BOSS_Kodiak_PWS.pdf

PDF 1 MB Posted

Attached to
Base Operation Support Services for Base Kodiak, AK
Solicitation number
HSCG84-16-R-PKC001
Issued by

About this file

BOSS Kodiak PWS.pdf

View the file

Other files

File Type Posted
Amendment_16_-_HSCG84-16-R-PKC001.pdf PDF
Amendment_15_-_HSCG84-16-R-PKC001.pdf PDF
HSCG84-16-R-PKC001_-BOSS_Kodiak_Solicitation_-_Amend_15.pdf PDF
Amendment_14_-_HSCG84-16-R-PKC001.pdf PDF
TE_1.5_Historic_Averages_and_Priorities_for_Service_Work_-_AMEND_13.pdf PDF
Amendment_12_-_HSCG84-16-R-PKC001.pdf PDF
HSCG84-16-R-PKC001_-BOSS_Kodiak_Solicitation_-_Amend_12.pdf PDF
RFI_with_Answers_-_4_-_FINAL.pdf PDF
HSCG84-16-R-PKC001_-BOSS_Kodiak_Solicitation_-_Amend_11.pdf PDF
Amendment_11_-_HSCG84-16-R-PKC001.pdf PDF
RFI_with_Answers_-_3_-_FINAL.pdf PDF
HSCG84-16-R-PKC001_-BOSS_Kodiak_Solicitation_-_Amend_9.pdf PDF
Amendment_9_-_HSCG84-16-R-PKC001.pdf PDF
RFI_with_Answers_-_2_-_FINAL.pdf PDF
TE_5.2_Sports_Fields_-_Amend_8.docx DOCX document
Base_Kodiak_BOSS_PWS_-_Amendment_8.pdf PDF
Amendment_8_-_HSCG84-16-R-PKC001.pdf PDF
Wage_Determination_with_CBA_-_Amend_8.pdf PDF
Seniority_List_Averages_-_Amend_8.pdf PDF
HSCG84-16-R-PKC001_-BOSS_Kodiak_Solicitation_-_Amend_8.pdf PDF
CLIN_Schedule_-Amendment_7.xlsx XLSX spreadsheet
Amendment_7_-_HSCG84-16-R-PKC001.pdf PDF
Amend__7_-_Revised_Refs1of2.zip ZIP file
Amend__7_-_Revised_Refs2of2.zip ZIP file
Amend__7_-_Revised_Append.zip ZIP file
Base_Kodiak_BOSS_PWS_-_Amendment_7.pdf PDF
RFI_with_Answers_-_1.pdf PDF
Amendment_6_-_HSCG84-16-R-PKC001.pdf PDF
Amendment_4_-_HSCG84-16-R-PKC001.pdf PDF
Amendment_3_-_HSCG84-16-R-PKC001.pdf PDF
References_1_of_3.zip ZIP file
Amendment_2_-_HSCG84-16-R-PKC001.pdf PDF
HSCG84-16-R-PKC001_-BOSS_Kodiak_Solicitation_-_Amend_2.pdf PDF
References_2_of_3.zip ZIP file
Prepropsal_Conf-BOSS_Kodiak-08-JUN-2016_-_Rev_2.ppt PPT presentation
Amendment_1_-_HSCG84-16-R-PKC001.pdf PDF
QASP.pdf PDF
CLIN_Schedule_of_Prices.xlsx XLSX spreadsheet
Wage_Determination_with_CBA.pdf PDF
Appendices_A-E.zip ZIP file
HSCG84-16-R-PKC001_-BOSS_Kodiak_Solicitation.pdf PDF
Draft_CLIN_Schedule.pdf PDF
Draft_PWS_for_BOSS_Kodiak.pdf PDF
Kodiak_Installation_Access.pdf PDF
Special_Notice.pdf PDF
PWS_Comments_June_2015_2.pdf PDF
Base_Kodiak_QA_s.pdf PDF
Attendance_List.docx DOCX document
Draft_PWS_for_Site_Visit_With_Watermark.pdf PDF
Sources_Sought_BOSS_Kodiak.doc DOC document
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2017 USCG Base Kodiak BOSS

Performance Work Statement Page 1

PWS FOR BASE OPERATION SUPPORT SERVICES

AT USCG BASE KODIAK, AK

Table of Contents

SECTION 1.0 INTRODUCTION

BACKGROUND

2.1. LOCATION AND BACKGROUND INFORMATION

2.2. PHYSICAL DESCRIPTION

2.2.1. Acreage

2.2.2. Buildings, Structures, Roads, and Grounds

2.2.3. Generation Equipment

2.2.4. Electric

2.2.5. Propane

2.2.6. Heating Plants

2.2.7. Water

2.2.8. Sewage Disposal

SECTION 3.0 SCOPE

3.1. NORMAL WORKING HOURS

3.2. WORK COORDINATION

3.2.1. Facility Closures

3.2.2. Utility Outages

3.2.3. Digging Permits

3.2.4. Federal Holidays

3.2.5. Secure Areas

3.2.6. Occupied Areas

3.2.7. Scheduling Work

3.3. PHYSICAL SECURITY

3.4. KEY CONTROL

3.5. ENERGY AND UTILITIES CONSERVATION PROGRAMS

3.6. EQUIPMENT WARRANTIES

3.7. ENVIRONMENTAL PROGRAM

3.7.1. Regulations and Laws

3.7.2. Citations

3.7.3. Spills

3.8. INSPECTION BY REGULATORY AGENCIES

3.9. SAFETY REQUIREMENTS AND REPORTS

3.9.1. Accident, Fire, and Damage Reports

3.9.2. Contractor Safety Plan

3.9.3. Hazardous and Toxic Material Safety

3.9.3.A. HANDLING HAZARDOUS OR TOXIC MATERIAL

3.9.3.B. ASBESTOS

3.9.3.C. LEAD ABATEMENT

3.10. CRITICAL SYSTEM WORK AND NOTIFICATIONS

3.11. TRANSITION OF CONTRACTOR OPERATIONS

3.11.1. Transition Period

3.11.2. Phase-Out

3.11.3. Costs

3.12. REQUIRED PLANS

3.12.1. Security Plans

3.12.2. Safety Plan

3.12.3. Emergency Operations Plan

3.12.4. Quality Control Plan

3.12.5. Facilities Maintenance Plan

Performance Work Statement Page 2

3.12.6. Training Plan

3.12.7. Phase-Out Plan

3.12.8. Environmental Program Management Plan

3.13. PERMITS AND LICENSES

3.14. PWS LANGUAGE

3.15. TECHNOLOGICAL IMPROVEMENTS

3.16. EQUIPMENT, FACILITY, AND WORK ORDER WORKLOAD VARIATIONS

3.17. DIRECTIONS FROM THE COR

3.18. APPLICABLE REFERENCES AND TECHNICAL DATA

SECTION 4.0 TASK STRUCTURE AND PRICING INFORMATION

4.1. LEVEL III SERVICE WORK

4.1.1. General

4.1.2. Preparation of Proposals

4.1.3. Labor Requirements

4.1.4. Material Requirements

4.1.5. Subcontracting Requirements

4.1.6. Construction and Weight Handling Equipment Requirements

4.1.7. Government Review of Contractor Proposal

4.1.8. Cost Estimating System

4.1.9. Issuance of Task Order

4.1.10. Changes to Scope of Work

4.1.11. Reporting of Actual Resources Utilized by the Contractor

4.1.12. Ongoing Work Site Cleanup

SECTION 5.0 TASKS

5.1. LEVEL II SERVICE WORK

5.1.1. Scope

5.1.2. Requirements

5.1.2.A. Additional Standard Work Orders (Discretionary Item) 5.1.2.B. Additional Jumbo Work Orders (Discretionary Item)

5.1.2.C. WORK ORDER GENERATION

5.1.2.D. CUSTOMER NOTIFICATIONS

5.1.2.E. WORK ORDER REVIEW

5.1.2.F. AFTER-HOURS SERVICE WORK ORDERS

5.1.2.G. DIG PERMITS

5.1.2.H. UTILITY OUTAGES

5.1.2.I. CONTRACTOR-IDENTIFIED WORK

5.1.2.J. SERVICE WORK ORDER RESPONSE AND COMPLETION

5.1.2.N. SERVICE WORK ORDER RECORD KEEPING

5.1.2.O. GOVERNMENT ISSUED WORK ORDERS

5.1.2.P. LABOR

5.1.2.Q. MATERIALS

5.1.2.R. OFF-ISLAND WORK

5.1.2.S. PERFORMANCE CONSIDERATIONS

5.1.3. Deliverables

5.1.3.A. MONTHLY REPORT

5.1.4. Indefinite Delivery Indefinite Quantity (IDIQ)

5.1.4.A. PERFORM LEVEL III SERVICE WORK

5.1.4.C. GYM EQUIPMENT DIAGNOSIS

5.1.4.D. ADDITIONAL SERVICE WORK ORDERS

5.1.5. Service Specifications for U.S. Navy

5.2. PREVENTIVE MAINTENANCE

5.2.1. Scope

5.2.4. Requirements

5.2.4.A. CATEGORY 1 CRITICAL PREVENTIVE MAINTENANCE

5.2.4.B. CATEGORY 2 ESSENTIAL PREVENTIVE MAINTENANCE

5.2.4.C. CATEGORY 3 PRIORITY PREVENTIVE MAINTENANCE (Discretionary Item) 5.2.4.D. CATEGORY 4 ROUTINE PREVENTIVE MAINTENANCE (Discretionary Item)

Performance Work Statement Page 3

5.2.4.E. CATEGORY 5 DEFERRED MAINTENANCE

5.2.4.F. GYM EQUIPMENT PM (Discretionary Item)

5.2.4.G. NEW EQUIPMENT

5.2.4.H. EQUIPMENT IDENTIFICATION TAGS

5.2.4.I. EQUIPMENT CONFIGURATION

5.2.5. RECORDS

5.2.6. Deliverables

5.2.6.A. ANNUAL PREVENTIVE MAINTENANCE PLAN

5.2.6.C. IDIQ

5.2.6.C.1. EQUIPMENT ENROLLMENT

5.2.7. Service Specifications for U.S. Navy

5.3. JANITORIAL SERVICES

5.3.1. Scope

5.3.2. Requirements

5.3.2.A. CLEANING FREQUENCY

5.3.2.B. CLEANING HOURS

5.3.2.C. SECURE AREAS

5.3.2.D. MOVABLE ITEMS

5.3.2.E. WEATHER

5.3.2.F. EMERGENCIES AND REPAIRS

5.3.2.G. CONDUCT OF PERSONNEL

5.3.2.H. RESTROOMS AND LOCKER ROOMS

5.3.2.I. WASTE COLLECTION, REMOVAL, AND DISPOSAL

5.3.2.J. FLOOR MAINTENANCE

5.3.2.K. SURFACE MAINTENANCE

5.3.2.K.5. GLASS CLEANING AND MAINTENANCE

5.3.2.L. SPOT CLEANING AND MAINTENANCE

5.3.2.M. SERVICE CALLS

5.3.3. Deliverables

5.3.3.A. SCHEDULES

5.3.3.B. EQUIPMENT

5.3.4. IDIQ

5.3.4.A. ADDITIONAL CLEANING SERVICES

5.3.4.B. BUILDING 9 CHAIRS

5.3.5. Service Specifications for U.S. Navy

5.4. REFUSE COLLECTION AND DISPOSAL

5.4.1. Scope

5.4.2. Requirements

5.4.2.A. COLLECT AND DISPOSE OF REFUSE

5.4.2.A.6. ADDITIONAL RECYCLABLE MATERIAL COLLECTION AND DISPOSAL

5.4.2.B. BULK REFUSE

5.4.2.C. RECYCLABLE MATERIALS (Discretionary Item)

5.4.2.D. ILLEGAL DISPOSAL

5.4.2.E. BEAR DISTURBANCES

5.4.2.F. REFUSE CONTAINER SITE CONDITIONS

5.4.2.G. MAINTAIN REFUSE CONTAINERS

5.4.2.H. WASTE PICKUP VEHICLES

5.4.2.I. COOKING GREASE AND OIL

5.4.3. Deliverables

5.4.3.A. REFUSE COLLECTION SCHEDULE

5.4.3.B. MONTHLY RECYCLABLE MATERIAL AND WASTE REPORT

5.4.3.C. MONTHLY LANDFILL AND SLUDGE DISPOSAL FEE REPORTS

5.4.4. IDIQ

5.4.4.A. PAINT REFUSE CONTAINERS (NON-ALUMINUM)

5.4.4.B. SPECIAL EVENTS AND PROJECTS

5.4.4.C. REFUSE COLLECTION FOR BASE WIDE CLEANUP

5.4.5. Service Specifications for the U.S. Navy

5.5. GROUNDS MAINTENANCE

5.5.1. Scope

5.5.2. Requirements

Performance Work Statement Page 4

5.5.2.A. GROUNDS COVER MAINTENANCE

5.5.2.B. ENHANCED CUTTING STANDARDS FOR IMPROVED GROUNDS (Discretionary Item) 5.5.2.C. ENHANCED CUTTING STANDARDS FOR SEMI IMPROVED GROUNDS (Discretionary Item) 5.5.2.D. EDGING AND TRIMMING (Discretionary Item) 5.5.2.F. LANDSCAPED AREA MAINTENANCE (Discretionary Item)

5.5.2.G. SPORTS FIELD WINTER REPAIR

5.5.2.H. BRUSH CLEARING

5.5.2.I. AREA T AND AREA R GROUNDS (Discretionary Item)

5.5.2.J. RCRA SITES

5.5.3. Deliverables

5.5.3.A. ANNUAL GROUNDS MAINTENANCE PLAN

5.5.4. IDIQ

5.5.4.A. ADDITIONAL BRUSH CLEARING (adjacent to roadways) 5.5.4.B. ADDITIONAL BRUSH CLEARING (area)

5.5.4.C. TREE REMOVAL

5.5.4.D. HOLES AND DEPRESSIONS

5.5.4.E. PRUNING

5.5.4.F. RESEEDING

5.5.4.G. SPORTS FIELD GROUND COVER MAINTENANCE

5.5.4.H. MULCHING AND WEED REMOVAL OF LANDSCAPED AREAS

5.5.4.I. TREE PRUNING

5.5.4.J. HEDGE TRIMMING

5.5.4.K. FERTILIZATION

5.5.4.L. EDGING

5.5.4.M. TRIMMING

5.5.5. Service Specifications for U.S. Navy

5.6. SNOW REMOVAL, ICE CONTROL, AND TRACTION

5.6.1. Scope

5.6.2. Requirements

5.6.2.A. GENERAL SNOW REMOVAL REQUIREMENTS

5.6.2.B. PRIORITY 1 SNOW REMOVAL AREAS (TE 6.1)

5.6.2.C. PRIORITY 2 SNOW REMOVAL AREAS (TE 6.1, TE 6.2, AND TE 6.4)

5.6.2.D. PRIORITY 2A SNOW REMOVAL

5.6.2.E. ICE AND TRACTION CONTROL

5.6.3. Deliverables

5.6.3.A. SNOW REMOVAL, ICE CONTROL, AND SANDING PLAN

5.6.4. IDIQ

5.7. ROADWAY AND SEWER MAINTENANCE AND REPAIR

5.7.1. Scope

5.7.2. Requirements

5.7.2.A. CULVERT AND STORM DRAIN MAINTENANCE

5.7.2.B. CLEANING OF STORM DRAINAGE SYSTEM

5.7.2.C. CLEANING OF SEWER SYSTEM

5.7.2.D. GRADING

5.7.2.E. SWEEPING

5.7.2.F. OPERATIONAL AND SAFETY PAVEMENT AND CURB MARKING

5.7.2.G. OTHER PAVEMENT AND CURB MARKING (Discretionary Item)

5.7.2.H. PAVEMENT PATCHING AND REPAIR

5.7.2.I. LIGHTING

5.7.2.J. FLOODING AND STORM SUPPORT

5.7.2.K. SERVICE WORK

5.7.3. Deliverables

5.7.3.A. DEBRIS CLEANING SCHEDULE

5.7.3.B. SEWER CLEANING SCHEDULE

5.7.3.C. GRADING SCHEDULE

5.7.3.D. PAVEMENT AND CURB MARKING SCHEDULE

5.7.4. IDIQ

5.7.4.A. AIR STATION MARKINGS

5.7.4.B. PAVEMENT CRACK FILLING

5.7.4.C. SEAL COATING PAVEMENT

5.7.4.D. MISCELLANEOUS GRADING

Performance Work Statement Page 5

5.7.4.E. MISCELLANEOUS PAVEMENT MARKINGS

5.7.4.F. PAVEMENT PATCHING AND REPAIR

5.7.5. Service Specifications for U.S. Navy

5.8. FUEL SERVICES

5.8.1. Scope

5.8.2. Requirements

5.8.2.A. GENERAL REQUIREMENTS

5.8.2.B. PLANT OPERATIONS

5.8.2.C. NON-ROUTINE PLANT OPERATIONS

5.8.2.D. TANK SOUNDINGS

5.8.2.E. FUEL DECONTAMINATION

5.8.2.F. OVERFILL PROTECTION

5.8.2.G. AVIATION FUEL FARM

5.8.2.H. AVIATION FUEL FARM TRAINING

5.8.2.I. FUEL QUALITY CONTROL

5.8.2.J. FUEL SPECIFICATIONS

5.8.2.K. SAMPLING AND TESTING

5.8.2.L. TRANSFER FUEL TO AND FROM VESSELS

5.8.2.M. OPERATIONS MAINTENANCE

5.8.2.N. HYDROSTATIC TESTING

5.8.2.O. CALIBRATION

5.8.2.P. ALARMS

5.8.2.Q. HOUSEKEEPING AND GROUNDS MAINTENANCE

5.8.2.R. RECORDS

5.8.2.S. CHANGES TO MANUALS

5.8.2.T. LABELS AND SAFETY DATA SHEETS

5.8.2.U. FUELS SERVICE WORK

5.8.3. Deliverables

5.8.3.A. BULK FUEL INVENTORIES

5.8.3.B. CALIBRATION REPORT

5.8.3.C. AVIATION FUEL FARM TRANSFER RECORDS

5.8.3.D. FUEL OPERATIONS AD-HOC REPORTS

5.8.3.E. CONTRACTOR DETAILED PLANS

5.8.4. IDIQ

5.8.4.A. BULK TANK CLEANING AND ENTRY FOR INSPECTION

5.8.4.B. ADDITIONAL FUEL SAMPLING AND ANALYSIS

5.8.4.C. CARGO PIER CATHODIC PROTECTION INSPECTION

5.8.4.D. FUEL PIER CATHODIC PROTECTION INSPECTION

5.8.4.E. VESSEL BOOMING SERVICE

5.9. AIR PROGRAMS

5.9.1. Scope

5.9.2. Requirements

5.9.2.A. AIR EMISSIONS

5.9.2.B. OZONE DEPLETING SUBSTANCES (ODS)

5.9.3. Deliverables

5.9.3.A. AIR EMISSIONS DATA

5.9.4. IDIQ

5.10. ENVIRONMENTAL MANAGEMENT AND STEWARDSHIP

5.10.1. Scope

5.10.2. Requirements

5.10.2.A. ENVIRONMENTAL STEWARDSHIP

5.10.2.B. COMPLIANCE WITH ENVIRONMENTAL PERMITS

5.10.2.C. ENVIRONMENTAL MANAGEMENT SYSTEM (EMS)

5.10.2.D. OPERATIONAL SUSTAINABILITY PERFORMANCE PLAN (OSPP)

5.10.2.E. NATIONAL ENVIRONMENTAL POLICY ACT

5.10.2.F. ENVIRONMENTAL COMPLIANCE AND STEWARDSHIP INTERNAL AUDITS

5.10.2.G. HAZARDOUS MATERIALS MANAGEMENT

5.10.3. Deliverables

5.10.3.A. EMS PROGRAM

5.10.3.B. SUSTAINABILITY REPORT

Performance Work Statement Page 6

5.10.3.C. MONTHLY ENVIRONMENTAL STEWARDSHIP INSPECTION REPORTS

5.10.3.D. NEPA CHECKLISTS

5.10.3.E. HAZARDOUS MATERIALS MANAGEMENT MONTHLY REPORT

5.10.3.F. HAZARDOUS MATERIALS MANAGEMENT ANNUAL REPORT

5.10.3.G. WASTE REDUCTION REPORT

5.10.4. IDIQ

5.11. WATER PROGRAMS

5.11.1. Scope

5.11.2. Requirements

5.11.2.A. DOMESTIC WATER PROGRAM

5.11.2.B. SANITARY WATER PROGRAM

5.11.2.C. STORM WATER PROGRAM

5.11.2.D. SECONDARY CONTAINMENT DISCHARGE PROGRAM

5.11.3. Deliverables

5.11.4. IDIQ

5.12. REGULATED WASTE

5.12.1. Scope

5.12.2. Requirements

5.12.2.A. AVOID AND MINIMIZE GENERATION OF REGULATED WASTE (RW)

5.12.2.B. WASTE ACCUMULATION AREAS (WAA)

5.12.2.C. COLLECT AND TRANSPORT HAZARDOUS WASTE TO HWSB

5.12.2.D. PROVIDE HAZARDOUS WASTE TECHNICIAN SERVICES

5.12.2.D.1. SPILL DETECTION

5.12.2.D.2. HOUSEKEEPING

5.12.2.E. MAINTAIN PETROLEUM CONTAMINATED SOIL STOCKPILES

5.12.2.F. MAINTAIN AND MANAGE EXEMPT SOLID WASTE LANDFILL

5.12.2.G. REGULATED WASTE MANAGEMENT RECORDS

5.12.2.H. TRAINING RECORDS

5.12.2.I. SERVICE WORK

5.12.3. Deliverables

5.12.3.A.1. MONTHLY REGULATED WASTE REPORT

5.12.4. IDIQ

5.12.5. Service Specifications for U.S. Navy

5.13. HEATING OIL TANK TESTING

5.13.1. Scope

5.13.2. Requirements

5.13.2.A. HEATING OIL TANK TESTING

5.13.2.B. TANK REPAIRS

5.13.3. Deliverables

5.13.3.A. TANK TESTING SCHEDULE

5.13.3.B. UST TANK INTEGRITY TESTING REPORT

5.13.3.C. AST VISUAL TESTING TANK REPORT

5.13.4. IDIQ

5.13.4.A. INTEGRITY TESTING

5.13.5. Service Specifications for U.S. Navy

5.14. DISASTER AND SPILL RESPONSE

5.14.1. Scope

5.14.2. Requirements

5.14.2.A. READINESS EXERCISES

5.14.2.B. READINESS TRAINING

5.14.2.C. SPILL RESPONSE

5.14.3. Deliverables

5.14.3.A. QUARTERLY TRAINING AND QUALIFICATION REPORTS

5.14.3.B. EMERGENCY OPERATIONS PLAN

5.14.4. IDIQ

5.14.4.A. SPILLS BEYOND LEVEL II

5.14.5. Service Specifications for U.S. Navy

5.15. VEHICLES AND MOTORIZED EQUIPMENT

5.15.1. Scope

Performance Work Statement Page 7

5.15.2. Requirements

5.15.2.A. VEHICLE MAINTENANCE

5.15.2.B. VEHICLE MAINTENANCE SCHEDULING

5.15.2.C. RECORDS

5.15.2.E. TIRE SERVICE

5.15.2.F. VEHICLE SERVICE WORK

5.15.2.G. VEHICLE WASHING FACILITY

5.15.3. Deliverables

5.15.3.A. AN ANNUAL VEHICLE PREVENTIVE MAINTENANCE PLAN

5.15.3.B. FOUR-WEEK PLANS

5.15.3.C. FIRE APPARATUS & RESPONSE EQUIPMENT AVAILABILITY REPORT

5.15.3.D. COAST GUARD EXCHANGE SERVICE (CGES) SUPPORT REPORTS

5.15.4. IDIQ

5.15.4.A. SEASONAL TIRE CHANGES

5.15.5. Service Specifications for U.S. Navy

5.16. CENTRAL HEATING PLANT, WASTE WATER TREATMENT PLANT, AND WATER

TREATMENT PLANT

5.16.1. Scope

5.16.2. Requirements

5.16.2.A. OPERATIONAL EMERGENCIES

5.16.2.B. ROUTINE PLANT OPERATIONS

5.16.2.C. NON-ROUTINE PLANT OPERATIONS

5.16.2.D. INSPECTING PLANT OPERATIONS

5.16.2.E. STAFFING

5.16.2.F. CALIBRATION

5.16.2.G. HOUSEKEEPING AND GROUNDS MAINTENANCE

5.16.2.H. ALARMS

5.16.2.I. RECORDS

5.16.2.I.8. EQUIPMENT ENROLLMENT (Discretionary Item) 5.16.2.I.9. EQUIPMENT ENROLLMENT (Discretionary Item) 5.16.2.I.10. EQUIPMENT ENROLLMENT (Discretionary Item)

5.16.3. Deliverables

5.16.3.A. INITIAL AND ANNUAL PLANT PLANS

5.16.3.B. CALIBRATION REPORT

5.16.3.C. PREVENTIVE MAINTENANCE REPORTS

5.16.3.D. PLANT OPERATIONS AD-HOC REPORTS

5.16.4. IDIQ

5.16.4.A. INSTALL ADDITIONAL COUPON STATIONS

5.16.4.B. WATER SYSTEM AST INSPECTION AND CLEANING

5.16.5. Central Heating Plant Operations

5.16.5.A. GENERAL CENTRAL HEATING PLANT REQUIREMENTS

5.16.5.B. WATCH STANDER REQUIREMENTS

5.16.5.C. ROUTINE PLANT OPERATIONS

5.16.5.D. PLANT AND EQUIPMENT MALFUNCTIONS

5.16.5.E. ALARMS

5.16.5.F. OPERATION EFFICIENCY STANDARDS

5.16.5.G. BOILER WATER TESTING

5.16.5.H. AIR STACK ANALYSIS

5.16.5.I. EQUIPMENT READINGS

5.16.5.J. USED OIL FUEL SOURCE

5.16.5.K. BUILDING 614 BOILER

5.16.5.L. PERFORM BUILDING 12 BASEMENT SUMP CHECK

5.16.5.M. OUTAGES

5.16.5.N. CENTRAL HEATING PLANT RECORDS

5.16.6. Waste Water Treatment Plant

5.16.6.A. WASTE WATER TREATMENT PLANT OPERATION

5.16.6.B. TREATED WASTE WATER QUALITY

5.16.6.C. TREATMENT CHEMICALS

5.16.6.D. SLUDGE AND WASTE DISPOSAL

5.16.6.E. WASTE WATER TREATMENT PLANT MAINTENANCE

5.16.6.F. WASTE WATER TREATMENT PLANT RECORDS

Performance Work Statement Page 8

5.16.6.G. WASTE WATER TREATMENT PLANT SERVICE WORK

5.16.6.H. WASTE WATER TREATMENT PLANT DELIVERABLES

5.16.7. Water Treatment Plant

5.16.7.A. PLANT OPERATION

5.16.7.B. WATER PRODUCTION

5.16.7.C. TREATED WATER QUALITY

5.16.7.D. WATER TREATMENT CHEMICALS

5.16.7.E. DISTRIBUTION SYSTEM CORROSION CONTROL

5.16.7.F. WATER METER READINGS

5.16.7.G. WATER TREATMENT PLANT MAINTENANCE AND REPAIR

5.16.7.H. LABELS AND SAFETY DATA SHEETS

5.16.7.I. WATER TREATMENT PLANT SERVICE WORK

5.16.7.J. WATER TREATMENT PLANT DELIVERABLES

5.17. LIQUID OILY WASTE SYSTEM FACILITIES AND EQUIPMENT

5.17.1. Scope

5.17.1.C. EQUIPMENT ENROLLMENT (Discretionary Item)

5.17.2. Requirements

5.17.2.A. OPERATIONS

5.17.2.B. OPERATIONAL EMERGENCIES

5.17.2.C. ROUTINE OPERATIONS

5.17.2.D. NON-ROUTINE OPERATIONS

5.17.2.E. OPERATIONS AND INSPECTION

5.17.2.F. OILY WASTE STREAM MANAGEMENT

5.17.2.G. RECEIVE PUMP AND TRANSPORT USED OIL AND OILY WATER

5.17.2.H. PROCESSED USED OIL AND WATER QUALITY

5.17.2.I. SLUDGE AND UNTREATABLE LIQUID OILY WASTE DISPOSAL

5.17.2.J. MAINTENANCE

5.17.2.K. HOUSEKEEPING AND GROUNDS MAINTENANCE

5.17.2.L. CALIBRATION

5.17.2.M. ALARM MONITORING

5.17.2.N. LOWS P2 AND BMP PLAN AND RECORD KEEPING

5.17.2.O. LABELS AND SAFETY DATA SHEETS

5.17.2.P. SERVICE WORK

5.17.3. Deliverables

5.17.3.A. CONTRACTOR DETAILED PLANS

5.17.3.B. CALIBRATION REPORT

5.17.3.C. MONTHLY OPERATING REPORT

5.17.3.D. LOWS OPERATIONS AD-HOC REPORTS

5.17.4. IDIQ

5.17.4.A. RECEIVE, PUMP, AND TRANSPORT TENANT UNIT USED OIL AND OILY WATER

5.18. MAIL, SHIPPING, AND RECEIVING

5.18.1. Scope

5.18.2. Requirements

5.18.2.A. PROVIDE MAIL SERVICES

5.18.2.B. PROVIDE SHIPPING AND RECEIVING SERVICES

5.18.3. Deliverables

5.18.3.A. MAIL BUSINESS INTELLIGENCE TOOL (MBIT) REPORT

5.18.3.B. OTHER REPORTS AND DATA REQUESTS

5.18.4. IDIQ

5.18.4.A. ON-BASE MAIL DELIVERY SERVICES

5.18.4.B. OFF-BASE MAIL DELIVERY SERVICES

5.18.4.C. AFTER-HOURS SHIPPING AND RECEIVING

5.18.5. Service Specifications for U.S. Navy

5.19. HOUSING MAINTENANCE

5.19.1. Scope

5.19.2. Requirements

5.19.2.A. ADVANCE NOTICE

5.19.2.B. JOINT INSPECTION SCHEDULING

5.19.2.C. POSSESSION OF UNIT

5.19.2.D. JOINT INSPECTION FORM

Performance Work Statement Page 9

5.19.2.E. WORK DEADLINE

5.19.2.F. WORKING HOURS

5.19.2.G. GOVERNMENT RE-OCCUPATION

5.19.2.H. FINAL INSPECTION

5.19.2.I. SIGN-OFF

5.19.2.J. MASTER SCHEDULE

5.19.2.K. PARTS ON ORDER

5.19.2.L. EXTENSIVE WORK

5.19.2.M. UNIT VACANCY

5.19.2.N. NON-VACANT UNITS

5.19.3. Deliverables

5.19.3.A. MONTHLY MAINTENANCE REPORT

5.19.3.B. MONTHLY APPLIANCE REPORT

5.19.4. IDIQ

5.19.4.A. BASIC COM PACKAGE – CLIN x019AA

5.19.4.B. ADDITIONAL MAINTENANCE ITEMS

5.20. SUPPORT SERVICES

5.20.1. Scope

5.20.2. Requirements

5.20.2.A. MATERIAL HANDLING

5.20.2.B. UNSCHEDULED SUPPORT TASKS

5.20.2.C. RECURRING SUPPORT TASKS

5.20.2.D. LINE HANDLING SERVICES (Discretionary Item)

5.20.3. Deliverables

5.20.3.A. MATERIALS HANDLING COST SCHEDULE

5.20.3.B. STATUS LOGS

5.20.4. IDIQ

5.20.4.A. CRANE SERVICES. Provide an hourly rate for crane services to include Labor and materials.

Minimum order will be no less than 4 hours

5.20.4.B. HEAVY LIFT CRANE SERVICES

5.20.5. Service Specifications for U.S. Navy

5.21. PEST CONTROL SERVICES (Discretionary Item)

5.21.1. Scope

5.21.2. Requirements

5.21.2.A. LICENSING AND SUPERVISION

5.21.2.B. SCHEDULED PEST CONTROL

5.21.2.C. PEST CONTROL WORK COORDINATION

5.21.2.D. NOTIFICATION OF ACTUAL OR POTENTIAL PEST PROBLEMS

5.21.2.E. PEST CONTROL PERFORMANCE STANDARDS

5.21.2.F. PESTICIDES

5.21.2.G. PESTICIDE SECURITY

5.21.2.H. SENSITIVE AREAS

5.21.2.I. CARCASS DISPOSAL

5.21.3. Deliverables

5.21.3.A. PEST CONTROL SURVEILLANCE PLAN

5.21.3.B. PEST CONTROL OPERATIONS RECORDS

5.21.3.C. PESTICIDE LIST

5.21.3.D. PEST TREATMENT SUBCONTRACTS

5.21.4. IDIQ

5.21.4.A. ANIMAL CONTROL

5.21.4.B. PEST SERVICES IN ADDITIONAL LOCATIONS

5.21.5. Service Specifications for U.S. Navy

5.22. MAINTENANCE, REPAIR, AND IMPROVEMENT UNIT PRICED WORK

5.22.1. Scope

5.22.2. Requirements

5.22.2.A. MRI UNIT PRICED WORK ORDERING AND SCHEDULING

5.22.3. Deliverables

5.22.4. IDIQ

5.22.4.A. INTERIOR AND EXTERIOR PAINTING

5.22.4.B. CARPETING

Performance Work Statement Page 10

5.22.4.C. VINYL OR SHEET LINOLEUM

5.22.4.D. LAMINATE FLOORING

5.22.4.E. COVE BASE MOLDING

5.22.5. Service Specifications for U.S. Navy

5.23. FRONT GATE SECURITY GUARD SERVICES (Discretionary Item)

5.23.1. Scope

5.23.2. Requirements

5.23.2.A. FOLLOW BASE ACCESS PROCEDURES

5.23.2.B. REDUCE TRAFFIC CONGESTION

5.23.2.C. ACCIDENT AND INCIDENT ASSISTANCE

5.23.2.D. SECURITY LOG

5.23.2.E. LAW ENFORCEMENT SITUATIONS

5.23.2.F. WORKING HOURS AND SHIFT CHANGES

5.23.2.G. EMPLOYEE CONDUCT

5.23.2.H. DRILLS AND EXERCISES

5.23.2.I. SURVEILLANCE SYSTEMS

5.23.2.J. TRAINING

5.23.3. Deliverables

5.23.3.A. GUARD LIST

5.23.3.B. GUARD SCHEDULES

5.23.3.C. TRAINING PLAN

5.23.4. IDIQ

5.23.4.A. SPECIAL EVENT GUARDS

5.24. AIR STATION VEHICLES AND EQUIPMENT

5.24.1. Scope

5.24.2. Requirements

5.24.2.A. MAINTENANCE

5.24.2.B. SCHEDULING AND RECORDS

5.24.2.C. FLEET MANAGEMENT

5.24.2.D. NEW VEHICLES AND EQUIPMENT DOCUMENTATION

5.24.2.E. AIR STATION VEHICLE RECOVERY SERVICE

5.24.2.F. VEHICLE SERVICE WORK

5.24.3. Deliverables

5.24.3.A. ANNUAL PM PLAN

5.24.3.B. FOUR-WEEK PM PLANS

5.24.4. IDIQ

5.25. ALARM AND FIRE SUPPRESSION SYSTEMS

5.25.1. Scope

5.25.2. Requirements

5.25.2.A. INSPECTION, TESTING, AND MAINTENANCE SERVICES

5.25.2.C. SCHEDULED MAINTENANCE

5.25.2.D. KINGFISHER AND FIRE ALARM SERVICES

5.25.3. Deliverables

5.25.3.A. COMPLETED INSPECTION REPORTS

5.25.3.B. SYSTEM INSPECTION REPORTS

5.25.3.C. KINGFISHER SUMMARY REPORTS

5.25.4. IDIQ

5.25.5. Service Specifications for U.S. Navy

SECTION 6.0 DELIVERABLES

6.1. DELIVERABLE FORMAT AND SUBMISSION

6.2. REIMBURSIBLE SUPPORT SERVICES REPORT

6.3. FACILITY ENGINEERING MANAGEMENT REPORT

6.4. ANNUAL REPORT ON GOVERNMENT PROPERTY

SECTION 7.0 PERSONNEL REQUIREMENTS AND QUALIFICATIONS

7.1. GENERAL

7.2. STAFFING

7.2.1. Conduct of Contractor Employees

7.2.2. Conflict of Interest

Performance Work Statement Page 11

7.2.3. Employee Health Standards

7.2.4. Ability to Communicate

7.2.5. Contractor Employee Identification

7.3. KEY PERSONNEL

7.3.1. PROJECT MANAGER (PM)

7.3.2. CONTRACTOR QUALITY CONTROL (CQC) REPRESENTATIVE

7.3.3. UTILITY SYSTEMS MANAGER

7.3.4. OSH PROGRAM MANAGER

7.3.5. ENVIRONMENTAL PROGRAM MANAGER

7.3.6. AVIATION FUEL STATION PRIMARY OPERATOR (AFO)

7.3.7. PRIMARY HAZARDOUS WASTE TECHNICIAN (HWT)

7.3.8. LEAD OPERATORS FOR FUEL SERVICES, WWTP, WTP, CHP, AND USED OIL PLANT

7.4. PERSONNEL QUALIFICATIONS AND CERTIFICATIONS

7.5. ADDITIONAL REQUIREMENTS FOR DESIGNATED POSITIONS

7.5.1. Intrusion Detection Systems (IDS), Fire Alarm, and Electronics Mechanics

7.5.2. Energy Management Control System (EMCS) Technician

7.5.3. SCADA, PLC, HMI Technician

7.5.4. Drivers

7.5.5. Equipment Operators

7.5.6. Grounds Maintenance Supervisor

7.5.7. Fuel Service Operators

7.5.8. Fuel Distribution System Mechanic

7.5.9. Hazardous Waste Technician

7.5.10. Waste Accumulation Area Managers

7.5.10.A. CONTRACTOR LEAD WASTE ACCUMULATION AREA MANAGER

7.5.11. Heating Oil Tank Inspectors

7.5.12. Vehicle Technicians

7.5.13. Boiler Plant Operator (BPO)

7.5.14. Boiler Plant Duty Stander

7.5.15. Water Treatment Plant Operators

7.5.16. Waste Water Treatment Plant Operators

7.5.17. Certified Hazardous Materials Shipper

7.5.18. Mail, Shipping, and Receiving Staff

7.5.19. Underground Storage Tank Testers

7.5.20. Front Gate Security Guards

7.5.21. Cathodic Inspection Workers

7.5.22. Fire Suppression System Workers

7.6. EVIDENCE OF CERTIFICATION, QUALIFICATION, AND TRAINING

7.7. REMOVAL OR DISMISSAL OF EMPLOYEES

7.8. CONTINGENCIES

7.9. STRIKE CONTINGENCY PLAN

7.10. SECURITY REQUIREMENTS

7.10.1. Secure Areas

7.10.2. Security Clearances

7.10.3. Loitering

7.10.4. Vehicle Registration and Identification

SECTION 8.0 QUALITY CONTROL

8.1.1. Quality Control Plan (QCP)

8.1.2. Quality Control Files

8.1.3. Documentation & Enforcement

8.1.4. Subcontractor Quality Control

8.1.5. Customer Comments

8.1.6. Performance Briefings

SECTION 9.0 QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)

Performance Work Statement Page 12

SECTION 10.0 GOVERNMENT-FURNISHED AND CONTRACTOR-FURNISHED

EQUIPMENT, FACILITIES, AND SERVICES

10.1. GOVERNMENT-FURNISHED PROPERTY AND SERVICES

10.1.1. Government-Furnished Property

10.1.2. Government-Furnished Facilities

10.1.3. Government-Furnished Equipment

10.1.4. Government-Furnished Materials (GFM)

10.1.5. Government-Furnished Services

10.2. CONTRACTOR-FURNISHED ITEMS

10.2.1. General

10.2.2. Contractor-Furnished Vehicles and Equipment

10.2.3. Contractor-Furnished Parts and Components

10.2.4. Contractor-Furnished Test Equipment

10.2.5. Contractor-Furnished Communication Equipment

10.2.6. Contractor-Furnished Manufacturers' Manuals

10.2.7. Biobased Products

10.2.8. Contractor Records

10.2.9. Specific Requirements by Task Area

SECTION 11.0 LIST OF PWS APPENDIXES AND TECHNICAL EXHIBITS

11.1. Appendices

11.1.1. Appendix A Definitions and Acronyms

11.1.2. Appendix B Consolidated Government Furnished Specifications

11.1.3. Appendix C Summary of Section 5.0 Task Area Deliverables

11.1.4. Appendix D List of References and Publications

11.1.5. Appendix E Performance Requirements Statement

11.2. Technical Exhibits

Performance Work Statement Page 13

SECTION 1.0 INTRODUCTION. The purpose of this contract is to provide base operation support services (BOSS) to U.S. Coast Guard (USCG) Base Kodiak. Contractor work and responsibility shall include all Contractor planning, programming, administration, management, and execution necessary to provide the services specified in this contract. The Contractor shall conduct work in accordance with the contract and this performance work statement (PWS), and all applicable federal, state, and local laws, regulations, or directives. The Contractor shall ensure that all work meets acceptable quality levels (AQL) or tolerances specified in the contract or in applicable referenced documents. The Contractor shall perform all related contractor administrative services required to perform work such as material requisitioning, quality control (QC), financial control, and correspondence. The Contractor shall also maintain records, files, and libraries of documents to include technical manuals, warranties, and manufacturer's instructions and recommendations, which are necessary and related to the functions being performed, in addition to any records required by federal, state, and local laws, regulations, or directives.

BACKGROUND. The requirements set forth in the PWS shall be the basis for determining and estimating all labor, manpower, materials, and services necessary to perform this contract successfully. The major goals of this contract are to maintain facilities and equipment in accordance with current regulations, manufacturer recommendations, and best industry practices; ensure the safety and health of federal employees and members of the public along with protecting, conserving, and preserving environmental, cultural and natural resources;

achieve a pleasing and healthy appearance of grounds and property; ensure consistent, professional, and result-oriented performance; manage work to provide efficient operations; and to manage costs to achieve the above results in the most cost effective and economical way possible. The Government encourages the offerors to consider thoughtful and innovative ways of accomplishing these PWS requirements.

SECTION 2.0

2.1. LOCATION AND BACKGROUND INFORMATION. Base Kodiak is located on Kodiak Island, Alaska. Work shall be performed at or dispatched from the base. This includes all land and waters that are controlled by the Coast Guard in the vicinity of Kodiak Island and forward operating locations. Technical Exhibit (TE) 26.1 is a map of the Base Kodiak and its facilities.

2.1.1. For the purposes of this contract, the term “Base Kodiak” includes the following properties:

2.1.1.A. U.S. Coast Guard Communications Station (COMMSTA) detachment;

2.1.1.B. U.S. Coast Guard Air Station (AIRSTA) Kodiak;

2.1.1.C. Marine Safety Detachment (MSD) Kodiak;

2.1.1.D. Vessels home ported at Base Kodiak and any visiting cutters or vessels;

2.1.1.D.1. There may be services that the Contractor will be required to provide for the cutters that fall within the scope of the work identified herein. Any work that falls outside of this scope may be completed through a Level III Task Order.

Performance Work Statement Page 14

2.1.2. Other supported agencies include but are not limited to: Federal Aviation Administration (FAA), U.S. Fish and Wildlife Service, U.S. Postal Service, Defense Commissary Agency (DECA), National Park Service, National Oceanographic and Atmospheric Administration (NOAA), National Weather Service, National Data Buoy Center (NDBC), Alaska Department of Transportation, and Kodiak National Wildlife Refuge.

2.1.3. Forward operating locations include but are not limited to Sitkinak Island, Cold Bay, Cordova, St. Paul, Homer, Seward, and Valdez.

2.1.4. The Contractor shall provide some of the services in this PWS to U.S. Navy Special Warfare (NSW) Base – Spruce Cape.

2.1.4.A. If the Spruce Cape NSW Base is to receive services described in a Section 5 task area, then the parameters of the service will be described in paragraphs in the individual task sections titled “Service Specifications for U.S. Navy.” If this section does not exist under a particular task section, then the Spruce Cape NSW Base either does not need any of the services listed in that contract line item number (CLIN), or if the services are provided, then they will be ordered under the Level II Service Work CLIN 1001NN.

2.1.4.B. In all cases when the Spruce Cape NSW Base is receiving regular services in a Section 5 task area, a sub-CLIN will be assigned.

2.2. PHYSICAL DESCRIPTION.

2.2.1. Acreage. Base Kodiak property cumulatively consists of approximately 21,500 acres.

2.2.2. Buildings, Structures, Roads, and Grounds. Base Kodiak has approximately 400 buildings and structures totaling over 2,500,000 square feet of floor space. Square footages of individual buildings are listed in TE 3.2. Types of occupancy and usage include dormitories, classrooms, office buildings, warehouses, industrial shops, and recreation facilities. Base Kodiak’s property includes but is not limited to detached, semi-detached, and attached family housing dwellings, barracks, office buildings, warehouses, a fire station, telecommunications sites, an elementary school, aircraft hangars, fuel storage tanks, fuel and cargo piers, industrial shops, shopping facilities, restaurants, recreation facilities serving the Coast Guard and other Government agencies, numerous landscaped areas including athletic fields, and paved areas including roads, parking lots, and sidewalks.

2.2.3. Generation Equipment. Base Kodiak has permanent emergency generation equipment in 16 buildings, with generators varying in size from 7.5 kilowatts to 550 kW. In addition, there are 12 portable generators in sizes from 8 kilowatts to 500 kilowatts to provide emergency power for communications or other equipment in the event of power failure.

2.2.4. Electric. The Coast Guard purchases normal electrical power from Kodiak Electric Association.

2.2.5. Propane. Propane is used in limited quantities at several facilities. Local commercial sources provide gas service.

Performance Work Statement Page 15

2.2.6. Heating Plants. The central heating plant hea