AMEND 0001 TO SOL.doc
DOC document 52 KB Posted
- Attached to
- FY 2010 DRY DOCK & REPAIR OF CGC BERTHOLF
- Solicitation number
- HSCG8510R610K16
About this file
AMENDMENT 0001 EXTENDING DUE DATE FOR PROPOSALS
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AMEND 0006 TO SOL.doc | DOC document | |
| WMSL512-001 NSC Zone Sys Comp Term Airflow Test_Rev A.pdf | ||
| WMSL512-002 NSC TP Zone Pressurization Test Before Laundry Mods.pdf | ||
| AMEND 0005 TO SOL.doc | DOC document | |
| AMEND 0004 TO SOL.doc | DOC document | |
| CORRECTED SECTION B - BERTHOLF DRYDOCK.doc | DOC document | |
| AMEND 0003 TO SOL.doc | DOC document | |
| USCGC BERTHOLF_Drydock and Repair_May_2010_Rev 1A.pdf | ||
| ASC556333-HY REV E.pdf | ||
| AMEND 0002 TO SOL.doc | DOC document | |
| 750-WMSL_100_8_1_-_D 1 .dwf | DWF file | |
| USCGC BERTHOLF_Drydock and Repair_May_2010_Rev 0.pdf | ||
| FINAL BERTHOLF DD SOLICITATION.doc | DOC document |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. CONTRACT ID CODE
| PAGE |
| OF PAGES |
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
| 1 |
| 2 |
| 2. AMENDMENT/MODIFICATION NO. |
| 3. EFFECTIVE DATE |
| 4. REQUISITION/PURCHASE REQ. NO. |
| 5. PROJECT NO. (If applicable) |
| 0001 |
| 19 Feb 2010 |
| 21-10-850610K16 |
| 6. ISSUED BY |
| CODE |
| HSCG85 |
| 7. ADMINISTERED BY (If other than Item 6) |
| CODE |
COMMANDER, USCG
Surface Forces Logistics Center 1301 Clay Street, Suite 807N Oakland, CA 94612
| 8. NAME AND ADRESS OF CONTRACTOR (no., street, county, State and ZIP Code) |
| ( |
| 9.A AMENDMENT OF SOLICITATION NO. |
ALL PROSPECTIVE OFFERORS
HSCG85-10-R-610K16
9B. DATE (SEE ITEM 11)
27 JAN 2010
| X |
| 10A. MODIFICATION OF CONTRACT/ORDER NO. |
10B. DATED (SEE ITEM 13)
| CODE |
| FACILITY CODE |
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FORMCHECKBOX
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers FORMCHECKBOX is extended, FORMCHECKBOX is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning 2 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the Offer submitted: or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
N/A
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT/.ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc)
SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF: FAR 52.212-4(c) and MUTUAL AGREEMENT OF THE PARTIES
D. OTHER (Specify type of modification and authority
E. IMPORTANT: Contractor FORMCHECKBOX is not, FORMCHECKBOX is required to sign this document and return 1 copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
SUBJCET: Solicitation HSCG85-10-R-610K16
Dry-Dock Repairs of USCGC BERTHOLF
The purposes of this Amendment are to provide the following information:
1. The Coast Guard has determined that the Specification for this procurement needs minor revisions. These revisions will include new drawings, references, and wording of the requirements. The revised Specifications will be posted to FedBizOps as soon as available.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
| 15A. NAME AND TITLE OF SIGNER (Type or print) |
| 16A NAME AND TITLE OF CONTRACTING OFFICER (Type or print) |
JO ANN T. YAMANE
| 15B. CONTRACTOR/OFFEROR |
| 15C. DATE SIGNED |
| 16B. UNITED STATES OF AMERICA |
| 16C. DATE SIGNED |
BY
(Signature of person authorized to sign)
(Signature of Contracting Officer)
NSN 7540-01-152-8070
30-105
STANDARD FORM 30 (REV. 10-83
Therefore this Amendment 0001 is to advise all Prospective Offeror’s that the announced due date for receipt of proposals of Thursday 25 February 2010, 11:00 A. M., Local California Time is revised. The revised Due Date and Time is Thursday 4 March 2010, 11:00 Local California Time.
USCGC WAESCHE (WMSL-751), which has had the new stern doors required by this Solicitation installed by the ship builder, Northrup-Grumman Ship Builders, is scheduled to arrive at Coast Guard Island, Alameda, CA on 28 February 2010. Since replacement of CGC BERTHOLF’s stern doors with doors nearly identical to those of CGC WAESCHE is a major requirement of this Solicitation, potential offerors are encouraged to conduct ship-checks of this installation on CGC WAECHE. Offeror’s wishing to conduct ship-check of CGC WESCHE on or after 1 March 2010,(subject to the actual arrival date and time of CGC WAESCHE) and prior to the date and time established by future Amendment for submission of Proposals MUST DO THE FOLLOWING:
Submit the information described Below, at least 24 working hours in advance of any requested visit, by Email to: Gary.g.kim@uscg.mil
NAME OF COMPANY:
DATE AND TIME SHIP CHECK REQUESTED;
FULL NAMES & CITIZENSHIP OF ALL REPRESENTATIVES VISITING SHIP:
Please note that we cannot insure that the date and time you wish to conduct Ship-Checks can be accommodated by the Coast Guard. We will contact you after receipt of your request and provide you a date and time that is available.
The Coast Guard will make reasonable efforts to insure that Base & Ship Security are aware of your planned arrival. However, entry onto the Base in a privately-owned auto will require that you provide current Driver’s License and Proof of Automobile Liability Insurance. The Coast Guard assumes no liability for potential offeror’s inability to gain access to Coast Guard Island, Alameda, CA and to conduct the ship-check’s they desire.
2. To provide responses to Requests For Clarifications received as of 18 February 2010 as follows:
Q: Did the builder publish underwater body, freeboard, and topside surface area’s in square footage? Or, what is the Block Coefficient for the WMSL class?
A: Attached dwg (750-WMSL_100_8_1_-_D[1].DWF) show WMSL Wet Surface Sq ft to be 19,970 with a Block Coefficient of .492
Q: If an offeror proposes to use Northrup-Grumman Ship Building to perform the requirements of Specification paragraph 3.1.4.5 of D Item 13, will a Conflict Of Interest Waiver be required for Northrup-Grumman?
A: No Waiver will be required as all potential offerors will have the same ability to seek these technical support services from Northrup-Grumman.
B. Offerors are reminded to acknowledge this Amendment by inserting their firms name in Block 8 and completing Blocks 15A, B, and C and returning a signed copy to the Contracting Officer.