HEALY_DS17_Amendment0002.pdf
PDF 1 MB Posted
- Attached to
- USCGC HEALY Dockside Ship Repair FY2017
- Solicitation number
- HSCG85-17-R-P45008
About this file
Amendment Two
View the file
Other files
| File | Type | Posted |
|---|---|---|
| HEALY_DS_FY17_JA_Rev._2__Redacted.pdf | ||
| HEALY_DS17_Amendment0005.pdf | ||
| HEALY_DS17_Amendment0004.pdf | ||
| HEALY_DS17_Amendment0003.pdf | ||
| HEALY_DS17_Amendment0001.pdf | ||
| Pub9.zip | ZIP file | |
| Pub6.zip | ZIP file | |
| Pub5.zip | ZIP file | |
| Pub_1.zip | ZIP file | |
| Pub7.zip | ZIP file | |
| HSCG85-17-R-P45008_J A_Redacted.pdf | ||
| Pub_2.zip | ZIP file | |
| Pub3.zip | ZIP file | |
| Pub8.zip | ZIP file | |
| HEALY_DS_FY17_Solicitation.zip | ZIP file | |
| HSCG85-17-R-P45008_DRAWINGS.zip | ZIP file | |
| Pub4.zip | ZIP file |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
A0002 10Nov16
6. ISSUED BY CODE 75174 7. ADMINISTERED BY (If other than Item 6) CODE
USCG Surface Forces Logistics Center Attn: Amy Kelm 1301 Clay Street, Suite 800N Oakland CA 94612 E-mail: Amy.A.Kelm@uscg.mil
8. NAME AND ADRESS OF CONTRACTOR (no., street, county, State and ZIP Code) 9.A AMENDMENT OF SOLICITATION NO.
HSCG85-17-R-P45008
9B. DATE (SEE ITEM 11)
26Oct2016
10A. MODIFICATION OF CONTRACT/ORDER
NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning 1 copy of the amendment; (b) By acknowledging receipt of this amendment on each copy of the Offer submitted: or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT/.ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority).
E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
USCGC HEALY (WAGB 20)
DOCKSIDE REPAIRS FY2017
See next page.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remain unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)
)PREVIOUS EDITION UNUSABLE Prescribed by GSA, FAR (48 CFR) 53.2
1. The replacement pages for the solicitation have the following changes marked with an [A2]:
a) Page three (3), the SF1449, in block:
i) eight (8) the offer due date is hereby changed from 16Novemebr2016 to 22Novemeber2016; and,
ii) twenty (20) the Specification reference is hereby changed from “..(Rev-1, 02November2016), Attachment 2 to (Rev-2, 09November2016), Attachment 2”.
b) Page five (5) paragraph:
i) Proposal Submittal Procedures. This paragraph is replaced in its entirety.
Changes were made to clarify the mailing address for proposals and to add a courtesy copy for emailed proposals.
c) Page six (6) paragraph:
i) Questions. The second sentence is changed from “The last day to ask questions regarding this solicitation is 10Novemeber2016 at 12:00 p.m. Pacific Time” to “The last day to ask questions regarding this solicitation is 16Novemeber2016 at 10:00 a.m. Pacific Time”.
2. Attachment 2, Specifications is hereby replaced in its entirety. The Revision Record in the Specification document lists the changes made to the document.
3. Response(s) to Request(s) for Clarifications questions are attached.
4. The proposal closing date is hereby changed to 22November2016 (1:00 p.m. Pacific Time).
5. No other changes are made or implied.
HSCG85‐17‐R‐P45008 Page 3
USCGC HEALY DS17
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
1. REQUISITION NUMBER
2. CONTRACT NO.
3. AWARD/EFFECTIVE
DATE
4. ORDER NUMBER
5. SOLICITATION NUMBER
HSCG85-17-R-P45008
6. SOLICITATION
ISSUE DATE
26October2016
7. FOR
SOLICITATION
INFORMATION
CALL:
a. NAME
Amy Kelm
b. TELEPHONE NUMBER (no collect calls)
(206) 217-6767
8. OFFER DUE DATE/
LOCAL TIM
22November2016, 1:00 p.m. Pacific Time
9. ISSUED BY CODE 75174
USCG Surface Forces Logistics Center Attn: Amy Kelm 1301 Clay Street, Suite 800N Oakland CA 94612
E-mail: Amy.A.Kelm@uscg.mil
10. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: 100 %FOR:
SMALL BUSINESS WOMEN-OWNED SMALL
BUSINESS (WOSB)
HUBZONE SMALL NAICS:
BUSINESS ECONOMICALLY DISADVANTAGED 336611
WOMEN-OWNED SMALL (EDWOSB)
SERVICE-DISABLED
VETERAN-OWNED SIZE STANDARD:
SMALL BUSINESS 8(A) 1000 Employees
11. DELIVERY FOR FOB
DESTINATION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
12. DISCOUNT
TERMS
Net 30
13a. THIS CONTRACT IS A
RATED ORDER UNDER DPAS (15
CFR 700)
13b. RATING
14. METHOD OF SOLICITATION
RFQ IFB RFP
15. DELIVER TO CODE
See Description of Supplies/Services
16. ADMINISTERED BY CODE
Same as block 9
17a. CONTRACTOR/ CAGE CODE FACILITY
OFFEROR CODE
DUNS No.
TELEPHONE NO:
FAX NO:
18a. PAYMENT WILL BE MADE BY CODE
Commanding Officer USCG Finance Center 1430A Kristina Way Chesapeake, VA 23326
(800) 565-5504
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH
ADDRESS IN OFFER
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK
BELOW IS CHECKED SEE ADDENDUM
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
The Contractor shall perform DOCKSIDE Repairs to the USCGC HEALY (WAGB 20) in accordance with this solicitation and the specification, USCGC HEALY (WAGB
20) Specification for DOCKSIDE Repairs FY2017 (Rev-2, 09November2016), Attachment 2. Scope of work shall include ship repair and associated support work, and may include work that is not currently listed as Definite or Optional Items. Price Schedule is provided as a separate document (ATTACHMENT 1 – Price Schedule).
25. ACCOUNTING AND APPROPRIATION DATA
26. TOTAL AWARD AMOUNT (FOR GOVT USE ONLY)
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 & 52.212-5
ARE ATTACHED. ADDENDA ARE ARE NOT ATTACHED.
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4, FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED.
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND
RETURN 1COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO
FURNISH AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE
IDENTIFIED ABOVE AND ON ANY ADDITIONAL SHEETS SUBJECT TO
THE TERMS AND CONDITIONS SPECIFIED HEREIN.
29. AWARD OF CONTRACT: REFERENCE _____
OFFER DATED___. YOUR OFFER ON SOLICITATION (BLOCK 5), INCLUDING ANY
ADDITIONS OR CHANGES WHICH ARE SET FORTH HEREIN, IS ACCEPTED AS TO
ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR
31a. UNITED STATES OF AMERICA (SINGATURE OF CONTRACTING OFFICER)
[A2]
HSCG85‐17‐R‐P45008 Page 5
CONTINUATION OF SF 1449 – BLOCKS 17a - 25
(1) Block 17a: Contractor shall include DUNS number.
(2) Block 17b: REMITTANCE ADDRESS: Payment will be made to the Financial Institution listed in System for Award Management (SAM). To receive award Contractor must be registered in SAM at http://www.sam.gov .
(3) Block 19 through 24: SEE ATTACHMENT 1, PRICE SCHEDULE
(4) Block 25: ACCOUNTING AND APPROPRIATION DATA: To be included on contract award document.
DESCRIPTION OF WORK:
(a) The Contractor shall furnish all necessary labor, material, services, equipment, supplies, power, accessories, facilities and such other things as are necessary, except as otherwise specified, for the dockside of the USCGC HEALY in accordance with this solicitation and attached specifications (Attachment 2, Specifications).
(b) Failure to read the specifications in their entirety will not relieve the offeror from the responsibility for properly estimating the difficulty or price of successfully performing the work.
Failure to do so will be at the offeror 's risk. All proposals submitted in response to this solicitation shall stand firm for 90 calendar days from the response date of this solicitation.
ALL CONTRACTORS ARE RESPONSIBLE FOR VERIFYING THE RECEIPT OF
THEIR PROPOSALS.
AVAILABILITY OF FUNDS: Funds are not presently available for this project. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation either before or after the bid opening/closing date.
PROPOSAL SUBMITTAL PROCUEDURES: Mailed and e-mailed proposals will be accepted. Faxed proposals will not be accepted. When submitting proposals by mail, please contact Amy Kelm at (206) 217-6767 or email at Amy.A.Kelm@uscg.mil providing the mail carrier and any tracking number, if applicable. Mail proposals to:
USCG – Base Seattle – SFLC Attn: Amy Kelm 1519 Alaskan Way S., Bldg 3 Seattle, WA 98134 When submitting proposals by email, please submit the electronic copy to Amy.A.Kelm@uscg.mil with a courtesy copy (cc) to Ryan.R.DelaCruz@uscg.mil using WinZip software. All submissions shall include the solicitation number in the subject line of the email.
The WinZip password shall be submitted under a separate email. Please Note: There is not a character length or mixed case requirement imposed on your password. These submission instructions will also apply to any future correspondence, as applicable, in response to this solicitation.
HSCG85‐17‐R‐P45008 Page 6
PERIOD OF PERFORMANCE: The contract is expected to be awarded on or about 22December2016. The anticipated awarded period of performance for the basic requirement will be 84 calendar days; 23January2017 to 16April2017. Note that there is an additional four days of sea trails whose dates will be coordinated with the Contracting Officer Representative (COR).
The period of performance will be definitized after source selection is complete on the dockside package for USCGC HEALY. An arrival conference will be held within 48 hours of the scheduled start date.
PLACE OF PERFORMANCE: Work under this contract will be performed at USCG Base Seattle at 1519 Alaskan Way S, Seattle, WA 98134 at Pier 36A.
QUESTIONS: All questions to be submitted via email to Amy.A.Kelm@uscg.mil using the Request for Clarification Form, Attachment 3. The last day to ask questions regarding this solicitation is 16Novemeber2016 at 10:00 a.m. Pacific Time. After this date further requests may not be accepted due to time constraints.
CONTRACT TYPE: This solicitation will result in the award of a firm fixed price contract.
SCHEDULE OF SUPPLIES/SERVICES: See ATTACHMENT 1, PRICE SCHEDULE.
Utilize the attached electronic (MSExcel) “Price Schedule” for submission of all pricing on this procurement. Base Contract Line Item Numbers (CLINs) are marked as “D” for Definitive. Optional CLINS are marked “O” for Optional. Insert unit prices for all Items listed in the Schedule. Submit the MSExcel “Price Schedule” with your signed offer.
Attachment 3
REQUEST FOR CLARIFICATION
SHIP & HULL No.: CGC HEALY (WAGB 20) DOCKSIDE REPAIRS FY2017
RFP No.: HSCG85-17-R-P45008
SOLICITATION SECTION: PARA NO.
WORK ITEM NO. WI-018 PARA NO.
TITLE:
Deck Preserve and Deck Covering Magnesite Renew
QUESTION:
Each compartment has several non-accessible areas, many of these areas are in good order.
Q10: Contractor recommends non-accessible areas be subject to CFR and change request?
Q10A: AMR 5 has multiple Vidmar Cabinets, is the intent to move them to allow access?
RESPONSE:
10: Contractor shall work around or remove all interferences in way of failed decking areas. The area specified in this work item will be reduced to renewal of failed areas only as follows:
Ref# Compartment Exact Location/Interferences Approx Sq.Ft.
1 AMR 6 2-75-0-E 500 75
2 AMR 5 2-63-0-E 500 75
3 AMR 7 2-84-0-E 500 75
Science Cargo Hold
2 2-117-0-AA 300 75
Additionally, the specification will be amended to apply a complete topcoat of the magnesite deck areas in accordance with SFLC Standard Specification 6310 and the Magnesite Manufacturers product data sheet. The areas to be top-coated are as follows:
Ref# Compartment Exact Location/Interferences Approx Sq.Ft.
1 AMR 6 2-75-0-E 500
2 AMR 5 2-63-0-E 500
3 AMR 7 2-84-0-E 500
Science Cargo Hold
2 2-117-0-AA 300
10A: The contractor shall remove all interferences in way of deck preservation.
RFP No.: HSCG85-17-R-P45008
SOLICITATION SECTION: PARA NO.
WORK ITEM NO. WI-010
PARA
NO.Table 1
TITLE: Misc Piping, Repair and Renewal
Q11: The Table 1 list AMR 5 as the location of the 8” Pipe Repair, ship check reveled it is located in AMR 4, is that correct?
Q11A: Table 1 also identifies one 8 inch flange, which is welded to a Long Radius 90 degree which is part of the 5LF of pipe, is that correct?
11: AMR5 is the correct location of this pipe. However, it is an MSW (Main Sea Water) line not CFW as specified.
11A: Correct.
RFP No.: HSCG85-17-R-P45008
SOLICITATION SECTION: PARA NO.
WORK ITEM NO. WI-027
PARA
NO.3.1.6
TITLE: Sea Valves Renew
Q12: GFM does not list the CG Cofferdams, will CG be supplying (2) Cofferdams?
Q12A: Paragraph 3.6 calls for renewing the Copper Nickle 1 inch bolts, each Valve has 36 bolts which equates to 144 New Bolts, the existing Bolts appears to be in excellent condition.
Contractor recommends that up to 10% of the bolts be renewd?
12: The Coast Guard will provide 2 cofferdams for use on the seachests.
12A: The specification for WI-027 paragraph will be amended to:
3.6 Valve reinstallation/installation. Upon completion of all authorized work, the Contractor shall accomplish the following:
Remove and dispose of all blank flanges and associated gaskets.
Reinstall/install all overhauled and new valves with new gaskets.
Renew all missing or damaged valve label plates.
Renew up to10% of bolting hardware.
SOLICITATION SECTION: PARA NO.
WORK ITEM NO. WI-021 PARA NO.
TITLE: Deck Exterior Preserve Science Work Deck
Q13: There are Bolted Down Mooring Chocks, Mooring Bits, Handrails, Cradles for the cranes. Misc Items. Will all of these items be required to be removed in way of preservation?
Q13A: Can the contractor use existing bolt holes in the deck to install temporary safety rail?
13: All bitts, chocks, handrails, crane pedestals that are bolted to the deck shall be removed in order to properly preserve the deck.
13A: The contractor may use existing bolt holes as needed.
RFP No.: HSCG85-17-R-P45008
SOLICITATION SECTION: PARA NO.
WORK ITEM NO. WI-025 PARA NO.
TITLE: Valves Overhaul
Q14: The CWF contains fresh water diluted with antifreeze (Nalcool) is that correct?
Q14A: For bidding purposes, how many gallons of residual water is expected to be recovered and disposed of from AMR 5 and AMR 6?
Q14B: For bidding purposes, how much make up Nalcool will be required to resupply the CG?
14: Correct.
14A: Approximately 2,400 gallons of residual.
14B: 80 gallons of Nalcool 2000 will need to be resupplied.
RFP No.: HSCG85-17-R-P45008
SOLICITATION SECTION: PARA NO.
WORK ITEM NO. WI-030
PARA NO.
3.2.2 Table 1
TITLE: System Relief Valves, 5 Year Certification
Q15: Table 1 does not identify manufacture, contractor notes some of the relief valves found during the ship check are Danco Valves. Danco only sells repair parts to the Government.
Contractor recommends all Danco Relief Valves be subject to a CFR and change request.
15: Danco relief valves shall be overhauled at an OEM authorized repair facility. Submit a CFR.
SOLICITATION SECTION: PARA NO.
WORK ITEM NO. WI-035 PARA NO.
TITLE: Ships Service Refrigeration Plants Install New
Q16: The specification has no Temporary Services Item, recommend CG address Refrigerated Ships Stores during Dockside Repairs.
Q16A: Paragraph 3.10 Defroster Panels, contractor request the Make, Model and Part Number for the new Defroster Panels.
16: The ship has made alternate arrangements to store refrigerated items.
16A: The only data the CG has on these panels is what is shown in TP 5159. Page 135/183 provides a list of materials and shows the panel schematic.
RFP No.: HSCG85-17-R-P45008
SOLICITATION SECTION: PARA NO.
WORK ITEM NO. WI-034 PARA NO.
TITLE: Science Refrigeration Plants Install New
Q17: Please confirm contractor is to Re-Use old De-froster panels?
Q17A: Please provide a sketch of the new location of this refer plant? This is needed to identify which electrical spaces with large electrical banks and ducting located beneath the new Foundation.
17: Contractor is to renew associated defroster panels.
17A: A new requirement has been added to the specification for the contractor to propose the location of the new refrigeration plant within the vicinity of the old plants.
RFP No.: HSCG85-17-R-P45008
SOLICITATION SECTION: PARA NO.
WORK ITEM NO. WI-035 PARA NO. 3.13
TITLE: Ships Service Refrigeration Plants Install New
Q18: Contractor has identified the New Relief piping to start at the relief valve, up through the deck into the gym and tying into the first Tee, is that correct?
18: Correct. Relief piping from the relief valve to where the piping size changes to 3”
SOLICITATION SECTION: PARA NO.
WORK ITEM NO. WI-006 PARA NO.
TITLE: Flex Hose Assemblies
Q7: Hoses with re-useable ends, contractor recommends to re-use, subject to a CFR if replacement is needed.
7: SFLC Std Spec 5000 allows the use of re-usable fittings. Renewal of re-usable fittings is not required unless they are damaged or do not meet the material requirements of SFLC Std Spec 5000 C2.2.1.2.1
RFP No.: HSCG85-17-R-P45008
SOLICITATION SECTION: PARA NO.
WORK ITEM NO. WI-032
PARA NO.1.1
and 3.3
TITLE: Vacuum Sewage System, Hydrojet Cleaning
The Intent describes just the Vacuum Sewage System for cleaning as well as the Background Information and the rest of the specification. However 3.3 mentions the Grey Water being shut down.
Q8: Please confirm cleaning of Sewage System Only.
Q8A: Does the CG need Sanitary Showers or just Sanitary Toilets?
Q8B: SFLC 0000 3.2.11.6 requires portable toilets to be Clean and Emptied Daily, Contractor/CG has previously found this to be excessive, Contractor recommends twice weekly, Tuesday’s and Friday’s, would that be allowed?
8: The Sewage piping is the only piping required to be cleaned.
8A: Table II of SFLC Std Spec 0000 for a 420 WAGB provides the amount and type of sanitary facility amenities required.
8B: Please propose to the requirements of 3.2.11.6
RFP No.: HSCG85-17-R-P45008
SOLICITATION SECTION: PARA NO.
WORK ITEM NO. WI-032
PARA
NO.3.4.3
TITLE: Vacuum Sewage System, Hydrojet Cleaning
Paragraph 3.4.3 requires a video to determine internal condition of the sewage piping system, Contractor past performance has found this step is unnecessary and fails to provide the objective.
Q9: Contractor recommends paragraph 3.4.3 be waived.
9: The video will be used to document pre-cleaning condition to post-cleaning condition. Please propose to the specification.
USCGC HEALY (WAGB 20)
SPECIFICATION FOR DOCKSIDE REPAIRS
FY2017
Developed By: David E. Kent
(Rev-2, 09 November 2016)
TABLE OF CONTENTS
Revisions Record ...................................................................................................................................................... iii Consolidated List of References ................................................................................................................................ v Consolidated List of Government-furnished Property ............................................................................................ xiii Consolidated List of Critical Inspection Items ....................................................................................................... xiv Principal Characteristics .......................................................................................................................................... xv General Requirements WORK ITEM 1: Fuel Oil Purifier (FOP) Overhaul WORK ITEM 2: Lube Oil Purifier (LOP) Overhaul WORK ITEM 3: Port Miranda davit, Biennial Inspect and Repair WORK ITEM 4: Sea Trial Performance, Support, Provide WORK ITEM 5: Compartment Insulation (General), Renew WORK ITEM 6: Flex Hose Assemblies, Renew WORK ITEM 7: Internal Hoist, Annual Inspect and Test WORK ITEM 8: Internal Hoist, 5 Year Inspect and Test WORK ITEM 9: Piping Insulation, Renew WORK ITEM 10: Miscellaneous Piping, Repair and Renewal WORK ITEM 11: Bow Crane TB 60-65, Annual Inspect and Test WORK ITEM 12: J-Bar Davits, Level 2 Inspect and Test WORK ITEM 13: 04 Deck Cranes TB 100-55, Annual Inspect and Test WORK ITEM 14: Aft Starboard Crane K40-55, Biennial Overhaul WORK ITEM 15: Aft Port Crane, Annual Inspect and Test WORK ITEM 16: A-Frames, Annual Inspect and Repair WORK ITEM 17: Starboard Miranda davit, Annual Inspect and Repair WORK ITEM 18: Deck Preserve, and Deck Covering, Magnesite, Renew – Partial WORK ITEM 19: Deck Covering, Electrical Matting, Renew WORK ITEM 20: Decks - Exterior, Preserve (“MIL-Spec/Flight Deck” System) WORK ITEM 21: Decks Exterior, Preserve - Science Working Deck WORK ITEM 22: Bilges, Preserve– Partial WORK ITEM 23: Pressure Gauges and Thermometers, Calibrate WORK ITEM 24: RTD Sensors And Thermocouples, Calibrate WORK ITEM 25: Valves, Overhaul WORK ITEM 26: Valves, Renew WORK ITEM 27: Sea Valves, Renew WORK ITEM 28: Boiler Tubes, Renew All Boiler Tubes on Boiler #1 WORK ITEM 29: Boiler, Annual Maintenance WORK ITEM 30: System Relief Valves, 5 Year Certification WORK ITEM 31: Fuel Manifold, Overhaul WORK ITEM 32: Vacuum Sewage System, Hydrojet Cleaning WORK ITEM 33: Roller Curtain Door Assemblies, Service and Inspect WORK ITEM 34: Science Refrigeration Plants, Install New WORK ITEM 35: Ship Service Refrigeration Plants, Install New WORK ITEM 36: Deck Socket, Modify, OPTIONAL WORK ITEM 37: Deck Socket Renewal, OPTIONAL iii (REV-2)
REVISIONS RECORD
This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.
DATE REV# WORK
ITEM#
CHANGES MADE
11/2/2016 1 10 Added 500 gallons of residual water to paragraph 3.3
11/2/2016 1 13 Added paragraph 3.5 for preservation work
11/2/2016 1 14 Removed paragraph 3.4 for work related to Jib Boom. Added paragraph 3.13 for preservation work
11/2/2016 1 15 Added paragraph 3.6 for preservation work
11/2/2016 1 18 Removed paragraph 3.1.4.1 relating to Fan Room
11/2/2016 1 26 Removed paragraph 3.3.2 relating to flange drilling
11/2/2016 1 27 Added 2000 gallons of residual water to paragraph 3.2.
Removed Contractor provided furnished items in paragraph 3.4.
11/9/2016 2 18 Updated interferences in paragraph 3.1.4. Updated Table 3.2.1 reducing approximate square feet of magnesite decking renewal. Added paragraph 3.2.11 to clarify surface coating requirement.
11/9/2016 2 10 Changed system from CFW to MSW for 8” pipe and added additional detail to type of piping.
11/9/2016 2 19 Added GFM list to work item.
11/9/2016 2 27 Updated paragraph 3.1.6 clarifying as GFM cofferdam(s). Updated paragraph 3.6 changing requirement from renew “all” to “up to 10% of” bolting hardware.
11/9/2016 2 21 Updated paragraph 3.1.4 to provide sample of interferences for removal. Added paragraph 3.1.4.1 providing details of interference removal and use of existing bolt holes.
11/9/2016 2 25 Updated paragraph 3.2.1 to include details of system iv (REV-2) fluids and fluid renewal particulars.
11/9/2016 2 30 Added paragraph 3.4.1.1 requiring overhaul of Danco relief valves at authorized repair facility.
11/6/2016 2 32 Added additional requirements to paragraph 3.3
11/9/2016 2 34 Added paragraphs 3.12.2.1-3.12.2.6 to renew defroster panels. Added paragraph 3.7.1 for new requirement for proposal of new refrigeration plant.
NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.
v (REV-2)
CONSOLIDATED LIST OF REFERENCES
The below-listed documents form a part of this specification to the extent specified herein.
Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at time of specification writing and during contract execution.
All Coast Guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – as follows:
MIL/DOD/CID Specifications: http://www.assistdocs.com/search/search_basic.cfm
Commandant Instruction Manuals: http://www.uscg.mil/directives/default.asp
Public Laws, Code of Federal Regulations, U.S Codes, and other Federal Government laws::
www.gpoaccess.gov
The Government is aware of the following internet web links where contractors may procure commercial specifications:
American Welding Society (AWS): http://www.awspubs.com/index.php
ANSI, ASTM, IEEEE, NFPA, ASME, SAE Standards: http://www.techstreet.com/
NFPA: http://www.nfpa.org
SSPC Standards and pictorial guides: http://shopping.netsuite.com/sspcmarketplace
COAST GUARD DRAWINGS
Coast Guard Drawing 420 WAGB 101-001, Rev D, Construction Dwg Units 023-024
Coast Guard Drawing 420 WAGB 101-002, Rev C, Construction Drawing for Units 101 & 102
Coast Guard Drawing 420 WAGB 101-005, Rev B, Construction Drawing for Units 106
Coast Guard Drawing 420 WAGB 101-011, Rev C, Construction Drawing for Units 126
Coast Guard Drawing 420 WAGB 101-012, Rev B, Construction Drawing for Units 131 & 132
Coast Guard Drawing 420 WAGB 101-013, Rev C, Construction Dwg Unit 133 & 134
Coast Guard Drawing 420-WAGB 101-024, Rev C, Construction Drawings for Unit 261 & 262
Coast Guard Drawing 420 WAGB 101-028, Rev D, Construction Drawing for Units 410 & 411
Coast Guard Drawing 420 WAGB 101-033, Rev B, Construction Drawings for Units 430 & 431
Coast Guard Drawing 420 WAGB 101-045, Rev D, Construction Dwg Units 422 & 423
Coast Guard Drawing 420 WAGB 101-049, Rev C, Construction Drawing for Units 605
Coast Guard Drawing 420 WAGB 101-053, Rev D, Construction Dwg Unit 626-000
Coast Guard Drawing 420-WAGB 101-056, Rev B, Construction Dwg Units 703 & 704
Coast Guard Drawing 420 WAGB 101-059, Rev A, Construction Drawing for Units 811
Coast Guard Drawing 420 WAGB 101-060, Rev A, Construction Drawing for Units 830 & 831
Coast Guard Drawing 420 WAGB 101-065, Rev C, Construction Drawing for Units 111 & 112
Coast Guard Drawing 420-WAGB 167-001, Rev E, Hatches & Scuttles vi (REV-2)
Coast Guard Drawing 420 WAGB 167-004, Rev C, Helo Hangar & Misc. Roller Curtains Doors Arrg't & Instl Details
Coast Guard Drawing 420-WAGB 180-002, Rev F, Mech & Elec Fdns for Units 103,104,113,114,123,124,125,133,134,135,143,144,145
Coast Guard Drawing 420-WAGB 180-005, Rev E, Mechanical & Electrical Foundations
Coast Guard Drawing 420-WAGB 180-008, Rev E, Misc Onboard Mounted Foundations
Coast Guard Drawing 420 WAGB 256-001, Rev F, Main Seawater Circulation System
Coast Guard Drawing 420 WAGB 261-001, Rev D, Fuel Service System
Coast Guard Drawing 420 WAGB 261-002, Rev B, FO Fill & Transfer Manifold Ten - 8" Valves
Coast Guard Drawing 420 WAGB 262-005, Rev C, Main Engine Lube Oil Service System
Coast Guard Drawing 420 WAGB 262-008, Rev C, Main Motor, Thrust, LINE Shaft Bearing, Lube Oil Service System
Coast Guard Drawing 420 WAGB 264-001, Rev F, Lube Oil Fill Transfer & Purification System
Coast Guard Drawing 420-WAGB 320-002, Rev AG, Power System One LINE Diagram
Coast Guard Drawing 420 WAGB 505-001, Rev D, Piping General Notes & Installation Details
Coast Guard Drawing 420-WAGB 505-002, Rev B, Plumbing Fixtures Hook-Up Details
Coast Guard Drawing 420 WAGB 508-001, Rev E, Pp & Mchry Insulation Sched
Coast Guard Drawing 420 WAGB 508-002, Rev D, Piping & Machinery Insulation Schedule L/M
Coast Guard Drawing 420 WAGB 514-002, Rev D, Diagram of Hot & Chilled Water System
Coast Guard Drawing 420-WAGB 516-509, Rev D, General Arrangement 1.7 Ton Refrigeration System for Scientific Stores
Coast Guard Drawing 420-WAGB 516-511, Rev E, Scientific Stores Refrig. Sys. 1.7 Ton Rfgt- 22 Piping Diagram
Coast Guard Drawing 420-WAGB 516-513, Rev G, Scientific Stores Refrig. Sys. 1.7 Ton Rfgt- 22 Condensing Unit Wiring Dia.
Coast Guard Drawing 420-WAGB 516-519, Rev D, Manifold, Board Freeze Room Scientific Stores
Coast Guard Drawing 420 WAGB 521-001, Rev E, Diagram Firemain System
Coast Guard Drawing 420 WAGB 524-001, Rev H, Diagram Auxiliary Seawater System
Coast Guard Drawing 420 WAGB 528-001, Rev E, Diagram of Plumbing & Int. Deck Drain & Vacuum Collection System
Coast Guard Drawing “Clean Outs 420-WAGB 528-001-5-11, Diagram of Plumbing & Int. Deck Drain & Vacuum Collection System”
Coast Guard Drawing 420 WAGB 529-001, Rev C, Diagram Ballast, Mn Drainage, & Independent Drainage System
Coast Guard Drawing 420 WAGB 530-001, Rev D, Diagram of Main Diesel Gen CFW Cooling System
Coast Guard Drawing 420 WAGB 531-001, Rev F, Distilling Plant System
Coast Guard Drawing 420 WAGB 532-002, Rev D, Hot & Cold Potable Water & Brominator
Coast Guard Drawing 420 WAGB 532-006, Rev B, Diagram of Main Diesel Engine Cooling Water System (Jw & Inj) vii (REV-2)
Coast Guard Drawing 420 WAGB 533-001, Rev -, Starting Air Compressor Head Tank (5 Tank)
Coast Guard Drawing 420 WAGB 535-001, Rev G, Diagram Steam, Feed & Condensate System
Coast Guard Drawing 420 WAGB 541-004, Rev D, Diagram Fuel Fill, Transfer & Purification
Coast Guard Drawing 420 WAGB 542-001, Rev C, JP-5, Fill, X-Fer, Svc, Purif, Stripping & Helo Defueling Sys
Coast Guard Drawing 420 WAGB 551-005, Rev D, Diag - Starting Air Sys
Coast Guard Drawing 420 WAGB 551-006, Rev H, Diagram Ship Service & Control Air Sys
Coast Guard Drawing 420 WAGB 555-006, Rev E, Diagram AFFF System
Coast Guard Drawing 420 WAGB 556-001, Rev D, Diagram Hydraulic Oil Storage, Transfer Purification & Service System
Coast Guard Drawing 420 WAGB 573-001, Rev B, Crane Pedestals Arr & Dets
Coast Guard Drawing 420 WAGB 573-002, Rev D, Boom Rests
Coast Guard Drawing 420 WAGB 573-003, Rev A, Science Hoist – FR 133 STBD
Coast Guard Drawing 420 WAGB 573-511, Rev F, General Arrangement KB 15-45
Coast Guard Drawing 420 WAGB 573-522, Rev D, General Arrangement TB 100-55
Coast Guard Drawing 420 WAGB 573-545, Rev G, Aft. "A" Frame Base Weldment
Coast Guard Drawing 420 WAGB 573-546, Rev D, Stbd "A" Frame Base Weldment
Coast Guard Drawing 420 WAGB 573-547, Rev -, Hydraulic Cylinder Aft a-Frame
Coast Guard Drawing 420 WAGB 573-548, Rev -, Hydraulic Cylinder Starboard a-Frame
Coast Guard Drawing 420 WAGB 573-558, Rev E, Aft. "A" Frame Stop Tube Weldment
Coast Guard Drawing 420 WAGB 573-559, Rev C, Side "A" Frame Stop Tube Weldment
Coast Guard Drawing 420-WAGB-582-003, Rev B, Bosn/Hawser Stores & Fueling Hose Room
Coast Guard Drawing 420 WAGB 583-501, Rev -, General Arrangement of Miranda Davit
MRT/3900
Coast Guard Drawing 420 WAGB 589-005, Rev -, 6000LB Science Hoist Control Sys ISO & E
Coast Guard Drawing 420 WAGB 589-506, Rev C, General Arrgt 600LB. Capacity Trash Hoist
Coast Guard Drawing 420 WAGB 589-507, Rev E, General Arrangement 1000LB Capacity Stores Hoist
Coast Guard Drawing 420 WAGB 593-003, Rev C, Diagram - Oily Bilge Collecting & Transfer
Coast Guard Drawing 420 WAGB 593-004, Rev B, Diagram Oily Water Oil, And Waste Water Collecting Systems
Coast Guard Drawing 420 WAGB 611-001, Rev E, Portable Davits and Sockets
Coast Guard Drawing 420 WAGB 611-003, Rev G, Misc Deck Sockets
Coast Guard Drawing 420 WAGB 623-501, Rev C, Accommodation Ladder General Notes
Coast Guard Drawing 420 WAGB 631-001, Rev D, Paint Schedule & Corrosion Control
Coast Guard Drawing 420 WAGB 635-001, Rev D, Insulation Layouts & Dets
Coast Guard Drawing 420-WAGB 644-002, Rev D, Plumbing Fixture List & Sanitary Spaces and CG Lockers Arr & Dets
Coast Guard Drawing 420 WAGB 801-001, Rev H, Booklet of General Drawings
Coast Guard Drawing 420 WAGB 801-011, Rev D, List of Relief Valves viii (REV-2)
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual
Coast Guard Commandant Instruction (COMDTINST) M9000.6 (series), Naval Engineering Manual
Coast Guard Technical Publication (TP) 2006C, Mar 2009, Preventative Maintenance Manual, Damage Control --- Not Available on Ne-Tims, Hard Copy Available in V Library
Coast Guard Technical Publication (TP) 5061, 01-NOV-03, S9261-Be-MMC-010 - Purification System, Fuel Oil
Coast Guard Technical Publication (TP) 5068, 01-NOV-03, S9264-A9-MMC-010 - Purification System, Lube Oil
Coast Guard Technical Publication (TP) 5162, 01-NOV-03, S9517-Ay-MMC-010 - Boiler, Oil Fired Auxiliary
Coast Guard Technical Publication (TP) 5207, 01-NOV-03, S9555-Dm-MMC-010 - Fire Extinguishing System, High Pressure Carbon D
Coast Guard Technical Publication (TP) 5221, 01-NOV-03, SG700-Ap-MMC-010 - A-Frames
Coast Guard Technical Publication (TP) 5223, Oct 2005 , SWBS 572, Section A, Dumbwaiter (200 lb Capacity) – Model 20700
Coast Guard Technical Publication (TP) 5232, 01-Nov-03, S9538-AR-MMC-010 – Davit Winch & HPU (Rescue Boat (RHIB)) Volume 1
Coast Guard Technical Publication (TP) 5233, 01-Nov-03, S9538-AR-MMC-020 - Davit Winch & HPU (Rescue Boat (RHIB)) Volume 2
Coast Guard Technical Publication (TP) 5236, 01-NOV-03, S9167-Ah-MMC-010 - Door, Science Staging Area
Coast Guard Technical Publication (TP) 5237, 01-NOV-03, S9167-Av-MMC-010 - Hangar Door
Coast Guard Technical Publication (TP) 5243, Nov 2013, SG811-B4-MMC-010 – Crane, Electro-Hydraulic Telescoping Boom – Model TB60-65
Coast Guard Technical Publication (TP), 01-NOV-03, SG811-B5-MMC-010 - Crane, Single Articulating Boom Crane – Model K40-55
Coast Guard Technical Publication (TP) 19-NOV-14, SG811-C5-MMC-010 - Crane, Primary Telescoping Boom Pedestal Type – Model 100-55
Coast Guard Technical Publication (TP) 5246, July 2004, SG811-C6-MMC-010 - Crane, Knuckleboom – Model K15-45
Coast Guard Technical Publication (TP) 5247, Jun 2006, SG812-A7-MMC-010 – Crane, Science Staging Area Bridge
Coast Guard Technical Publication (TP) 5249, SWBS 589, Nov 2003, SG825-A3-MMC-010 – Hoist, Stores (1000-LB Capacity)
Coast Guard Technical Publication (TP) 5250, SWBS 589, Oct 2005, SG825-AY-MMC-010 – Hoist, Science (6000-LB Capacity)
Coast Guard Technical Publication (TP) 5251, SWBS 589, Oct 2005, SG825-AZ-MMC-010 – Hoist, Trash (600-LB Capacity)
Coast Guard Technical Publication (TP) 5271, 01-NOV-03, S9623-AC-MMC-010 - Accommodation Ladder ix (REV-2)
Coast Guard Technical Publication (TP) 5326, Oct 2004, Hoist, Shaw-Box Science Van Electric
– Series 700
Coast Guard Technical Publication (TP) 5336, 06-NOV-07, The Cranesmart "LMI" System
Coast Guard Technical Publication (TP) 7803, 26-JUN-12, Swivel Truck Trolley Hoist – Model
ZS-4L
Maintenance Procedure Card M-A-10661 Boiler Automated Safety Control Service
Maintenance Procedure Card M-A-7210 Boiler Inspection and Cleaning
Maintenance Procedure Card M-A-13039 Boiler Safety Valves Test/Check
Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 0000, 2014, General Requirements
Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 0740, 2014, Welding and Allied Processes
Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 5000, 2014, General
Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 6310, 2014, Requirements for Preservation of Ship Structures
Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 6341, 2014, Install New Deck Covering Systems
Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 8635, 2014, Temporary Services
Surface Forces Logistic Center Technical Standard (SFLC TS) 572, 2014, Stores and Provisions Handling
Surface Forces Logistic Center Technical Standard (SFLC TS) 573, Cargo Handling Systems- Booms and Frames
Surface Forces Logistic Center Technical Standard (SFLC TS) 583-1, 2013, Life Saving Appliances
Surface Forces Logistic Center Technical Standard (SFLC TS) 583-2, 2013, Shipboard Boat Hoisting Systems
Surface Forces Logistic Center Technical Standard (SFLC TS) 583-3, 2013, Boat Cradles and Lifting Appliances
Surface Forces Logistic Center Technical Standard (SFLC TS) 589, 2014, Cranes
OTHER REFERENCES
American National Standards Institute (ANSI/ISO) 17025, 2005, General Requirements for the Competence of Testing and Calibration Laboratories
American National Standards Institute (ANSI/NCSL) Z540.3, 2006, General Requirements for Calibration and Measuring and Test Equipment
American Society of Mechanical Engineers (ASME) A17.1, 2010, Safety Code for Elevators and Escalators
American Society of Mechanical Engineers (ASME) B16.11, 2005, Forged Steel Fittings, Socket- Welding and Threaded
American Society of Mechanical Engineers (ASME) B16.25, 2007, Butt welding Ends
American Society of Mechanical Engineers (ASME) B16.34, 2013, Valves-Flanged, Threaded, and Welding End x (REV-2)
American Society of Mechanical Engineers (ASME) B16.9, 2007, Factory-Made Wrought Butt welding Fittings
American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (2013)
American Petroleum Institute (API) Specification 9A, 2004, Specification for Wire Rope
ASTM International (ASTM) A449, 2007, Standard Specification for Hex Cap Screws, Bolts and Studs, Steel, Heat Treated, 120/105/90 Ksi Minimum Tensile Strength, General Use
ASTM International (ASTM) A563-07a, 2007, Standard Specification for Carbons and Alloy Steel Nuts
ASTM International (ASTM) A1023, 2009, Standard Specification for Stranded Carbon Steel Wire Ropes for General Purposes
ASTM International (ASTM) B633, 2007, Standard Specification for Electrodeposited Coating of Zinc on iron and Steel
ASTM International (ASTM) D4174, Reapproved 2010, Standard Practice for Cleaning, Flushing, and Purification of Petroleum Fluid Hydraulic Systems
ASTM International (ASTM) F683, 2003, Standard Practice for Selection and Application of Thermal Insulation for Piping and Machinery
ASTM International (ASTM) F992, 2011, Standard Specification for Valve Label Plates
Federal Specification (Fed Spec) DDD-C-95, Mar 1972, Carpets and Rugs, Wool, Nylon, Acrylic, Modacrylic
Federal Specification (Fed Spec) QQ-N-281, Oct 1985, Nickel-Copper-Aluminum Alloy Bar, Rod, Plate, Sheet, Strip, WIRE, Forgings, And Structural and Special Shaped Sections
Federal Specification (Fed Spec) RR-W-410, Jun 2010, Wire Rope and Strand
Huber A-Frame Drawing HI-571-1001, Rev C
International Standard Organization (ISO) 3448, 1992, Industrial Liquid Lubricants - ISO Viscosity Classification
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-61, 2013 Edition, Pressure Testing Of Steel Valves
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-67, 2011 Edition, Butterfly Valves
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-72, 2010 Edition, Ball Valves with Flanged or Butt-Welding Ends for General Service
Manufacturers' Standardization Society of the Valve and Fittings Industry (MSS) SP-80, 2013 Edition, Bronze Gate, Globe, Angle and Check Valves
MIL-G-24716, Apr 1993, Gaskets, Metallic-Flexible Graphite, Spiral Wound
MIL-PRF-1149, Jun 1998, Gasket Materials, Synthetic Rubber, 50 and 65 Durometer Hardness
MIL-PRF-18458, May 2007, Grease, Wire Rope-Exposed Gear
MIL-PRF-24613, Nov 2007, Deck Covering Materials, Interior, Cosmetic Polymeric
MIL-PRF-24667, May 2008, Coating system, Non-Skid, for Roll or Spray Application
MIL-PRF-3135, Sep 2008, Deck Covering Underlay Materials
MIL-R-21252, May 1991, Rubber Sheet, Solid, Synthetic, Shipboard Water Evaporator Gasketing
MIL-STD-1689, Nov 1990, Fabrication, Welding and Inspection of Ships Structure xi (REV-2)
MIL-T-16420, Rev K, Amd 1, 9/16/1988; Tube, Copper-Nickel Alloy, Seamless and Welded (Copper Alloy Numbers 715 and 706)
National Board Inspection Code (NBIC), (2013)
Naval Sea Systems Command (NAVSEA) Underwater Ship Husbandry Manuals (UWSH) S0600-AA-PRO-160, Jan 2011, Chapter 16, Cofferdams
Naval Sea Systems Command (NAVSEA) S6430-AE-TED-010, Jul 1996, Technical Directive for Piping Devices, Flexible Hose Assemblies
Naval Sea Systems Command (NAVSEA) S6435-TL-MMI-010, Angle Relief Valve – Type D50
Naval Sea Systems Command (NAVSEA) S6435-TP-MMI-010, Angle Relief Valves, BCS Series For Air/Gas Service
Naval Sea Systems Command (NAVSEA) S6435-UU-MMI-010, Angle Relief Valve – Model
D50FF
Naval Ship’s Technical Manual (NSTM) Chapter 505, Rev 5; Piping Systems
Naval Ship’s Technical Manual (NSTM) Chapter 556, Rev 9, Hydraulic Equipment Power Transmission and Control
Naval Ship's Technical Manual (NSTM) Chapter 572, Jul 2009, Shipboard Stores and Provision Handling
Naval Ship's Technical Manual (NSTM) Chapter 589, May 2002, Cranes
Naval Ship's Technical Manual (NSTM) Chapter 772, Dec 2000, Cargo and Weapons Elevators
NAVSEA Drawing 804-5773931, Rev A, Acoustic & Thermal Insulation For Compartments Installation Details
NAVSEA Drawing 804-5959214, Rev-, Piping Insulation - Installation Details
NAVSEA Dwg 810-1385880, Rev D; Fittings, Cu-Ni Alloy, Slip on Sleeve
NAVSEA S6430-AE-TED-010, Rev -; Technical Directive for Piping Devices, Flexible Hose Assemblies
NAVSEA SG700-AM-MMC-010/34712, POWER UNIT, HYDRAULIC, AFT GENERAL
SERVICE
NAVSEA SG700-AP-MMC-010, Rev -; Preliminary Operation & Maintenance Manual for WAGB-20 Polar Icebreaker a-Frames
PolySpec 7K Deck Top Magnesite Insulation
QPL-24667, Nov 2014, Qualified Product List of Products Qualified under Performance Specification MIL-PRF-24667, Coating system, Non-Skid, for Roll or Spray Application
Society of Automotive Engineers (SAE) J2280, 1996, Ships Systems and Equipment - Fasteners - Selection and Identification Requirements
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.1 (SSPC-SP 1), 2015, Solvent Cleaning
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2013, Power Tool Cleaning to Bare Metal
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.15 (SSPC-SP 15), 2013, Commercial Grade Power Tool Cleaning
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.3 (SSPC-SP 3), 2004, Power Tool Cleaning
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 5/NACE No.1, 2007, White Metal Blast Cleaning xii (REV-2)
The Society for Protective Coatings (SSPC)/NACE Joint Surface Preparation Standard SSPC-SP 10/NACE No.2, 2007, Near-White Metal Blast Cleaning xiii (REV-2)
CONSOLIDATED LIST OF GOVERNMENT-FURNISHED PROPERTY
The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.
MTI WI ITEM DESCRIPTION NSN/PN QTY
ESTIMATED
COST
($/Unit)
N 27 M/O-BTFLY Valve 4 ea $37,240
N 33 Motor, Alternating Current PN: 1203-127 4
N 33 Rod, Brake Release PN: 1205-876 4
N 33 Lower Housing End Cap PN: 1205-XXX 4
Y 34 Science Stores Refrigeration Plant Adrick Unit Model
ADR-054-2Q
N 34 Marine Water Regulating Valve, ½” 2-Way 2
34 Unit Cooler 2
34 Unit Cooler Manifold Board 2
Y 35 Ships Stores Refrigerant Plant ADR-074-2Q 3
35 Marine Water Regulating Valve, 3/4” 2-Way 3
35 Unit Cooler 7
35 Unit Cooler Manifold Board 4
N 35 304 SS socket inserts for SO-2 Sockets 25 ea $150.00
N 36 EH36 Steel Deck Socket SO-2 5 ea. $900.00 xiv (REV-2)
CONSOLIDATED LIST OF CRITICAL INSPECTION ITEMS
The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.1.4 (Inspection report particulars):
Work Item
Title
3 Port Miranda davit, Inspect and Repair - Level 2
8 Internal Hoist, Level 1 Inspect and Test
11 Bow Crane TB 60-65, Inspect and Test, Level 1
12 J-Bar Davits, Level 2, Inspect and Test
13 04 Deck Cranes TB 100-55, Level 1 Inspect and Repair
14 Aft Starboard Crane K40-55, Level 2 Overhaul
15 Aft Port Cranes, Inspect and Test (Level 1)
16 A-Frames, Inspect and Repair – Level 1
17 Starboard Miranda Davit, Inspect and Repair – Level 1
23 Bilges, Preserve – 100%
24 Bilges, Preserve – Partial
34 Science Refrigeration Plant, Install New
35 Ship’s Service Refrigeration Plant, Install New
36 Roller Curtain Door Assemblies, Service and Inspect
37 Roller Curtain Door Assemblies, Service and Inspect
USCGC HEALY (WAGB 20) DOCKSIDE AVAILABILITY FY2017
xv (REV-2)
PC_WAGB_420_0909
PRINCIPAL CHARACTERISTICS
420' (WAGB-20) WAGB CGC HEALY
PHYSICAL CHARACTERISTICS
Length Overall 420'
Length between Perpendiculars 396' 6"
Beam, Extreme 82' 0"
Depth amidships to Main Deck 42' 0"
Draft to Bottom of Keel @ Full Load
29' 3"
Full Load Displacement 16,000 long tons
Effective keel length 230' 0"
Mast height above DWL @ 28' draft
158' 3/8"
HULL CHARACTERISTICS
Frame Spacing 15"
Material EH-36
Hull ASTM A131, GR EH 36, or ABS EH 36
Flight Deck ASTM A131, GR EH 36, or ABS EH 36
Superstructure ASTM A131, GR EH 36, or ABS EH 36
MACHINERY CHARACTERISTICS
Propulsion
4 Sulzer 12ZA40S
2 AC Synchronous, 11.2MW Drive Motors
Auxiliary Generator 1 EMD 16-645F7B, 2200 KW, 450V AC, 3 phase
Rudders 2 xvi (REV-2)
Anchor & Chain Two 13,200 lbs Navy Stockless, 150 fathoms chain
Port, 165 fathoms chain Starboard
TANK CAPACITIES (GALLONS)
Diesel Oil or JP-5 (@ 95%) 1,187,117
JP-5 (Helo) (@ 95%) 56,434
9250 Lube Oil (@ 95%) 24,794
Fresh Water (@ 95%) 34,553
Hydraulic Oil (@95%) 8,571
Ballast Water (@95%) 899,776
1 (REV-2)
00000_0114_FLT
REC_00000_FLT_ Commercial Project @ CG Facility (1212)
General Requirements
1. SCOPE
1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed by commercial contractors at a Coast Guard facility for Coast Guard vessels.
1.2 Term interchangeability. The terms 'Contractor', 'CG Yard', 'NAVSTA EVERETT', 'shipyard', 'Base', and 'Coast Guard Industrial' are used interchangeably in this specification. Where the primary service provider is Coast Guard personnel, references to contractor and other noted descriptors within this specification or within drawings, publications, SFLC Standard Specifications or other commercial and military references are deemed the same as prime service provider.
2. REFERENCES
None
Coast Guard Commandant Instruction (COMDTINST)_MI0360.3C , Change 1, Jun 2006, Coatings and Color Manual
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2012, General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2012, Welding and Allied Processes
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2012, ASTM International (ASTM) 6966, 2008, Standard Practice for Collection of Settled Dust Samples Using Wipe Sampling Methods for Subsequent Determination of Metals
Code of Federal Regulations (CFR) Title 29, Part 1910, Jul 2008, Occupational Safety and Health Standards
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2004, Power Tool Cleaning to Bare Metal
Code of Federal Regulations (CFR) Title 33 CFR, Jul 2010, Navigation and Navigable Waters
Code of Federal Regulations (CFR) Title 40, Chapter I, 2008, Environmental Protection Agency
Code of Federal Regulations (CFR) Title 49, Chapter I, 2008, Pipeline and Hazardous Materials Safety Administration, Department Of Transportation
2 (REV-2)
3. REQUIREMENTS
3.1 General. The Contractor shall conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability.
3.1.1 Work Hours. Contractor is authorized to conduct work Monday through Friday 0700 – 1700. Any work conducted outside this time frame has to be authorized through the COR with a minimum of 24 hours notice.
NOTE
The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.
3.2 Fire watch requirements. The Contractor shall refer to 3.3.1.3 (Fire watch requirements) of SFLC Std Spec 0000, in accomplishing the following task:
Contractor shall provide fire watch personnel and fire extinguishers for the duration of the availability period.
3.3 Preservation requirements. The Contractor shall accomplish all preservation tasks, including touch-ups, in accordance with SFLC Std Spec 6310.
3.3.1 Brand name approval. Ensure that all contractor-furnished coatings are in accordance with SFLC Std Spec 6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).
3.3.2 Coating colors and system color schemes. Ensure that all colors and color coat/paint schemes are in accordance with COMDTINST MI0360.3C , Chapter 11 (Cutter and Boat Colors Exterior and Interior).
Unless a waiver has been granted (in writing) by the KO, deviations from authorized coatings (listed in Appendix C of SFLC Std Spec 6310) and colors and color schemes (provided in Chapter 11 of COMDTINST MI0360.3) are strictly prohibited.
3.4 Welding and brazing requirements. The Contractor shall perform all welding and allied processes, and NDI in accordance with SFLC Std Spec 0740.
3.5 HW disposal. The Contractor shall be responsible for all hazardous wastes generated by work under this contract. Label and package all hazardous wastes in 49 CFR-approved containers, and in accordance with all other applicable Federal, state, and local laws and regulations. In addition, comply with applicable parts of 40 CFR 262, applicable to handling of hazardous wastes.
3.5.1 Along with the Government, the Contractor shall be contractually…
This is the start of the file's text. The full file is on GovTribe.