HSCG85-13-R-P45005_Walnut_DS14_Schedule_of_Supplies.xlsx

XLSX spreadsheet 13 KB Posted

Attached to
CGC WALNUT FY14 DOCKSIDE REPAIRS
Solicitation number
HSCG85-13-R-P45005
Issued by

About this file

HSCG85-13-R-P45005 Walnut DS14 Schedule of Supplies

View the file

Other files

File Type Posted
HSCG85-13-R-P45005_Walnut_DS14_Schedule_of_Supplies_(AMD_0007).xlsx XLSX spreadsheet
Amendment0007_13RP45005.pdf PDF
Amendment0006_13RP45005.pdf PDF
225-WLB_528_8_PART_A.zip ZIP file
225-WLB_528_6_PART_F.zip ZIP file
225-WLB_505_1.zip ZIP file
225-WLB_528_9.zip ZIP file
225-WLB_528_8_PART_D.zip ZIP file
Amendment0005_13RP45005.pdf PDF
225-WLB_528_8_PART_E.zip ZIP file
225-WLB_612_1.zip ZIP file
225-WLB_528_6_PART_B.zip ZIP file
225-WLB_528_1.zip ZIP file
225-WLB_512_1.zip ZIP file
225-WLB_528_6_PART_E.zip ZIP file
225-WLB_528_8_PART_F.zip ZIP file
225-WLB_528_6_PART_C.zip ZIP file
225-WLB_528_8_PART_B.zip ZIP file
225-WLB_528_8_PART_C.zip ZIP file
225-WLB_528_6_PART_D.zip ZIP file
225-WLB_528_6_PART_A.zip ZIP file
Amendment0004_13RP45005.pdf PDF
Amendment0003_13RP45005.pdf PDF
Amendment0002_13RP45005.pdf PDF
Amendment0001_13RP45005.pdf PDF
HSCG85-13-R-P45005_Walnut_DS14_PP_Questionnaire.doc DOC document
HSCG85-13-R-P45005_Walnut_DS14_Specification_Rev_0.pdf PDF
HSCG85-13-R-P45005_Walnut_DS14_Clarification_Request_Form.doc DOC document
HSCG85-13-R-P45005_Walnut_DS14_Solicitation.doc DOC document
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOS&S

PRICING SCHEDULE FOR:
USCGC WALNUT (WLB-225A) DOCKSIDE AVAILABILITY FY2014
ITEMDESCRIPTIONUNIT PRICEUNITQTYEXTENDED PRICE
O-001Tanks (MP Fuel Stowage and Overflow), Clean and Inspect$0.00JOB1$0.00
O-002Tanks (MP Fuel Service), Clean and Inspect$0.00JOB1$0.00
D-003Tanks (Ballast), Clean and Inspect$0.00JOB1$0.00
D-004Hydraulic Chain Stoppers, Overhaul$0.00JOB1$0.00
D-005Boat Boom, Level 2 Inspect and Repair$0.00JOB1$0.00
D-006Single Point Davit - RHIB, Level 2 Inspect and Repair$0.00JOB1$0.00
D-007Tanks (Potable Water), Preserve “100%”$0.00JOB1$0.00
D-008Temporary Services, Provide$0.00JOB1$0.00
D-009Scuttles, Upgrade$0.00JOB1$0.00
D-010Deck Covering (Interior Wet/Dry), Renew-Heads, Closets, & Vestibule$0.00JOB1$0.00
D-011Piping Insulation, Renew$0.00JOB1$0.00
D-012Fuel Oil Tank TLI Striker Plate, Renew$0.00JOB1$0.00
D-013AC Foundation Resilient Mounts, Renew$0.00JOB1$0.00
D-014AMR Deck and AC Plant Foundation, Repair$0.00JOB1$0.00
D-015Exhaust Stack Plating, Renew$0.00JOB1$0.00
D-016Ventilation Systems, Renew$0.00JOB1$0.00
D-017Gooseneck Vent Pipe, Renew$0.00JOB1$0.00
D-018HVAC Fan Coil Unit, Renew$0.00JOB1$0.00
D-019Stack and Uptake Space Safety Improvements$0.00JOB1$0.00
D-020Vent Ducts (All Other), Commercial Cleaning$0.00JOB1$0.00
D-021Buoy Cargo Hold Deck, Preserve 100%$0.00JOB1$0.00
D-022Main Mast , Preserve, 100%$0.00JOB1$0.00
O-023Deck Covering (Interior Wet/Dry), Renew-57 Pway & Dry Stores$0.00JOB1$0.00
D-024Rails- Handrails and Stanchions, Renew$0.00JOB1$0.00
D-025Bilges (Machinery Space) - AMR , Preserve$0.00JOB1$0.00
D-026SORS Cargo Hatch Coaming, Overhaul$0.00JOB1$0.00
D-027Fan Room Deck Plating Repair$0.00JOB1$0.00
O-028Lube Oil Onload Riser Cutoff Valve Installation$0.00JOB1$0.00
D-029Miscellaneous Space Drain Piping Repair$0.00JOB1$0.00
O-030SCBA TCTO$0.00JOB1$0.00
O-00AComposite Labor Rate$0.00Hour1$0.00
D-00BGFP ReportNSPEANSP
D-00CTravel and Perdiem$0.00JOB1$0.00
Total Price of Definite Items$0.00
Total Price of Option Items$0.00
Total Price of Definite and Optional Items$0.00

(4/17/2013)_x000D_ Draft-0 - Page &P of &N

File details come from the government source that posted it. Updated .