system is activated by pull stations and/or smoke detectors and is monitored at the guard shack. The telephone and data systems are separate and do not include dedicated closets or cabinets that are inadequately secured and cooled. The building includes an internal security system that is actuated by contact, infrared, and optical devices and is centrally monitored at the guard shack.

10 Other Electrical Systems

The building has two 500kW emergency generators. The building does have a dedicated grounding system and does not have a lightning protection system.

11 Equipment and Furnishings

The building does include fixed laundry, laboratory, and specialty medical equipment that is in good condition. The building does include fixed casework, window treatment, floor grilles and furnishings that are in good condition.

12 Upgrades Completed

2014 – Locker Room Shower Renovation $8000.00 2014 – Repipe New Water Heaters $5,000.00 2014 - Bridgeport PAC System Wire Upgrade $18,340.00 2014 – Safety Control Upgrade $10,000.00 2014 – Bay 7 Observation Deck Renovation $5,000.00 2014 – Purchased Snow Removal Equipment for Gators $6,000.00 2014 – Post 5 Guard House Upgrade $10,000.00

13 Projected Work 2015 – Cold Lab HVAC Upgrade $TBD

Building Design and Condition Report:

COBRA Incinerator Building 801-D

Gross Area 6,000 SF Year Built 1986 Site Acres 37.1 Current Repair Cost $14,144 Replacement Cost $1,016,776

FCI 1.39%

Facility Description: This slab on grade, steel frame, metal wall building houses the high temperature incinerator, autoclaves, hot water boilers and associated auxiliary equipment.

COBRA Operations and Maintenance Building 801-E

Gross Area 7,188 SF Year Built 1986 Site Acres 37.1 Current Repair Cost $158,936 Replacement Cost $610,114

FCI 26.05%

Facility Description: The facility is a one story building with a mezzanine 7,188 sq.ft. located on a 37.1 acres site close to the I 20 Interstate in Anniston Alabama. The building was constructed in 1986.

1 Substructure The buildings rest on slab-on-grade foundations that are not showing signs of settlement or damage. The building does not have a basement.

2 Shell The superstructure is concrete frame. Floor construction is slab on grade. Roof construction is metal pan with lightweight fill. The exterior enclosure is comprised of walls of, CMU block. Exterior windows are steel sash with fixed single pane. Exterior doors are hollow metal steel. Roofing is typically pitched with single ply membrane in good condition. Entrances do comply with ADA requirements.

3 Interiors Interior construction partition wall types typically include painted CMU with some drywall. Interior doors are generally hollow core metal doors, metal frames.

Interior fittings include graphics, lockers, toilet accessories, shelving, handrails, and toilet partitions in fair condition. Toilet configurations and accessories are adequate but do not comply with ADA requirements. Interior graphics and/or signage are inadequate and do not appear to comply with ADA requirements. The interior wall finishes are typically painted CMU, tile, drywall generally in good condition. Floor finishes are typically, concrete, vinyl composition tile and they are in fair condition. Ceiling finishes are typically plaster/wood which are in good condition.

Building Design and Condition Report:

COBRA Water Tower Building 801-F

Gross Area 900 SF Year Built 1986 Site Acres 37.1 Current Repair Cost $10,950 Replacement Cost $631,537

FCI 1.73%

Facility Description: Water tower, foundations, pumps and equipment.

COBRA Generator Building 4489

Gross Area 1,200 SF Year Built 2006 Site Acres 37.1 Current Repair Cost $0.00 Replacement Cost $942,560

FCI 0.00%

Facility Description: This slab-on-grade, metal wall, steel frame structure houses the new emergency generator.

Building Design and Condition Report:

COBRA Dress Out Building 4487

Gross Area 1,800 SF Year Built 2004 Site Acres 37.1 Current Repair Cost $0.00 Replacement Cost $117,051

FCI 0.00%

Facility Description: This building was constructed by Contractor in 2004 and is used as a dress out building and classroom.

Building Design and Condition Report:

COBRA Northville Buildings 4490-4494

Gross Area 4,600 SF Year Built 2000 Site Acres 37.1 Current Repair Cost $3,555 Replacement Cost $193,593

FCI 1.84%

Facility Description: The Northville Training Venue consists of five buildings of CMU walls, concrete slab, wood frame construction used for response training. The buildings have no mechanical services. Four buildings are approximately 800 Sq.Ft each with the center building of approximately 1200 Sq.Ft.

COBRA Post 5 Entry Control Point

Gross Area 600 SF Year Built 2004 Site Acres 37.1 Current Repair Cost 0% Replacement Cost $75,000.00

FCI 0%

Facility Description: The Entry Control Point Building consist of 600

SF.

Continued Work 2015 - Ongoing security upgrade to Entry Control Point, Project Description: upgrade barricade electrical, electronic, and mechanical controls.

Building Design and Condition Report:

Parking COBRA

Gross Area 505,296 SF Year Built 1986 Renovated 1998 Current Repair Cost 37.1 Replacement Cost $5,854

FCI $1,773,806

0.33%

Parking Lot

Surface Parking is available on-site. There is sufficient parking capacity for the occupants where 4 out of 119 are handicap spaces and path to building entrances does not comply with ADA requirements. Parking striping is in fair condition. Landscaping is indigenous, in good condition and is not irrigated. Drainage is generally adequate and is handled by surface discharge and area drains. Concrete sidewalks immediately adjacent to the facility are in fair condition with a few cracked/settled sections. There appears to be adequate site lighting for vehicular and pedestrian night traffic. The water supply is provided from the campus distribution system and appears to be in good condition. Fire water is provided from a campus fire water distribution system. The sanitary sewer system includes a lift station that delivers waste to the campus sanitary main system and appears to be in good condition. Storm water removal is provided by the campus storm water system.

