CLIN'S PRICE COST SCHEDULE(final revised)2.pdf
PDF 35 KB Posted
- Solicitation number
- HSFE06-11-R-0014
About this file
Attachment B.1 Price/Cost Schedule.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MAINTENANCE AND DEACTIVATION REQUIREMENT
CLIN Description CLIN Type Unit
Issue Est. Qty Unit Price Total Price
0001 Direct Housing Unit Maintenance Phase-In/Transition Lump Sum Fee includes Transition, Accepting units and 1st thirty days Maintenance for accepted units. Time & Material EA 1 $ - $ -
MH/PM Monthly Maintenance: Per Assigned Unit.
Includes Routine/Preventive Maintenance making repairs, providing pest control services as required and call center operations. (Starting after Phase-In Month 2) Time & Material Monthly 50 $ - $ -
0003 Major Repairs. Written authorization is needed from the CO/COTR prior to use of this CLIN Time & Material EA 1 $ - $ -
Emergency Maintenance Service Call to eliminate a threat or hazard to the health, safety or security of the occupant. Time & Material EA 45 $ - $ -
ODC/Miscellaneous Maintenance: Any task which is not addressed in other sections of the SOW. Written authorization is needed from the CO/COTR prior to use of this CLIN (See RFP Section E.6 Page 41) Time & Material EA N/A $ - $ 20,000.00
0006 Clean and Make Ready. (only to be used when unit is to be reoccupied Time & Material EA 1 $ - $ -
MH/PM Reposition Time & Material EA 1 $ - $ -
MH/PM Relocation Time & Material EA 1 $ - $ -
Power Pole/Pedestal and Meter Loop Time & Material EA 1 $ - $ -
0010 MH/PM Basic Deactivations (Includes Deactivation, Clean Unit and Fumigate if necessary. Time & Material EA 16 $ - $ -
MH/PM Emergency Deactivations Time & Material EA 2 $ - $ -
MH/PM Difficult Site (Hard Tow) Time & Material EA 2 $ - $ -
MH/PM Transportation Additional Mileage over 150 miles (covers Deactivation, Installations, Re- Installations, and Relocations Time & Material Per Mile 50,000 $ - $ -
MH/PM Unit Installation (Includes Hauling, Installing, Site Preparation, Blocking and Leveling, Anchoring and Straps, Installing Standard Steps, Clean and Make Ready for Occupancy. Time & Material EA 1 $ - $ -
Install UFAS Compliant Platform Steps Time & Material EA 1 $ - $ -
Install UFAS Compliant Ramp up to 30" Time & Material EA 1 $ - $ -
Install UFAS Compliant Ramp Per Foot over 30 Feet Time & Material Per Foot 25 $ - $ -
BASE PERIOD
Subtotal for Base Period
CLIN Description CLIN Type Unit
Issue Est. Qty Unit Price Total Price
1001 Direct Housing Unit Maintenance Phase-In/Transition Lump Sum Fee includes Transition, Accepting units and 1st thirty days Maintenance for accepted units. Time & Material EA 1 $ - $ -
MH/PM Monthly Maintenance: Per Assigned Unit.
Includes Routine/Preventive Maintenance making repairs, providing pest control services as required and call center operations. (Starting after Phase-In Month 2) Time & Material Monthly 50 $ - $ -
1003 Major Repairs. Written authorization is needed from the CO/COTR prior to use of this CLIN Time & Material EA 1 $ - $ -
Emergency Maintenance Service Call to eliminate a threat or hazard to the health, safety or security of the occupant. Time & Material EA 45 $ - $ -
ODC/Miscellaneous Maintenance: Any task which is not addressed in other sections of the SOW. Written authorization is needed from the CO/COTR prior to use of this CLIN (See RFP Section E.6 Page 41) Time & Material EA N/A $ - $ 20,000.00
1006 Clean and Make Ready. (only to be used when unit is to be reoccupied Time & Material EA 1 $ - $ -
MH/PM Reposition Time & Material EA 1 $ - $ -
MH/PM Relocation Time & Material EA 1 $ - $ -
Power Pole/Pedestal and Meter Loop Time & Material EA 1 $ - $ -
1010 MH/PM Basic Deactivations (Includes Deactivation, Clean Unit and Fumigate if necessary. Time & Material EA 50 $ - $ -
MH/PM Emergency Deactivations Time & Material EA 2 $ - $ -
MH/PM Difficult Site (Hard Tow) Time & Material EA 2 $ - $ -
MH/PM Transportation Additional Mileage over 150 miles (covers Deactivation, Installations, Re- Installations, and Relocations Time & Material Per Mile 50,000 $ - $ -
MH/PM Unit Installation (Includes Hauling, Installing, Site Preparation, Blocking and Leveling, Anchoring and Straps, Installing Standard Steps, Clean and Make Ready for Occupancy. Time & Material EA 1 $ - $ -
Install UFAS Compliant Platform Steps Time & Material EA 1 $ - $ -
Install UFAS Compliant Ramp up to 30" Time & Material EA 1 $ - $ -
Install UFAS Compliant Ramp Per Foot over 30 Feet Time & Material Per Foot 25 $ - $ -
OPTION PERIOD 1
Subtotal for Option Period 1
MAINTENANCE AND DEACTIVATION REQUIREMENT
CLIN Description CLIN Type Unit
Issue Est. Qty Unit Price Total Price
2001 Direct Housing Unit Maintenance Phase-In/Transition Lump Sum Fee includes Transition, Accepting units and 1st thirty days Maintenance for accepted units. Time & Material EA 1 $ - $ -
MH/PM Monthly Maintenance: Per Assigned Unit.
Includes Routine/Preventive Maintenance making repairs, providing pest control services as required and call center operations. (Starting after Phase-In Month 2) Time & Material Monthly 50 $ - $ -
2003 Major Repairs. Written authorization is needed from the CO/COTR prior to use of this CLIN Time & Material EA 1 $ - $ -
Emergency Maintenance Service Call to eliminate a threat or hazard to the health, safety or security of the occupant. Time & Material EA 45 $ - $ -
ODC/Miscellaneous Maintenance: Any task which is not addressed in other sections of the SOW. Written authorization is needed from the CO/COTR prior to use of this CLIN (See RFP Section E.6 Page 41) Time & Material EA N/A $ - $ 20,000.00
2006 Clean and Make Ready. (only to be used when unit is to be reoccupied Time & Material EA 1 $ - $ -
MH/PM Reposition Time & Material EA 1 $ - $ -
MH/PM Relocation Time & Material EA 1 $ - $ -
Power Pole/Pedestal and Meter Loop Time & Material EA 1 $ - $ -
2010 MH/PM Basic Deactivations (Includes Deactivation, Clean Unit and Fumigate if necessary. Time & Material EA 50 $ - $ -
MH/PM Emergency Deactivations Time & Material EA 2 $ - $ -
MH/PM Difficult Site (Hard Tow) Time & Material EA 2 $ - $ -
MH/PM Transportation Additional Mileage over 150 miles (covers Deactivation, Installations, Re- Installations, and Relocations Time & Material Per Mile 50,000 $ - $ -
MH/PM Unit Installation (Includes Hauling, Installing, Site Preparation, Blocking and Leveling, Anchoring and Straps, Installing Standard Steps, Clean and Make Ready for Occupancy. Time & Material EA 1 $ - $ -
Install UFAS Compliant Platform Steps Time & Material EA 1 $ - $ -
Install UFAS Compliant Ramp up to 30" Time & Material EA 1 $ - $ -
Install UFAS Compliant Ramp Per Foot over 30 Feet Time & Material Per Foot 25 $ - $ -
$ - GRANT TOTAL
OPTION PERIOD 2
Subtotal Option Period 2
CLIN Table
File details come from the government source that posted it. Updated .