General_Decision_Number.pdf
PDF 52 KB Posted
- Solicitation number
- HSCG87-14-R-PJT675
About this file
Davis Bacon
View the file
Other files
| File | Type | Posted |
|---|---|---|
| NOTICE_TO_OFFERORS_AMD_00002.pdf | ||
| Amendment_00002.pdf | ||
| SF1442.pdf | ||
| Amendment_00001.pdf | ||
| 2Standard_Requirements_Homer_Housing_3419908.doc | DOC document | |
| Construction_Clauses.pdf | ||
| 4Basic_Materials_and_Methods_Homer_Housing_3419908.doc | DOC document | |
| 1Summary_of_Work_Homer_Housing_3419908.doc | DOC document | |
| S-3846_drawings.pdf | ||
| 3Electrical_General_Requirements_Homer_Housing_3419908.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
General Decision Number: AK140005 01/17/2014 AK5
Superseded General Decision Number: AK20130005
State: Alaska
Construction Type: Residential
Counties: Aleutians East, Aleutians West, Bethel, Bristol
Bay, Dillingham, Haines, Juneau, Kenai Peninsula, Ketchikan
Gateway, Kodiak Island, Matanuska-Susitna, Peninsula & Lake, Prince Of Wales-Outer Ketchika, Sitka, Skagway-Yakutat-Angoon, Valdez-Cordova, Wade Hampton and Wrangell-Petersburg Counties in Alaska.
Area III (Boroughs of Central/Southern Alaska below 62 degrees
North Latitude excluding Anchorage Area)
Modification Number Publication Date
0 01/03/2014
1 01/17/2014
* ENGI0302-005 01/01/2014
Rates Fringes
Power equipment operators:
GROUP 1.....................$ 39.28 20.35
GROUP 1A....................$ 41.04 20.35
GROUP 2.....................$ 38.51 20.35
GROUP 3.....................$ 37.79 20.35
GROUP 4.....................$ 31.58 20.35
TUNNEL WORK
GROUP 1....................$ 43.21 20.35
GROUP 1A...................$ 45.14 20.35
GROUP 2....................$ 42.36 20.35
GROUP 3....................$ 41.57 20.35
GROUP 4....................$ 34.74 20.35
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 1: Asphalt Roller: Breakdown, Intermediate, and
Finish; Back Filler; Barrier Machine (Zipper); Beltcrete with power pack and similar conveyors; Bending Machine;
Boat Coxwains; Bulldozers; Cableways, Highlines and
Cablecars; Cleaning Machine; Coating Machine; Concrete
Hydro Blaster; Cranes-45 tons and under or 150 foot boom and under (including jib and attachments): (a) Hydralifts or Transporters, all track or truck type,(b) Derricks;
Crushers; Deck Winches-Double Drum; Ditching or Trenching
Machine (16 inch or over); Drilling Machines, core, cable, rotary and exploration; Finishing Machine Operator, Concrete Paving, Laser Screed, Sidewalk, Curb and Gutter
Machine; Helicopters; Hover Craft, Flex Craft, Loadmaster, Air Cushion, All Terrain Vehicle, Rollagon, Bargecable, Nodwell, and Snow Cat; Hydro Ax: Feller Buncher and similar; Loaders (2 1/2 yards through 5 yards, including all attachments): Forklifts with telescopic boom and swing attachment, Overhead and front end, 2 1/2 yards through 5 yards, Loaders with forks or pipe clamps; Loaders, elevating belt type, Euclid and similar types; Mechanics, Bodyman; Micro Tunneling Machine; Mixers: Mobile type w/hoist combination; Motor Patrol Grader; Mucking Machines:
Mole, Tunnel Drill, Horizontal/Directional Drill Operator, and/or Shield; Operator on Dredges; Piledriver Engineers, L. B. Foster, Puller or similar Paving Breaker; Power
Plant, Turbine Operator, 200 k.w. and over (power plants or combination of power units over 300 k.w.); Scrapers-through
40 yards; Service Oiler/Service Engineer; Sidebooms-under
45 tons; Shot Blast Machine; Shovels, Backhoes, Excavators with all attachments, and Gradealls (3 yards and under), Spreaders, Blaw Knox, Cedarapids, Barber Greene, Slurry
Machine; Sub-grader (Gurries, Reclaimer, and similar types); Tack tractor; Truck mounted Concrete Pumps, Conveyor, Creter; Water Kote Machine; Unlicensed off road hauler
GROUP 1A: Camera/Tool/Video Operator (Slipline), Cranes-over 45 tons or 150 foot (including jib and attachments): (a) Clamshells and Draglines (over 3 yards),
(b) Tower cranes; Licensed Water/Waste Water Treatment
Operator; Loaders over 5 yds.; Certified Welder, Electrical
Mechanic, Camp Maintenance Engineer, Mechanic (over 10,000 hours); Motor Patrol Grader, Dozer, Grade Tractor, Roto-mill/Profiler (finish: when finishing to final grade and/or to hubs, or for asphalt); Power Plants: 1000 k.w.
