18_ATTCH_4New Past Performance Questionaire

41 KB Posted

Attached to
District 14 (Hawaii & Guam) electronics maintenance services
Solicitation number
HSCG89-09-R-65M206
Issued by

About this file

ATTCH 4 Past Performance Questionaire

Text of this file

HSCG89-09-R-65M206

District 14

PAST

PERFORMANCE

SURVEY

NAME OF OFFEROR:_______________________________________________________________________

PROJECT REFERENCED:

1. Title:_____________________________________________________________________________________

2. Contract or Identifying Number:_______________________________________________________________

3. Period of Performance:___________________________ Dollar Value: ________________________________

4. Description of services performed:______________________________________________________________ Relevant Experience and Complexity:

Preventive and Emergency Maintenance Services?________________________________________________________ VHF-FM radio, Nationwide Automated Information Systems, Microwave Communications Systems and associated Components Maintained?_______________________________________________________________________________________________________________________________________________________________________________________________ Generators Maintenance and Fueling Services?____________________________________________________________ Property Management?__________________________________________________________________________________ 24/7 casualty response?___________________________________________________________________________________ Questionnaire Completed by: ________________________________________Date:______________________

Company: ____________________________________ Title:_________________________________________

Phone Number: ________________________________ Fax Number:___________________________________

Rate the contractor in the listed performance areas utilizing the following guide. Circle appropriate response for yes/no questions. Please provide comments.

Ratings:

E = Excellent S= Satisfactory U = Unsatisfactory

N = Not Observed

A. CUSTOMER SERVICE QUALITY:

1. Did Contractor meet quality requirements of the product or service?

E S U N

Comments:_______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

2. . Was there a commitment on the contractor’s part to provide effective customer service? If not, please explain.

Yes No Comments:_______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

3. Would you recommend or conduct business with this contractor again? If not, please explain.

Yes No

Comments:_______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Overall rating:____________

B. CONTRACT ADMINISTRATION HISTORY (Contracting Office fills out))

1. Has the contractor been issued Contract Discrepancy Reports (CDR’s) and if so, was the problem corrected satisfactorily?

No

2. Was there an excessive amount of CDR’s issued?

3. Have either a Cure Notice or Show Cause Letter ever been issued to the contractor?

4. When applicable, does the contractor properly handle and dispose of hazardous waste?

5. Does the contractor comply with all applicable labor standards?

6. Has an election ever been made to not exercise an option due to contractor’s poor performance? If yes, please explain.

7. Was communication with the contractor cooperative, responsive and productive? (Response to modifications, letters, etc.)

Yes No

C. CONTRACT PERFORMANCE

1. Was the contractor timely in delivery of preventive maintenance services to the contracted schedule?

3. Was the contractor timely in responding to emergency site outages, if any?

4. Has the contractor been assessed any liquidated damages or deductions for late or non-performance of services?

5. Was the contractor timely in providing reports for services provided, if any?

6. Did the contractor fail any property or inventory audits?

E S U N

Overall Rating: _______________

COMMENTS:___________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

D. COST CONTROL

1. Have there been any indications that the contractor has had any financial problems?

Yes

No (If yes, please explain.)

Comments: ________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

2. Does the contractor have any outstanding claims or debts in excess of $2,500? Yes No (If yes, please explain)_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

3. Overall Rating: _______________

E. SUMMARY

1. What would be your overall and final rating for this contractor?

E S U N Past performance Questionnaire, (to be filled out by Customer, and Mail directly to Coast Guard, kathryn .m.rato@uscg.mil)

ATTCH4

Other files

File Type Posted
Amendment1toSol.pdf PDF
QuestionAmendment1.doc DOC document
8.5_D14 TE-3 to TE-5 2_090508adc_Rev2 —
15_ATTCH2_TE8_CDR.doc DOC document
20_05-2147.txt TXT text file
4_ATTCH_1_D14 Electronic Maint_QASP.doc DOC document
17_TE-9_2 2006 NDS Hawaii Trouble Calls.pdf PDF
14_D14 TE-7 NDS Circuit Block Diagram 090507adc.pdf PDF
DHSform700-5.pdf PDF
1_1449.doc DOC document
17_TE 9_1 2007 NDS_Hawaii Trouble Calls.pdf PDF
3_FINALREVINSTURCTIONSTOOFFEROR —
7_TE-2-1 POINTS OF CONTACT.doc DOC document
8_TE-2-2 D14 site map.pdf PDF
6_TE-1_D14_Electronics Maintenance PRS —
19_05-2153.txt TXT text file
13TE-6 NAIS Preventive Maintenance and Spares Data —
21_ATTCH_6SmallBiz_Plan_format.pdf PDF
8.5_D14 TE-3 to TE-5 2_090508adc_Rev2 —
5_D14_NDS NAIS Maintenance PWS_090804adc_Rev3.doc DOC document
17.4Corrective Maintenance History TE9 GUAM.doc DOC document
2_ADDENDUM FAR 52a.doc DOC document
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .