15_ATTCH2_TE8_CDR.doc

DOC document 31 KB Posted

Attached to
District 14 (Hawaii & Guam) electronics maintenance services
Solicitation number
HSCG89-09-R-65M206
Issued by

About this file

Te-8 Contractor Defiency Report CDR

View the file

Other files

File Type Posted
Amendment1toSol.pdf PDF
QuestionAmendment1.doc DOC document
8.5_D14 TE-3 to TE-5 2_090508adc_Rev2 —
20_05-2147.txt TXT text file
4_ATTCH_1_D14 Electronic Maint_QASP.doc DOC document
17_TE-9_2 2006 NDS Hawaii Trouble Calls.pdf PDF
14_D14 TE-7 NDS Circuit Block Diagram 090507adc.pdf PDF
DHSform700-5.pdf PDF
1_1449.doc DOC document
17_TE 9_1 2007 NDS_Hawaii Trouble Calls.pdf PDF
18_ATTCH_4New Past Performance Questionaire —
3_FINALREVINSTURCTIONSTOOFFEROR —
7_TE-2-1 POINTS OF CONTACT.doc DOC document
8_TE-2-2 D14 site map.pdf PDF
6_TE-1_D14_Electronics Maintenance PRS —
19_05-2153.txt TXT text file
13TE-6 NAIS Preventive Maintenance and Spares Data —
21_ATTCH_6SmallBiz_Plan_format.pdf PDF
8.5_D14 TE-3 to TE-5 2_090508adc_Rev2 —
5_D14_NDS NAIS Maintenance PWS_090804adc_Rev3.doc DOC document
17.4Corrective Maintenance History TE9 GUAM.doc DOC document
2_ADDENDUM FAR 52a.doc DOC document
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HSCG89-09-R-65M206

ATTCH 2 TE-8

U. S. COAST GUARD

CONTRACT DISCREPANY REPORT (CDR)

1. Contract No._____________DO#_______2. FY______3. Report # _____

4. TO: (Contractor/QCI)________________________________________

5. FROM:

(COTR/QAE)_____________________________________________

6. DATES:

Prepared | Oral Notification | Returned by Contractor | Action Complete

1. Discrepancy or Problem (Describe in detail; include references to PWS paragraph or other contract clause or provision; attach continuation sheet if necessary; COTR/QAE shall cite applicable QC program procedure(s))

8.

TO:

(Contracting Officer)_______________________________

9.

FROM:

(Contractor)________________________________________

10. Contractor’s response as to cause, corrective action and actions to prevent recurrence. Attach continuation sheet if necessary.

11. Signature of Contractor’s Representative:

________________________________________________Date__________

12. Government Evaluation: acceptance, partial acceptance, rejection. Attach continuation sheet if necessary.

13. Government Actions: payment deductions, performance evaluation meetings, or other actions.

14. Closeout Actions: contractor notified; by whom/date; follow-up actions pending.

File details come from the government source that posted it. Updated .