and over; Quad; Screed; Shovels, Backhoes, Excavators with all attachments (over 3 yards), Sidebooms over 45 tons;
Slip Form Paver, C.M.I. and similar types; Scrapers over 40 yards;
GROUP 2: Boiler-fireman; Cement Hog and Concrete Pump
Operator; Conveyors (except as listed in group 1); Hoist on steel erection; Towermobiles and Air Tuggers;
Horizontal/Directional Drill Locator;Licensed Grade
Technician; Loaders, (i.e., Elevating Grader and Material
Transfer Vehicle); Locomotives: rod and geared engines;
Mixers; Screening, Washing Plant; Sideboom (cradling rock drill regardless of size); Skidder; Trencing Machine under
16 inches; Waste/ Waste Water Treatment Operator.
GROUP 3: "A" Frame Trucks, Deck Winches: single power drum;
Bombardier (tack or tow rig); Boring Machine; Brooms-power;
Bump Cutter; Compressor; Farm tractor; Forklift, industrial type; Gin Truck or Winch Truck with poles when used for hoisting; Grade Checker and Stake Hopper; Hoist, Air
Tuggers, Elevators; Loaders: (a) Elevating-Athey, Barber
Green and similar types (b) Forklifts or Lumber Carrier
(on construction job site) (c) Forklifts with Tower (d)
Overhead and Front-end, under 2 1/2 yds. Locomotives:Dinkey
(air, steam, gas and electric) Speeders; Mechanics (light duty); Oil, Blower Distribution; Post Hole Diggers, mechanical; Pot Fireman (power agitated); Power Plant, Turbine Operator, under 200 k.w.; Pumps-water; Roller-other than Plantmix; Saws, concrete; Skid Steer with all attachments; Straightening Machine; Tow Tractor
GROUP 4: Rig Oiler/Crane Assistant Engineer;Parts and
Equipment Coordinator; Swamper (on trenching machines or shovel type equipment); Spotter; Steam Cleaner; Drill
Helper.
FOOTNOTE: Groups 1-4 receive 10% premium while performing tunnel or underground work. Rig Oiler/Crane Assistant
Engineer shall be required on cranes over 85 tons or over
100 feet of boom.
* LABO0341-008 07/01/2013
*Including Site and Street Work Only
Laborers: South of the 63rd
Parallel & West of Longitude
138 Degrees
GROUP 1.....................$ 29.25 22.32
GROUP 2.....................$ 30.25 22.32
GROUP 3.....................$ 31.15 22.32
GROUP 3A....................$ 34.43 22.32
GROUP 3B....................$ 35.26 22.32
GROUP 4.....................$ 18.82 22.32
TUNNELS, SHAFTS, AND RAISES
GROUP 1....................$ 32.18 22.32
GROUP 2....................$ 33.28 22.32
GROUP 3....................$ 34.27 22.32
GROUP 3A...................$ 37.87 22.32
GROUP 3B...................$ 38.79 22.32
LABORERS CLASSIFICATIONS
GROUP 1: Asphalt Workers (shovelman, plant crew); Brush
Cutters; Camp Maintenance Laborer; Carpenter Tenders; Choke
Setters, Hook Tender, Rigger, Signalman; Concrete
Laborer(curb and gutter, chute handler, grouting, curing, screeding); Crusher Plant Laborer; Demolition Laborer;
Ditch Diggers; Dump Man; Environmental Laborer (asbestos
(limited to nonmechanical systems), hazardous and toxic waste, oil spill); Fence Installer; Fire Watch Laborer;
Flagman; Form Strippers; General Laborer; Guardrail
Laborer, Bridge Rail Installers; Hydro-Seeder Nozzleman;
Laborers (building); Landscape or Planter; Laying of
Decorative Block (retaining walls, flowered decorative block 4 feet and below); Material Handlers; Pneumatic or
Power Tools; Portable or Chemical Toilet Serviceman; Pump
Man or Mixer Man; Railroad Track Laborer; Sandblast, Pot
Tender; Saw Tenders; Scaffold Building and Erecting; Slurry
Work; Stake Hopper; Steam Point or Water Jet Operator;
Steam Cleaner Operator; Tank Cleaning; Utiliwalk, Utilidor
Laborer and Conduit Installer; Watchman (construction projects); Window Cleaner
GROUP 2: Burning and Cutting Torch; Cement or Lime Dumper or
Handler (sack or bulk); Choker Splicer; Chucktender (wagon, airtrack and hydraulic drills); Concrete Laborers (power buggy, concrete saws, pumpcrete nozzleman, vibratorman);
Culvert Pipe Laborer; Cured in place Pipelayer;
Environmental Laborer (marine work, oil spill skimmer operator, small boat operator); Foam Gun or Foam Machine
Operator; Green Cutter (dam work); Gunnite Operator; Hod
Carriers; Jackhammer or Pavement Breakers (more than 45 pounds);Laying of Decorative Block (retaining walls, flowered decorative block above 4 feet); Mason Tender and
Mud Mixer (sewer work); Pilot Car; Plasterer, Bricklayer and Cement Finisher Tenders; Power Saw Operator; Railroad
Switch Layout Laborer; Sandblaster; Sewer Caulkers; Sewer
Plant Maintenance Man; Thermal Plastic Applicator; Timber
Faller, chain saw operator, filer; Timberman
GROUP 3: Alarm Installer; Bit Grinder; Guardrail Machine
Operator; High Rigger and tree topper; High Scaler;
Multiplate; Slurry Seal Squeegee Man
GROUP 3A: Asphalt Raker, Asphalt Belly dump lay down; Drill
Doctor (in the field); Drillers (including, but not limited to, wagon drills, air track drills; hydraulic drills);
Powderman; Pioneer Drilling and Drilling Off Tugger (all type drills); Pipelayers
GROUP 3B: Grade checker (setting or transfering of grade marks, line and grade)
GROUP 4: Final Building Cleanup
TUNNELS, SHAFTS, AND RAISES CLASSIFICATIONS
GROUP 1: Brakeman; Muckers; Nippers; Topman and Bull Gang;
Tunnel Track Laborer
GROUP 2: Burning and Cutting Torch; Concrete Laborers;
Jackhammers; Nozzleman, Pumpcrete or Shotcrete.
GROUP 3: Miner; Retimberman to, wagon drills, air track drills; hydraulic drills);
type drills); Pipelayers.
Tunnel shaft and raise rates only apply to workers regularly employed inside a tunnel portal or shaft collar.
* LABO0942-002 07/01/2013
*Including Site and Street Work Only
Laborers: North of the 63rd
Parallel & East of Longitude
138 Degrees
GROUP 1.....................$ 29.25 22.32
GROUP 2.....................$ 30.25 22.32
GROUP 3.....................$ 31.15 22.32
GROUP 3A....................$ 34.43 22.32
GROUP 3B....................$ 35.26 22.32
GROUP 4.....................$ 18.82 22.32
TUNNELS, SHAFTS, AND RAISES
GROUP 1....................$ 32.18 22.32
GROUP 2....................$ 33.28 22.32
GROUP 3....................$ 34.27 22.32
GROUP 3A...................$ 37.87 22.32
GROUP 3B...................$ 38.79 22.32
LABORERS CLASSIFICATIONS
GROUP 1: Asphalt Workers (shovelman, plant crew); Brush
Cutters; Camp Maintenance Laborer; Carpenter Tenders; Choke
Setters, Hook Tender, Rigger, Signalman; Concrete
Laborer(curb and gutter, chute handler, grouting, curing, screeding); Crusher Plant Laborer; Demolition Laborer;
Ditch Diggers; Dump Man; Environmental Laborer (asbestos
(limited to nonmechanical systems), hazardous and toxic waste, oil spill); Fence Installer; Fire Watch Laborer;
Flagman; Form Strippers; General Laborer; Guardrail
Laborer, Bridge Rail Installers; Hydro-Seeder Nozzleman;
Laborers (building); Landscape or Planter; Laying of
Decorative Block (retaining walls, flowered decorative block 4 feet and below); Material Handlers; Pneumatic or
Power Tools; Portable or Chemical Toilet Serviceman; Pump
Man or Mixer Man; Railroad Track Laborer; Sandblast, Pot
Tender; Saw Tenders; Scaffold Building and Erecting; Slurry
Work; Stake Hopper; Steam Point or Water Jet Operator;
Steam Cleaner Operator; Tank Cleaning; Utiliwalk, Utilidor
Laborer and Conduit Installer; Watchman (construction projects); Window Cleaner
GROUP 2: Burning and Cutting Torch; Cement or Lime Dumper or
Handler (sack or bulk); Choker Splicer; Chucktender (wagon, airtrack and hydraulic drills); Concrete Laborers (power buggy, concrete saws, pumpcrete nozzleman, vibratorman);
