15_ATTCH2_TE8_CDR.doc
DOC document 31 KB Posted
- Solicitation number
- HSCG89-09-R-65M206
About this file
Te-8 Contractor Defiency Report CDR
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment1toSol.pdf | ||
| QuestionAmendment1.doc | DOC document | |
| 8.5_D14 TE-3 to TE-5 2_090508adc_Rev2 | — | |
| 20_05-2147.txt | TXT text file | |
| 4_ATTCH_1_D14 Electronic Maint_QASP.doc | DOC document | |
| 17_TE-9_2 2006 NDS Hawaii Trouble Calls.pdf | ||
| 14_D14 TE-7 NDS Circuit Block Diagram 090507adc.pdf | ||
| DHSform700-5.pdf | ||
| 1_1449.doc | DOC document | |
| 17_TE 9_1 2007 NDS_Hawaii Trouble Calls.pdf | ||
| 18_ATTCH_4New Past Performance Questionaire | — | |
| 3_FINALREVINSTURCTIONSTOOFFEROR | — | |
| 7_TE-2-1 POINTS OF CONTACT.doc | DOC document | |
| 8_TE-2-2 D14 site map.pdf | ||
| 6_TE-1_D14_Electronics Maintenance PRS | — | |
| 19_05-2153.txt | TXT text file | |
| 13TE-6 NAIS Preventive Maintenance and Spares Data | — | |
| 21_ATTCH_6SmallBiz_Plan_format.pdf | ||
| 8.5_D14 TE-3 to TE-5 2_090508adc_Rev2 | — | |
| 5_D14_NDS NAIS Maintenance PWS_090804adc_Rev3.doc | DOC document | |
| 17.4Corrective Maintenance History TE9 GUAM.doc | DOC document | |
| 2_ADDENDUM FAR 52a.doc | DOC document |
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HSCG89-09-R-65M206
ATTCH 2 TE-8
U. S. COAST GUARD
CONTRACT DISCREPANY REPORT (CDR)
1. Contract No._____________DO#_______2. FY______3. Report # _____
4. TO: (Contractor/QCI)________________________________________
5. FROM:
(COTR/QAE)_____________________________________________
6. DATES:
Prepared | Oral Notification | Returned by Contractor | Action Complete
1. Discrepancy or Problem (Describe in detail; include references to PWS paragraph or other contract clause or provision; attach continuation sheet if necessary; COTR/QAE shall cite applicable QC program procedure(s))
8.
TO:
(Contracting Officer)_______________________________
9.
FROM:
(Contractor)________________________________________
10. Contractor’s response as to cause, corrective action and actions to prevent recurrence. Attach continuation sheet if necessary.
11. Signature of Contractor’s Representative:
________________________________________________Date__________
12. Government Evaluation: acceptance, partial acceptance, rejection. Attach continuation sheet if necessary.
13. Government Actions: payment deductions, performance evaluation meetings, or other actions.
14. Closeout Actions: contractor notified; by whom/date; follow-up actions pending.
File details come from the government source that posted it. Updated .