0001.pdf

PDF 55 KB Posted

Attached to
CGC BERTHOLF (WMSL 750) Dockside Repairs FY14 FQ4
Solicitation number
HSCG85-14-R-P45908
Issued by

About this file

Amendment 0001

View the file

Other files

File Type Posted
0003.pdf PDF
BERTHOLF_(WMSL_418)_DS_FQ4_ZBH_14R3.pdf PDF
0002.pdf PDF
Consumables_List.pdf PDF
Bertholf_DS_Repairs_FY14_FQ4.zipx ZIPX file
Bertholf_DS_Repairs_FY14_FQ4.zipx ZIPX file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. CONTRACT ID CODE PAGE OF PAGES

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1 2

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

0001 09 MAY 2014 21-14-854P45908

6. ISSUED BY CODE HSCG85 7. ADMINISTERED BY (If other than Item 6) CODE

COMMANDER, USCG

Surface Forces Logistics Center – Contract & Procurement Division 1301 Clay Street, Suite 807N Oakland, CA 94612

8. NAME AND ADRESS OF CONTRACTOR (no., street, county, State and ZIP Code) √ 9.A AMENDMENT OF SOLICITATION NO.

TO ALL PROSPECTIVE OFFERORS

HSCG85-14-R-P45908

X 9B. DATE (SEE ITEM 11)

24 APR 2014

10A. MODIFICATION OF CONTRACT/ORDER

NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning 2 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the Offer submitted: or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT/.ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority).

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

SUBJECT: Solicitation No. HSCG85-14-R-P45908, DOCKSIDE REPAIRS OF USCGC BERTHOLF (WMSL 750) FY’13 FQ4

SEE CONTINUATION PAGES

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

Jake M. Apolonio, CONTRACT SPECIALIST 15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY

(Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)PREVIOUS

EDITION UNUSABLE Prescribed by GSA, FAR (48 CFR) 53.243

Solicitation No. HSCG85-14-R-P45908 CGC BERTHOLF (WMSL 750) Dockside Repairs FY’14 FQ4 Amendment No. 0001

The purpose of this amendment is as follows:

1. To address the following clarification questions

D-18, Para 3.7 (Main Reduction Gear and Cross-Connect Gear Stand-by Oil Pumps, Renew and Overhaul) Q: Is the intent of paragraph 3.7 of work item 18 to test contractor refurbished pumps vice “newly installed” pumps? Or is this a part of the Op-Test of the newly installed pumps?

A: Survey the newly installed pumps; no survey is needed of the contractor refurbished pumps.

D-14, (Ventilation System, Modify) Q: Contractor would like clarification on if the ventilation system is free of POLYCHLORIONATED

BIPHENYLS?

A: The ventilation system is designed to be and is free of Polychlorinated Biphenyls (PCBs).

D-16, Para 3.5.5 (Close-In-Weapon System, Replacement) Q: Paragraph 3.5.5 states “The contractor shall package and crate all removed equipment listed in the Table 5…” Spec does not indicate who will be responsible for shipping packaged equipment to Raytheon Missile Systems.

A: The U.S. Coast Guard will be responsible for shipping the equipment. The contractor will package it and ensure it is ready for shipment. Contractor shall put the address on there.

The solicitation closing date is not extended due to this amendment. Receipt of proposals are still due no later than 24MAY14 @ 1400 Pacific time.

SF 30 (0001)
Jake M. Apolonio, CONTRACT SPECIALIST

Page 2 - 0001

File details come from the government source that posted it. Updated .