Culvert Pipe Laborer; Cured in place Pipelayer;
Environmental Laborer (marine work, oil spill skimmer operator, small boat operator); Foam Gun or Foam Machine
Operator; Green Cutter (dam work); Gunnite Operator; Hod
Carriers; Jackhammer or Pavement Breakers (more than 45 pounds);Laying of Decorative Block (retaining walls, flowered decorative block above 4 feet); Mason Tender and
Mud Mixer (sewer work); Pilot Car; Plasterer, Bricklayer and Cement Finisher Tenders; Power Saw Operator; Railroad
Switch Layout Laborer; Sandblaster; Sewer Caulkers; Sewer
Plant Maintenance Man; Thermal Plastic Applicator; Timber
Faller, chain saw operator, filer; Timberman
GROUP 3: Alarm Installer; Bit Grinder; Guardrail Machine
Operator; High Rigger and tree topper; High Scaler;
Multiplate; Slurry Seal Squeegee Man to, wagon drills, air track drills; hydraulic drills);
type drills); Pipelayers
GROUP 4: Final Building Cleanup
TUNNELS, SHAFTS, AND RAISES CLASSIFICATIONS
GROUP 1: Brakeman; Muckers; Nippers; Topman and Bull Gang;
Tunnel Track Laborer
GROUP 2: Burning and Cutting Torch; Concrete Laborers;
Jackhammers; Nozzleman, Pumpcrete or Shotcrete.
GROUP 3: Miner; Retimberman to, wagon drills, air track drills; hydraulic drills);
type drills); Pipelayers.
Tunnel shaft and raise rates only apply to workers regularly employed inside a tunnel portal or shaft collar.
TEAM0959-004 09/01/2013
TRUCK DRIVER
(1A) Dump, Over 8 yards.....$ 40.16 18.57
SUAK1999-008 05/14/1999
Area III
CARPENTER
excluding Batt & Blow
Insulation and Drywall
Hanging.....................$ 17.68
CEMENT MASON/CONCRETE FINISHER...$ 20.00
DRYWALL FINISHER/TAPER...........$ 20.10
DRYWALL HANGER...................$ 15.00
Electrician/Wireman..............$ 17.45 3.18
FENCE ERECTOR (including wood and chain link)..................$ 13.18
FLOOR LAYER: Carpet
Carpet......................$ 20.64
INSTALLER
Batt & Blown................$ 18.55
Laborer, General (excluding site and street work)............$ 13.88
PAINTER (excluding drywall finishing).......................$ 20.60 4.47
PIPEFITTER (HVAC piping).........$ 14.00
PLUMBER/PIPEFITTER (excluding
HVAC work).......................$ 22.80
ROOFER...........................$ 19.27
Sheet Metal Worker (HVAC Duct
Work)............................$ 16.79
TRUCK DRIVER (excluding dump, over 8 yards and dump 8 yards or under)........................$ 17.56
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is union or non-union.
Union Identifiers
An identifier enclosed in dotted lines beginning with characters other than "SU" denotes that the union classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination.
The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be July 1, 2011 in the above example.
Union prevailing wage rates will be updated to reflect any changes in the collective bargaining agreements governing the rates.
0000/9999: weighted union wage rates will be published annually each January.
Non-Union Identifiers
Classifications listed under an "SU" identifier were derived from survey data by computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007
5/13/2010. SU indicates the rates are not union majority rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date.
Survey wage rates will remain in effect and will not change until a new survey is conducted.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour
Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the
Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the
Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator
(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
U.S. Department of Labor
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION