CLIN_Schedule_-Amendment_7.xlsx

XLSX spreadsheet 112 KB Posted

Attached to
Base Operation Support Services for Base Kodiak, AK
Solicitation number
HSCG84-16-R-PKC001
Issued by

About this file

CLIN Schedule of Prices -Amendment 7

View the file

Other files

File Type Posted
Amendment_16_-_HSCG84-16-R-PKC001.pdf PDF
HSCG84-16-R-PKC001_-_BOSS_Kodiak_Solicitation_-_Amend_16.pdf PDF
Amendment_15_-_HSCG84-16-R-PKC001.pdf PDF
TE_26.3_-_GFE_Inventory_List_-_Amend_14.xls XLS spreadsheet
Amendment_13_-_HSCG84-16-R-PKC001.pdf PDF
HSCG84-16-R-PKC001_-BOSS_Kodiak_Solicitation_-_Amend_12.pdf PDF
Amendment_12_-_HSCG84-16-R-PKC001.pdf PDF
Amendment_11_-_HSCG84-16-R-PKC001.pdf PDF
RFI_with_Answers_-_3_-_FINAL.pdf PDF
Amendment_10_-_HSCG84-16-R-PKC001.pdf PDF
RFI_with_Answers_-_2_-_FINAL.pdf PDF
TE_5.2_Sports_Fields_-_Amend_8.docx DOCX document
Seniority_List_Averages_-_Amend_8.pdf PDF
HSCG84-16-R-PKC001_-BOSS_Kodiak_Solicitation_-_Amend_8.pdf PDF
RFI_with_Answers_-_1R.pdf PDF
Base_Kodiak_BOSS_PWS_-_Amendment_8.pdf PDF
Amendment_7_-_HSCG84-16-R-PKC001.pdf PDF
Amend__7_-_Revised_Refs1of2.zip ZIP file
Amend__7_-_Revised_Refs2of2.zip ZIP file
Amend__7_-_Revised_Append.zip ZIP file
RFI_with_Answers_-_1.pdf PDF
PAST_PERFORMANCE_QUESTIONNAIRE.pdf PDF
HSCG84-16-R-PKC001_-BOSS_Kodiak_Solicitation_-_Amend_7.pdf PDF
Amend__7_-_WDs.zip ZIP file
Amend__7_-_TE_Updates-Add.zip ZIP file
Base_Kodiak_BOSS_PWS_-_Amendment_7.pdf PDF
Amendment_6_-_HSCG84-16-R-PKC001.pdf PDF
Amendment_5_-_HSCG84-16-R-PKC001.pdf PDF
Amendment_4_-_HSCG84-16-R-PKC001.pdf PDF
Amendment_3_-_HSCG84-16-R-PKC001.pdf PDF
HSCG84-16-R-PKC001_-BOSS_Kodiak_Solicitation_-_Amend_2.pdf PDF
References_2_of_3.zip ZIP file
Prepropsal_Conf-BOSS_Kodiak-08-JUN-2016_-_Rev_2.ppt PPT presentation
TE_11.3_-_BASE_Kodiak_SWPPP_2015.pdf PDF
References_3_of_3.zip ZIP file
Site_Visit_and_Preproposal_Sign-in_Sheets.pdf PDF
QASP.pdf PDF
Wage_Determination_with_CBA.pdf PDF
Appendices_A-E.zip ZIP file
BOSS_Kodiak_PWS.pdf PDF
HSCG84-16-R-PKC001_-BOSS_Kodiak_Solicitation.pdf PDF
Technical_Exhibits.zip ZIP file
CONTRACT_DISCREPANCY_REPORT.pdf PDF
Draft_CLIN_Schedule.pdf PDF
Kodiak_Installation_Access.pdf PDF
PWS_Comments_June_2015_2.pdf PDF
Base_Kodiak_QA_s.pdf PDF
Attendance_List.docx DOCX document
Draft_PWS_for_Site_Visit_With_Watermark.pdf PDF
Sources_Sought_BOSS_Kodiak.doc DOC document
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CLIN Schedule

INDEFINITE-DELIVERY, INDEFINITE-QUANTITY CONTRACT LINE ITEMS*Base Ordering Period (x=0)Ordering Period One (x=1)Ordering Period Two (x=2)Ordering Period Three (x=3)Ordering Period Four (x=4)
CLIN GROUPSUB CLINTYPE OF WORKPWS SECTIONEst QtyUNITUnit Price:Amount:Est QtyUNITUnit Price:Amount:Unit Price:Amount:Unit Price:Amount:Unit Price:Amount:
x100013.0 GENERAL SCOPE REQUIREMENTS
x10001AAStanding3.4 KEY CONTROL12/Month$0.0012/Month$0.00$0.00$0.00$0.00
x10001ABStanding3.6 EQUIPMENT WARRANTIES12/Month$0.0012/Month$0.00$0.00$0.00$0.00
x10001ACStanding3.9 SAFETY REQUIREMENTS AND REPORTS12/Month$0.0012/Month$0.00$0.00$0.00$0.00
x10001ADStanding3.11 TRANSITION OF CONTRACTOR OPERATIONS (for Base Ordering Period only)2/Month$0.00
x10001AEStanding3.12 REQUIRED PLANS12/Month$0.0012/Month$0.00$0.00$0.00$0.00
x10001AFStanding3.12.7 PHASE OUT PLAN (for Ordering Period Four only)1/event$0.00
x10001 Total:$0.00x10001 Total:$0.00$0.00$0.00$0.00
x001x001Standing5.1. LEVEL II SERVICE WORK.12/Month$0.0012/Month$0.00$0.00$0.00$0.00
x001AADiscretionary5.1.2.A. 250 ADDITIONAL STANDARD WORK ORDERS (Discretionary Item)12/Month$0.0012/Month$0.00$0.00$0.00$0.00
x001ABDiscretionary5.1.2.B. 25 ADDITIONAL JUMBO WORK ORDERS (Discretionary Item)12/Month$0.0012/Month$0.00$0.00$0.00$0.00
x001ACIDIQ5.1.4.A. PERFORM LEVEL III SERVICE WORK (PLEASE FILL OUT THE CLINx001AC LABOR RATE TAB BELOW)15/eventVariesVaries15/eventVariesVariesVariesVariesVariesVariesVariesVaries
x001ADIDIQ5.1.4.B. OFF-ISLAND WORK.5/hr$0.005/hr$0.00$0.00$0.00$0.00
x001AEIDIQ5.1.4.C. GYM EQUIPMENT DIAGNOSIS.15/event$0.0015/event$0.00$0.00$0.00$0.00
x001AFIDIQ5.1.4.D. ADDITIONAL SERVICE WORK ORDERS. (25 Standard)4/lot of 25$0.004/lot of 25$0.00$0.00$0.00$0.00
x001AGIDIQ5.1.4.D. ADDITIONAL SERVICE WORK ORDERS. (10 Jumbo)2/lot of 10$0.002/lot of 10$0.00$0.00$0.00$0.00
x001NNStanding5.1.5. Service Specifications for U.S. Navy.12/Month$0.0012/Month$0.00$0.00$0.00$0.00
x001 Total:$0.00x001 Total:$0.00$0.00$0.00$0.00
x002x002Standing5.2. PREVENTIVE MAINTENANCE.12/Month$0.0012/Month$0.00$0.00$0.00$0.00
x002AAStanding5.2.4.A. CATEGORY 1 PREVENTIVE MAINTENANCE12/Month$0.0012/Month$0.00$0.00$0.00$0.00
x002ABStanding5.2.4.B. CATEGORY 2 PREVENTIVE MAINTENANCE12/Month$0.0012/Month$0.00$0.00$0.00$0.00
x002ACDiscretionary5.2.4.C. CATEGORY 3 PREVENTIVE MAINTENANCE (Discretionary Item)12/Month$0.0012/Month$0.00$0.00$0.00$0.00
x002ADDiscretionary5.2.4.D. CATEGORY 4 PREVENTIVE MAINTENANCE (Discretionary Item)12/Month$0.0012/Month$0.00$0.00$0.00$0.00
x002AEDiscretionary5.2.4.F. GYM EQUIPMENT PM. (Discretionary Item)4/quarter year$0.004/quarter year$0.00$0.00$0.00$0.00
x002AFIDIQ5.2.6.C.1. EQUIPMENT ENROLLMENT. (Per Item)175/each$0.00175/each$0.00$0.00$0.00$0.00
x002AGIDIQ5.2.6.C.1. EQUIPMENT ENROLLMENT. (Per 50 Items)60/lot of 50 Items$0.0060/lot of 50 Items$0.00$0.00$0.00$0.00
x002NNStanding5.2.8. Service Specifications for U.S. Navy.12/Month$0.0012/Month$0.00$0.00$0.00$0.00
x002 Total:$0.00x002 Total:$0.00$0.00$0.00$0.00
x003x003Standing5.3. JANITORIAL SERVICES.12/Month$0.0012/Month$0.00$0.00$0.00$0.00
IDIQ5.3.4.A. ADDITIONAL CLEANING SERVICES.
x003AAIDIQEmpty Trash Cans (lot of 5 in adjacent area or building)10/lot of 5$0.0010/lot of 5$0.00$0.00$0.00$0.00
x003ABIDIQRemove Recycle Materials10/event$0.0010/event$0.00$0.00$0.00$0.00
x003ACIDIQClean & Sanitize Kitchen/coffee mess areas5/event$0.005/event$0.00$0.00$0.00$0.00
x003ADIDIQClean & Sanitize Restrooms/Locker Rooms5/sq ft$0.005/sq ft$0.00$0.00$0.00$0.00
x003AEIDIQRestock Restrooms (Paper Towel, Toilet Paper, Soap)10/event$0.0010/event$0.00$0.00$0.00$0.00
x003AFIDIQDust Furniture /Desks/Chairs5/event$0.005/event$0.00$0.00$0.00$0.00
x003AGIDIQClean Water Fountains/Containers10/each$0.0010/each$0.00$0.00$0.00$0.00
x003AHIDIQClean Windows Interior1000/sq ft$0.001000/sq ft$0.00$0.00$0.00$0.00
x003AIIDIQDust Blinds1000/linear ft$0.001000/linear ft$0.00$0.00$0.00$0.00
x003AJIDIQWash Walls5000/sq ft$0.005000/sq ft$0.00$0.00$0.00$0.00
x003AKIDIQClean HVAC Grilles400/sq ft$0.00400/sq ft$0.00$0.00$0.00$0.00
x003ALIDIQSweep Entrance Way incl Mats50/event$0.0050/event$0.00$0.00$0.00$0.00
x003AMIDIQClean Glass & Door on Entrance50/event$0.0050/event$0.00$0.00$0.00$0.00
x003ANIDIQVacuum Carpet10000/sq ft$0.0010000/sq ft$0.00$0.00$0.00$0.00
x003AOIDIQShampoo Carpets10000/sq ft$0.0010000/sq ft$0.00$0.00$0.00$0.00
x003APIDIQSweeping10000/sq ft$0.0010000/sq ft$0.00$0.00$0.00$0.00
x003AQIDIQFloor Wet Mopping10000/sq ft$0.0010000/sq ft$0.00$0.00$0.00$0.00
x003ARIDIQFloor Scrubbing8000/sq ft$0.008000/sq ft$0.00$0.00$0.00$0.00
x003ASIDIQFloor Buffing10000/sq ft$0.0010000/sq ft$0.00$0.00$0.00$0.00
x003ATIDIQStrip Floors10000/sq ft$0.0010000/sq ft$0.00$0.00$0.00$0.00
x003AUIDIQWax Floors10000/sq ft$0.0010000/sq ft$0.00$0.00$0.00$0.00
x003AVIDIQClean Light Fixtures50/event$0.0050/event$0.00$0.00$0.00$0.00
x003AWIDIQClean Exterior Windows1000/sq ft$0.001000/sq ft$0.00$0.00$0.00$0.00
x003AXIDIQ5.3.4.B. BUILDING 9 (Billiken) CHAIRS820/chair$0.00820/chair$0.00$0.00$0.00$0.00
x003NNStanding5.3.5. Service Specifications for U.S. Navy.12/Month$0.0012/Month$0.00$0.00$0.00$0.00
x003 Total:$0.00x003 Total:$0.00$0.00$0.00$0.00
x004x004Standing5.4.1 to 5.4.3 REFUSE COLLECTION AND DISPOSAL.12/Month$0.0012/Month$0.00$0.00$0.00$0.00
x004AADiscretionary5.4.2.C. RECYCLABLE MATERIALS (Discretionary Item)12/Month$0.0012/Month$0.00$0.00$0.00$0.00
x004ABIDIQ5.4.4.A. PAINT REFUSE CONTAINERS (NON-ALUMINUM). Size: 6 yd15/container$0.0015/container$0.00$0.00$0.00$0.00
x004ACIDIQ5.4.4.A. PAINT REFUSE CONTAINERS (NON-ALUMINUM). Size: 20 yd5/container$0.005/container$0.00$0.00$0.00$0.00
x004ADIDIQ5.4.4.B. SPECIAL EVENTS AND PROJECTS.5/event$0.005/event$0.00$0.00$0.00$0.00
x004AEIDIQ5.4.4.C. REFUSE COLLECTION FOR BASE WIDE CLEANUP.1/event$0.001/event$0.00$0.00$0.00$0.00
x004NNStanding5.4.5. Service Specifications for the U.S. Navy.12/Month$0.0012/Month$0.00$0.00$0.00$0.00
x004 Total:$0.00x004 Total:$0.00$0.00$0.00$0.00
x005x005Standing5.5. GROUNDS MAINTENANCE.12/Month$0.0012/Month$0.00$0.00$0.00$0.00
x005AADiscretionary5.5.2.B. ENHANCED CUTTING STANDARD FOR IMPROVED GROUNDS (Discretionary Item)12/Month$0.0012/Month$0.00$0.00$0.00$0.00
x005ABDiscretionary5.5.2.C. ENHANCED CUTTING STANDARD FOR SEMI-IMPROVED GROUNDS (Discretionary Item)12/Month$0.0012/Month$0.00$0.00$0.00$0.00
x005ACDiscretionary5.5.2.D. EDGING AND TRIMMING (Discretionary Item)12/Month$0.0012/Month$0.00$0.00$0.00$0.00
x005ADDiscretionary5.5.2.F. LANDSCAPED AREA MAINTENANCE (Discretionary Item)12/Month$0.0012/Month$0.00$0.00$0.00$0.00
x005AEDiscretionary5.5.2.I. AREA T AND AREA R GROUNDS (Discretionary Item)12/Month$0.0012/Month$0.00$0.00$0.00$0.00
x005AFIDIQ5.5.4.A. ADDITIONAL BRUSH CLEARING. (Adjacent to road ways)25/mile$0.0025/mile$0.00$0.00$0.00$0.00
x005AGIDIQ5.5.4.B. ADDITIONAL BRUSH CLEARING. (area)30/acre$0.0030/acre$0.00$0.00$0.00$0.00
x005AHIDIQ5.5.4.C. TREE REMOVAL.20/tree$0.0020/tree$0.00$0.00$0.00$0.00
x005AKIDIQ5.5.4.D.1 HOLES AND DEPRESSIONS. (Topsoil, Improved Grounds)1000/cu yd$0.001000/cu yd$0.00$0.00$0.00$0.00
x005ALIDIQ5.5.4.D.2 HOLES AND DEPRESSIONS. (Gravel, Improved Grounds)1000/cu yd$0.001000/cu yd$0.00$0.00$0.00$0.00
x005AMIDIQ5.5.4.D.1 HOLES AND DEPRESSIONS. (Topsoil, Semi-Improved Grounds)1000/ cu yd$0.001000/ cu yd$0.00$0.00$0.00$0.00
x005ANIDIQ5.5.4.D.2 HOLES AND DEPRESSIONS. (Gravel, Semi-Improved Grounds)1000/cu yd$0.001000/cu yd$0.00$0.00$0.00$0.00
x005AOIDIQ5.5.4.E. PRUNING.4/ (1/4) acre$0.004/ (1/4) acre$0.00$0.00$0.00$0.00
x005APIDIQ5.5.4.F. RESEEDING.1000/sq yd$0.001000/sq yd$0.00$0.00$0.00$0.00
x005AQIDIQ5.5.4.G. SPORTS FIELD GROUND COVER MAINTENANCE.4/event$0.004/event$0.00$0.00$0.00$0.00
x005ARIDIQ5.5.4.H. MULCHING AND WEED REMOVAL OF LANDSCAPED AREAS2500/sqft$0.002500/sqft$0.00$0.00$0.00$0.00
x005ASIDIQ5.5.4.I. TREE PRUNNING20/event$0.0020/event$0.00$0.00$0.00$0.00
x005ATIDIQ5.5.4.J. HEDGE TRIMMING1500/linear ft$0.001500/linear ft$0.00$0.00$0.00$0.00
x005AUIDIQ5.5.4.K. FERTILIZATION145/acre$0.00145/acre$0.00$0.00$0.00$0.00
x005AVIDIQ5.5.4.L. EDGING10000/linear ft$0.0010000/linear ft$0.00$0.00$0.00$0.00
X005AWIDIQ5.5.4.M TRIMMING20000/linear ft$0.0020000/linear ft$0.00$0.00$0.00$0.00
x005NNStanding5.5.5. Service Specifications for U.S. Navy.12/Month$0.0012/Month$0.00$0.00$0.00$0.00
x005 Total:$0.00x005 Total:$0.00$0.00$0.00$0.00
x006x006Standing5.6. SNOW REMOVAL, ICE CONTROL, AND TRACTION.12/Month$0.0012/Month$0.00$0.00$0.00$0.00
x006 Total:$0.00x006 Total:$0.00$0.00$0.00$0.00
x007x007Standing5.7. ROADWAY AND SEWER MAINTENANCE AND REPAIR.12/Month$0.0012/Month$0.00$0.00$0.00$0.00
x007AADiscretionary5.7.2.G. OTHER PAVEMENT AND CURB MARKING (Discretionary Item)12/Month$0.0012/Month$0.00$0.00$0.00$0.00
x007ABIDIQ5.7.4.A. AIR STATION MARKINGS.5000/lot of 500 linear ft$0.005000/lot of 500 linear ft$0.00$0.00$0.00$0.00
x007ACIDIQ5.7.4.B. PAVEMENT CRACK FILLING1000/linear ft$0.001000/linear ft$0.00$0.00$0.00$0.00
x007ADIDIQ5.7.4.C. SEAL COATING PAVEMENT450/lot of 1000 sqft$0.00450000/lot of 1000 sqft$0.00$0.00$0.00$0.00
x007AEIDIQ5.7.4.D. MISCELLANEOUS GRADING.1000/lot of 1000 sq ft$0.0010000/lot of 1000 sq ft$0.00$0.00$0.00$0.00
x007AFIDIQ5.7.4.E. MISCELLANEOUS PAVEMENT MARKINGS15000/linear ft$0.0015000/linear ft$0.00$0.00$0.00$0.00
IDIQ5.7.4.F. PAVEMENT PATCHING AND REPAIR$0.00$0.00$0.00$0.00$0.00
x007AGIDIQBituminous Pavement1750/sq yd$0.001750/sq yd$0.00$0.00$0.00$0.00
x007AHIDIQRigid Pavement750/sq yd$0.00750/sq yd$0.00$0.00$0.00$0.00
x007NNIDIQ5.7.5. Service Specifications for U.S. Navy.6/event$0.006/event$0.00$0.00$0.00$0.00
x007 Total:$0.00x007 Total:$0.00$0.00$0.00$0.00
x008x008Standing5.8. FUEL SERVICES.12/Month$0.0012/Month$0.00$0.00$0.00$0.00
x008AADiscretionary5.8.2.A.6.EQUIPMENT ENROLLMENT (Discretionary Item).1/event$0.001/event$0.00$0.00$0.00$0.00
x008ABIDIQ5.8.4.A. BULK TANK CLEANING AND ENTRY FOR INSPECTION.2/event$0.002/event$0.00$0.00$0.00$0.00
x008ACIDIQ5.8.4.B. ADDITIONAL FUEL SAMPLING AND ANALYSIS.50/event$0.0050/event$0.00$0.00$0.00$0.00
x008ADIDIQ5.8.4.C. CARGO PIER CATHODIC PROTECTION INSPECTION1/event$0.001/event$0.00$0.00$0.00$0.00
x008AEIDIQ5.8.4.D. FUEL PIER CATHODIC PROTECTION INSPECTION1/event$0.001/event$0.00$0.00$0.00$0.00
x008AFIDIQ5.8.4.E. VESSEL BOOMING SERVICE10/event$0.0010/event$0.00$0.00$0.00$0.00
x008 Total:$0.00x008 Total:$0.00$0.00$0.00$0.00
x009x009Standing5.9. AIR PROGRAMS.12/Month$0.0012/Month$0.00$0.00$0.00$0.00
x009 Total:$0.00x009 Total:$0.00$0.00$0.00$0.00
x010x010Standing5.10. ENVIRONMENTAL MANAGEMENT AND STEWARDSHIP.12/Month$0.0012/Month$0.00$0.00$0.00$0.00
x010 Total:$0.00x010 Total:$0.00$0.00$0.00$0.00
x011x011Standing5.11. WATER PROGRAMS.12/Month$0.0012/Month$0.00$0.00$0.00$0.00
x011 Total:$0.00x011 Total:$0.00$0.00$0.00$0.00
x012x012Standing5.12. REGULATED WASTE.12/Month$0.0012/Month$0.00$0.00$0.00$0.00
x012NNStanding5.12.5. Service Specifications for U.S. Navy.12/Month$0.0012/Month$0.00$0.00$0.00$0.00
x012 Total:$0.00x012 Total:$0.00$0.00$0.00$0.00
x013x013Standing5.13. HEATING OIL TANK TESTING.12/Month$0.0012/Month$0.00$0.00$0.00$0.00
x013AAIDIQ5.13.4.A. INTEGRITY TESTING. (UST)15/event$0.0015/event$0.00$0.00$0.00$0.00
x013ABIDIQ5.13.4.A. INTEGRITY TESTING. (AST)15/event$0.0015/event$0.00$0.00$0.00$0.00
x013NNStanding5.13.5. Service Specifications for U.S. Navy.12/Month$0.0012/Month$0.00$0.00$0.00$0.00
x013 Total:$0.00x013 Total:$0.00$0.00$0.00$0.00
x014x014Standing5.14. DISASTER AND SPILL RESPONSE.12/Month$0.0012/Month$0.00$0.00$0.00$0.00
x014AAIDIQ5.14.4.A.1. SPILLS BEYOND LEVEL II. (Most Probable Discharge)3/event$0.003/event$0.00$0.00$0.00$0.00
x014ABIDIQ5.14.4.A.2. SPILLS BEYOND LEVEL II. (Worst Case Discharge)1/event$0.001/event$0.00$0.00$0.00$0.00
x014NNStanding5.14.5. Service Specifications for U.S. Navy.12/Month$0.0012/Month$0.00$0.00$0.00$0.00
x014 Total:$0.00x014 Total:$0.00$0.00$0.00$0.00
x015x015Standing5.15. VEHICLES AND MOTORIZED EQUIPMENT.12/Month$0.0012/Month$0.00$0.00$0.00$0.00
x015AAStanding5.15.2.B.1.CATEGORY 1 VEHICLE PREVENTIVE MAINTENANCE12/Month$0.0012/Month$0.00$0.00$0.00$0.00
x015ABStanding5.15.2.B.2. CATEGORY 2 VEHICLE PREVENTIVE MAINTENANCE12/Month$0.0012/Month$0.00$0.00$0.00$0.00
x015ACDiscretionary5.15.2.B.3. CATEGORY 3 VEHICLE PREVENTIVE MAINTENANCE (Discretionary Item)12/Month$0.0012/Month$0.00$0.00$0.00$0.00
x015ADDiscretionary5.15.2.B.4. CATEGORY 4 VEHICLE PREVENTIVE MAINTENANCE (Discretionary Item)12/Month$0.0012/Month$0.00$0.00$0.00$0.00
x015AEStanding5.15.2.I TIRE SERVICE12/Month$0.0012/Month$0.00$0.00$0.00$0.00
x015AAIDIQ5.15.4.A. SEASONAL TIRE CHANGES.20/lot of 4 tires$0.0020/lot of 4 tires$0.00$0.00$0.00$0.00
x015NNStanding5.15.5. Service Specifications for U.S. Navy12/Month$0.0012/Month$0.00$0.00$0.00$0.00
x015 Total:$0.00x015 Total:$0.00$0.00$0.00$0.00
x016x016Standing5.16. CENTRAL HEATING PLANT, WASTE WATER TREATMENT PLANT, AND WATER TREATMENT PLANT.12/Month$0.0012/Month$0.00$0.00$0.00$0.00
x016AADiscretionary5.16.2.I.8. Equipment Enrollment CHP (Discretionary Item)1/event$0.001/event$0.00$0.00$0.00$0.00
x016ABDiscretionary5.16.2.I.9. Equipment Enrollment WWTP (Discretionary Item)1/event$0.001/event$0.00$0.00$0.00$0.00
x016ACDiscretionary5.16.2.I.10. Equipment Enrollment WTP (Discretionary Item)1/event$0.001/event$0.00$0.00$0.00$0.00
x016ADIDIQ5.16.4.A Install additional coupon stations5/event$0.005/event$0.00$0.00$0.00$0.00
x016AEIDIQ5.16.4.B. Water System AST Inspection and Cleaning1/event$0.001/event$0.00$0.00$0.00$0.00
x016AFStanding5.16.5. Central Heating Plant Operations.12/Month$0.0012/Month$0.00$0.00$0.00$0.00
x016AGStanding5.16.6. Waste Water Treatment Plant.12/Month$0.0012/Month$0.00$0.00$0.00$0.00
x016AHStanding5.16.7. Water Treatment Plant.12/Month$0.0012/Month$0.00$0.00$0.00$0.00
x016 Total:$0.00x016 Total:$0.00$0.00$0.00$0.00
x017x017Standing5.17. LIQUID OILY WASTE FACILITIES AND EQUIPMENT.12/Month$0.0012/Month$0.00$0.00$0.00$0.00
x017AADiscretionary5.17.1.C. EQUIPMENT ENROLLMENT LOWS Plant (Discretionary Item).1/event$0.001/event$0.00$0.00$0.00$0.00
x017ABIDIQ5.17.4.A. RECEIVE, PUMP, AND TRANSPORT TENANT UNIT USED OIL AND OILY WATER5000/gallon$0.005000/gallon$0.00$0.00$0.00$0.00
x017 Total:$0.00x017 Total:$0.00$0.00$0.00$0.00
x018x018Standing5.18. MAIL, SHIPPING, AND RECEIVING.12/Month$0.0012/Month$0.00$0.00$0.00$0.00
x018AADiscretionary5.18.2.A.1 USCG BARRACKS PERSONAL MAIL (Discretionary Item)12/Month$0.0012/Month$0.00$0.00$0.00$0.00
x018ABIDIQ5.18.4.A. ON-BASE MAIL DELIVERY SERVICES. (1 time)10/event$0.0010/event$0.00$0.00$0.00$0.00
x018ACIDIQ5.18.4.A. ON-BASE MAIL DELIVERY SERVICES. (daily service)30/day$0.0030/day$0.00$0.00$0.00$0.00
x018ADIDIQ5.18.4.A. ON-BASE MAIL DELIVERY SERVICES. (1 time per week)10/week$0.0010/week$0.00$0.00$0.00$0.00
x018AEIDIQ5.18.4.A. ON-BASE MAIL DELIVERY SERVICES. (1 time per month)5/month$0.005/month$0.00$0.00$0.00$0.00
x018AFIDIQ5.18.4.B. OFF-BASE MAIL DELIVERY SERVICES. ( 1 time)15/event$0.0015/event$0.00$0.00$0.00$0.00
x018AGIDIQ5.18.4.B. OFF-BASE MAIL DELIVERY SERVICES.(daily service)30/day$0.0030/day$0.00$0.00$0.00$0.00
x018AHIDIQ5.18.4.B. OFF-BASE MAIL DELIVERY SERVICES. (1 time per week)10/week$0.0010/week$0.00$0.00$0.00$0.00
x018AIIDIQ5.18.4.B. OFF-BASE MAIL DELIVERY SERVICES. (1 time per month)5/month$0.005/month$0.00$0.00$0.00$0.00
x018AJIDIQ5.18.4.C. AFTER-HOURS SHIPPING AND RECEIVING.40/occurrence$0.0040/occurrence$0.00$0.00$0.00$0.00
x018NNStanding5.18.5. Service Specifications for U.S. Navy.12/month$0.0012/month$0.00$0.00$0.00$0.00
x018 Total:$0.00x018 Total:$0.00$0.00$0.00$0.00
x019x019Standing5.19. HOUSING MAINTENANCE.12/Month$0.0012/Month$0.00$0.00$0.00$0.00
x019AAIDIQ5.19.1.A.1 Basic COM Package150/unit$0.00150/unit$0.00$0.00$0.00$0.00
5.19.1.A.2 Additional Housing Maintenance Line Items
x019ABIDIQComplete Cleaning Service (vacant unit only)35/each$0.0035/each$0.00$0.00$0.00$0.00
x019ACIDIQChemically Shampoo Carpet1200/sq ft$0.001200/sq ft$0.00$0.00$0.00$0.00
x019ADIDIQPressure Wash Exterior (per unit)50/each$0.0050/each$0.00$0.00$0.00$0.00
x019AEIDIQPressure Wash Exterior (per SF)5000/sq ft$0.005000/sq ft$0.00$0.00$0.00$0.00
x019AFIDIQReplace Interior Hinged Hollow Core Door-door only30/each$0.0030/each$0.00$0.00$0.00$0.00
x019AGIDIQReplace Interior Hinged Hollow Core Door with Frame10/each$0.0010/each$0.00$0.00$0.00$0.00
x019AHIDIQReplace Interior Solid Core Door-door only10/each$0.0010/each$0.00$0.00$0.00$0.00
x019AJIDIQReplace Interior Solid Core Door with Frame5/each$0.005/each$0.00$0.00$0.00$0.00
x019AKIDIQReplace Exterior Hinged Solid Core Door-door only5/each$0.005/each$0.00$0.00$0.00$0.00
x019ALIDIQReplace Exterior Hinged Solid Core Door with Frame10/each$0.0010/each$0.00$0.00$0.00$0.00
x019AMIDIQReplace Bi-Fold or By-Pass Closet Door (all doors, hardware, and frame)5/each$0.005/each$0.00$0.00$0.00$0.00
x019ANIDIQReplace Bi-Fold or By-Pass Closet Door-door only (per panel)15/each$0.0015/each$0.00$0.00$0.00$0.00
x019AOIDIQReplace Sliding Patio/Balcony Door (both panes including frame)10/each$0.0010/each$0.00$0.00$0.00$0.00
x019APIDIQReplace in kind Storm Door15/each$0.0015/each$0.00$0.00$0.00$0.00
x019AQIDIQReplace in kind Garage Door and Runners5/each$0.005/each$0.00$0.00$0.00$0.00
x019ARIDIQReplace Window/Door Screen and frame200/each$0.00200/each$0.00$0.00$0.00$0.00
x019ASIDIQReplace Window Glass40/each$0.0040/each$0.00$0.00$0.00$0.00
x019ATIDIQReplace Complete Window Including Frame25/each$0.0025/each$0.00$0.00$0.00$0.00
x019AUAIDIQReplace Siding (Vinyl)500/Linear Feet$0.00500/Linear Feet$0.00$0.00$0.00$0.00
x019AUBIDIQReplace Siding (aluminum)300/Linear Feet$0.00350/Linear Feet$0.00$0.00$0.00$0.00
x019AUCIDIQReplace Siding (Cedar)350/Linear Feet$0.00350/Linear Feet$0.00$0.00$0.00$0.00
x019AUDIDIQReplace Siding (Cement Board)350/Linear Feet$0.00350/Linear Feet$0.00$0.00$0.00$0.00
x019AVIDIQReplace Gutter and Downspout1000/Linear Feet$0.001000/Linear Feet$0.00$0.00$0.00$0.00
x019AWIDIQReplace Mini-blind/Vertical Blind1500/Linear Feet$0.001500/Linear Feet$0.00$0.00$0.00$0.00
x019AXAIDIQReplace Interior Light Fixture75/each$0.0075/each$0.00$0.00$0.00$0.00
x019AXBIDIQReplace Exterior Light Fixture75/each$0.0075/each$0.00$0.00$0.00$0.00
x019AYIDIQReplace Kitchen Counter-tops/Bathroom Vanity Top/Backsplash500/Linear Feet$0.00500/Linear Feet$0.00$0.00$0.00$0.00
x019AZIDIQReplace Medicine Cabinet25/each$0.0025/each$0.00$0.00$0.00$0.00
x019BAIDIQGypsum/Greenboard/Drywall2000/sq ft$0.002000/sq ft$0.00$0.00$0.00$0.00
x019BBIDIQFull Interior Paint (2 Bedroom Units) includes 2+40/each$0.0040/each$0.00$0.00$0.00$0.00
x019BCIDIQFull Interior Paint (3 Bedroom Units)40/each$0.0040/each$0.00$0.00$0.00$0.00
x019BDIDIQFull Interior Paint (4 Bedroom Units)40/each$0.0040/each$0.00$0.00$0.00$0.00
x019BEIDIQInterior Paint/Stain (occupied)1000/sq ft$0.001000/sq ft$0.00$0.00$0.00$0.00
x019BFIDIQInterior Paint/Stain (vacant)75000/sq ft$0.0075000/sq ft$0.00$0.00$0.00$0.00
x019BGIDIQExterior Paint/Stain7500/sq ft$0.007500/sq ft$0.00$0.00$0.00$0.00
x019BHIDIQCaulking and refinishing (occupied)200/each$0.00200/each$0.00$0.00$0.00$0.00
x019BJIDIQReplace or Repair Concrete500/sq ft$0.00500/sq ft$0.00$0.00$0.00$0.00
x019BKIDIQRoad Striping/Parking Stall Striping5000/Linear Feet$0.005000/Linear Feet$0.00$0.00$0.00$0.00
x019BLIDIQReplace or Install Carpet Squares (occupied)15000/sq yd$0.0015000/sq yd$0.00$0.00$0.00$0.00
x019BMIDIQReplace Carpet with Padding, (including Tackstrips and Transition Strips)10000/sq yd$0.0010000/sq yd$0.00$0.00$0.00$0.00
x019BNIDIQReplace Vinyl/Sheet Linoleum Flooring, (including Base Molding and Transition Strips)1000/sq yd$0.001000/sq yd$0.00$0.00$0.00$0.00
x019BOAIDIQReplace Base Molding (rubber)2000/Linear Feet$0.002000/Linear Feet$0.00$0.00$0.00$0.00
x019BOBIDIQReplace Base Molding (Wood)1000/Linear Feet$0.001000/Linear Feet$0.00$0.00$0.00$0.00
x019BPIDIQInterior and Exterior Pest Control30/each$0.0030/each$0.00$0.00$0.00$0.00
x019BQIDIQReplace Bath Tub15/each$0.0015/each$0.00$0.00$0.00$0.00
x019BRIDIQRepair Roofs/Scrape Moss/ Clear Gutters200/each$0.00200/each$0.00$0.00$0.00$0.00
x019BSIDIQGrass Cutting (vacant/not in COM)50/each$0.0050/each$0.00$0.00$0.00$0.00
x019BTIDIQReplace Kitchen Sink10/each$0.0010/each$0.00$0.00$0.00$0.00
x019BUIDIQReplace Bathroom Sink10/each$0.0010/each$0.00$0.00$0.00$0.00
x019BVIDIQReplace Shower Enclosure40/each$0.0040/each$0.00$0.00$0.00$0.00
x019BWIDIQReplace in kind Wood Laminate Flooring1000/sq ft$0.001000/sq ft$0.00$0.00$0.00$0.00
x019BXIDIQInstall Bathroom Fan20/each$0.0020/each$0.00$0.00$0.00$0.00
x019BYIDIQRefinish Cabinets50/each$0.0050/each$0.00$0.00$0.00$0.00
x019BZIDIQFireplace Inspection/Cleaning100/each$0.00100/each$0.00$0.00$0.00$0.00
x019CAAIDIQInstall Refrigerator (refurbished)20/each$0.0020/each$0.00$0.00$0.00$0.00
x019CABIDIQInstall refrigerator (new)20/each$0.0020/each$0.00$0.00$0.00$0.00
x019CBAIDIQInstall Dishwasher (Refurbished)20/each$0.0020/each$0.00$0.00$0.00$0.00
x019CBBIDIQInstall Dishwasher (New)20/each$0.0020/each$0.00$0.00$0.00$0.00
x019CCAIDIQInstall Clothes Washer (Refurbished)20/each$0.0020/each$0.00$0.00$0.00$0.00
x019CCBIDIQInstall Clothes Washer (New)20/each$0.0020/each$0.00$0.00$0.00$0.00
x019CDAIDIQInstall Clothes Dryer (Refursished)20/each$0.0020/each$0.00$0.00$0.00$0.00
x019CDBIDIQInstall Clothes Dryer (New)20/each$0.0020/each$0.00$0.00$0.00$0.00
x019CEAIDIQInstall Freestanding Stove/Oven (Refurbished)20/each$0.0020/each$0.00$0.00$0.00$0.00
x019CEBIDIQInstall Freestanding Stove/Oven (New)20/each$0.0020/each$0.00$0.00$0.00$0.00
x019CFAIDIQInstall Cook Top Range (Refurbished)8/each$0.008/each$0.00$0.00$0.00$0.00
x019CFBIDIQInstall Cook Top Range (New)8/each$0.008/each$0.00$0.00$0.00$0.00
x019CGAIDIQInstall Under Counter Oven (refurbished)8/each$0.008/each$0.00$0.00$0.00$0.00
x019CGBIDIQInstall Under Counter Oven (New)8/each$0.008/each$0.00$0.00$0.00$0.00
x019CHAIDIQInstall Microwave Oven (Refurbished)13/each$0.0013/each$0.00$0.00$0.00$0.00
x019CHBIDIQInstall Microwave Oven (New)13/each$0.0013/each$0.00$0.00$0.00$0.00
x019CJIDIQReplace Garbage Disposal (New)30/each$0.0030/each$0.00$0.00$0.00$0.00
x019CKIDIQReplace Deck Boards1000/Linear Feet$0.001000/Linear Feet$0.00$0.00$0.00$0.00
x019CLIDIQReplace Structural Roof Supports15/each$0.0015/each$0.00$0.00$0.00$0.00
x019CMIDIQReplace Oven Hood (New)40/item$0.0040/item$0.00$0.00$0.00$0.00
x019 Total:$0.00x019 Total:$0.00$0.00$0.00$0.00
x020x020Standing5.20. SUPPORT SERVICES.12/Month$0.0012/Month$0.00$0.00$0.00$0.00
x020AADiscretionary5.20.2.D. LINE HANDLING SERVICES (Discretionary Item).12/month$0.0012/month$0.00$0.00$0.00$0.00
x020ABIDIQ5.20.4.A. CRANE SERVICES (Hourly Rate Base Kodiak Mobilization).380/hr$0.00380/hr$0.00$0.00$0.00$0.00
x020ACIDIQ5.20.4.A.2. CRANE SERVICES (Hourly Rate Off Site Mobilization).20/hr$0.0020/hr$0.00$0.00$0.00$0.00
x020ADIDIQ5.20.4.B. HEAVY LIFT CRANE SERVICES (Hourly Rate Base Kodiak Mobilization)100/hr$0.00100/hr$0.00$0.00$0.00$0.00
x020AEIDIQ5.20.4.B.2 HEAVY LIFT CRANE SERVICES (Hourly Rate Off Site Mobilization)10/hr$0.0010/hr$0.00$0.00$0.00$0.00
x020NNStanding5.20.5. Service Specifications for U.S. Navy.15/hr$0.0015/hr$0.00$0.00$0.00$0.00
x020 Total:$0.00x020 Total:$0.00$0.00$0.00$0.00
x021x021Discretionary5.21. PEST CONTROL SERVICES (Discretionary Item).12/Month$0.0012/Month$0.00$0.00$0.00$0.00
x021AAIDIQ5.21.4.A. ANIMAL CONTROL.12/event$0.0012/event$0.00$0.00$0.00$0.00
5.21.4.B. PEST SERVICES IN ADDITIONAL LOCATIONS. (per building for 1 month)
x021ABIDIQUndesirable Vegetation30/ 100 SF$0.0030/ 100 SF$0.00$0.00$0.00$0.00
x021ACIDIQStructural Pests20/ 100 SF$0.0020/ 100 SF$0.00$0.00$0.00$0.00
x021ADIDIQPests in and Around Buildings60/ 100 SF$0.0060/ 100 SF$0.00$0.00$0.00$0.00
x021AEIDIQPublic Health Pests70/ 100 SF$0.0070/ 100 SF$0.00$0.00$0.00$0.00
x021AFIDIQTurf and Ornamental Pests30/ 100 SF$0.0030/ 100 SF$0.00$0.00$0.00$0.00
x021AGIDIQVertebrate Pests70/ 100 SF$0.0070/ 100 SF$0.00$0.00$0.00$0.00
x021AHIDIQOther Pest Management Services (per instance)150/ 100 SF$0.00150/ 100 SF$0.00$0.00$0.00$0.00
5.21.4.B. PEST SERVICES IN ADDITIONAL LOCATIONS. (per acre of area treated for 1 month)
x021AIIDIQUndesirable Vegetation3/acre$0.003/acre$0.00$0.00$0.00$0.00
x021AJIDIQStructural Pests3/acre$0.003/acre$0.00$0.00$0.00$0.00
x021AKIDIQPests in and Around Buildings1/acre$0.001/acre$0.00$0.00$0.00$0.00
x021ALIDIQPublic Health Pests2/acre$0.002/acre$0.00$0.00$0.00$0.00
x021AMIDIQTurf and Ornamental Pests1/acre$0.001/acre$0.00$0.00$0.00$0.00
x021ANIDIQVertebrate Pests2/acre$0.002/acre$0.00$0.00$0.00$0.00
x021AOIDIQOther Pest Management Services (per instance)3/acre$0.003/acre$0.00$0.00$0.00$0.00
x021NN5.21.5 Service Specifications for US Navy
x021NOIDIQ5.21.4.A. ANIMAL CONTROL.3/event$0.003/event$0.00$0.00$0.00$0.00
5.21.4.B. PEST SERVICES IN ADDITIONAL LOCATIONS. (per building for 1 month)
x021NPIDIQUndesirable Vegetation100/ 100 SF$0.00100/ 100 SF$0.00$0.00$0.00$0.00
x021NQIDIQStructural Pests100/ 100 SF$0.00100/ 100 SF$0.00$0.00$0.00$0.00
x021NRIDIQPests in and Around Buildings100/ 100 SF$0.00100/ 100 SF$0.00$0.00$0.00$0.00
x021NSIDIQPublic Health Pests100/ 100 SF$0.00100/ 100 SF$0.00$0.00$0.00$0.00
x021NTIDIQTurf and Ornamental Pests100/ 100 SF$0.00100/ 100 SF$0.00$0.00$0.00$0.00
x021NUIDIQVertebrate Pests700/ 100 SF$0.00700/ 100 SF$0.00$0.00$0.00$0.00
x021NVIDIQOther Pest Management Services (per instance)150/ 100 SF$0.00150/ 100 SF$0.00$0.00$0.00$0.00
x021 Total:$0.00x021 Total:$0.00$0.00$0.00$0.00
x0225.22. MAINTENANCE, REPAIR, AND IMPROVEMENT UNIT PRICED WORK.
x022AAIDIQ5.22.4.A. INTERIOR AND EXTERIOR PAINTING. (Interior)75000/sq ft$0.0075000/sq ft$0.00$0.00$0.00$0.00
x022ABIDIQ5.22.4.A. INTERIOR AND EXTERIOR PAINTING. (Exterior)25000/sq ft$0.0025000/sq ft$0.00$0.00$0.00$0.00
x022ACIDIQ5.22.4.B. CARPETING.30000/sq ft$0.0030000/sq ft$0.00$0.00$0.00$0.00
x022ADIDIQ5.22.4.C. VINYL OR SHEET LINOLEUM. (Vinyl)10000/sq ft$0.0010000/sq ft$0.00$0.00$0.00$0.00
x022AEIDIQ5.22.4.C. VINYL OR SHEET LINOLEUM. (Linoleum)10000/sq ft$0.0010000/sq ft$0.00$0.00$0.00$0.00
x022AFIDIQ5.22.4.D. LAMINATE FLOORING.10000/sq ft$0.0010000/sq ft$0.00$0.00$0.00$0.00
x022AGIDIQ5.22.4.E. COVE BASE MOLDING. (Wood)3000/linear ft$0.003000/linear ft$0.00$0.00$0.00$0.00
x022AHIDIQ5.22.4.E. COVE BASE MOLDING. (Rubber)3000/linear ft$0.003000/linear ft$0.00$0.00$0.00$0.00
x022NNIDIQ5.22.5. Service Specifications for U.S. Navy.12/Month$0.0012/Month$0.00$0.00$0.00$0.00
x022 Total:$0.00x022 Total:$0.00$0.00$0.00$0.00
x023x023Discretionary5.23. FRONT GATE SECURITY GUARD SERVICES (Discretionary Item).12/Month$0.0012/Month$0.00$0.00$0.00$0.00
x023AAIDIQ5.23.4.A. SPECIAL EVENT GUARDS.40/hour$0.0040/hour$0.00$0.00$0.00$0.00
x023 Total:$0.00x023 Total:$0.00$0.00$0.00$0.00
x024x024Standing5.24. AIR STATION VEHICLES AND EQUIPMENT12/Month$0.0012/Month$0.00$0.00$0.00$0.00
x024 Total:$0.00x024 Total:$0.00$0.00$0.00$0.00
x025x025Standing5.25.1. ALARM AND FIRE SUPPRESSION SYSTEMS.12/Month$0.0012/Month$0.00$0.00$0.00$0.00
x025AAStanding5.25.2.C. ALARM AND FIRE SUPPRESSION SYSTEM SERVICE WORK12/Month$0.0012/Month$0.00$0.00$0.00$0.00
x025NNStanding5.25.5. Service Specifications for U.S. Navy.12/Month$0.0012/Month$0.00$0.00$0.00$0.00
x025 Total:$0.00x025 Total:$0.00$0.00$0.00$0.00
x026x026Standing5.26 LOCKSMITH SERVICES12/Month$0.0012/Month$0.00$0.00$0.00$0.00
x026AAIDIQ5.26.4.A BULK REKEYING20/lot of 25$0.0020/lot of 25$0.00$0.00$0.00$0.00
x026NNStanding5.26.5 Service Specification for U.S. Navy12/Month$0.0012/Month$0.00$0.00$0.00$0.00
x026 Total$0.00x026 Total$0.00$0.00$0.00$0.00
x060x060Standing6.0 DELIVERABLES12/Month$0.0012/Month$0.00$0.00$0.00$0.00
x060 Total:$0.00x060 Total:$0.00$0.00$0.00$0.00
x070x070Standing7.0 PERSONNEL REQUIREMENTS AND QUALIFICATIONS12/Month$0.0012/Month$0.00$0.00$0.00$0.00
x070AAStanding7.3.1 PROJECT MANAGER12/Month$0.0012/Month$0.00$0.00$0.00$0.00
x070ABStanding7.3.2 CONTRACTOR QUALITY CONTROL (CGC) REPRESENTATIVE12/Month$0.0012/Month$0.00$0.00$0.00$0.00
x070ACStanding7.3.3 UTILITY SYSTEMS MANAGER12/Month$0.0012/Month$0.00$0.00$0.00$0.00
x070ADStanding7.3.4 OSH PROGRAM MANAGER12/Month$0.0012/Month$0.00$0.00$0.00$0.00
x070AEStanding7.3.5 ENVIRONMENTAL PROGRAM MANAGER12/Month$0.0012/Month$0.00$0.00$0.00$0.00
x070AFStanding7.3.6 AVIATION FUEL STATION PRIMARY OPERATOR (AFO)12/Month$0.0012/Month$0.00$0.00$0.00$0.00
x070AGStanding7.3.7 PRIMARY HAZARDOUS WASTE TECHNICIAN (HWT)12/Month$0.0012/Month$0.00$0.00$0.00$0.00
x070AHStandingCONTRACT ADMINISTRATIVE AND SUPPORT RESOURCES12/Month$0.0012/Month$0.00$0.00$0.00$0.00
x070 Total:$0.00x070 Total:$0.00$0.00$0.00$0.00
x080x080Standing8.0 QUALITY CONTROL12/Month$0.0012/Month$0.00$0.00$0.00$0.00
x080 Total:$0.00x080 Total:$0.00$0.00$0.00$0.00
x=0x=1x=2x=3x=4
TOTAL CONTRACT VALUE FOR LINE ITEMS x10001, x001 through x025, x060, x070, and x080:$0.00$0.00$0.00$0.00$0.00
*ORDERS FOR ANY OF THE CLINS ABOVE WILL ONLY BE ORDERED AND FUNDED ON TASK ORDERS AGAINST THE CONTRACT.

&14USCG Kodiak BOSS IDIQ CLIN Schedule

&P of &N

CLIN x001AC Labor Rates

CLIN x001AC Level III Job Orders, IAW Section 4.1 of the PWS, are separately priced and may
be subject to the Service Contract Labor Standards or Construction Wage Rate Requirements .
Note: To calculate the total price for this line item:
(1) use proposed composite* labor rates for each labor category below;
(2) multiply by the exact number of labor hours indicated for each labor category times the
applicable composite labor rate and enter the total for that labor category;
(3) add all category totals for a total labor cost;
(4) add the cost of any materials, equipment and subcontractor (MES) costs, which is to include
its markup factor, to the total labor costs to arrive at the total price for the Level III Job Orders.
*Composite Labor Rates: The composite labor rate for each labor category shall be fixed hourly rate
including but not limited to wages, health and welfare benefits, other fringe benefits, taxes,
Overhead**, G&A**and Profit**. The composite labor rates listed below are binding for all Level III
Job Orders issued during the period of performance of the contract.
**Except for adjustments in accordance with FAR 52.222-43, Fair Labor Standards Act and Service
Contract Act--Price Adjustment (Multiple Year and Option Contracts) and
FAR 52.222-32 -- Construction Wage Rate Requirements—Price Adjustment (Actual Method) the composite
labor rate is binding for all Level III Job Orders issued during this performance period of the contract.
Service work that exceeds the $10,000 Level II ceiling threshold, in combined direct labor and direct material
costs will become a Level III job order IAW Section 4.1 of the PWS.
The number of estimated hours shown will be used for evaluation and budgetary purposes.
The number of hours required in any contract year will vary, and the Government does not guarantee the
amount of hours shown will equal the amount of hours the contractor will have to provide.
COMPOSITE LABOR RATES FOR LEVEL III JOB ORDERS
Base Ordering Period (x=0)
Firm Fixed Price (FFP) Rates Subject to the Construction Wage Rate Requirements
EstimatedComposite
Labor CategoryLabor HoursLabor RatesTotal
1. Asbestos Worker20x$ - 0=$ - 0
2. Hazardous Material Handler5x$ - 0=$ - 0
3. Boilermaker5x$ - 0=$ - 0
4. Carpenter30x$ - 0=$ - 0
5. Electrician15x$ - 0=$ - 0
6. Painter,Brush,Roller,Sign15x$ - 0=$ - 0
7. Painter,Steel,Paper,Vinyl15x$ - 0=$ - 0
8. Painter,Spray,Sandblast15x$ - 0=$ - 0
9. Plumbers,Steamfitters15x$ - 0=$ - 0
10. Roofers5x$ - 0=$ - 0
11. Sheet Metal Workers5x$ - 0=$ - 0
12. Sprinkler Fitters5x$ - 0=$ - 0
13. Tile Setters5x$ - 0=$ - 0
14. Laborers, Group 130x$ - 0=$ - 0
15. Laborers, Group 210x$ - 0=$ - 0
16. Laborers, Group 35x$ - 0=$ - 0
17. Power Equip.Oper,Grp 130x$ - 0=$ - 0
18. Power Equip.Oper,Grp 1A5x$ - 0=$ - 0
19. Power Equip.Oper,Grp 25x$ - 0=$ - 0
20. Power Equip.Oper,Grp 35x$ - 0=$ - 0
21. Truck Drivers, Group 15x$ - 0=$ - 0
22. Truck Drivers, Group 25x$ - 0=$ - 0
23. Truck Drivers, Group 35x$ - 0=$ - 0
24. Truck Drivers, Group 45x$ - 0=$ - 0
25. Truck Drivers, Group 55x$ - 0=$ - 0
(A) Total FFP Labor Cost for Construction Wage Rate Requirements
(SUM TOTAL FOR 1 - 25)$ - 0
FFP Rates Subject to the Service Contract Labor Standards
Estimated
Labor CategoryLabor HoursTotal

AUTOMOTIVE SERVICES:

1. Motor Equip Metal Mechanic5x$ - 0=$ - 0
2. Motor Vehicle Mechanic40x$ - 0=$ - 0
3. Motor Vehicle Mech Helper2x$ - 0=$ - 0
4. Motor Vehicle Wrecker2x$ - 0=$ - 0
5. Tire Repairer2x$ - 0=$ - 0

GENERAL SERVICES AND SUPPORT:

6. Janitor, Porter, Cleaner10x$ - 0=$ - 0
7. Laborer, General Maint.2x$ - 0=$ - 0
8. Laborer, Grounds Maint.120x$ - 0=$ - 0

MATERIALS HANDLING & PACKING:

9. Forklift Operator5x$ - 0=$ - 0
10. Fuel Distr Systems Oper.80x$ - 0=$ - 0
11. Material Handling Laborer3x$ - 0=$ - 0
12. Hazardous Material Tech5x$ - 0=$ - 0

MECHANICS & MAINTENANCE & REPAIR:

13. Carpenter, Maintenance100x$ - 0=$ - 0
14. Carpet Layer3x$ - 0=$ - 0
15. Electrician, Maintenance40x$ - 0=$ - 0
16. Fire Alarm System Mech15x$ - 0=$ - 0
17. General Maint. Worker20x$ - 0=$ - 0
18. Heating, Regrigeration & Air$ - 0
Conditioning Mechanic15x$ - 0=$ - 0
19. Heavy Equipment Mechanic80x$ - 0=$ - 0
20. Maintenance Trades Helper3x$ - 0=$ - 0
21. Mason, Maintenance3x$ - 0=$ - 0
22. Painter, Maintenance40x$ - 0=$ - 0
23. Pipe Fitter, Maintenance40x$ - 0=$ - 0
24. Plumber, Maintenance40x$ - 0=$ - 0
25. Asbestos Worker3x$ - 0=$ - 0
26. Welder, Maintenance10x$ - 0=$ - 0
27. Rigger3x$ - 0=$ - 0
28. Elevator Repairer3x$ - 0=$ - 0
29. Appliance Mechanic3x$ - 0=$ - 0
30. Electronics Technician5x$ - 0=$ - 0
31. Machinist Maintenance3x$ - 0=$ - 0
32. Sheet Metal Worker, Maint.3x$ - 0=$ - 0

PLANT & SYSTEM OPERATION:

33. Boiler Operator5x$ - 0=$ - 0
34. Sewage Plant Operator5x$ - 0=$ - 0
35. Water Treatment Plant Oper5x$ - 0=$ - 0

TRANSPORTATION/MOBILE EQUIPMENT:

36. Bus Driver5x$ - 0=$ - 0
37. Heavy Equipment Operator80x$ - 0=$ - 0
38. Tractor Operator5x$ - 0=$ - 0
39. Truck Driver, Light Truck2x$ - 0=$ - 0
40. Truck Driver, Medium Truck2x$ - 0=$ - 0
41. Truck Driver, Heavy Truck25x$ - 0=$ - 0
(B) Total FFP Labor Cost for Service Contract Labor Standards
(SUM TOTAL FOR 1-41)$ - 0
(C) TOTAL LABOR COST FOR LEVEL III JOB ORDERS
[SUM OF (A)+(B)]$ - 0
(D)MATERIAL, EQUIPMENT AND SUBCONTRACTING (MES) HANDLING/ADMINISTRATIVE/
PROFIT RATES FOR JOB ORDERS

For evaluation purposes only, MES costs are estimated at:

Material$10,000.00
Equipment$2,000.00
Subcontractor$23,000.00
SUM OF MES (D) COSTS$35,000.00
(E)A handling charge (as a %) will be added to the MES costs for indirect (overhead) costs.
The MES handling charge is binding for all Level III orders issued during this period. The handling
charge shall not include profit, shall include all appropriate costs IAW
section 4.1 of the PWSE =0.00%
(F)A profit rate (as a %) will be applied to the MES costs for Profit.
The Profit rate is binding for Level III orders issued during this period, and
shall be applied IAW section 4.1 of the PWS.F =0.00%

(G) COMPOSITE Handling-Profit rate (E+F) = 0.00%

(H) TOTAL ESTIMATED MES FOR LEVEL III JOB ORDERS$0.00
This is the sum of (D)+(G)
(J) TOTAL PRICE FOR LEVEL III JOB ORDERS FOR BASE ORDERING PERIOD$ 35,000.00
This is the total of labor (C) plus the total MES (H). (This figure is for evaluation and budget purposes only and
is not part of the firm-fixed-priced portion of the contract.)
Ordering Period One (x=1)
Firm Fixed Price (FFP) Rates Subject to the Construction Wage Rate Requirements
EstimatedComposite
Labor CategoryLabor HoursLabor RatesTotal
1. Asbestos Worker20x$ - 0=$ - 0
2. Hazardous Material Handler5x$ - 0=$ - 0
3. Boilermaker5x$ - 0=$ - 0
4. Carpenter30x$ - 0=$ - 0
5. Electrician15x$ - 0=$ - 0
6. Painter,Brush,Roller,Sign15x$ - 0=$ - 0
7. Painter,Steel,Paper,Vinyl15x$ - 0=$ - 0
8. Painter,Spray,Sandblast15x$ - 0=$ - 0
9. Plumbers,Steamfitters15x$ - 0=$ - 0
10. Roofers5x$ - 0=$ - 0
11. Sheet Metal Workers5x$ - 0=$ - 0
12. Sprinkler Fitters5x$ - 0=$ - 0
13. Tile Setters5x$ - 0=$ - 0
14. Laborers, Group 130x$ - 0=$ - 0
15. Laborers, Group 210x$ - 0=$ - 0
16. Laborers, Group 35x$ - 0=$ - 0
17. Power Equip.Oper,Grp 130x$ - 0=$ - 0
18. Power Equip.Oper,Grp 1A5x$ - 0=$ - 0
19. Power Equip.Oper,Grp 25x$ - 0=$ - 0
20. Power Equip.Oper,Grp 35x$ - 0=$ - 0
21. Truck Drivers, Group 15x$ - 0=$ - 0
22. Truck Drivers, Group 25x$ - 0=$ - 0
23. Truck Drivers, Group 35x$ - 0=$ - 0
24. Truck Drivers, Group 45x$ - 0=$ - 0
25. Truck Drivers, Group 55x$ - 0=$ - 0
(A) Total FFP Labor Cost for Construction Wage Rate Requirements
(SUM TOTAL FOR 1 - 25)$ - 0
FFP Rates Subject to the Service Contract Labor Standards
Estimated
Labor CategoryLabor HoursTotal

AUTOMOTIVE SERVICES:

1. Motor Equip Metal Mechanic5x$ - 0=$ - 0
2. Motor Vehicle Mechanic40x$ - 0=$ - 0
3. Motor Vehicle Mech Helper2x$ - 0=$ - 0
4. Motor Vehicle Wrecker2x$ - 0=$ - 0
5. Tire Repairer2x$ - 0=$ - 0

GENERAL SERVICES AND SUPPORT:

6. Janitor, Porter, Cleaner10x$ - 0=$ - 0
7. Laborer, General Maint.2x$ - 0=$ - 0
8. Laborer, Grounds Maint.120x$ - 0=$ - 0

MATERIALS HANDLING & PACKING:

9. Forklift Operator5x$ - 0=$ - 0
10. Fuel Distr Systems Oper.80x$ - 0=$ - 0
11. Material Handling Laborer3x$ - 0=$ - 0
12. Hazardous Material Tech5x$ - 0=$ - 0

MECHANICS & MAINTENANCE & REPAIR:

13. Carpenter, Maintenance100x$ - 0=$ - 0
14. Carpet Layer3x$ - 0=$ - 0
15. Electrician, Maintenance40x$ - 0=$ - 0
16. Fire Alarm System Mech15x$ - 0=$ - 0
17. General Maint. Worker20x$ - 0=$ - 0
18. Heating, Regrigeration & Air$ - 0
Conditioning Mechanic15x$ - 0=$ - 0
19. Heavy Equipment Mechanic80x$ - 0=$ - 0
20. Maintenance Trades Helper3x$ - 0=$ - 0
21. Mason, Maintenance3x$ - 0=$ - 0
22. Painter, Maintenance40x$ - 0=$ - 0
23. Pipe Fitter, Maintenance40x$ - 0=$ - 0
24. Plumber, Maintenance40x$ - 0=$ - 0
25. Asbestos Worker3x$ - 0=$ - 0
26. Welder, Maintenance10x$ - 0=$ - 0
27. Rigger3x$ - 0=$ - 0
28. Elevator Repairer3x$ - 0=$ - 0
29. Appliance Mechanic3x$ - 0=$ - 0
30. Electronics Technician5x$ - 0=$ - 0
31. Machinist Maintenance3x$ - 0=$ - 0
32. Sheet Metal Worker, Maint.3x$ - 0=$ - 0

PLANT & SYSTEM OPERATION:

33. Boiler Operator5x$ - 0=$ - 0
34. Sewage Plant Operator5x$ - 0=$ - 0
35. Water Treatment Plant Oper5x$ - 0=$ - 0

TRANSPORTATION/MOBILE EQUIPMENT:

36. Bus Driver5x$ - 0=$ - 0
37. Heavy Equipment Operator80x$ - 0=$ - 0
38. Tractor Operator5x$ - 0=$ - 0
39. Truck Driver, Light Truck2x$ - 0=$ - 0
40. Truck Driver, Medium Truck2x$ - 0=$ - 0
41. Truck Driver, Heavy Truck25x$ - 0=$ - 0
(B) Total FFP Labor Cost for Service Contract Labor Standards
(SUM TOTAL FOR 1-41)$ - 0
(C) TOTAL LABOR COST FOR LEVEL III JOB ORDERS
[SUM OF (A)+(B)]$ - 0
(D)MATERIAL, EQUIPMENT AND SUBCONTRACTING (MES) HANDLING/ADMINISTRATIVE/
PROFIT RATES FOR JOB ORDERS

For evaluation purposes only, MES costs are estimated at:

Material$10,000.00
Equipment$2,000.00
Subcontractor$23,000.00
SUM OF MES (D) COSTS$35,000.00
(E)A handling charge (as a %) will be added to the MES costs for indirect (overhead) costs.
The MES handling charge is binding for all Level III orders issued during this period. The handling
charge shall not include profit, shall include all appropriate costs IAW
section 4.1 of the PWSE =0.00%
(F)A profit rate (as a %) will be applied to the MES costs for Profit.
The Profit rate is binding for Level III orders issued during this period, and
shall be applied IAW section 4.1 of the PWS.F =0.00%

(G) COMPOSITE Handling-Profit rate (E+F) = 0.00%

(H) TOTAL ESTIMATED MES FOR LEVEL III JOB ORDERS$0.00
This is the sum of (D)+(G)
(J) TOTAL PRICE FOR LEVEL III JOB ORDERS FOR ORDERING PERIOD ONE$ 35,000.00
This is the total of labor (C) plus the total MES (H). (This figure is for evaluation and budget purposes only and
is not part of the firm-fixed-priced portion of the contract.)
Ordering Period Two (x=2)
Firm Fixed Price (FFP) Rates Subject to the Construction Wage Rate Requirements
EstimatedComposite
Labor CategoryLabor HoursLabor RatesTotal
1. Asbestos Worker20x$ - 0=$ - 0
2. Hazardous Material Handler5x$ - 0=$ - 0
3. Boilermaker5x$ - 0=$ - 0
4. Carpenter30x$ - 0=$ - 0
5. Electrician15x$ - 0=$ - 0
6. Painter,Brush,Roller,Sign15x$ - 0=$ - 0
7. Painter,Steel,Paper,Vinyl15x$ - 0=$ - 0
8. Painter,Spray,Sandblast15x$ - 0=$ - 0
9. Plumbers,Steamfitters15x$ - 0=$ - 0
10. Roofers5x$ - 0=$ - 0
11. Sheet Metal Workers5x$ - 0=$ - 0
12. Sprinkler Fitters5x$ - 0=$ - 0
13. Tile Setters5x$ - 0=$ - 0
14. Laborers, Group 130x$ - 0=$ - 0
15. Laborers, Group 210x$ - 0=$ - 0
16. Laborers, Group 35x$ - 0=$ - 0
17. Power Equip.Oper,Grp 130x$ - 0=$ - 0
18. Power Equip.Oper,Grp 1A5x$ - 0=$ - 0
19. Power Equip.Oper,Grp 25x$ - 0=$ - 0
20. Power Equip.Oper,Grp 35x$ - 0=$ - 0
21. Truck Drivers, Group 15x$ - 0=$ - 0
22. Truck Drivers, Group 25x$ - 0=$ - 0
23. Truck Drivers, Group 35x$ - 0=$ - 0
24. Truck Drivers, Group 45x$ - 0=$ - 0
25. Truck Drivers, Group 55x$ - 0=$ - 0
(A) Total FFP Labor Cost for Construction Wage Rate Requirements
(SUM TOTAL FOR 1 - 25)$ - 0
FFP Rates Subject to the Service Contract Labor Standards
Estimated
Labor CategoryLabor HoursTotal

AUTOMOTIVE SERVICES:

1. Motor Equip Metal Mechanic5x$ - 0=$ - 0
2. Motor Vehicle Mechanic40x$ - 0=$ - 0
3. Motor Vehicle Mech Helper2x$ - 0=$ - 0
4. Motor Vehicle Wrecker2x$ - 0=$ - 0
5. Tire Repairer2x$ - 0=$ - 0

GENERAL SERVICES AND SUPPORT:

6. Janitor, Porter, Cleaner10x$ - 0=$ - 0
7. Laborer, General Maint.2x$ - 0=$ - 0
8. Laborer, Grounds Maint.120x$ - 0=$ - 0

MATERIALS HANDLING & PACKING:

9. Forklift Operator5x$ - 0=$ - 0
10. Fuel Distr Systems Oper.80x$ - 0=$ - 0
11. Material Handling Laborer3x$ - 0=$ - 0
12. Hazardous Material Tech5x$ - 0=$ - 0

MECHANICS & MAINTENANCE & REPAIR:

13. Carpenter, Maintenance100x$ - 0=$ - 0
14. Carpet Layer3x$ - 0=$ - 0
15. Electrician, Maintenance40x$ - 0=$ - 0
16. Fire Alarm System Mech15x$ - 0=$ - 0
17. General Maint. Worker20x$ - 0=$ - 0
18. Heating, Regrigeration & Air$ - 0
Conditioning Mechanic15x$ - 0=$ - 0
19. Heavy Equipment Mechanic80x$ - 0=$ - 0
20. Maintenance Trades Helper3x$ - 0=$ - 0
21. Mason, Maintenance3x$ - 0=$ - 0
22. Painter, Maintenance40x$ - 0=$ - 0
23. Pipe Fitter, Maintenance40x$ - 0=$ - 0
24. Plumber, Maintenance40x$ - 0=$ - 0
25. Asbestos Worker3x$ - 0=$ - 0
26. Welder, Maintenance10x$ - 0=$ - 0
27. Rigger3x$ - 0=$ - 0
28. Elevator Repairer3x$ - 0=$ - 0
29. Appliance Mechanic3x$ - 0=$ - 0
30. Electronics Technician5x$ - 0=$ - 0
31. Machinist Maintenance3x$ - 0=$ - 0
32. Sheet Metal Worker, Maint.3x$ - 0=$ - 0

PLANT & SYSTEM OPERATION:

33. Boiler Operator5x$ - 0=$ - 0
34. Sewage Plant Operator5x$ - 0=$ - 0
35. Water Treatment Plant Oper5x$ - 0=$ - 0

TRANSPORTATION/MOBILE EQUIPMENT:

36. Bus Driver5x$ - 0=$ - 0
37. Heavy Equipment Operator80x$ - 0=$ - 0
38. Tractor Operator5x$ - 0=$ - 0
39. Truck Driver, Light Truck2x$ - 0=$ - 0
40. Truck Driver, Medium Truck2x$ - 0=$ - 0
41. Truck Driver, Heavy Truck25x$ - 0=$ - 0
(B) Total FFP Labor Cost for Service Contract Labor Standards
(SUM TOTAL FOR 1-41)$ - 0
(C) TOTAL LABOR COST FOR LEVEL III JOB ORDERS
[SUM OF (A)+(B)]$ - 0
(D)MATERIAL, EQUIPMENT AND SUBCONTRACTING (MES) HANDLING/ADMINISTRATIVE/
PROFIT RATES FOR JOB ORDERS

For evaluation purposes only, MES costs are estimated at:

Material$10,000.00
Equipment$2,000.00
Subcontractor$23,000.00
SUM OF MES (D) COSTS$35,000.00
(E)A handling charge (as a %) will be added to the MES costs for indirect (overhead) costs.
The MES handling charge is binding for all Level III orders issued during this period. The handling
charge shall not include profit, shall include all appropriate costs IAW
section 4.1 of the PWSE =0.00%
(F)A profit rate (as a %) will be applied to the MES costs for Profit.
The Profit rate is binding for Level III orders issued during this period, and
shall be applied IAW section 4.1 of the PWS.F =0.00%

(G) COMPOSITE Handling-Profit rate (E+F) = 0.00%

(H) TOTAL ESTIMATED MES FOR LEVEL III JOB ORDERS$0.00
This is the sum of (D)+(G)
(J) TOTAL PRICE FOR LEVEL III JOB ORDERS FOR ORDERING PERIOD TWO$ 35,000.00
This is the total of labor (C) plus the total MES (H). (This figure is for evaluation and budget purposes only and

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .