PRICE COST SCHEDULErevised 7-21-2011.pdf

PDF 35 KB Posted

Attached to
MAINTENANCE AND DEACTIVATION OF TEMPORARY HOUSING UNITS
Solicitation number
HSFE06-11-R-0014
Issued by

About this file

Revised Attachment B.1 Price/Cost Schedule

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MAINTENANCE AND DEACTIVATION REQUIREMENT

CLIN Description CLIN Type Unit

Issue Est. Qty Unit Price Total Price

0001 Direct Housing Unit Maintenance Phase-In/Transition Lump Sum Fee includes Transition, Accepting units and 1st thirty days Maintenance for accepted units. Time & Material EA 1 $ - $ -

MH/PM Monthly Maintenance: Per Assigned Unit.

Includes Routine/Preventive Maintenance making repairs, providing pest control services as required and call center operations. (Starting after Phase-In Month 2) Time & Material Monthly 50 $ - $ -

0003 Major Repairs. Written authorization is needed from the CO/COTR prior to use of this CLIN Time & Material EA 1 $ - $ -

Emergency Maintenance Service Call to eliminate a threat or hazard to the health, safety or security of the occupant. Time & Material EA 45 $ - $ -

ODC/Miscellaneous Maintenance: Any task which is not addressed in other sections of the SOW. Written authorization is needed from the CO/COTR prior to use of this CLIN Time & Material EA 66 $ - $ -

0006 Clean and Make Ready. (only to be used when unit is to be reoccupied Time & Material EA 1 $ - $ -

MH/PM Reposition Time & Material EA 1 $ - $ -

MH/PM Relocation Time & Material EA 1 $ - $ -

Power Pole/Pedestal and Meter Loop Time & Material EA 1 $ - $ -

0010 MH/PM Basic Deactivations (Includes Deactivation, Clean Unit and Fumigate if necessary. Time & Material EA 16 $ - $ -

MH/PM Emergency Deactivations Time & Material EA 2 $ - $ -

MH/PM Difficult Site (Hard Tow) Time & Material EA 2 $ - $ -

MH/PM Transportation Additional Mileage over 150 miles (covers Deactivation, Installations, Re- Installations, and Relocations Time & Material Per Mile 50,000 $ - $ -

MH/PM Unit Installation (Includes Hauling, Installing, Site Preparation, Blocking and Leveling, Anchoring and Straps, Installing Standard Steps, Clean and Make Ready for Occupancy. Time & Material EA 1 $ - $ -

Install UFAS Compliant Platform Steps Time & Material EA 1 $ - $ -

Install UFAS Compliant Ramp up to 30" Time & Material EA 1 $ - $ -

Install UFAS Compliant Ramp Per Foot over 30 Feet Time & Material Per Foot 25 $ - $ -

BASE PERIOD

Subtotal for Base Period

CLIN Description CLIN Type Unit

Issue Est. Qty Unit Price Total Price

1001 Direct Housing Unit Maintenance Phase-In/Transition Lump Sum Fee includes Transition, Accepting units and 1st thirty days Maintenance for accepted units. Time & Material EA 1 $ - $ -

MH/PM Monthly Maintenance: Per Assigned Unit.

Includes Routine/Preventive Maintenance making repairs, providing pest control services as required and call center operations. (Starting after Phase-In Month 2) Time & Material Monthly 50 $ - $ -

1003 Major Repairs. Written authorization is needed from the CO/COTR prior to use of this CLIN Time & Material EA 1 $ - $ -

Emergency Maintenance Service Call to eliminate a threat or hazard to the health, safety or security of the occupant. Time & Material EA 45 $ - $ -

ODC/Miscellaneous Maintenance: Any task which is not addressed in other sections of the SOW. Written authorization is needed from the CO/COTR prior to use of this CLIN Time & Material EA 66 $ - $ -

