WMSL512-001 NSC Zone Sys Comp Term Airflow Test_Rev A.pdf
PDF 165 KB Posted
- Attached to
- FY 2010 DRY DOCK & REPAIR OF CGC BERTHOLF
- Solicitation number
- HSCG8510R610K16
About this file
750-WMSL-512-501
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AMEND 0006 TO SOL.doc | DOC document | |
| WMSL512-002 NSC TP Zone Pressurization Test Before Laundry Mods.pdf | ||
| AMEND 0005 TO SOL.doc | DOC document | |
| AMEND 0004 TO SOL.doc | DOC document | |
| CORRECTED SECTION B - BERTHOLF DRYDOCK.doc | DOC document | |
| AMEND 0003 TO SOL.doc | DOC document | |
| USCGC BERTHOLF_Drydock and Repair_May_2010_Rev 1A.pdf | ||
| ASC556333-HY REV E.pdf | ||
| AMEND 0002 TO SOL.doc | DOC document | |
| 750-WMSL_100_8_1_-_D 1 .dwf | DWF file | |
| AMEND 0001 TO SOL.doc | DOC document | |
| USCGC BERTHOLF_Drydock and Repair_May_2010_Rev 0.pdf | ||
| FINAL BERTHOLF DD SOLICITATION.doc | DOC document |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TEST TITLE: Validated Zone, System, Compartment Page 1 of 65 and Terminal Volumetric Airflow Test NO.:WMSL512-001 Before Laundry Modifications REV/CHG: A
MARITIME SECURITY CUTTER, LARGE (WMSL BERTHOLF)
TEST PROCEDURE PREPARATION
United States Coast Guard
SFLC-ESD-NAME-AUX MACHY SECTION
SECURITY REVIEW CHECK
XUNCL___CONF___SECRET
/s/B. Baker 12/18/09 Prepared By Date
/s/M. Sirak 12/18/09 Checked By Date
/s/C.J. Martin 12/18/09 Approved By Date
TEST COMPLETION CERTIFICATION
Cutter Name USCG Cutter No.
Test Conductor Date
Government Witness Date
REMARKS:
TEST TITLE: Validated Zone, System, Compartment, Page 2 of 65 and Terminal Volumetric Air Flow Test TEST NO.: WMSL512-001
Before Laundry Modifications REV/CHG: A
LIST OF EFFECTIVE PAGES
APPROVAL
REV/CHG DESCRIPTION INITIAL DATE
- Initial Issue
A Revised Systems RS-31 to suit ECP 09-020-CG4B (Vent Mod White Paper)
Revised System TPSS-70 to suit SCIF 642 1109 751 HF TRANSMITTER RM REV- and ECN DW/DV00181
Revised Systems SS-50 and ES-100 to suit ECN
DW/DV00181
Revised Systems RS-5 and ES-100 to suit SCIF 641 BCE 1109 751 State Room Rev- BB 01-26-2010
TEST TITLE: Validated Zone, System, Compartment, Page 3 of 65
Before Laundry Modifications REV/CHG: A
LIST OF EFFECTIVE PAGES
PG-REV/CHG PG-REV/CHG PG-REV/CHG PG-REV/CHG PG-REV/CHG PG-REV/CHG
1 A 2 A 3 A 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 -
13 - 14 - 15 - 16 - 17 - 18 -
19 - 20 - 21 - 22 - 23 A 24 -
25 A 26 - 27 - 28 - 29 - 30 -
31 - 32 - 33 - 34 - 35 A 36 -
37 - 38 - 39 - 40 - 41 - 42 -
43 - 44 A 45 - 46 - 47 - 48 -
49 - 50 - 51 - 52 - 53 - 54 A
55 - 56 - 57 - 58 - 59 - 60 -
61 - 62 - 63 - 64 - 65 -
TEST TITLE: Validated Zone, System, Compartment, Page 4 of 65
Before Laundry Modifications REV/CHG:-
TEST OUTLINE
1. O B J E C T I V E
Demonstrate that the ventilation system delivers the correct quantity of air to each compartment as per design.
2. ESTIMATED TESTING TIME
200 Hours
3. REFERENCES
3.1 750-WMSL-512-066, HVAC System Diagram
3.2 750-WMSL-512-059, HVAC Equipment List
3.3 750-WMSL-512-005, Vent & Air Cond Fan Rm(P) Mn Dk Unit 3140
3.4 750-WMSL-512-006, Vent & Air Cond Fan Rm(P) 01 Lvl Unit 4210
3.5 750-WMSL-512-007, Vent & Air Cond Fan Rm(P) 2nd Dk Unit 2330
3.6 750-WMSL-512-008, Vent & Air Cond Fan Rm(P) Mn Dk Unit 2140
3.7 750-WMSL-512-009, Vent & Air Cond Fan Rm(S) 2nd Dk Unit 2330
3.8 750-WMSL-512-010, Vent & Air Cond Fan Rm(S) 2nd Dk Unit 3230
3.9 750-WMSL-512-011, Vent & Air Cond Fan Rm 02 Lvl Unit 4220
3.10 750-WMSL-512-012, Vent & Air Cond Fan Rm 02 Lvl Unit 4420
3.11 750-WMSL-512-013, Vent & Air Cond Fan Rm 2nd Dk Unit 2230
3.12 750-WMSL-512-014, Vent & Air Cond Fan Rm 2nd Dk Unit 1330
3.13 750-WMSL-512-017, Vent & Air Cond Arr 1st Platf Unit 1220
3.14 750-WMSL-512-018, Vent & Air Cond Arr 2nd Deck Unit 1230
3.15 750-WMSL-512-019, Vent & Air Cond Arr Mn Deck Unit 1240
3.16 750-WMSL-512-020, Vent & Air Cond Arr 1st Platf Unit 1320
3.17 750-WMSL-512-021, Vent & Air Cond Arr 2nd Deck Unit 1330
3.18 750-WMSL-512-022, Vent & Air Cond Arr Mn Deck Unit 1340
3.19 750-WMSL-512-023, Vent & Air Cond Arr 2nd Platf Unit 2110
TEST TITLE: Validated Zone, System, Compartment, Page 5 of 65
Before Laundry Modifications REV/CHG:-
TEST OUTLINE
3. REFERENCES (Continued),
3.20 750-WMSL-512-024, Vent & Air Cond Arr 1st Platf Unit 2120
3.21 750-WMSL-512-025, Vent & Air Cond Arr 2nd Deck Unit 2130
3.22 750-WMSL-512-026, Vent & Air Cond Arr Mn Deck Unit 2140
3.23 750-WMSL-512-027, Vent & Air Cond Arr 2nd Platf Unit 2210
3.24 750-WMSL-512-028, Vent & Air Cond Arr 1st Platf Unit 2220
3.25 750-WMSL-512-029, Vent & Air Cond Arr 2nd Deck Unit 2230
3.26 750-WMSL-512-030, Vent & Air Cond Arr Mn Deck Unit 2240
3.27 750-WMSL-512-031, Vent & Air Cond Arr 2nd Platf Unit 2310
3.28 750-WMSL-512-032, Vent & Air Cond Arr 1st Platf Unit 2320
3.29 750-WMSL-512-033, Vent & Air Cond Arr 2nd Deck Unit 2330
3.30 750-WMSL-512-034, Vent & Air Cond Arr Mn Deck Unit 2340
3.31 750-WMSL-512-035, Vent & Air Cond Arr 2nd Platf Unit 3110
3.32 750-WMSL-512-036, Vent & Air Cond Arr 1st Platf Unit 3120
3.33 750-WMSL-512-037, Vent & Air Cond Arr 2nd Deck Unit 3130
3.34 750-WMSL-512-038, Vent & Air Cond Arr Mn Deck Unit 3140
3.35 750-WMSL-512-039, Vent & Air Cond Arr 1st Platf Unit 3220
3.36 750-WMSL-512-040, Vent & Air Cond Arr 2nd Deck Unit 3230
3.37 750-WMSL-512-041, Vent & Air Cond Arr Mn Deck Unit 3240
3.38 750-WMSL-512-042, Vent & Air Cond Arr 2nd Deck Unit 3330
3.39 750-WMSL-512-043, Vent & Air Cond Arr 01 Lvl Unit 4110
3.40 750-WMSL-512-044, Vent & Air Cond Arr 02 Lvl Unit 4120
3.41 750-WMSL-512-045, Vent & Air Cond Arr 01 Lvl Unit 4210
3.42 750-WMSL-512-046, Vent & Air Cond Arr 02 Lvl Unit 4220
TEST TITLE: Validated Zone, System, Compartment, Page 6 of 65
Before Laundry Modifications REV/CHG:-
TEST OUTLINE
3. REFERENCES (Continued)
3.43 750-WMSL-512-046, Vent & Air Cond Arr Stack Unit 4230
3.44 750-WMSL-512-048, Vent & Air Cond Arr 01 Lvl Unit 4310
3.45 750-WMSL-512-049, Vent & Air Cond Arr Stack Unit 4320
3.46 750-WMSL-512-050, Vent & Air Cond Arr 01 Lvl Unit 4420
3.47 750-WMSL-512-051, Vent & Air Cond Arr Stack Unit 4430
3.48 750-WMSL-512-060, Vent & Air Cond Fan Room (P) 2nd Dk Unit 3130
3.49 750-WMSL-512-061, Vent & Air Cond Fan Room (P) 01 Lvl Unit 4210
3.50 750-WMSL-512-062, Vent & Air Cond Fan Room 02-29-1-Q Unit 4120
3.51 750-WMSL-512-063, Vent & Air Cond Fan Room 02-29-3-Q Unit 4120
3.52 750-WMSL-512-064, Vent & Air Cond Arr Unit 3320 – 1st Platform
3.53 750-WMSL-512-065, Vent & Air Cond Arr Unit 4130
3.55 750-WMSL-512-501, SCIF ShipAlt – HVAC Modifications
3.56 750-WMSL-512-502, JP-5 Hose Room Ventilation Installation
3.57 750-WMSL-512-503, SCIF ShipAlt – Transmitter Room HVAC Modifications
3.58 750-WMSL-512-504, Mods Incidental to New Crew Lounge Install
3.59 Technical Specifications, Sections 095-300, 095-302, 095-512, 302, and 512
4. TEST OR SUPPORT EQUIPMENT AND MATERIAL
GENERIC NAME QUANTITY IDENTIFYING INFORMATION
4.1 Anemometer 1 Rotating vane type with range 100 –
3000 ft/min
4.2 Flow Hood or Balometer 1 With range 0 – 3000 CFM
4. TEST OR SUPPORT EQUIPMENT AND MATERIAL (Continued)
GENERIC NAME QUANTITY IDENTIFYING INFORMATION
4.3 Velometer 1 With range 100 – 3000 ft/min
TEST TITLE: Validated Zone, System, Compartment, Page 7 of 65
Before Laundry Modifications REV/CHG:-
TEST OUTLINE
4.4 Variable Orifices 6 For installation in place of CBR
filters and capable of creating a pressure drop of 7.0 inches w.g.
5. COMPUTER PROGRAMS REQUIRED None
6. PREREQUISITES
6.1 Prior to commencing tests specified in this test procedure, verify that an installation inspection for the components comprising the system, or that portion thereof, to be tested has been conducted and documented.
NOTE
Completion of the entire test procedure, document, or function listed as a prerequisite is not always required. Only those portions pertaining to the system being tested must be completed.
7. SPECIAL CONDITIONS AND SERVICES
440 Vac, 60 Hz, 3 Phase Power
8. EQUIPMENT INVOLVED IN TEST
Ventilation fans, fan coil assemblies, and terminals.
9. CONFIGURATION
N/A
10. METHOD
Each ventilation terminal will be tested to verify that the terminal delivers the correct quantity of air as per design.
11. STATION ASSIGNMENTS
NO. OF
STATION PERSONNEL COMMENTS
Ventilation System 2 Test Conductor/Operator
TEST TITLE: Validated Zone, System, Compartment, Page 8 of 65
Before Laundry Modifications REV/CHG:-
SAFETY INSTRUCTIONS
1. Test personnel will strictly adhere to all safety precautions, including, but not limited to, all CAUTION and WARNING notes contained in this test procedure and applicable documents.
2. Prior to conducting tests, CAUTION label plate data shall be available to test personnel for purposes of personnel safety.
3. Permit only necessary test personnel in vicinity of ventilation system under test.
4. Voltages hazardous to life will be present at switchboards and related equipment during this test. To prevent serious injury or death, ensure that all personnel remain clear of energized equipment and circuits during the test.
5. Ensure that associated circuits and equipment are ready to accept input voltages. Obtain permission from the switchboard watch on duty and other activities prior to energizing and de-energizing circuits.
6. Equipment shall be secured for releasing, arcing or chattering of contacts, excessive time to attain speed, unusual noise or vibration, sign of overheating or improper lubrication, unnatural seal leakage, or other evidence of abnormal operation.
7. The supervisor in charge of conducting the test is responsible for insuring that all unauthorized personnel remain clear of the test areas for the duration of the test if he determines that a hazard to personnel exists.
8. Dangerous voltages exist inside motor controllers when power is available from ship's power panels. Rubber matting and rubber gloves shall be used. A non-conducting rescue rod shall be available or a non-conducting safety line shall be used.
TEST TITLE: Validated Zone, System, Compartment, Page 9 of 65
Before Laundry Modifications REV/CHG:-
INITIAL CONDITIONS AND SETUP
STEP STATION INSTRUCTIONS
1 N/A Prior to the performance of this test, ascertain that Paragraph 6 and Step 3 minimum requirements necessary for the start of this test have been met.
2 N/A Verify that each test instrument to be used has been calibrated to provide the measurement accuracies specified in Paragraph 4. The instrument serial number or Metrology Laboratory number designation and calibration due date for each instrument used shall be recorded on the Test Equipment Used Sheet provided in this test procedure.
NOTE
Other test measurement equipment may be substituted for that specified in Paragraph 4 provided accuracy requirements are not compromised.
3 Ventilation Before testing and balancing, the following conditions shall exist (as System applicable (for the area under test):
a. Systems shall be clean and all system ducting and components shall be installed, except for CBR filters.
b. A variable orifice, capable of achieving a pressure drop of 7.0 inches water gauge at design air flow shall be installed in lieu of the CBR filters.
c. CPS dampers 01-37-4(5) and 01-41-2(7), TPES 2 position damper 01-37- 2(6), and orifice damper 02- 29-2(34) shall be in the full open position.
d. Other normally open closures, dampers, and valves shall be open.
e. Ship shall be tested and balanced at atmospheric pressure and passages containing PCVs shall be open to the weather by means of opening suitable ship’s access doors.
f. Non-CPS filters shall be clean and in place, and access plates, inspection covers and fittings shall be in place. Fans shall be operated at high speed.
g. If the system to be tested takes suction from or discharges into a plenum chamber common to other systems, the other systems shall be operated at full capacity.
h. Access to the compartment tested shall be left open, except for compartments having either natural supply or natural exhaust or compartments designed to have a positive or negative internal pressure.
i. Access to spaces having either natural supply or natural exhaust shall be closed unless the access is the natural supply or exhaust.
j. In machinery spaces, laundry, galley, and similar heat-producing spaces, the heat-producing equipment shall be secured.
TEST TITLE: Validated Zone, System, Compartment, Page 10 of 65
Before Laundry Modifications REV/CHG:-
TESTING STEPS
STEP STATION INSTRUCTIONS
NOTE
During testing, adhere to all CAUTIONS and WARNINGS given in the Safety Instructions Section.
1 Fan Verify airflow from fan is at design air quantity. Record results on data sheets.
Volumetric Airflow Test
NOTE
All ventilation systems shall be balanced so that the delivered quantity of air to each compartment is within the following allowable range of the design quantity:
Outside CPS Within CPS
CM TM CM TM
Supply* 90% - 110% 80% - 120% 98% - 110% 90% - 110%
Exhaust** 90% - 110% 80% - 120% 95% - 105% 90% - 110%
A/C 90% - 110% 80% - 120% 100% - 110% 80% - 120%
* With the exception of replenishment air terminals within the CPS Zone, which shall be 98% through 108%.
**With the exception of hoods and exhaust terminals in washrooms, water closets, and shower spaces, which shall be no less than 100%.
Where:
CM = Total allowable measured airflow of a compartment TM = Allowable measured airflow of an individual terminal within a compartment
NOTE
Ventilation systems serving the following spaces shall be balanced to maintain a minimum negative pressure of 0.25 inches w.g. relative to surrounding spaces when access doors are closed:
Medical Waste Stowage Room, 1-72-2-A Paint Locker, 1-76-6-K Hazmat Stowage, 1-76-8-K Flammable Liquids Storage, 1-79-4-K VCHT Room, 3-38-2-E
2 Ventilation Using an anemometer, measure air speed at each ventilation terminal Terminal servicing that particular space. Calculate the gross area for each terminal using the formula below. Calculate the actual air quantity by multiplying the air speed times the gross area. Record results on data sheet.
TEST TITLE: Validated Zone, System, Compartment, Page 11 of 65
Before Laundry Modifications REV/CHG:-
TESTING STEPS
STEP STATION INSTRUCTIONS
2 Ventilation NOTE l Terminal The “Gross Area” for each terminal is calculated using the following formulas:
Area = h (in) x w (in) /144 (for rectangular terminals) Area = n/4 x dia2 /144(for round terminals)
NOTE
Where the air speed cannot be measured through an opening using an anemometer, such as in a replenishment supply air branch directly connected to a recirculation system, or a bypass, measure the air speed in the duct using a velometer or Pitot tube with differential pressure gauge.
NOTE
Where the gross area cannot be calculated accurately, such as for a supply diffuser of a recirculation system, measure the air quantity in CFM directly from the terminal using a flow hood or balometer.
NOTE
Fan Coil Units with no duct connected do not require air flow measurement or balancing.
TEST TITLE: Validated Zone, System, Compartment, Page 12 of 65
Before Laundry Modifications REV/CHG:-
SHUTDOWN AND SECURING
STEP STATION INSTRUCTIONS
1 Various Restore system to pretest configuration or configuration suitable for subsequent intended activities.
TEST TITLE: Validated Zone, System, Compartment, Page 13 of 65
Before Laundry Modifications REV/CHG:-
TEST DATA RECORDING
PRE-TEST REQUIREMENT VERIFICATION
Satisfactory completion of the applicable requirements specified in the Test Outline Section, the Safety Instructions Section, and the Initial Conditions and Setup Section of this Test Procedure.
Complete: ______________________ _____________ (Test Conductor Signature) (Date)
See next page.
TEST TITLE: Validated Zone, System, Compartment, Page 14 of 65
Before Laundry Modifications REV/CHG:-
TEST DATA RECORDING
INDEX
Systems Inside CPS Zone Page Systems Inside CPS Zone Page
RS-1 15 TPSS-70 23
RS-2 16 TPES-125 24
RS-3 17
RS-4 18
RS-6 19
RS-16 20
RS-32 21
RS-33 22
Systems Outside CPS Zone Page Systems Outside CPS Zone Page
RS-5 25 SS-50 44
RS-8 26-27 SS-53 45
RS-9 28 SS-56 46
RS-10 29 SS-57 47
RS-11 30 SS-58 48
RS-12 31 SS-59 49
RS-13 32 SS-61 50-51
RS-14 33 SS-69 52
RS-30 34 SS-71 53
RS-31 35 ES-100 54
FCA-20 36 ES-107 55
FCA-21 37 ES-108 56
FCA-22 38 ES-109 57
FCA-25 39 ES-111 58-59
FCA-26 40 ES-116 60
FCA-27 41 ES-118 61
FCA-28 42 ES-119 62
FCA-29 43 ES-(NEW) 1-83-2 63
TEST TITLE: Validated Zone, System, Compartment, Page 15 of 65
Before Laundry Modifications REV/CHG:-
TEST DATA RECORDING
Compartment/Terminal Design Required Gross Actual
CFM CFM Area CFM
2 RS-1
Fan Total Airflow 4200 4130 ________ ________
3” Dia Fan Bypass Airflow 70 70 ________ ________
SUPPLY
Pilot House 03-29-0-C
24x27 Diffuser, Fr 31 S 1905 1524-2286 _________ _________
24x27 Diffuser, Fr 31 P 1905 1524-2286 _________ _________
Compartment Total 3810 3810-4191 _________
Mk 46 Equipment Room 04-30-0-Q
12x6 Diffuser, Fr 30 CL 270 270-297 _________ _________
RETURN
Pilot House 03-29-0-C
24x24 Open Duct, Fr 33 S 2640 2112-3168 _________ _________
18x24 Open Duct, Fr 33 S 1440 1152-1728 _________ _________
Compartment Total 4080 4080-4488 _________
TEST TITLE: Validated Zone, System, Compartment, Page 16 of 65
Before Laundry Modifications REV/CHG:-
2 RS-2
Fan Total Airflow 8500 6675 _________ _________
10” Dia Fan Bypass Airflow 1825 1825 _________ _________
SUPPLY
Operations Center 02-29-0-C
15x15 Diffuser, Fr 30.5 P 605 484-726 _________ _________
15x15 Diffuser, Fr 34 P 605 484-726 _________ _________
15x15 Diffuser, Fr 33 P 605 484-726 _________ _________
36x12 Diffuser, Fr 36 P 2085 1668-2502 _________ _________
48x12 Diffuser, Fr 36 P 2775 1668-2502 _________ _________
Compartment Total 6675 6675-7343 _________
RETURN
Operations Center 02-29-0-C
24x42 Open Duct, Fr 30 P 6330 6330-6963 _________ _________
TEST TITLE: Validated Zone, System, Compartment, Page 17 of 65
Before Laundry Modifications REV/CHG:-
2 RS-3
Fan Total Airflow: 8500 8310 _________ _________
7” Dia Fan Bypass Airflow 190 190 _________ _________
SUPPLY
Comm/MEES 02-38-0-C
30x24 Diffuser, Fr 39 P 2345 1876-2814 _________ _________
24x18 Diffuser, Fr 40 P 1175 940-1410 _________ _________
24x18 Diffuser, Fr 41 S 1175 940-1410 _________ _________
Direct Connected Supply to
SLQ 32 450 450-495 _________ _________
TRS-3D Radar 415 415-457 _________ _________
Compartment Total 5560 5560-6116 _________
MEES Processing Center 02-40-1-C
30x27 Diffuser, Fr 41.5 S 2750 2750-3031 _________ _________
RETURN
Comm/MEES 02-38-0-C
38x26 Open Duct, Fr 40.5 P 6605 5284-7926 _________ _________
7 dia Bellmouth, Fr 42 P 570 456-684 _________ _________
30x16 Open Duct, Fr 39 P 785 628-942 _________ _________
Compartment Total 7960 7960-8756 _________
TEST TITLE: Validated Zone, System, Compartment, Page 18 of 65
Before Laundry Modifications REV/CHG:-
2 RS-4
Fan Total Airflow 2000 1490 _________ _________
8” Dia Fan Bypass Airflow 510 510 _________ _________
SUPPLY
Commanding Officer Cabin 01-28-3-L
9x9 Diffuser, Fr 29 S 215 172-258 _________ _________
9x9 Diffuser, Fr 31 S 215 172-258 _________ _________
Compartment Total 430 430-473 _________
Commanding Officer Stateroom 01-34-1-L
9x6 Diffuser, Fr 32 S 165 165-182 _________ _________
Executive Officer Stateroom 01-28-2-L
9x6 Diffuser, Fr 31 P 185 185-204 _________ _________
Executive Officer Office 01-28-6-Q
12x9 Diffuser, Fr 30 P 295 295-325 _________ _________
Engineering Officer Stateroom 01-33-2-L
9x6 Diffuser, Fr 35 P 150 150-165 _________ _________
Operations Officer Stateroom 01-33-4-L
9x6 Diffuser, Fr 35 P 190 190-209 _________ _________
Officer Stateroom 1-29-2-L
6x6 Diffuser, Fr 30 P 75 75-83 _________ _________
RETURN
Commanding Officer Cabin 01-28-3-L
12x12 Grill, Fr 33 S 325 325-358 _________ _________
Commanding Officer Cabin 01-28-3-L
10x10 Grill, Fr 32 P 265 265-292 _________ _________
TEST TITLE: Validated Zone, System, Compartment, Page 19 of 65
Before Laundry Modifications REV/CHG:-
TEST DATA RECORDING
Compartment/Terminal Design Required Gross Actual
CFM CFM Area CFM
2 RS-6
Fan Total Airflow 1500 1500 ________ _________
SUPPLY
CPO Stateroom 1-32-1-L
6x6 Diffuser, Fr 33.5 S 135 135-149 ________ _________
CPO Stateroom 1-32-3-L
12x6 Diffuser, Fr 33.5 S 270 270-297 ________ _________
CPO Stateroom 1-41-3-L
12x9 Diffuser, Fr 43 S 300 300-330 ________ _________
CPO Stateroom 1-28-8-L
9x6 Diffuser, Fr 29.5 P 165 165-182 ________ _________
CPO Stateroom 1-32-2-L
6x6 Diffuser, Fr 33.5 P 145 145-160 ________ _________
CPO Stateroom 1-32-4-L
9x6 Diffuser, Fr 33.5 P 190 190-209 ________ _________
CPO Stateroom 1-36-2-L
12x6 Diffuser, Fr 38 P 295 295-325 ________ _________
RETURN
Passage 1-29-0-L
11x6 Bellmouth, Fr 41 P 800 800-880 ________ _________
TEST TITLE: Validated Zone, System, Compartment, Page 20 of 65
Before Laundry Modifications REV/CHG:-
2 RS-16
Fan Total Airflow: 2600 2360 ________ _________
4” Dia Fan Bypass Airflow: 240 240 ________ _________
SUPPLY
Passage 01-38-1-L
12x10 Duct Opening, Fr 41 S 845 845-930 ________ _________
Ship Office 01-37-4-Q S
12x9 Diffuser, Fr 39 P 305 244-366 ________ _________
12x9 Diffuser, Fr 41 P 305 244-366 ________ _________
Compartment Total 610 549-671 ________ _________
Passage 1-29-0-L
12x15 Diffuser, Fr 40 S 500 500-550 ________ _________
Training Center 1-37-0-Q
12x6 Diffuser, Fr 38.5 P 205 164-246 ________ _________
12x6 Diffuser, Fr 40.5 P 200 160-240 ________ _________
Compartment Total 405 405-446 _________
RETURN
Passage 01-38-1-L
8 dia Bellmouth, Fr 38 S 505 505-556 ________ _________
Ship Office 01-37-4-Q
12x7 Bellmouth, Fr 37.5 P 610 610-671 ________ _________
Battle Dressing Locker 01-41-1-Q
6x6 Grill, Fr 42 S 75 75-83 ________ _________
Passage 1-29-0-L
6x5 Bellmouth, Fr 37.5 P 310 310-341 ________ _________
Training Center 1-37-0-Q
12x12 Grill, Fr 38 P 405 405-446 ________ _________
TEST TITLE: Validated Zone, System, Compartment, Page 21 of 65
Before Laundry Modifications REV/CHG:-
2 RS-32
Fan Total Airflow 3280 3280 _________ _________
SUPPLY
SCIF 02-32-1-C
24x21 Diffuser, Fr 35 S 1640 1024-1968 _________ _________
21x21 Diffuser, Fr 35 S 1640 1024-1968 _________ _________
Compartment Total 3280 3280-3608 _________
RETURN
SCIF 02-32-1-C
24x6 Open Duct, Fr 39.5 S 350 280-385 _________ _________
24x6 Open Duct, Fr 39.5 S 350 280-385 _________ _________
44x14 Open Duct, Fr 39.5 S 1725 1380-2070 _________ _________
30x12 Open Duct, Fr 39 S 780 624-936 _________ _________
Compartment Total 3205 3205-3526 _________
TEST TITLE: Validated Zone, System, Compartment, Page 22 of 65
Before Laundry Modifications REV/CHG:-
2 RS-33
Fan Total Airflow 4200 3100 _________ _________
6” Dia Fan Bypass Airflow 1100 1100 _________ _________
SUPPLY
LAN Room 1-36-1-Q
21x21 Diffuser, Fr 36.5 S 1035 828-1242 _________ _________
21x21 Diffuser, Fr 38 S 1035 828-1242 _________ _________
21x21 Diffuser, Fr 39 S 1030 824-1236 _________ _________
Compartment Total 3100 3100-3410 _________
RETURN
LAN Room 1-36-1-Q
18x36 Opening in Plenum, Fr 40 S 3100 3100-3410 _________ _________
TEST TITLE: Validated Zone, System, Compartment Page 23 of 65
Before Laundry Modifications REV/CHG: A
2 TPSS-70
Fan Total Airflow 3600 3600 _________ _________
Cooling Coil Bypass Airflow 2700 2700 _________ _________
Fan Room 02-29-1-Q Replenishment Air Duct
(Hard Connected to RS-2) 345 338-373 _________ _________
Fan Room 02-29-3-Q Replenishment Air Duct
(Hard Connected to RS-1) 50 49-54 _________ _________
Fan Room 02-41-2-Q Replenishment Air Duct
(Hard Connected to RS-3) 390 382-421 _________ _________
Protective Clothing Storeroom 01-36-1-A 4 dia J terminal, Fr 37 S 85 83-94 _________ _________
Fan Room 01-37-6-Q Replenishment Air Duct
(Hard Connected to RS-4) 900 882-972 _________ _________
Replenishment Air Duct (Hard Connected to RS-32) 75 74-81 _________ _________
IC Room 1-28-1-C
4 dia J terminal, Fr 28.5 S 75 74-81 _________ _________
Laundry 1-28-3-Q 8 dia E terminal, Fr 30 S 450 441-495 _________ _________
LAN Room 1-36-1-Q 4 dia duct opening, Fr 39.5 S 75 74-81 _________ _________
Fan Room 1-40-4-Q Replenishment Air Duct
(Hard Connected to RS-6) 625 613-677 _________ _________
Replenishment Air Duct (Hard Connected to RS-16) 455 446-492 _________ _________
Transmitter Room 1-41-1-Q Replenishment Air Duct
(4 dia duct opening, Fr 43 S) 75 74-81 _________ _________
TEST TITLE: Validated Zone, System, Compartment, Page 24 of 65
Before Laundry Modifications REV/CHG:-
2 TPES-125
Fan Total Airflow 1950 1620 _________ _________
5” Dia Fan Bypass Airflow 330 330 _________ _________
Deck Toilet 02-36-0-L 4 dia Bellmouth, Fr 37 S 100 100-05 _________ _________
Bath 01-33-1-L 6x6 Grill, Fr 32 S 105 105-10 _________ _________
Bath 01-28-4-L 6x6 Grill, Fr 29 P 95 95-100 _________ _________
Toilet/Shower 01-36-2-L 6x6 Grill, Fr 36.5 P 75 75-79 _________ _________
Toilet/Shower 01-36-4-L 6x6 Grill, Fr 36.5 P 75 75-79 _________ _________
Toilet/Shower 01-36-2-L 6x6 Grill, Fr 36.5 P 75 75-79 _________ _________
Laundry 1-28-3-Q 7 dia Bellmouth, Fr 29 S 165 149-182 _________ _________
7 dia Bellmouth, Fr 29.5 S 165 149-182 _________ _________
7 dia Bellmouth, Fr 30.5 SS 165 149-182 _________ _________
Compartment Total 495 470-520 __________
Toilet/Shower 1-34-1-L 6x6 Grill, Fr 35.5 S 75 75-79 _________ _________
Toilet/Shower 1-34-3-L 6x6 Grill, Fr 35.5 S 75 75-79 _________ _________
Toilet/Shower 1-41-1-L 6x4 Grill, Fr 41 S 75 75-79 _________ _________
Toilet/Shower 1-28-2-L 6x6 Grill, Fr 28.5 P 75 75-79 _________ _________
Toilet/Shower 1-28-4-L 6x6 Grill, Fr 28.5 P 75 75-79 _________ _________
Toilet/Shower 1-34-2-L 6x6 Grill, Fr 35.5 P 75 75-79 _________ _________
Toilet/Shower 1-34-4-L 6x6 Grill, Fr 35.5 P 75 75-79 _________ _________
Toilet/Shower 1-40-2-L 6x4 Grill, Fr 40 P 75 75-79 _________ _________
TEST TITLE: Validated Zone, System, Compartment Page 25 of 65
Before Laundry Modifications REV/CHG: A
TEST DATA RECORDING
Compartment/Terminal Design Required Gross Actual
CFM CFM Area CFM
2 RS-5
Fan Total Airflow 1500 1500 _________ _________
SUPPLY
Officer Stateroom 1-26-1-L
12x6 Diffuser, Fr 27 P 190 189-231 _________ _________
Officer Stateroom 1-26-2-L
12x6 Diffuser, Fr 27 S 195 189-231 _________ _________
Officer Stateroom 1-22-6-L
12x6 Diffuser, Fr 24 P 220 234-286 _________ _________
Officer Stateroom 1-22-0-L
12x6 Diffuser, Fr 24 P 190 234-286 _________ _________
Officer Stateroom 1-22-1-L
12x6 Diffuser, Fr 23.5 S 190 194-237 _________ _________
Passage 2-22-0-L
4 dia J terminal, Fr 23 S 100 108-132 _________ _________
CPO Stateroom 2-22-1-L
9x9 Diffuser, Fr 25 S 200 212-259 _________ _________
CPO Stateroom 2-26-1-L
9x9 Diffuser, Fr 27 S 215 225-275 _________ _________
RETURN
