Attachment I IDIQ Pricing Sheet
| WORK ITEM PRICING (IAW SPECIFICATION USCGC POLAR STAR (WAGB-10) Dry Dock Repairs FY 2018) | ||||
| SCHEDULE OF SUPPLIES/SERVICES | QUANTITY | UNIT | UNIT PRICE | AMOUNT |
| WI-1 Hull Plating (U/W Body), Inspect | 1 | JB | $ - 0 | |
| WI-2 Hull Plating (U/W Body), Ultrasonic Testing | 1 | JB | $ - 0 | |
| WI-3 Shaft Handling Equipment, Maintenance | 1 | JB | $ - 0 | |
| WI-4 Tanks (Mp Fuel Storage, Service And Overflow) Clean and Inspect | 1 | JB | $ - 0 | |
| WI-5 Propulsion Shafting - Strain Gage and Air Gap Readings (All) | 1 | JB | $ - 0 | |
| WI-6 Centerline Propulsion Hub Removal and Reinstallation | 1 | JB | $ - 0 | |
| WI-7 Port Propulsion Hub Removal and Reinstallation | 1 | JB | $ - 0 | |
| WI-8 Starboard Propulsion Hub Removal and Reinstallation | 1 | JB | $ - 0 | |
| WI-9 Propulsion Shaft Seal, Clean, Inspect and Overhaul | 1 | JB | $ - 0 | |
| WI-10 Boiler, Biennial Maintenance, Perform & Water Jet Clean | 1 | JB | $ - 0 | |
| WI-11 Sea Strainers (Hayward) Open, Clean, and Inspect | 1 | JB | $ - 0 | |
| WI-12 Cathodic Protection / Zinc Anodes, Renew | 1 | JB | $ - 0 | |
| WI-13 Sewage Holding Tank(s) Clean and Inspect | 1 | JB | $ - 0 | |
| WI-14 Temporary Fuel Oil Offload and Storage Drydock | 1 | JB | $ - 0 | |
| WI-15 Drydock | 1 | JB | $ - 0 | |
| WI-16 Temporary Services, Drydock Contractor Facility, Provide | 1 | JB | $ - 0 | |
| WI-17 Dock and Sea Trial Performance, Support, Provide | 1 | JB | $ - 0 | |
| WI-18 Miranda Davit, Biennial Inspection and Test | 1 | JB | $ - 0 | |
| WI-19 Allied K280-70 Crane, Starboard, Annual Inspect and Repair | 1 | JB | $ - 0 | |
| WI-20 Allied K280-70 Crane, Port, Annual Inspect and Repair | 1 | JB | $ - 0 | |
| WI-21 Allied T60-60 Crane, Annual Inspect and Repair | 1 | JB | $ - 0 | |
| WI-22 Flex Hose Assemblies, Renew | 1 | JB | $ - 0 | |
| WI-23 Deck (Polymeric) Replace | 1 | JB | $ - 0 | |
| WI-24 Bulkhead and Deck Covering (Laundry/Gym/Vestibule), Renew | 1 | JB | $ - 0 | |
| WI-25 Plate Repair (Laundry) | 1 | JB | $ - 0 | |
| WI-26 Life Rafts, Upgrade to Navy Mark 7 | 1 | JB | $ - 0 | |
| SCHEDULE OF SUPPLIES/SERVICES | EST QUANTITY* | UNIT | UNIT PRICE | AMOUNT |
| WI-27 Fixed Windows (CO Cabin), Repairs | 1 | JB | $ - 0 | |
| WI-28 Sewage System Modifications 3-69-2-Q | 1 | JB | $ - 0 | |
| WI-29 Sewage System Modifications 3-143-6-Q | 1 | JB | $ - 0 | |
| WI-30 Plumbing Vent Modifications Female PO1 Head | 1 | JB | $ - 0 | |
| WI-31 Air Conditioning System, Install New | 1 | JB | $ - 0 | |
| WI-32 Alternate Electric Power, Provide | 1 | JB | $ - 0 | |
| WI-33 Fire Prevention and Protection, Provide | 1 | JB | $ - 0 | |
| WI-34 Fathometer Transducer, Renew | 1 | JB | $ - 0 | |
| WI-35 Elevators and Dumbwaiter, Level 1 Annual Certification | 1 | JB | $ - 0 | |
| WI-36 Damage Control and Firefighting Systems, Perform Maintenance | 1 | JB | $ - 0 | |
| WI-37 Lodging and Dining, Provide | 1 | JB | $ - 0 | |
| TOTAL DEFINITE WORK ITEM PRICING | $ - 0 | |||
| TASK ORDER GROWTH, NEW TASK ORDERS, NEW TASK ORDER CLIN PRICING. |
Quantities below are estimated for evaluation purposes only. Order quantities may not exceed the number of units specified or may in fact exceed these quantities. The unit price will be the maximum rate used in any task order changes or new task orders during execution of this contract.
| SCHEDULE OF SUPPLIES/SERVICES | EST QUANTITY | UNIT | UNIT PRICE | AMOUNT |
| WI-38 Extension of Lodging (per room) | 1620 | DA | $ - 0 | |
| WI-38 Extension of Dining (per person) | 2745 | DA | $ - 0 | |
| WI-15 Dry Dock Extension/ Lay Days in accordance with HSAR 3052.217-94 | 45 | DA | $ - 0 | |
| WI-14 Temporary Services Provide Extension. The price for day consists of a daily rate for all services in the "Temporary Services" Task Order Work Item except Heavy Lift and Hazardous Waste | 45 | DA | $ - 0 | |
| Composite Labor Rate: In accordance with "Composite Labor Rate" in FAR 52.212-4, amended, Terms and Conditions 17. | 20000 | HR | $ - 0 | |
| Firewatch Composite Labor Rate | 500 | HR | $ - 0 | |
| Loading Rate: All inclusive loading rate to be added to materials and subcontracts (Unit Price should be 1.X) | 1500000 | % | $ - 0 | |
| Crane Hour: Price for crane service per hour including operator and riggers | 200 | HR | $ - 0 | |
| Forklift Hour: Forklift service per hour including operator and riggers | 200 | HR | $ - 0 | |
| Oily Rag Disposal | 200 | LB | $ - 0 | |
| Filter Disposal | 75 | EA | $ - 0 | |
| Bilge Water/Oily Waste Disposal | 15000 | GA | $ - 0 | |
| Jacket Water Disposal | 1000 | GA | $ - 0 | |
| Lead Testing | 100 | EA | $ - 0 | |
| Asbestos Testing | 100 | EA | $ - 0 | |
| Hydraulic Fluid Disposal (gal) | 2500 | GA | $ - 0 | |
| Marine Chemist Certification | 30 | EA | $ - 0 | |
| Manlift Rental 135' including fuel | 4 | WK | $ - 0 | |
| Manlift Rental 60' including fuel | 4 | WK | $ - 0 | |
| Manlift Rental 135' delivery and removal | 1 | JB | $ - 0 | |
| Manlift Rental 60' delivery and removal | 1 | JB | $ - 0 |