1006 Clean and Make Ready. (only to be used when unit is to be reoccupied Time & Material EA 1 $ - $ -

MH/PM Reposition Time & Material EA 1 $ - $ -

MH/PM Relocation Time & Material EA 1 $ - $ -

Power Pole/Pedestal and Meter Loop Time & Material EA 1 $ - $ -

1010 MH/PM Basic Deactivations (Includes Deactivation, Clean Unit and Fumigate if necessary. Time & Material EA 50 $ - $ -

MH/PM Emergency Deactivations Time & Material EA 2 $ - $ -

MH/PM Difficult Site (Hard Tow) Time & Material EA 2 $ - $ -

MH/PM Transportation Additional Mileage over 150 miles (covers Deactivation, Installations, Re- Installations, and Relocations Time & Material Per Mile 50,000 $ - $ -

MH/PM Unit Installation (Includes Hauling, Installing, Site Preparation, Blocking and Leveling, Anchoring and Straps, Installing Standard Steps, Clean and Make Ready for Occupancy. Time & Material EA 1 $ - $ -

Install UFAS Compliant Platform Steps Time & Material EA 1 $ - $ -

Install UFAS Compliant Ramp up to 30" Time & Material EA 1 $ - $ -

Install UFAS Compliant Ramp Per Foot over 30 Feet Time & Material Per Foot 25 $ - $ -

OPTION PERIOD 1

Subtotal for Option Period 1

MAINTENANCE AND DEACTIVATION REQUIREMENT

CLIN Description CLIN Type Unit

Issue Est. Qty Unit Price Total Price

2001 Direct Housing Unit Maintenance Phase-In/Transition Lump Sum Fee includes Transition, Accepting units and 1st thirty days Maintenance for accepted units. Time & Material EA 1 $ - $ -

MH/PM Monthly Maintenance: Per Assigned Unit.

Includes Routine/Preventive Maintenance making repairs, providing pest control services as required and call center operations. (Starting after Phase-In Month 2) Time & Material Monthly 50 $ - $ -

2003 Major Repairs. Written authorization is needed from the CO/COTR prior to use of this CLIN Time & Material EA 1 $ - $ -

Emergency Maintenance Service Call to eliminate a threat or hazard to the health, safety or security of the occupant. Time & Material EA 45 $ - $ -

ODC/Miscellaneous Maintenance: Any task which is not addressed in other sections of the SOW. Written authorization is needed from the CO/COTR prior to use of this CLIN Time & Material EA 66 $ - $ -

2006 Clean and Make Ready. (only to be used when unit is to be reoccupied Time & Material EA 1 $ - $ -

MH/PM Reposition Time & Material EA 1 $ - $ -

MH/PM Relocation Time & Material EA 1 $ - $ -

Power Pole/Pedestal and Meter Loop Time & Material EA 1 $ - $ -

2010 MH/PM Basic Deactivations (Includes Deactivation, Clean Unit and Fumigate if necessary. Time & Material EA 50 $ - $ -

MH/PM Emergency Deactivations Time & Material EA 2 $ - $ -

MH/PM Difficult Site (Hard Tow) Time & Material EA 2 $ - $ -

MH/PM Transportation Additional Mileage over 150 miles (covers Deactivation, Installations, Re- Installations, and Relocations Time & Material Per Mile 50,000 $ - $ -

MH/PM Unit Installation (Includes Hauling, Installing, Site Preparation, Blocking and Leveling, Anchoring and Straps, Installing Standard Steps, Clean and Make Ready for Occupancy. Time & Material EA 1 $ - $ -

Install UFAS Compliant Platform Steps Time & Material EA 1 $ - $ -

Install UFAS Compliant Ramp up to 30" Time & Material EA 1 $ - $ -

Install UFAS Compliant Ramp Per Foot over 30 Feet Time & Material Per Foot 25 $ - $ -

$ - GRANT TOTAL

OPTION PERIOD 2

Subtotal Option Period 2

CLIN Table

File details come from the government source that posted it. Updated .