Building Number and Description

Building # Description 4478 Pump House 4479 Post 5 4480 Guard House 4481 Admin Building 4482 Training Building 4483 Incinerator Pad 4484 O&M Building 4485 ID Filter Pad 4486 Water Tower 4487 Dress Out Bldg 4488 Warehouse 4489 Generator #1 4490 Northville Building #1 (Dr. Office) 4491 Northville Building #2 (Photo Lab/Pet Store) 4492 Northville Building #3 (2-Story Building) 4493 Northville Building #4 (Athletic Goods/Cell Phone) 4494 Northville Building #5 (Food Court) 4495 Parking Lot 4496 Northville Building #6 (Firehouse) 4497 Diesel Dike 4498 Waste Water Dike 4499 Northville 4500 1000 Meter Gate 4501 Power Substation 4502 Lift Station (Sewer System)

COBRATF Cobra Training Facility

MAJOR EQUIPMENT BY BUILDING NUMBER

Equipment by Building # Description 4478-BFV Backflow Valve 4478-EWH Electric Wall Heater 4478-M1 Motor 1 4478-M2 Motor 2 4478-P1 Pump 1 4478-P2 Pump 2 4479-AC AC Unit

4479-HWH Hot Water Heater (Post 5) 4479-SG1 Slide Gate 1 4479-SG2 Slide Gate 2 4479-SG3 Slide Gate 3 4479-SG4 Slide Gate 4 4479-SG5 Slide Gate 5 4480-AC AC Unit 4481-AC1 AC Unit 1 4481-AC2 AC Unit 2 4481-AC3 AC Unit 3 4481-AC4 AC Unit 4 4481-AC5 AC Unit 5 (Window Unit) 4482-AC1 Air Compressor -1 4482-AC2 Air Compressor -2 4482-AC3 Air Compressor -3 4482-ACL AC Unit (Lab)

4482-ACMC AC Unit (MINICAMS) 4482-ACMR AC Unit (Med Room) 4482-ACSC AC Unit (Safety Control) 4482-AH1 Air Handler -1

4482-AH10 Air Handler -10 4482-AH12 Air Handler -12

4482-AH13 AIR HANDLER 13

4482-AH14 Air Handler -14 4482-AH5 Air Handler -5 4482-AH8 Air Handler -8 4482-AH9 Air Handler -9 4482-BAM Breathing Air Machine

4482-CHILLER1 Chiller -1 4482-CHILLER2 Chiller -2

4482-CT Cooling Tower 4482-GEN2 Generator -2 4482-LRF Lab Refrigerator 4482-SG Slide Gate 4483-AC1 Auto Clave -1 4483-AC2 Auto Clave -2

4483-COND Condensate System 4483-DEAERATOR DeAerator System

4483-FAN1 Fan -1 (Anderson 2000) 4483-FAN2 Fan -2 (Combustion Air Blower)

4483-FAN3 Fan -3 (Pyrolizer Air Blower) 4483-INC Incinerator System (including main boiler) 4483-MCC MCC Room w/ HVAC on Roof 4483-PB1 Package Boiler -1 4483-PB2 Package Boiler -2 4483-PB3 Boiler #3 - Big Boiler

4483-SCRUB Scrubber System 4484-BH Backhoe

4484-DLIFT Dynalift 4484-FLD Forklift (Diesel) 4484-FLE Forklift (Electric)

4484-LEASE Lease Truck 4484-ML Manlift 4485-AC AC Unit

4485-ACSC N/A

4485-BAY1-2 Filter Pad Bank Bays 1 & 2 4485-BAY3-4 Filter Pad Bank Bays 3 & 4 4485-BAY5-6 Filter Pad Bank Bays 5 & 6 4485-BAY7 Filter Pad Bank Bay 7 4485-DOFF Filter Pad Bank Doff

4485-EIDMOTOR Emergency ID Motor on DOFF ID Filter Pad Bank 4485-HC Filter Pad Bank Hot Corridor 4485-HL Filter Pad Bank Hot Laundry

4485-LAB Filter Pad Bank Lab 4485-MC Filter Pad Bank Mask Check

4485-PBAM N/A

4486-ML Mechanical Level 4486-SP Sump Pump (Automatic) 4487-AC AC Unit

4489-PBAM Red Breathing Air Machine 4491-AC AC Unit (Window Unit) 4496-FT1 Firetruck -1 (Ford Pumper) 4496-FT2 Firetruck -2 (American LaFrance) 4497-DT Diesel Tank 4498-CT Caustic Tank

4498-NPWT Non-Potable Water Tank 4498-WWT Waste Water Tank

4500-SG Slide Gate 4501-T1 Transformer 1 4501-T2 Transformer 2 4502-AB Alarm Bell 4502-LF1 Level Float 1 4502-LF2 Level Float 2 4502-LF3 Level Float 3 4502-LF4 Level Float 4 4502-MCC Motor Control Cabinet 4502-P1 Pump 1

4502-P2 Pump 2 4502-WL Warning Light