CORRECTED SECTION B - BERTHOLF DRYDOCK.doc

DOC document 56 KB Posted

Attached to
FY 2010 DRY DOCK & REPAIR OF CGC BERTHOLF
Solicitation number
HSCG8510R610K16
Issued by

About this file

CORRECTED SECTION B

View the file

Other files

File Type Posted
AMEND 0006 TO SOL.doc DOC document
WMSL512-001 NSC Zone Sys Comp Term Airflow Test_Rev A.pdf PDF
WMSL512-002 NSC TP Zone Pressurization Test Before Laundry Mods.pdf PDF
AMEND 0005 TO SOL.doc DOC document
AMEND 0004 TO SOL.doc DOC document
AMEND 0003 TO SOL.doc DOC document
USCGC BERTHOLF_Drydock and Repair_May_2010_Rev 1A.pdf PDF
ASC556333-HY REV E.pdf PDF
AMEND 0002 TO SOL.doc DOC document
750-WMSL_100_8_1_-_D 1 .dwf DWF file
AMEND 0001 TO SOL.doc DOC document
USCGC BERTHOLF_Drydock and Repair_May_2010_Rev 0.pdf PDF
FINAL BERTHOLF DD SOLICITATION.doc DOC document
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Request for Proposals –AMENDMENT 0003

HSCG85-10-R-600K16

Dry-Dock & Repairs of CGC BERTHOLF

SECTION B - SUPPLIES AND SERVICES - PRICES

NOTICE TO OFFERORS: Offerors must complete and submit all applicable items of this solicitation, with particular emphasis on Sections A, B, I and K.

Contractor shall provide all labor, materials, facility, and equipment, except as specified, to perform DRY-DOCK AND REPAIRS of USCGC BERTHOLF (WMSL 750), from 17 MAY 2010 through 25 JUNE 2010.

All work will be performed at a Contractor provided facility.

B.1

DEFINITE ITEMS:

ITEM
DESCRIPTION
PRICE
D-01
Production Control, GANTT Bar Chart Provide
$
D-02
Tank Cleaning, Safe For Personnel – Safe For Hot Work
$
D-03
Hull Plating Repair
$
D-04
Hull Plating, Underwater Body Inspect
$
D-05
AFT Double WTD Replacement
$
D-06
AMR Emergency Egress Scuttles
$
D-07
Fuel Valve Motor Actuator & Control Install
$
D-08
Toilet/Shower And Stateroom Compartment Step Light Additions
$
D-09
Ventilation System Balancing
$
D-10
AMR Emergency Egress MCMS Firefighting Activation Controls
$
D-11
Fuel Oil Transfer Piping and Manifold Modifications
$
D-12
Forward ASIST Stop Mods
$
D-13
Stern Gate Installation
$
D-14
Stern Gate Removal, Disposal and Transom Repair
$
D-15
Hull Plating, Underwater Body Preserve, Partial
$
D-16
Hull Plating, Freeboard Preserve
$
D-17
Cathodic Protection System Inspect and Service
$
D-18
Two-High Berth Unit Addition to Stateroom 3-28-2-L
$
D-19
Temporary Services, Drydock Provide
$
D-20
Sea Trials
$
D-21
Drydocking Accomplish
$
TOTAL AMOUNT OF ALL DEFINITE ITEMS
$

B.2 OPTIONAL ITEMS – Optional Item (IF ANY) O-xx THROUGH O-xx may be awarded concurrent with Definite Items or when funds become available, but not later than 14 calendar days after commencement of the Definite Items, to maintain performance schedule. See Section H “Optional Items”.

ITEM
DESCRIPTION
BID PRICE

O-xx

B.3A COMPOSITE LABOR HOUR RATE APPLICABLE TO CONTRACT CHANGES (NON-FIRE WATCH)

The following labor hour rate shall be used in pricing all contract changes (except for the fire watch portion) in accordance with the clause of Section H entitled "COMPOSITE LABOR HOUR RATE FOR CONTRACT CHANGES."

Labor Hour Rate

Estimated Quantity**

Extended Amount

$ /per hour
X
1000
=
$

**NOTE: The estimated quantity and extended amount indicated above are for evaluation of bids only. The quoted rate will apply to all changes involving additional work under this contract regardless of the actual total hours required.

B.3B COMPOSITE LABOR HOUR RATE APPLICABLE TO CONTRACT CHANGES FOR FIRE WATCHES

The following labor hour rate shall be used in pricing the fire watch portion of all contract changes in accordance with the clause of Section H entitled "COMPOSITE LABOR HOUR RATE FOR CONTRACT CHANGES."

Labor Hour Rate

Estimated Quantity**

Extended Amount

$ /per hour
X
500
=
$

**NOTE: The estimated quantity and extended amount indicated above are for evaluation of bids only. The quoted rate will apply to all changes involving additional work under this contract regardless of the actual total hours required.

B.4

LAY DAYS

Provide a price for dry dock Lay Days in accordance with HSAR 3052.217-94 (DEC 2003). The quoted price per day will apply to all lay days. The estimated quantity of 3 days is for evaluation purposes only.

PRICE PER DAY:

X 3 DAYS
EXTENDED AMOUNT:

INTENTIONALLY LEFT BLANK