Passage 1-22-01-L
11x5 Bellmouth, Fr 27 P 595 536-655 _________ _________
Passage 2-22-0-L
8 dia Bellmouth, Fr 23 S 450 360-540 _________ _________
6x5 1/2 Bellmouth, Fr 27 P 455 364-546 _________ _________
Compartment Total 905 815-996 _________
TEST TITLE: Validated Zone, System, Compartment, Page 26 of 65
Before Laundry Modifications REV/CHG:-
TEST DATA RECORDING
Compartment/Terminal Design Required Gross Actual
CFM CFM Area CFM
2 RS-8
Fan Total Airflow: 4155 4155 _________ _________
SUPPLY
Crew Messroom 1-52-01-L
12x9 Diffuser, Fr 57.5 330 297-363 _________ _________
12x9 Diffuser, Fr 58 S 330 297-363 _________ _________
12x9 Diffuser, Fr 62 S 330 297-363 _________ _________
12x9 Diffuser, Fr 62 S 330 297-363 _________ _________
18x9 Diffuser, Fr 60 P 525 473-578 _________ _________
18x9 Diffuser, Fr 63 P 525 473-578 _________ _________
Compartment Total 2370 2133-2607 _________
CPO Messroom/Lounge 1-52-4-L
12x9 Diffuser, Fr 53.5 P 315 252-378 _________ _________
12x9 Diffuser, Fr 55.5 P 315 252-378 _________ _________
Compartment Total 630 567-693 _________
Dry Provisions Storeroom 1-67-2-A
8 Dia J Terminal, Fr 69 P 505 455-556 _________ _________
Passage 1-64-0-L
6x12 Diffuser, Fr 71 P 185 167-204 _________ _________
Passage 1-64-0-L
9x6 Diffuser, Fr 71.5 S 150 135-165 _________ _________
Passage 2-52-01-L
9x9 Diffuser, Fr 54 S 315 284-347 _________ _________
TEST TITLE: Validated Zone, System, Compartment, Page 27 of 65
Before Laundry Modifications REV/CHG:-
TEST DATA RECORDING
2 RS-8 (Continued)
RETURN
Crew Messroom 1-52-01-L
18x12 Grill, Fr 60 P 933 746-1120 _________ _________
18x12 Grill, Fr 63 S 932 746-1120 _________ _________
Compartment Total 1865 1679-2052 _________
CPO Messroom 1-52-4-L
14x12 Grill, Fr 56 P 630 567-693 _________ _________ Compartment/Terminal Design Required Gross Actual
CFM CFM Area CFM
General Stores 1-65-2-A
4 dia Bellmouth, Fr 67 P 100 90-110 _________ _________
Dry Provisions Storeroom 1-67-2-A
6 dia Bellmouth, Fr 69.5 P 505 455-556 _________ _________
Vending Storage 1-72-4-A
3 dia Bellmouth, Fr 71.5 P 75 68-83 _________ _________
5 dia Open Duct, Fr 63.5 S 170 153-187 _________ _________
TEST TITLE: Validated Zone, System, Compartment, Page 28 of 65
Before Laundry Modifications REV/CHG:-
2 RS-9
Fan Total Airflow: 5295 5295 _________ _________
SUPPLY
Galley 1-57-2-Q
21x21 Diffuser, Fr 58 P 1205 964-1446 _________ _________
21x21 Diffuser, Fr 60 P 1205 964-1446 _________ _________
21x21 Diffuser, Fr 62 P 1205 964-1446 _________ _________
21x21 Diffuser, Fr 63 P 1205 964-1446 _________ _________
Compartment Total 4820 4338-5302 _________
Scullery 1-52-1-Q
15x15 Diffuser, Fr 53 S 475 428-523 _________ _________
RETURN
Galley 1-57-2-Q
Canopy Hood, Fr 57.5 P 1800 1800-1980 _________ _________
Canopy Hood, Fr 61P 1600 1600-1760 _________ _________
Replenishment Air from
Weather 1895 1706-2085 _________ _________
TEST TITLE: Validated Zone, System, Compartment, Page 29 of 65
Before Laundry Modifications REV/CHG:-
2 RS-10
Fan Total Airflow 2600 2485 _________ _________
Fan 4” Dia Bypass Airflow 115 115 _________ _________
SUPPLY
Engineering Control Room & DC Central 2-52-1-E
15x12 Diffuser, Fr 53 S 595 476-714 _________ _________
15x12 Diffuser, Fr 55 S 595 476-714 _________ _________
15x12 Diffuser, Fr 57 S 590 472-708 _________ _________
Compartment Total 1780 1602-1958 _________
Elec/Computer Repair 2-59-0-Q
15x15 Diffuser, Fr 60 S 705 635-776 _________ _________
RETURN
Engineering Control Room & DC Central 2-52-1-E
12 dia Bellmouth, Fr 60 S 1580 1422-1738 _________ _________
16x11 open duct, Fr 63 S 785 707-864 _________ _________
TEST TITLE: Validated Zone, System, Compartment, Page 30 of 65
Before Laundry Modifications REV/CHG:-
2 RS-11
Fan Total Airflow 660 590 _________ _________
3” Dia Bypass Airflow 70 70 _________ _________
SUPPLY
Sick Bay 1-73-2-L
12x12 Diffuser, Fr 74 P 410 369-451 _________ _________
Ward 1-73-6-L
9x9 Diffuser, Fr 75 P 180 162-198 _________ _________
RETURN
Sick Bay 1-73-2-L
10x10 Grill, Fr 76 P 290 261-319 _________ _________
Ward 1-73-6-L
10x6 Grill, Fr 74 P 135 122-149 _________ _________
Fan Room 1-70-2-Q
11x4 F0 Replenishment Air from Weather 165 149-182 _________ _________
TEST TITLE: Validated Zone, System, Compartment, Page 31 of 65
Before Laundry Modifications REV/CHG:-
2 RS-12
Fan Total Airflow 1030 795 _________ _________
4” Dia Fan Bypass Airflow 235 235 _________ _________
SUPPLY
Crew Stateroom 2-64-5-L
12x12 Diffuser, Fr 68 S 445 401-490 _________ _________
Crew Stateroom 2-67-01-L
9x6 Diffuser, Fr 68.5 S 180 162-198 _________ _________
Passage 2-64-2-L 14x3.25 Open Duct, Fr 69 P 170 153-187 _________ _________
RETURN
Passage 2-64-1-L
6 dia Bellmouth, Fr 69 S 370 333-407 _________ _________
Passage 2-64-2-L 7 dia Bellmouth, Fr 67.5 P 425 383-468 _________ _________
TEST TITLE: Validated Zone, System, Compartment, Page 32 of 65
Before Laundry Modifications REV/CHG:-
2 RS-13
Fan Total Airflow 2000 1950 _________ _________
4” Dia Fan Bypass Airflow 50 50 _________ _________
SUPPLY
Crew Stateroom 2-82-3-L
12x12 Diffuser, Fr 86 S 425 383-460
Crew Stateroom 2-82-4-L
12x12 Diffuser, Fr 85 P 505 455-556 _________ _________
Passage 2-82-01-L
6x6 Diffuser, Fr 82 S 90 81-99 _________ _________
Crew Stateroom 2-85-01-L
9x6 Diffuser, Fr 86.5 S 160 144-176 _________ _________
Physical Fitness Room 3-82-0-Q
15x12 Diffuser, Fr 85 CL 545 436-654 _________ _________
9x9 Diffuser, Fr 85 S 270 216-324 _________ _________
Compartment Total 815 734-897 _________
RETURN
Crew Stateroom 2-82-3-L 12x8 Grill, Fr 83 S 200 180-220 _________ _________
Crew Stateroom 2-82-4-L 12x12 Grill, Fr 88 P 235 212-259 _________ _________
Passage 2-82-01-L 6 dia Bellmouth, Fr 82 P 520 468-572 _________ _________
Physical Fitness Room 3-82-0-Q 16x14 Grill, Fr 82.5 S 815 734-897 _________ _________
TEST TITLE: Validated Zone, System, Compartment, Page 33 of 65
Before Laundry Modifications REV/CHG:-
2 RS-14
Fan Total Airflow: 1560 1560 _________ _________
SUPPLY
Crew Stateroom 2-36-3-L
12x9 Diffuser, Fr 38 S 360 324-396 _________ _________ Passage 2-36-0-L
9x9 Diffuser, Fr 38.5 /S 145 131-160 _________ _________
Crew Stateroom 2-41-1-L 12x9 Diffuser, Fr 41 S 265 239-292 _________ _________
Crew Stateroom 2-36-2-L 9x6 Diffuser, Fr 38.5 P 175 158-193 _________ _________
Crew Stateroom 2-36-8-L 12x9 Diffuser, Fr 38.5 P 310 248-372 _________ _________
12x9 Diffuser, Fr 42 P 305 244-366 _________ _________
Compartment Total 615 554-377 _________
RETURN
Passage 2-36-0-L
6x6 Bellmouth, Fr 42 S 315 252-378 _________ _________
6 dia Bellmouth, Fr 41 P 315 252-378 _________ _________
Compartment Total 630 567-693 _________
Crew Stateroom 2-41-1-L
8x10 Grill, Fr 42 S 190 171-209 _________ _________
Crew Stateroom 2-36-8-L 12x12 Grill, Fr 40.5 P 440 396-484 _________ _________
TEST TITLE: Validated Zone, System, Compartment, Page 34 of 65
Before Laundry Modifications REV/CHG:-
2 RS-30
Fan Total Airflow: 1575 1575 _________ _________
SUPPLY
Crew Stateroom 2-70-0-L
9x9 Diffuser, Fr 71.5 S 225 203-248 _________ _________
Crew Stateroom 2-70-5-L 9x9 Diffuser, Fr 74 S 215 194-237 _________ _________
Crew Stateroom 2-70-6-L
9x9 Diffuser, Fr 74 P 275 248-303 _________ _________
Crew Stateroom 3-70-1-L 12x9 Diffuser, Fr 74 S 335 302-369 _________ _________
Crew Stateroom 3-71-1-L 9x6 Diffuser, Fr 73.5 S 150 135-165 _________ _________
Passage 3-70-0-L
6x6 Diffuser, Fr 71 P 75 68-83 _________ _________
Crew Stateroom 3-70-2-L
12x9 Diffuser, Fr 74 P 300 270-330 _________ _________
RETURN
Passage 2-70-1-L
4 dia Bellmouth, Fr 71 S 140 126-154 _________ _________
Passage 2-70-2-L
6 dia Bellmouth, Fr 74 P 350 315-385 _________ _________
Passage 3-70-0-L
7 dia Bellmouth, Fr 71 P 410 369-451 _________ _________
Passage 3-70-2-L 10x10 Grill, Fr 72 P 225 203-248 _________ _________
TEST TITLE: Validated Zone, System, Compartment Page 35 of 65
Before Laundry Modifications REV/CHG: A
TEST DATA RECORDING
Compartment/Terminal Design Required Gross Actual
CFM CFM Area CFM
2 RS-31
Fan Total Airflow: 2000 1830 _________ _________
5” Dia Fan Bypass Airflow: 135 135 _________ _________
SUPPLY
Crew Stateroom 2-33-1-L
6x9 Diffuser, Fr 35 S 190 152-258 _________ _________
6x9 Diffuser, Fr 35 S 190 152-258 _________ _________
Compartment Total 380 342-418 _________
Crew Stateroom 2-28-4-L 6x6 Diffuser, Fr 31 P 130 104-156 _________ _________
6x6 Diffuser, Fr 30 P 125 100-150 _________ _________
Compartment Total 255 230-281 _________
Crew Stateroom 2-33-2-L 6x9 Diffuser, Fr 35 P 175 140-210 _________ _________
6x9 Diffuser, Fr 35 P 170 136-204 _________ _________
Compartment Total 345 311-380 _________
Crew Stateroom 3-28-3-L 9x6 Diffuser, Fr 29.5 S 150 120-180 _________ _________
9x6 Diffuser, Fr 32.5 S 150 120-180 _________ _________
9x6 Diffuser, Fr 33 S 145 116-174 _________ _________
Compartment Total 445 401-490 _________
Crew Stateroom 3-28-2-L 9x6 Diffuser, Fr 29.5 P 110 88-132 _________ _________
9x6 Diffuser, Fr 29.5 P 110 88-132 _________ _________
9x6 Diffuser, Fr 33 P 110 88-132 _________ _________
9x6 Diffuser, Fr 33 P 110 88-132 _________ _________
Compartment Total 440 396-484 _________
RETURN
Passage 2-28-0-L
9x7 Bellmouth, Fr 32 S 450 405-495 _________ _________ Passage 2-33-1-L
10x12 Register, Fr 33 S 305 275-336 _________ _________ Passage 3-30-0-L
14x5 Bellmouth, Fr 31.5 S 700 630-770 _________ _________
TEST TITLE: Validated Zone, System, Compartment, Page 36 of 65
Before Laundry Modifications REV/CHG:-
2 FCA-20
Fan Total Airflow: 1760 1760 _________ __________
SUPPLY
Steering Gear Room 2-94-2-E 15x15 Diffuser, Fr 95 P 585 468-702 _________ __________
15x15 Diffuser, Fr 97 P 585 468-702 _________ __________
15x15 Diffuser, Fr 97 P 590 472-708 _________ __________
Compartment Total 1760 1584-1936 __________
Steering Gear Room 2-94-2-E FCA Return (no terminal) 1760 1584-1936 _________ __________
TEST TITLE: Validated Zone, System, Compartment, Page 37 of 65
Before Laundry Modifications REV/CHG:-
2 FCA-21
Fan Total Airflow: 1760 1760 _________ _________
SUPPLY
Steering Gear Room 2-94-1-E 15x15 Diffuser, Fr 95 S 585 468-702 _________ _________
15x15 Diffuser, Fr 97 S 585 468-702 _________ _________
15x15 Diffuser, Fr 97 S 590 472-708 _________ _________
Compartment Total 1760 1584-1936 _________
RETURN
Steering Gear Room 2-94-1-E FCA Return (no terminal) 1760 1584-1936 _________ _________
TEST TITLE: Validated Zone, System, Compartment, Page 38 of 65
Before Laundry Modifications REV/CHG:-
2 FCA-22
Fan Total Airflow: 990 990 ________ _________
SUPPLY
Boatswain Shop & Storeroom 2-10-0-A 12x12 Diffuser, Fr 11 S 330 264-396 _________ _________
12x12 Diffuser, Fr 14 S 330 264-396 _________ _________
12x12 Diffuser, Fr 14 P 330 264-396 _________ _________
Compartment Total 990 891-1089 _________
RETURN
Boatswain Shop & Storeroom 2-10-0-A FCA Return (no terminal) 990 891-1089 _________ _________
TEST TITLE: Validated Zone, System, Compartment, Page 39 of 65
Before Laundry Modifications REV/CHG:-
2 FCA-25
Fan Total Airflow: 900 900 _________ _______
SUPPLY
Armory 1-16-1-Q 12x9 Diffuser, Fr 17 S 265 239-292 _________ _________
Officer Stateroom 1-19-1-L 12x12 Diffuser, Fr 20 S 345 311-380 _________ _________
Officer Stateroom 1-18-2-L 12x9 Diffuser, Fr 20 P 290 261-319 _________ _________
Passage 1-16-01-L
FCA Return (no terminal) 900 810-990 _________ _________
TEST TITLE: Validated Zone, System, Compartment, Page 40 of 65
Before Laundry Modifications REV/CHG:-
2 FCA-26
Fan Total Airflow: 1745 1745 _________ _________
SUPPLY
Officer Wardroom Lounge 1-44-2-L
12x12 Diffuser, Fr 46 P 370 296-444 _________ _________
12x12 Diffuser, Fr 50 P 370 296-444 _________ _________
12x12 Diffuser, Fr 51 P 375 300-450 _________ _________
Compartment Total 1115 1004-1227 _________
Passage 1-44-0-L
12x18 Diffuser, Fr 50 P 630 567-693 _________ _________
RETURN
Officer Wardroom Lounge 1-44-2-L
20x12 Grill, 47.5 P 1115 1004-1227 _________ _________
Passage 1-44-0-L
9x5 Bellmouth, 46 S 315 252-378 _________ _________
12x12 Grill, 45.5 P 315 252-378 _________ _________
Compartment Total 630 567-693 _________
TEST TITLE: Validated Zone, System, Compartment, Page 41 of 65
Before Laundry Modifications REV/CHG:-
2 FCA-27
Fan Total Airflow: 1775 1775 _________ _________
SUPPLY
Passage 1-76-0-L
9x6 JA Terminal, Fr 80 S 375 338-415 _________ _________
Crew Stateroom 2-76-0-L
12x9 Diffuser, Fr 80 S 330 297-363 _________ _________
Passage 2-76-3-L 5 dia J Terminal, Fr 80 S 160 144-176 _________ _________
Passage 2-76-2-L 4 dia Open Duct, Fr 78 P 85 77-94 _________ _________
Crew Stateroom 2-76-4-L 12x12 Diffuser, Fr 79 P 360 324-396 _________ _________
Passage 3-76-2-L 4 dia J terminal, Fr 78 P 80 72-88 _________ _________
Crew Stateroom 3-76-6-L 15x9 Diffuser, Fr 78.5 P 385 347-424 _________ _________
Passage 1-76-0-L 8.5x5 Bellmouth, Fr 77.5 S 375 338-413 _________ _________
Passage 2-76-3-L 3x7 Bellmouth, Fr 80 S 160 144-176 _________ _________
Passage 2-76-2-L 8.5x5 Bellmouth, Fr 77 P 450 405-495 _________ _________
Crew Stateroom 2-76-4-L 10x10 Grill, Fr 77 P 175 158-193 _________ _________
Passage 3-76-2-L 9x5 Bellmouth, Fr 79 P 390 351-429 _________ _________
TEST TITLE: Validated Zone, System, Compartment, Page 42 of 65
Before Laundry Modifications REV/CHG:-
2 FCA-28
Fan Total Airflow: 1410 1410 _________ _________
SUPPLY
Crew Lounge 2-47-2-L
12x9 Diffuser, Fr 48 P 305 244-366 _________ _________
12x9 Diffuser, Fr 49 P 305 244-366 _________ _________
Compartment Total 610 549-671 _________
Passage 1-44-0-L 10 dia Open Duct, Fr 51.5 P 800 720-880 _________ _________
RETURN
Crew Lounge 2-47-2-L
10x10 Grill, 51 P 360 324-396 _________ _________
Passage 2-44-0-L
9x6 Bellmouth, 44.5 P 525 420-630 _________ _________
8 dia Bellmouth, 45 S 525 420-630 _________ _________
Compartment Total 1050 945-1155 _________
TEST TITLE: Validated Zone, System, Compartment, Page 43 of 65
Before Laundry Modifications REV/CHG:-
2 FCA-29
Fan Total Airflow: 965 965 __________ _________
SUPPLY
CIWS Control Room 02-62-0-Q 15x12 Diffuser, Fr 62 P 500 450-550 _________ _________
Aviation Control Station 02-66-0-C 15x6 Diffuser, Fr 66.5 P 270 243-297 _________ _________
Passage 01-59-01-L 9x6 Diffuser, Fr 64 P 195 176-215 _________ _________
RETURN
CIWS Control Room 02-62-0-Q 15x12 Open Duct, Fr 63.5 P 500 450-550 _________ _________
Passage 01-59-01-L 12x9 Open Duct, Fr 64.5 P 240 216-264 _________ _________
TEST TITLE: Validated Zone, System, Compartment Page 44 of 65
Before Laundry Modifications REV/CHG: A
2 SS-50
Fan Total Airflow: 3055 3055 ________ ________
Void 1-F-0-V 6 dia J terminal, Fr A CL 285 228-342 _________ _________
Line Handling Space and Windlass Machinery Room 1-9-0-Q 8 dia E terminal, Fr 13 S 520 416-624 _________ _________
8 dia E terminal, Fr 13 P 520 416-624 _________ _________
8 dia E terminal, Fr 13 P 515 412-618 _________ _________
Compartment Total 1555 1400-1711 _________
Passage 1-16-01-L 4 dia J terminal, Fr 19 P 150 135-165 _________ _________
Boatswain Shop & Storeroom 2-10-0-A 9 dia J terminal, Fr 10.5 P 385 347-424 _________ _________
Passage 2-16-1-L 4 dia Open duct, Fr 19 S 75 68-83 _________ _________
Passage 2-22-0-L 7 dia J terminal, Fr 22 S 375 338-413 _________ _________
Crew Lounge 3-16-0-Q 6 dia J terminal, Fr 18.5 S 540 486-594 _________ _________
Lift Station 3-20-0-Q 4 dia J terminal, Fr 18.5 S 75 68-83 _________ _________
TEST TITLE: Validated Zone, System, Compartment, Page 45 of 65
Before Laundry Modifications REV/CHG:-
2 SS-53
Fan Total Airflow: 8700 8545 ___________ ___________
5” Dia Fan Bypass Airflow: 155 155 ___________ ___________
Gun Support Room 1-16-0-Q 4 dia open duct, Fr 16 P 75 68-83 ___________ ___________
57 MM Magazine 2-16-0-M 6 dia open duct, Fr 21.5 P 140 126-154 ___________ ___________
Fwd DC Repair Locker 2-22-2-Q 6 dia E terminal, Fr 24 P 350 315-385 ___________ ___________
Air Conditioning Equipment Room 3-22-0-Q 12 dia E terminal, Fr 23 Cl 1330 1064-1596 ___________ ___________
12 dia E terminal, Fr 24 P 1330 1064-1596 ___________ ___________
12 dia E terminal, Fr 24.5 P 1330 1064-1596 ___________ ___________
12 dia E terminal, Fr 26 P 1330 1064-1596 ___________ ___________
12 dia E terminal, Fr 26.5 P 1330 1064-1596 ___________ ___________
12 dia E terminal, Fr27 P 1330 1064-1596 ___________ ___________
Compartment Total 7980 7182-8778 ____________
TEST TITLE: Validated Zone, System, Compartment, Page 46 of 65
Before Laundry Modifications REV/CHG:-
2 SS-56
Fan Total Airflow: 8500 7585 ___________ ___________
16x6 Fan fan Bypass Airflow: 915 915 ___________ ___________
Passage 01-59-01-L (@02 Lvl) Replenishment Air Duct (Hard Connected to FCA-29) 225 203-248 ___________ ___________ Aviation Workshop 01-59-0-Q 4 dia Open Duct, Fr 61 P 75 68-83 ___________ ___________ Helo Hanger 01-52-01-Q 7 dia E terminal, Fr 66 S 75 68-83 ___________ ___________ Fan Room 2-60-5-Q Replenishment Air Duct (Hard Connected to RS-10) 120 108-132 ___________ ___________ Refr Machinery Room 2-64-0-E 10 dia E terminal, Fr 66 S 875 788-963 ___________ ___________ Water Mist Pump Station 2-64-4-Q 11x12 J terminal, Fr 66 P 1060 848-1272 ___________ ___________
11x12 J terminal, Fr 67 P 1060 848-1272 ___________ ___________
Compartment Total 2120 1908-2332 ___________
Potable Water Pump Room 3-64-0-E 7 dia E terminal, Fr 66 S 400 320-480 ___________ ___________
7 dia E terminal, Fr67 S 400 320-480 ___________ ___________
5 dia E terminal, Fr 66.5S 150 120-180 ___________ ___________
Compartment Total 950 855-1045 ___________ JP-5 Pump Room 3-64-2-E 8 dia J terminal, Fr 68 P 580 522-638 ___________ ___________ Shaft Alley 5-64-1-Q 6 dia J terminal, Fr 65 S 305 275-336 ___________ ___________ Shaft Alley 5-64-2-Q 6 dia J terminal, Fr 65 P 305 275-336 ___________ ___________ Pump Room 5-72-01-E 18x10 Open Duct, Fr 73 P 1955 1760-2151 ___________ ___________
TEST TITLE: Validated Zone, System, Compartment, Page 47 of 65
Before Laundry Modifications REV/CHG:-
2 SS-57
Fan Total Airflow: 2160 2160 __________ _________
Laundry No. 2 (2-52-2-Q)
8 dia J terminal, Fr 54.5 P 450 405-495 __________ _________
Mech/DC Shop 2-55-2-Q 6 dia J terminal, Fr 55.5 P 300 270-330 __________ _________
Fan Room 2-60-5-Q Replenishment Air Duct (Hard Connected to RS-8) 810 729-891 __________ _________
Passage 2-64-2-L
4 dia Open Duct, Fr 67.5 P 150 135-165 __________ _________
Passage 2-70-2-L__
(Hard Connected to RS-30) 450 405-495 __________ _________
TEST TITLE: Validated Zone, System, Compartment, Page 48 of 65
Before Laundry Modifications REV/CHG:-
2 SS-58
Fan Total Airflow: 3310 3310 __________ _________
Hangar 01-52-01-Q
12 dia E terminal, Fr 56 S 1580 1264-1896 __________ _________
12 dia E terminal, Fr 63 S 1580 1264-1896 __________ _________
Compartment Total 3160 2844-3476 _________
Deck Gear Locker 01-59-1-Q
4 dia open duct, Fr 59 S 75 68-83 __________ _________
Helicopter Crash and Rescue 01-64-1-Q
4 dia open duct, Fr 64 S 75 68-83 __________ _________
TEST TITLE: Validated Zone, System, Compartment, Page 49 of 65
Before Laundry Modifications REV/CHG:-
2 SS-59
Fan Total Airflow: 3155 3155 __________ _________
Hangar 01-52-01-Q
12 dia E terminal, Fr 57 P 1580 1264-1896 __________ _________
12 dia E terminal, Fr 63 P 1575 1260-1890 __________ _________
Compartment Total 3155 2840-3471 _________
TEST TITLE: Validated Zone, System, Compartment, Page 50 of 65
Before Laundry Modifications REV/CHG:-
2 SS-61
Fan Total Airflow: 2825 2825 __________ _________
Law Enforcement Locker 1-76-4-A 4 dia J terminal, Fr 78 P 75 68-83 __________ _________
Paint Locker 1-76-6-K 4 dia J terminal, Fr 78 P 115 104-127 __________ _________
Hazmat Stowage 1-76-8-K 5 dia J terminal, Fr 78 P 200 180-220 __________ _________
Foul Weather Gear Locker & Drying Room 1-79-2-A 6 dia J terminal, Fr 81 P 290 261-319 __________ _________
Flammable Liquids Storage 1-79-4-K 5 dia J terminal, Fr 79 P 210 189-231 __________ _________
Boat Shop & Stowage/Work Space 1-81-2-Q__ 4 dia Open Duct, Fr 81 P 35 32-39 __________ _________
4 dia Open Duct, Fr 85.5 P 40 36-44 __________ _________
Aviation Office 1-82-2-Q 4 dia Open Duct, Fr 83.5 P 75 68-83 __________ _________
JP-5 Hose Room 1-84-4-A 4 dia Open Duct, Fr 83.5 P 60 54-68 __________ _________
Passage 2-76-2-L Replenishment Air Duct (Hard Connected to FCA-27) 225 203-248 __________ _________
Passage 2-82-01-L Replenishment Air Duct (Hard Connected to RS-13) 225 203-248 __________ _________
Boatswain Storeroom 2-88-1-A 4 dia J terminal, Fr 90 S 145 116-174 __________ _________
4 dia J terminal, Fr 90 S 145 116-174 __________ _________
Compartment Total 290 261-319 _________
Storeroom 2-88-2-A 4 dia J terminal, Fr 90 P 145 116-174 __________ _________
4 dia J terminal, Fr 90 P 145 116-174 __________ _________
Compartment Total 290 261-319 _________
TEST TITLE: Validated Zone, System, Compartment, Page 51 of 65
Before Laundry Modifications REV/CHG:-
2 SS-61 (Continued)
Central Engineering Storeroom 3-76-0-Q
5 dia J terminal, Fr 80 S 260 208-312 __________ _________
7x5 dia J terminal, Fr 80 S 300 240-360 __________ _________
Compartment Total 560 504-616 _________
Baggage Room 3-82-4-A 5 dia J terminal, Fr 88 P 195 176-215 __________ _________
NOTE: Reference 3.51 adds terminal in JP-5 Hose Room.
TEST TITLE: Validated Zone, System, Compartment, Page 52 of 65
Before Laundry Modifications REV/CHG:-
2 SS-69
Fan Total Airflow: 1500 1040 __________ _________
7” Dia Fan Bypass Airflow: 460 460 __________ _________
Passage 1-44-0-L
4 dia Open duct, Fr 46.5 S 115 104-127 __________ _________
Crew Stateroom 2-36-3-L Replenishment Air Duct (Hard Connected to RS-31) 375 338-413 __________ _________
Passage 2-44-0-L 6 dia J terminal, Fr 45 S 250 225-275 __________ _________
Fan Room 2-44-3-Q
(Hard Connected to RS-14) 300 270-330 __________ _________
TEST TITLE: Validated Zone, System, Compartment, Page 53 of 65
Before Laundry Modifications REV/CHG:-
2 SS-71
Fan Total Airflow: 250 145 ___________ __________
4” Dia Fan Bypass Airflow: 105 105 ___________ __________
Signal Shelter 03-38-1-C 4 dia J terminal, Fr 39.5 S 145 131-160 ___________ __________
TEST TITLE: Validated Zone, System, Compartment Page 54 of 65
Before Laundry Modifications REV/CHG: A
2 ES-100
Fan Total Airflow: 3055 3055 ___________ __________
Void 1-F-0-V 6” Dia Bellmouthl, Fr 9 S 285 257-314 ___________ __________
Line Handling Space and Windlass Machinery Room 1-9-0-Q 15x11 Bellmouth, Fr 15 S 1480 1332-1628 ___________ __________
Toilet/Shower 1-21-1-L 6x6 Grill, Fr 22 S 75 75-83 ___________ __________
Toilet/Shower 1-21-2-L 6x6 Grill, Fr 22 P 75 75-83 ___________ __________
Officer Stateroom 1-22-0-L 6x6 Grill, Fr 22 P 75 75-83 ___________ __________
Toilet/Shower 1-22-3-L 6x6 Grill, Fr 22.5 S 75 75-83 ___________ __________
Toilet/Shower 1-22-4-L 6x6 Grill, Fr 22.5 P 75 75-83 ___________ __________
Toilet/Shower 1-25-1-L 6x6 Grill, Fr 25 S 75 75-83 ___________ __________
Toilet/Shower 1-27-2-L 6x6 Grill, Fr 27.5 P 75 75-83 ___________ __________
Boatswain Shop & Storeroom 2-10-0-A 9 dia K terminal, Fr 14 S 385 347-424 ___________ __________
Passage 2-16-1-L 4 dia Bellmouth, Fr 17 S 75 75-83 ___________ __________
Toilet/Shower 2-25-3-L 6x6 Grill, Fr 26 S 75 75-83 ___________ __________
Crew Lounge 3-16-0-Q 7 dia Bellmouth, Fr 17 S 155 140-171 ___________ __________
Lift Station Room 3-20-0-Q 4 dia Bellmouth, Fr 20 S 75 75-83 ___________ __________
TEST TITLE: Validated Zone, System, Compartment, Page 55 of 65
Before Laundry Modifications REV/CHG:-
2 ES-107
Fan Total Airflow: 1570 1570 __________ __________
Deck Toilet 1-66-2-L 6x6 Grill, Fr 67 P 75 75-83 __________ __________
Laundry No 2 2-52-2-Q 7 dia Bellmouth, Fr 55 P 174 139-209 __________ __________
7 dia Bellmouth, Fr 55 P 173 138-208 __________ __________
7 dia Bellmouth, Fr 55 P 173 138-208 __________ __________
Compartment Total 520 468-572 __________
Mech/DC Shop 2-55-2-Q 6 dia Bellmouth, Fr 59 P 300 270-330 __________ __________
Deck Toilet 2-60-1-L 4 dia Bellmouth, Fr 61 S 75 75-83 __________ __________
Toilet/Shower 2-64-3-L 6x6 Grill, Fr 65 S 75 75-83 __________ __________
Toilet/Shower 2-67-0-L 6x6 Grill, Fr 67 S 75 75-83 __________ __________
Toilet/Shower 2-70-3-L 6x6 Grill, Fr 70.5 S 75 75-83 __________ __________
Toilet/Shower 2-70-4-L 6x6 Grill, Fr 70 P 75 75-83 __________ __________
Toilet/Shower 2-75-0-L 6x6 Grill, Fr 75.5 P 75 75-83 __________ __________
Toilet/Shower 3-72-1-L 6x6 Grill, Fr 72 S 75 75-83 __________ __________
Toilet/Shower 3-72-0-L 6x6 Grill, Fr 72 P 75 75-83 __________ __________
Toilet/Shower 3-72-2-L 6x6 Grill, Fr 72 P 75 75-83 __________ __________
TEST TITLE: Validated Zone, System, Compartment, Page 56 of 65
Before Laundry Modifications REV/CHG:-
2 ES-108
Fan Total Airflow: 3310 3310 __________ __________
Hangar 01-52-01-Q 14x7 Bellmouth, Fr 59 S 1560 1248-1872 __________ __________
14x7 Bellmouth, Fr 64 S 1555 1244-1866 __________ __________
Compartment Total 3115 2804-3427 __________
Helo Spares Storeroom Area 01-47-1-Q 5 dia Bellmouth, Fr 47 S 195 176-215 __________ __________
TEST TITLE: Validated Zone, System, Compartment, Page 57 of 65
Before Laundry Modifications REV/CHG:-
2 ES-109
Fan Total Airflow: 3155 3155 __________ __________
Hangar 01-52-01-Q 14x7 Bellmouth, Fr 64 P 1580…