TE_11.3_-_BASE_Kodiak_SWPPP_2015.pdf

PDF 2 MB Posted

Attached to
Base Operation Support Services for Base Kodiak, AK
Solicitation number
HSCG84-16-R-PKC001
Issued by

About this file

TE 11.3 - BASE Kodiak SWPPP 2015 - Amend 2

View the file

Other files

File Type Posted
HSCG84-16-R-PKC001_-_BOSS_Kodiak_Solicitation_-_Amend_16.pdf PDF
Amendment_16_-_HSCG84-16-R-PKC001.pdf PDF
HSCG84-16-R-PKC001_-BOSS_Kodiak_Solicitation_-_Amend_15.pdf PDF
Amendment_15_-_HSCG84-16-R-PKC001.pdf PDF
TE_26.3_-_GFE_Inventory_List_-_Amend_14.xls XLS spreadsheet
Amendment_14_-_HSCG84-16-R-PKC001.pdf PDF
Amendment_13_-_HSCG84-16-R-PKC001.pdf PDF
TE_1.5_Historic_Averages_and_Priorities_for_Service_Work_-_AMEND_13.pdf PDF
HSCG84-16-R-PKC001_-BOSS_Kodiak_Solicitation_-_Amend_12.pdf PDF
Amendment_12_-_HSCG84-16-R-PKC001.pdf PDF
HSCG84-16-R-PKC001_-BOSS_Kodiak_Solicitation_-_Amend_11.pdf PDF
Amendment_11_-_HSCG84-16-R-PKC001.pdf PDF
RFI_with_Answers_-_4_-_FINAL.pdf PDF
RFI_with_Answers_-_3_-_FINAL.pdf PDF
Amendment_10_-_HSCG84-16-R-PKC001.pdf PDF
Amendment_9_-_HSCG84-16-R-PKC001.pdf PDF
HSCG84-16-R-PKC001_-BOSS_Kodiak_Solicitation_-_Amend_9.pdf PDF
RFI_with_Answers_-_2_-_FINAL.pdf PDF
Seniority_List_Averages_-_Amend_8.pdf PDF
RFI_with_Answers_-_1R.pdf PDF
TE_5.2_Sports_Fields_-_Amend_8.docx DOCX document
HSCG84-16-R-PKC001_-BOSS_Kodiak_Solicitation_-_Amend_8.pdf PDF
Base_Kodiak_BOSS_PWS_-_Amendment_8.pdf PDF
Amendment_8_-_HSCG84-16-R-PKC001.pdf PDF
Wage_Determination_with_CBA_-_Amend_8.pdf PDF
PAST_PERFORMANCE_QUESTIONNAIRE.pdf PDF
RFI_with_Answers_-_1.pdf PDF
HSCG84-16-R-PKC001_-BOSS_Kodiak_Solicitation_-_Amend_7.pdf PDF
Amend__7_-_WDs.zip ZIP file
CLIN_Schedule_-Amendment_7.xlsx XLSX spreadsheet
Amendment_7_-_HSCG84-16-R-PKC001.pdf PDF
Amend__7_-_Revised_Refs1of2.zip ZIP file
Amend__7_-_Revised_Refs2of2.zip ZIP file
Amend__7_-_Revised_Append.zip ZIP file
Amend__7_-_TE_Updates-Add.zip ZIP file
Base_Kodiak_BOSS_PWS_-_Amendment_7.pdf PDF
Amendment_6_-_HSCG84-16-R-PKC001.pdf PDF
Amendment_5_-_HSCG84-16-R-PKC001.pdf PDF
Amendment_4_-_HSCG84-16-R-PKC001.pdf PDF
Amendment_3_-_HSCG84-16-R-PKC001.pdf PDF
HSCG84-16-R-PKC001_-BOSS_Kodiak_Solicitation_-_Amend_2.pdf PDF
References_2_of_3.zip ZIP file
Prepropsal_Conf-BOSS_Kodiak-08-JUN-2016_-_Rev_2.ppt PPT presentation
Site_Visit_and_Preproposal_Sign-in_Sheets.pdf PDF
References_3_of_3.zip ZIP file
References_1_of_3.zip ZIP file
Amendment_2_-_HSCG84-16-R-PKC001.pdf PDF
Amendment_1_-_HSCG84-16-R-PKC001.pdf PDF
QASP.pdf PDF
Technical_Exhibits.zip ZIP file
Show 40 more

Latest 50 of 65 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

i October 2015

STORMWATER POLLUTION

PREVENTION PLAN

USCG BASE KODIAK

October 2015 ii

This page intentionally left blank iii

Table of Contents

CHAPTER 1 OVERVIEW AND CERTIFICATION ............................................................................................ 1-7

1-1 BACKGROUND AND SCOPE ......................................................................................................................... 1-7 1-1 CERTIFICATION ........................................................................................................................................... 1-8

CHAPTER 2 PLANNING AND ORGANIZATION ............................................................................................ 2-1

2-1 OVERVIEW .................................................................................................................................................. 2-1 2-2 STORMWATER POLLUTION PREVENTION TEAM .......................................................................................... 2-2 2-3 SITE DESCRIPTION ...................................................................................................................................... 2-3

2-3.1 Mission and Activities at BASE Kodiak............................................................................................ 2-3 2-3.2 Impervious Surface Estimate ............................................................................................................. 2-4 2-3.3 Receiving Waters ............................................................................................................................... 2-4 2-3.4 Wetlands ............................................................................................................................................ 2-4 2-3.5 Water Quality Standards .................................................................................................................... 2-4 2-3.5.1 Water Quality Impairment Status ...................................................................................................... 2-4

CHAPTER 3 DESCRIPTION OF FACILITY AND POTENTIAL POLLUTANT SOURCES ........................... 3-1

3-1 INVENTORY OF MSGP SECTOR ASSOCIATED FACILITIES AND POTENTIAL POLLUTANT SOURCES ............. 3-1 3-2 COMMONLY USED/HANDLED MATERIALS ................................................................................................. 3-5 3-3 EXPOSED MATERIAL AND EQUIPMENT ....................................................................................................... 3-5 3-4 SPILLS AND RELEASES ................................................................................................................................ 3-5

3-4.1 Spill Evaluation ................................................................................................................................. 3-9 3-5 RECORDS AND DOCUMENTATION ............................................................................................................... 3-9 3-6 BENCHMARK STORMWATER MONITORING DATA ..................................................................................... 3-10 3-7 GENERAL LOCATION MAP AND SITE MAP ................................................................................................ 3-13 3-8 DESCRIPTION OF POTENTIAL POLLUTANT SOURCES ................................................................................. 3-18

3-8.1Potential Stormwater Pollutant Sources by Sector .................................................................................. 3-18 3-8.1.1 Treatment, Storage and Disposal Facility Sector (K)……………………………………………………….3-18 3-8.1.2 Landfill Sector (L) …………………………………………………………………………………………3-18 3-8.1.3 Land Transport and Warehousing Sector (P)……………………………………………………………….3-18 3-8.1.4 Water Transportation (Q)…………………………………………………………………………………...3-18 3-8.1.5 Air Transportation Sector (S) ………………………………………………………………………………3-18 3-8.1.6 Domestic Treatment Works Sector (T) ……………………………………………………………………3-19

3-9 NON-STORMWATER DISCHARGES ............................................................................................................ 3-19 3-9.1 1987 Sewer Storm Separation Study ............................................................................................... 3-19 3-9.2 1988 Sanitary Sewer Inflow/Infiltration Study ................................................................................ 3-19 3-9.3 Results of Dye Testing ..................................................................................................................... 3-20 3-9.4 1993 Dye Testing ............................................................................................................................. 3-21 3-9.5 1996 Dye Testing ............................................................................................................................. 3-21 3-9.6 Sewer Upgrade Projects ................................................................................................................... 3-22 3-9.7 2000-2001 Facility Floor Drain Investigation ................................................................................. 3-22

CHAPTER 4 POLLUTION PREVENTION CONTROL MEASURES ............................................................... 4-1

4-1 OVERVIEW .................................................................................................................................................. 4-1 4-2 CONTROL MEASURES/BEST MANAGEMENT PRACTICES ............................................................................. 4-1

4-2.2 Core Best Management Practices ...................................................................................................... 4-1 4-2.2.1 BMP 1: Minimize Exposure………………………………………………………………………………….4-1 4-2.2.2 BMP 2: Good Housekeeping…………………………………………………………………………………4-2 4-2.2.3 BMP 3: Maintenance…………………………………………………………………………………………4-2 4-2.2.4 BMP 4: Spill Prevention and Response Procedures………………………………………………………….4-2 4-2.2.5 BMP 5: Erosion and Sediment Control ……………………………………………………………………..4-3 4-2.2.6 BMP 6: Management of Runoff……………………………………………………………………………...4-4 4-2.2.7 BMP 7: Salt Storage Piles (or Piles Containing Salt)………………………………………………………..4-5 iv

4-2.2.8 BMP 8: Employee Training…………………………………………………………………………………..4-5 4-2.2.9 BMP 9: Non-Stormwater Discharges………………………………………………………………………...4-6

4-2.3 Sector-Specific Best Management Practices ...................................................................................... 4-7 4-2.3.1 BMP K-1: Landfill Preventive Maintenance……………………………………………………………….. 4-7 4-2.3.2 BMP P-1: Vehicle and Equipment Good Housekeeping Measures………………………………………….4-7 4-2.3.3 BMP Q-1: Water Transportation Good Housekeeping Measures……………………………………………4-8 4-2.3.4 BMP S-1: Air Transportation Good Housekeeping Measures……………………………………………….4-8 4-2.3.5 BMP T-1: Treatment Works Control Measures…………………………………………………………….4-10

CHAPTER 5 MONITORING, EVALUATION, AND TRAINING ................................................................... 5-11

5-1 OVERVIEW ................................................................................................................................................ 5-11 5-2 MONITORING ACTIVITIES ......................................................................................................................... 5-11

5-2.1 Visual Stormwater Monitoring ........................................................................................................ 5-11 5-2.1.1 Visual Assessment Documentation and Corrective Action…………………………………………………5-12

5-2.2 Stormwater Benchmark Monitoring ................................................................................................ 5-13 5-2.2.2 Reporting Benchmark Monitoring Data to DEC……………………………………………………………5-16 5-2.2.3 Benchmark Evaluation……………………………………………………………………………………...5-16

5-3 ANNUAL COMPREHENSIVE SITE INSPECTIONS .......................................................................................... 5-17 5-3.1 Comprehensive Site Inspection Documentation .............................................................................. 5-17 5-3.2 Comprehensive Site Inspection Corrective Actions ........................................................................ 5-18 5-3.3 Conditions Requiring Review and Revision to Eliminate Problem ................................................. 5-18 5-3.4 Conditions Requiring Review to Determine if Modifications Are Necessary ................................. 5-19

5-4 ROUTINE FACILITY INSPECTIONS .............................................................................................................. 5-19 5-4.1 Routine Facility Inspection Documentation .................................................................................... 5-20

5-5 TRAINING GUIDANCE ............................................................................................................................... 5-20

List of Tables

TABLE 1-1 BASE KODIAK INDUSTRIAL ACTIVITIES COVERED BY THE MULTI-SECTOR GENERAL

PERMIT ................................................................................................................................................................. 1-7

TABLE 2-1 FACILITY DATA SHEET ................................................................................................................ 2-1

TABLE 2-2 STORMWATER POLLUTION PREVENTION TEAM .................................................................. 2-2

TABLE 2-3 STORMWATER POLLUTION PREVENTION TEAM SUPPORT PERSONNEL ........................ 2-2

TABLE 2-4 WATER QUALITY IMPAIRMENT CATEGORY .......................................................................... 2-5

TABLE 3-2 COMMONLY USED/HANDLED MATERIALS ............................................................................ 3-5

TABLE 3-3: SPILLS AND RELEASES .............................................................................................................. 3-5

TABLE 3-4 SPILL EVALUATION SUMMARY ................................................................................................ 3-9

TABLE 3-5 PERMIT MONITORING BENCHMARKS FOR EACH SECTOR ............................................... 3-11

TABLE 3-6 BENCHMARK STORMWATER SAMPLING OVERVIEW ........................................................ 3-12

TABLE 3-7 RESULTS OF 1993 DYE TESTING AT LOCATIONS IN THE INDUSTRIAL AREA .............. 3-21

TABLE 3-8 SANITARY SEWER UPGRADE PROJECTS ............................................................................... 3-22

TABLE 4-1 MANAGEMENT OF RUNOFF ........................................................................................................ 4-4

TABLE 5-1 QUARTERLY VISUAL STORMWATER MONITORING OUTFALLS ..................................... 5-12

TABLE 5-2 BENCHMARK MONITORING .................................................................................................... 5-14

TABLE 5-2A WATER HARDNESS RANGE .................................................................................................... 5-16

TABLE 5-3 SECTOR-SPECIFIC ANNUAL COMPREHENSIVE SITE INSPECTION REQUIREMENTS ... 5-18

TABLE 5-4 SECTOR-SPECIFIC ROUTINE INSPECTION REQUIREMENT ................................................ 5-19 v

List of Figures FIGURE 3-1 STORMWATER OUTFALLS KEY MAP .................................................................................... 3-14

FIGURE 3-2 STORMWATER OUTFALLS NORTHERN PORTION .............................................................. 3-15

FIGURE 3-3 INDUSTRIAL AREA & AIR STATION ...................................................................................... 3-16

FIGURE 3-4 STORMWATER OUTFALLS NYMAN PENINSULA ................................................................ 3-17

Attachments Attachment A: 2015 MSGP and NOI Documentation

Attachment B: Acronyms and Definitions

Attachment C: Forms

Attachment D: Benchmark Monitoring Data

Attachment E: Best Management Practices Plan – USCG BASE Kodiak Bulk Fuel Storage Facility vi

This page intentionally left blank

1-7

Chapter 1 Overview and Certification

1-1 Background and Scope On November 16, 1990 (55 FR 47990), the Environmental Protection Agency (EPA) established regulations to control the amount of pollutants that accumulate in stormwater and discharge into waters of the United States. Facilities that discharge stormwater “associated with industrial activity” must comply with 40 CFR 122.26 and obtain a National Pollutant Discharge Elimination System (NPDES) permit.

The primary means to obtain an NPDES stormwater permit is through compliance with the Multi-Sector

General Permit for Stormwater Discharges Associated with Industrial Activity (MSGP). The State of

Alaska Department of Environmental Conservation (DEC) has been responsible for administering the permit since 2009. DEC issued a new MSGP permit (AKR060000) on 19 February 2015. The United

States Coast Guard (USCG) BASE Kodiak has elected to obtain NPDES stormwater permit coverage under this permit. The permit is designated as the 2015 MSGP in this document. The 2015 MSGP is included as Attachment A.

The 2015 MSGP is a broad-based pre-published permit that identifies actions necessary to achieve compliance. The permit specifies 30 industrial types of facilities (sectors) that trigger the requirement for permit coverage (i.e., if a facility engages in one or more of these 30 sectors they are “industrial” and permit coverage is required). Table 1-1 lists industrial operations conducted by BASE Kodiak:

Table 1-1 BASE Kodiak Industrial Activities Covered By the Multi-Sector General Permit Sector Sector Name Industrial Activities Covered

K Hazardous Waste Treatment, Storage, or

Disposal

Stormwater discharges associated with hazardous waste treatment, storage, or disposal facilities.

L Landfills and Land Application Sites Stormwater discharges associated with landfills.

P Land Transportation

Stormwater discharges associated with land transporting and warehouse facilities engaged in vehicle and equipment maintenance and equipment cleaning.

Q Water Transportation Stormwater discharge associated with water transportation facilities.

S Air Transportation Facilities

Stormwater discharges associated with air transportation facilities engaged in air transportation and airport and aircraft service and maintenance.

T Treatment Works Stormwater discharges associated with domestic wastewater treatment works.

Upon finalization of this SWPPP, BASE Kodiak will submit a Notice of Intent (NOI) to DEC to obtain permit coverage under the 2015 MSGP. Documentation that BASE Kodiak filed the NOI will be contained in Attachment A. This document will be modified when control measures are changed due to corrective actions or regulatory requirements.

BASE Kodiak leases a portion of its property to the Alaska Department of Transportation (AKDOT) for operation of the Kodiak Airport. Additionally, AKDOT subleases certain areas to private companies such as Kodiak Transfer. Prior to 2006, the airport and leased areas were incorporated in BASE Kodiak’s

SWPPP and BASE Kodiak had responsibility for stormwater compliance. AKDOT now has independent permit coverage and BASE Kodiak is no longer directly responsible for activities on AKDOT leased property (including the sublet areas).

1-8

1-1 Certification

I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information contained therein. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information contained is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.

Name: ____________________________________________________________________________

Title: _____________________________________________________________________________

Signature: _________________________________________________________________________ (Commanding Officer or designated/authorized representative

Signature requirement per the 2015 MSGP: “For a municipality, state, federal, or other public agency, either a principal executive officer or ranking elected official shall sign the application; in this subsection, a principal executive officer of an agency means: the chief executive officer of the agency or a senior executive officer having responsibility for the overall operations of a principal geographic unit or division of the agency.”

USCG BASE Kodiak Stormwater Pollution Prevention Plan

Chapter 2 Planning & Organization

2-1 October 2015

Chapter 2 Planning and Organization

2-1 Overview Stormwater runoff is part of the natural hydrologic cycle. However, human activities can alter natural drainage patterns and add pollutants to rainwater and snowmelt that run off the earth’s surface and enter streams, rivers, lakes, and coastal waters. DEC, through the NPDES permitting process, requires that industrial activities develop and implement a SWPPP.

The 2015 MSGP requires development and implementation of a Stormwater Pollution Prevention Plan

(SWPPP). The SWPPP must contain the following elements:

Identification of permittee;

Stormwater pollution prevention team;

Site description;

Summary of potential pollutant sources;

Description of control measures;

Schedules and procedures;

Signature requirements.

The five major steps/processes used to develop and maintain the BASE Kodiak SWPPP are:

Planning and organization

Assessment

Stormwater control measure (and/or Best Management Practices (BMPs)) identification

(selection and plan design)

Stormwater control measure implementation and training

Evaluation and monitoring

The stormwater pollution prevention process follows a plan-do-check-act process. The intent is to identify and evaluate potential pollutant sources, develop ways to minimize impacts through BMPs and training, implement those BMPs, and monitor/inspect to determine effectiveness. If the monitor/inspection aspect reveals a need for further actions, the process is repeated.

Table 2-1 provides BASE Kodiak summary information.

Table 2-1 Facility Data Sheet Site Name U.S. Coast Guard BASE Kodiak

Location Kodiak, Alaska

Geographic Location 57º45’00” N, 152º30’00” W

Owner/Operator U.S. Coast Guard

Telephone 1-907-487-5320

Point of Contact

Commanding Officer

Attn: Chief, Environmental Division

BASE Kodiak

P.O. Box 195025

Kodiak, AK 99619-5025

Applicable MSGP Sectors K (treatment, storage, and disposal)

2-2 October 2015

L (landfill)

P (land transportation and warehousing)

Q (water transportation)

S (air transportation)

T (treatment works)

Number of Employees ~2,500 employees and dependent personnel

Receiving Waters Womens Bay and St. Paul Harbor

NPDES Permitting Authority DEC

2-2 Stormwater Pollution Prevention Team

The Stormwater Pollution Prevention Team at BASE Kodiak is responsible for assisting the Stormwater

Program Manager in developing and revising the SWPPP, as well as maintaining control measures and taking corrective actions where required. The team is comprised of the staff positions listed in Table 2-2.

Table 2-3 lists staff positions that may support the team by providing technical or other support/input on an as-needed basis.

Table 2-2 Stormwater Pollution Prevention Team

Position/Title Telephone Team Responsibilities

BASE Kodiak

Assistant Facilities

Engineer

907-487-5320

X 2226

Responsible for oversight of base environmental programs.

BASE Kodiak

Environmental

Division Chief

907-487-5320

X 2249

Responsible for daily management and direction of environmental compliance efforts for BASE Kodiak environmental programs. Ensures that stormwater pollution prevention BMPs are implemented, that regular inspections are performed, and that all records (inspections, maintenance, training, monitoring, and spill) are maintained. Ensures that appropriate training is provided and the SWPPP is evaluated and updated as needed.

BASE Kodiak

Stormwater

Program Manager

907-487-5320

X 2208

Stormwater Pollution Prevention Team leader. Maintains official copy of the SWPPP; performs periodic inspections and audits of BMPs; maintains records of inspections, maintenance, training, monitoring, and spills for

BASE Kodiak, tenant commands and lessees. Schedules meetings of team as needed.

Air Station

(AIRSTA) Kodiak

Facility

Coordinator

907-487-5003

Ensures that control measures/BMPs are implemented in AIRSTA areas.

Ensures that regular inspections are performed and that all records

(inspections, maintenance, training, monitoring, and spill) are maintained for AIRSTA and copies are provided to the Stormwater Program Manager.

Ensures that appropriate training is provided to AIRSTA staff.

Environmental

Protection

Specialist, Base

Operations

Support Services

(BOSS)

Contractor

907-487-5474 Ensures that BMPs are implemented in BOSS Contractor areas. Ensures that proper spill prevention and response actions are taken to prevent or minimize stormwater pollution. Ensures that regular inspections are performed and that all records (inspections, maintenance, training, monitoring, and spills) are maintained for BOSS Contractor and copies are provided to the Stormwater Program Manager. Ensures that appropriate training is provided to BOSS Contractor staff.

Table 2-3 Stormwater Pollution Prevention Team Support Personnel

Position/Title Telephone Team Responsibilities

Staff Engineers/

Technicians, Design & Technical

Sections, Facilities Engineering

Department, BASE Kodiak

907-487-5320 Assist BASE Stormwater Program Manager and other

Stormwater Pollution Prevention team members as needed.

2-3 October 2015

Table 2-3 Stormwater Pollution Prevention Team Support Personnel

Position/Title Telephone Team Responsibilities

Legal Officer, BASE Kodiak

(and MLC Environmental Legal

Officer)

907-487-2212 Remains current on NPDES stormwater regulations and permit requirements. Provides legal counsel as needed.

Naval Facilities Engineering

Command Northwest

(360) 396-0033 Provides technical and regulatory support as requested.

2-3 Site Description

BASE Kodiak is located on the northeast portion of Kodiak Island, Alaska, approximately 8 miles south of the city of Kodiak. The facility is the U.S. Coast Guard's largest shore facility, occupying approximately 23,000 contiguous acres, including much of the Buskin River valley and Womens Bay.

Between the various USCG operating and support commands, there are approximately 1,100 military and

1,400 military dependents. The BASE provides support for USCG facilities, aircraft, and vessels throughout Alaska.

Many of the buildings and structures at the facility date from World War II when the facility was constructed as a naval base. Kodiak was a major staging area for North Pacific operations during World

War II. A naval submarine base and air station was constructed at Womens Bay and an army outpost, Fort Greely, was established near the Buskin River in April 1941, remaining until decommissioned in

December 1944. Bunkers and gun emplacements were built at Chiniak, Long Island, and Fort

Abercrombie. After the war, Navy and Army activities were phased out. The USCG took over the facilities in 1972.

2-3.1 Mission and Activities at BASE Kodiak

The USCG is a military, multi-mission, maritime service within the Department of Homeland Security and one of the nation's five armed services. Its core roles are to protect the public, the environment, and

U.S. economic and security interests in any maritime region in which those interests may be at risk. This includes international waters and America's coasts, ports, and inland waterways.

The USCG provides unique benefits to the nation because of its distinctive blend of military, humanitarian, and civilian law-enforcement capabilities. To serve the public, the USCG has five fundamental roles:

Maritime Safety: Eliminate deaths, injuries, and property damage associated with maritime transportation, fishing, and recreational boating. The service is always ready to respond to calls for help at sea.

Maritime Security: Protect America's maritime borders from all intrusions by: (a) halting the flow of illegal drugs, aliens, and contraband into the United States through maritime routes; (b) preventing illegal fishing; and (c) suppressing violations of federal law in the maritime arena.

Maritime Mobility: Facilitate maritime commerce and eliminate interruptions and impediments to the efficient and economical movement of goods and people, while maximizing recreational access to and enjoyment of the water.

National Defense: Defend the nation as one of the five U.S. Armed Services. Enhance regional stability in support of the National Security Strategy, utilizing the Coast Guard’s unique and relevant maritime capabilities.

Protection of Natural Resources: Eliminate environmental damage and degradation of natural resources associated with maritime transportation, fishing, and recreational boating.

2-4 October 2015

BASE Kodiak is the only USCG facility that supports both cutters and aircraft. Personnel assigned to

BASE Kodiak play a key role in USCG operations in western Alaska. Along with providing services for visiting cutters from the Pacific area, the BASE Kodiak team provides administrative, logistical, and family support to 13 operational units on Kodiak. These units combine to make the Kodiak complex the largest operational base in the USCG.

Primary activities at BASE Kodiak relate to cutter (vessel) and aircraft support including maintenance, fueling, piers, security, taxiways, runways, roads, hangers, utilities, bulk fuel, administration support, waste management/treatment, equipment and vehicle storage, de/anti-icing, snow management, and communication. Secondary activities include housing, recreation, childcare, food service, vehicle maintenance, shopping, and vehicle fueling.

2-3.2 Impervious Surface Estimate

The whole of BASE Kodiak covers 23,000 acres, which includes about 8,200 acres of mostly undeveloped watershed or 35% of the total base land area. The main industrial core area is 214 acres, about 46% of which is impervious. Overall, assuming the non-industrial areas are 15% impervious and the watershed portion has no impervious area, the overall BASE Kodiak impervious area is about 10%.

2-3.3 Receiving Waters Stormwater from the core BASE Kodiak industrial area discharges into Womens Bay and St. Paul

Harbor. See Figure 3-4. Closed Navy and Coast Guard landfills indirectly discharge into the Buskin

River after flowing through Red Lake and Lake Louise respectively. See Figure 3-2. The west side of

Nyman Peninsula discharges stormwater into Womens Bay and the east side discharges into St. Paul

Harbor. See Figure 3-4.

2-3.4 Wetlands No significant drainage from industrial areas goes into wetlands. The base’s primary wetland in terms of source water and habitat quality is an approximate 380-acre area west of Buskin Lake. This wetland is in the designated upper BASE Kodiak watershed outside the core BASE Kodiak industrial area.

The Buskin River is bordered by riverine habitats and riparian wetlands. The mouth of the Buskin River is a marine and estuarine wetland.

Throughout the lower Buskin Watershed (downstream of the Buskin Lake), there are numerous isolated shrub bogs and emergent wetlands that vary significantly in size.

Detailed wetland information can be found in the document: Dames & Moore, Revised Final Wetland

Delineation Study, US Coast Guard Integrated Support Command, Kodiak, Alaska, May 14, 1999.

2-3.5 Water Quality Standards Water Quality Standards in the state of Alaska are contained in 18 ACC 70 (amended as of April 8, 2012). The primary applicable fresh water resources associated with BASE Kodiak are the Buskin River and Lake Louise. The primary applicable marine waters associated with BASE Kodiak are St Paul

Harbor and Womens Bay.

2-3.5.1 Water Quality Impairment Status The Clean Water Act (CWA) mandates that each state develop a program to monitor the quality of its surface waters. Based on the monitoring program, the state must regularly prepare a report categorizing water bodies with regard to water quality. In Alaska, the most recent report is Alaska’s Final

2-5 October 2015

2014 Integrated Water Quality Monitoring and Assessment Report, December 23, 2013. Water bodies are placed into one or five categories as follows:

Category 1: Water Quality Standards Attained for All Uses. Water bodies are placed in this category if there are data to support a determination that the water quality standards and all of the uses are attained.

Category 2: Water Quality Standards Attained for Designated Uses. Water bodies are placed in this category if some of the water quality standards for the designated uses are attained.

Category 3: Data or Information Insufficient. Water bodies are placed in Category 3 if data or information is insufficient to determine that the water quality standards for any of the designated uses are attained.

Category 4: Impaired Waterbody. Impaired but Total Maximum Daily Load (TMDL) not required.

Waters have been determined to be impaired but do not need a TMDL. Category 4 waters are divided into three sub-categories:

4a TMDL Completed

4b Other Pollution Control Requirements are Reasonably Expected to Result in Attainment of the Water Quality Standard in a Reasonable Period of Time

4c Impairment is not caused by a Pollutant. Water bodies are placed in this category if the impairment is not caused by a pollutant affecting water quality, e.g., degraded riparian habitat.

Category 5: Impaired Waterbodies on the Section 303(d) List. Water bodies are placed in Category 5 if the water quality standard(s) are not attained, i.e., the water body is impaired for one or more designated uses by a pollutant(s) and requires a TMDL or water body recovery plan to attain

Alaska’s water quality standards (18 AAC 70).

Table 2-4 lists the impairment category for surface water bodies on or adjacent to BASE Kodiak.

Table 2-4 Water Quality Impairment Category Water body Category Note

Buskin Lake 3 Waters for which there is insufficient or no data and information to determine if any designated use is attained Buskin River 3

Lake Louise 3

Red Lake and Anton Road

Pond

4a Placed on the 1994 Section 303(d) list for iron and manganese pollution. A TMDL for metals (iron and manganese) for Red Lake and Anton Road Pond was developed in March 2013 and approved by EPA in June 2013. The DEC Contaminated Sites Program is coordinating with the USCG and the United States Army Corps of

Engineers throughout BASE Kodiak to continue systematic investigations, monitoring programs and cleanup at sites under the

Resource Conservation and Recovery Act (RCRA) hazardous waste management facility permit.

St. Paul Harbor 3 Waters for which there is insufficient or no data and information to determine if any designated use is attained Women’s Bay 3

Chapter 3 Description of Facility and Potential Pollutant Sources

3-1 October 2015

Chapter 3 Description of Facility and Potential Pollutant Sources

3-1 Inventory of MSGP Sector Associated Facilities and Potential Pollutant Sources Table 3-1 lists facilities and areas on BASE Kodiak that are “industrial” per the MSGP triggering permit coverage and therefore defines the focus of the SWPPP. Table 3-1 cross-references location of facilities and areas on Figures 3-1 through 3-4; the table describes operations, provides inventories of materials, and identifies potential pollutant sources. Table 3-1 also summarizes significant aspects of the SWPPP as detailed in other chapters.

B u ild in g

Building Name Figure

S ecto r

Description and Potential Pollutant Sources Outfall(s) Inspection/Monitoring Frequency

(see Chapter 5 and Attachment D)

N48 Hazardous Waste Storage

Building and LOWS

3-4 K.1 The Hazardous Waste Storage Building is located at the north end of the Nyman Peninsula, south of the Steam Plant. A RCRA Part B permit has been approved for this facility. All materials are stored in closed containers on pallets in secondary containment. The types of materials/waste include waste solvents, waste paints and paint-related material, spent batteries, and other hazardous wastes. The storage area has seven blind sumps and no drains. A component of the facility is the Liquid Oily Water Separator (LOWS) facility. The LOWS facility is a chemically-enhanced batch oil/water separation system, located at the former location of N-56. The system is designed to treat oily liquids received by and generated at BASE Kodiak consisting of oily water, oil/water emulsions, and used oils. The reclaimed oil is used for fuel at the steam plant. LOWS primarily processes bilge water prior to discharge into the sanitary sewer.

IA-2 (IA-2A) Routine Facility Inspection: Quarterly. At least one must be conducted during a period when a stormwater discharge is occurring.

Visual Assessment: Quarterly.

Comprehensive Site Inspection: Annual.

Benchmark Monitoring: Quarterly

LF-1 Coast Guard Landfill 3-2 L.1 The Coast Guard Landfill, estimated at 10 acres, is located in the Buskin River drainage area one mile north of the Kodiak Airport. The

USCG operated this landfill from approximately 1972 until 1987. The landfill was used for domestic waste disposal. Metal scrap and concrete debris were disposed in the west side of the landfill. When the landfill was closed, a combination of leachate collection and runoff diversion was installed. Water collected in the leachate collection/runoff diversion system is ditched and then piped to the sanitary sewer at the BASE Kodiak wastewater treatment plant. During the summer of 2000, an impervious clay liner was installed that significantly reduced the amount of rainwater infiltrating into the landfill and subsequent inflow into the sanitary sewer.

LF-1 Routine Facility Inspection: Quarterly. At least one must be conducted during a period when a stormwater discharge is occurring.

Visual Assessment: Quarterly.

Comprehensive Site Inspection: Annual.

Benchmark Monitoring: Quarterly

LF-2 Navy Landfill 3-2 L.2 The Navy Landfill covers 15 acres located approximately one-quarter mile southwest of the Coast Guard Landfill. Waste was disposed here from the 1940s to the early 1970s. In 1992, leachate from the landfill was observed seeping into three depressions that may have flowed into a lake at the toe of the landfill referred to as “Red Lake,” due to its distinctive rust color. The three depressions were filled during installation of a fence around the landfill. The landfill was capped during the summer of 2000. The cap has reduced if not eliminated risk to groundwater in the area.

LF-2 Routine Facility Inspection: Quarterly. At least one must be conducted during a period when a stormwater discharge is occurring.

Visual Assessment: Quarterly.

Comprehensive Site Inspection: Annual.

Benchmark Monitoring: Quarterly

19* BOSS Maintenance Shop

(Metal, Wood, and Pipe Shop)

*Note: Building 19 will be removed in 2016.

3-3 P.2 Building 19, located near Hangar 2, houses the metal, wood, and pipe shops operated by the BOSS Contractor. There is minimal outdoor storage associated with this building. A sawdust collection system is situated on the west side. Three oversized catch basins are east of building 19 (on the upper part of the embankment in the gravel parking area) that act as settling basins.

IA-3 Routine Facility Inspection: Quarterly. At least one must be conducted during a period when a stormwater discharge is occurring.

Visual Assessment: Quarterly.

Comprehensive Site Inspection: Annual.

N19/

N20/

N21/

N22

JP5 Fill Stand, “day” tanks, and pump house

3-3 NA Stormwater discharges from these facilities are authorized by a separate NPDES permit (AK-003142-9), and therefore the stormwater discharges are not a component of this SWPPP. It is included for reference. This complex of aircraft fueling related facilities is located on the east side of Seafarer Drive near building 10. The complex includes two “day” tanks (N19 & N20), the fill stand (N22), and the pump house (N21). The day tanks are fed from the supply tanks N10 or N12 located on Nyman Peninsula to the southwest of this area.

The “day” tanks and the fill stand have secondary containment that can, via valve, be discharged either to the storm drain or to Hangar 1

Oil/Water Separator (OWS). Drainage from N21 also goes to the Hangar 1 OWS.

NA

N1/N1A Public Works Garage/ Heavy

Equipment Maintenance

3-4 P.4 Building N1 is located northeast of Hangar 3. The building has 12 bays for vehicle maintenance, a painting preparation booth, a paint booth, offices, and a janitorial supply room. The BOSS Contractor occupies this building and performs maintenance on BASE fleet vehicles. An enclosed vehicle and equipment wash rack is located on the south side of the building. The wash rack drains to the sanitary sewer. Each bay has a floor drain that is connected to a 500-gallon OWS chamber that is connected to the sanitary sewer. These OWSs are checked annually and pumped out by BOSS Contractor staff.

Building N1A, attached to building N1, is used for maintenance of heavy equipment, such as large trucks, fire trucks, and cranes, by the

BOSS Contractor. There are no floor drains in the facility.

Types of items stored outside, adjacent to the building and across the street may include: trash trucks, tankers, and pickups. Items stored to the right on the grass may include compressors, backhoes, loaders, trucks, trailers, and old GSE units.

IA-3 Routine Facility Inspection: Quarterly. At least one must be conducted during a period when a stormwater discharge is occurring.

26 Convenience Stores and BOSS offices

3-4 P.5 Building 26, constructed in the 1940s, is located near Building 27 and houses a number of activities. The first floor has a USCG convenience store and shipping and receiving area. A USCG furniture store is located on the second floor. The third floor serves as the BOSS Contractor warehouse for material used in other locations at BASE Kodiak. The loading and unloading area on the first floor is comprised of concrete loading docks under cover.

IA-3 Routine Facility Inspection: Quarterly. At least one must be conducted during a period when a stormwater discharge is occurring.

3-2 October 2015

B u ild ecto r

Description and Potential Pollutant Sources Outfall(s) Inspection/Monitoring Frequency

(see Chapter 5 and Attachment D)

27 Cold and Dry Storage

Warehouse

3-4 P.6 The Cold and Dry storage building is a one-story structure located north of Building 26, on the corner of Cape Sarichef Street and

Albatross Avenue. The building has a loading and unloading area comprised of a concrete dock under cover on the east side. Pallets, cardboard, and crates may be stored on the loading dock.

IA-3 Routine Facility Inspection: Quarterly. At least one must be conducted during a period when a stormwater discharge is occurring.

N57 Floating Dock 3-4 Q.1 This is a seasonally installed floating dock for MWR and other recreational vessels located next to the Crab Cooker. No materials are stored on the dock. Fuel, hydraulic fluid, oil, could potentially be spilled from vessels. Non-potable water is supplied to the dock from a hose from the Crab Cooker building.

NA – Womens Bay

Routine Facility Inspection: Quarterly. At least one must be conducted during a period when a stormwater discharge is occurring.

Visual Assessment: None.

Comprehensive Site Inspection: Annual, if installed during the time of inspection.

Benchmark Monitoring: None. There is no defined outfall associated with the dock.

N551 MWR Crab Cooker 3-4 Q.1 Fish cleaning and crab cooking are performed in this building. There is a fish grinder in the back that discharges into Womens Bay. Boats may be rinsed outside the building and discharge is into the Womens Bay. Sign requires “Low Pressure Fresh Water Rinse for Boats

Only – No Detergents – No Oily Bilge Water Discharges – No Vehicle washing.” The fish grinder discharge is in accordance with correspondence (e-mails) between E. DeNoyelles (BASE Kodiak), K. McKerney (DEC), and C. Cora (EPA Region X) from the February

2004 timeframe. Dumping of fish carcasses into the bay is prohibited.

NP-CC Routine Facility Inspection: Quarterly. At least one must be conducted during a period when a stormwater discharge is occurring.

Visual Assessment: Quarterly.

Comprehensive Site Inspection: Annual.

Benchmark Monitoring: Quarterly

8 MWR Boathouse 3-4 Q.2 The MWR Boathouse is located at the north end of the Nyman Peninsula beside the Billiken Theater. The boathouse performs minor boat maintenance and repair including fiberglass repair, engine rebuilding and change-outs; boat storage; boat rinsing outside the building; and fuel storage and fueling. Vessel maintenance is conducted indoors. Vessel rinsing is conducted outdoors on the east side of the building with discharge into the storm sewer. This area was paved during 2015. Outdoor storage includes: pop-up type campers, fishing boats, and an unleaded fuel tank. Material potentially used and stored includes gasoline, paints, methyl ethyl ketone, acetone, oil, kerosene, gear oil, used gasoline, waste paint thinner, and used oil.

To the south of the Boathouse is a former dry cleaning facility currently undergoing clean-up via air sparging.

The five floor drains inside this facility discharge into the sanitary sewer. A storm drain is located just outside on the east side of the building.

NP-1a – Womens

Bay

Routine Facility Inspection: Quarterly. At least one must be conducted during a period when a stormwater discharge is occurring.

Visual Assessment: Quarterly.

Comprehensive Site Inspection: Annual.

Benchmark Monitoring: Quarterly

614 Auto Hobby Shop and Port

Operations

3-4 Q.3 The Auto Hobby Shop, built in 1992, is located on the west side of Nyman Peninsula, southwest of building N73 the Cutter Storage facility. The building provides the space, equipment, and supplies for Coast Guard personnel to perform maintenance on their own vehicles. The building also houses the Cutterman’s Club, a recreational facility for seamen in port, and Port Operations offices.

Types of chemicals used and stored include gear oil, lube oil, antifreeze, batteries, citrus cleaner, primer, paint, reducer, lacquer thinner, solvent, used gasoline, and waste chemicals.

Outdoor storage includes vehicles, tires, and recycling containers.

NP-3 Routine Facility Inspection: Quarterly. At least one must be conducted during a period when a stormwater discharge is occurring.

Visual Assessment: Quarterly.

Comprehensive Site Inspection: Annual.

Benchmark Monitoring: Quarterly

613 Cargo Pier 3-4 Q.4 Located northwest of the Auto Hobby Shop, the USCG and other vessels making port calls to BASE Kodiak tie-up at the pier. Materials are not stored on the pier; however, materials/supplies are supplied to vessels using trucks, fork trucks, and portable cranes. Bowsers

(~300-gallon portable tanks) are staged on the pier to collect bilge water. Vessel sewage is pumped pier-side via flexible hose to risers along the pier.

NA- direct to Womens Bay

Routine Facility Inspection: Quarterly. At least one must be conducted during a period when a stormwater discharge is occurring.

Visual Assessment: None.

Comprehensive Site Inspection: Annual.

Benchmark Monitoring: None. There is no defined outfall/point of discharge.

S40 Fuel Pier 3-4 Q.5 Fuel is unloaded to tanks on Nyman Peninsula at this pier, and vessels are fueled at this facility. The pier is constructed of wood and steel. There is no defined outfall/point of discharge. Secondary containment is located under the set of valves on the pier.

NA- direct to

Womens Bay

Routine Facility Inspection: Quarterly. At least one must be conducted during a period when a stormwater discharge is occurring.

Visual Assessment: None.

Comprehensive Site Inspection: Annual.

Benchmark Monitoring: None. There is no defined outfall/point of discharge.

A512 BOSS Fuels 3-4 Q.6 The BOSS fuels building is located south of the Auto Hobby Shop and operated by the BOSS Contractor. The BOSS performs analyses of fuels and used oil in the facility. There is outdoor storage of a skimmer boat, zodiac, anchor chains, tank truck, and vacuum truck.

One Hazardous Flammable locker is located in the back of the building (outside).

NP-3 Routine Facility Inspection: Quarterly. At least one must be conducted during a period when a stormwater discharge is occurring.

Visual Assessment: Quarterly.

Benchmark Monitoring: Quarterly

3-3 October 2015

B u ild ecto r

Description and Potential Pollutant Sources Outfall(s) Inspection/Monitoring Frequency

(see Chapter 5 and Attachment D)

N73 Cutter Storage 3-4 Q.7 Located to the east of the Cargo Pier, this facility provides shore-based storage for Coast Guard vessels. There is storage outside, mainly to the northeast, and it includes vehicles, chain, buoys, pipe, sheet metal, gear, fittings, crane, chillers, wood blocking, plywood, rope, nets, rowboat, a propane tank on a trailer, and boat trailers. The surface is currently graveled, but plans are to pave the area if funding becomes available.

In 2008, a Stormceptor stormwater treatment device was installed to serve this area.

NP-2a (Stormceptor outfall)

Routine Facility Inspection: Quarterly. At least one must be conducted during a period when a stormwater discharge is occurring.

Visual Assessment: Quarterly.

Comprehensive Site Inspection: Annual.

Benchmark Monitoring: Quarterly

N47 Equipment and Vehicle Storage 3-4 Q.8 This is an outdoor gravel-surfaced equipment and vehicle storage area northeast of the Cutter Storage facility. There is another separately fenced storage area behind adjacent. Equipment includes buoys, anchors, chains, and one AST. As many as 15 vehicles can be stored in the area..

NP-2a (This is the new Stormceptor outfall)

Routine Facility Inspection: Quarterly. At least one must be conducted during a period when a stormwater discharge is occurring.

Visual Assessment: Quarterly.

Comprehensive Site Inspection: Annual.

Benchmark Monitoring: Quarterly

14 Hangar 1 3-3 S.1 Hangar 1 is located about 2,000 feet southwest of the end of runway 36, at the head of Womens Bay. This hangar is the center of maintenance activity for C-130 aircraft based at BASE Kodiak. Aircraft maintenance performed inside the building includes:

Engine rebuilding and repair (T-56 shop)

Structural repair (metal shop)

Propeller repair (prop shop)

Rebuilding wheels and hydraulic lines

Welding

Aircraft washing in Bay 4

Electrical repair

Painting - Paint Booth

Engine fuel (gas) path cleaning is performed outside the building on the paved apron over the refueling pad. In this operation, gas path cleaner is introduced through lines into the engine. The engine is started and the gasoline path cleaner sprays out the exhaust. Depending on the engine undergoing cleaning, the waste is either allowed to discharge into the sanitary sewer or collected and sent off-station for disposal.

Fueling pits are connected via underground lines to an oil/water separator at the northeast corner of Hangar 1. The oil/water separator discharges to Jewel Beach (outfall IA-3).

Outside the hangar, there is one fueling pit (No. 4) for helicopters located on the tarmac. However, because it is necessary to fuel several helicopters at a time, and the fueling pit can accommodate only one, the Coast Guard also uses a fueling truck. The truck is a potential source of fuel that could drip or spill and enter the stormwater system.

Types of chemicals used or stored include lubricants, solvents, small quantities of spray paints, thinners, strippers, other engine fluids, engine gasoline path cleaner, detergents, used fuels, used oils, and waste solvent.

IA-1 Routine Facility Inspection: Quarterly. At least one must be conducted during a period when a stormwater discharge is occurring.

Visual Assessment: Quarterly.

Comprehensive Site Inspection: Annual.

Benchmark Monitoring: Four samples annually during the deicing season (October – March)

20 Hangar 2 3-3 S.2 Hangar 2 is located north of Hangar 1, between Hangars 1 and 3. The facility is no longer active as an aircraft hangar. The hangar is being used by the BOSS Roads and Grounds Maintenance Department and other BOSS functions. It also houses Air Station supply and the HAZMIN Center. If hangar continues with this use, it should be considered sector P.

IA-1 Routine Facility Inspection: Quarterly. At least one must be conducted during a period when a stormwater discharge is occurring.

15 Hangar 3 3-3 S.3 Hangar 3 is located northwest of Hangar 1. A wash rack is located in this facility, which discharges to sanitary sewer. The system can be routed to the storm sewer if the AFFF system activates. Helicopter engines are washed inside and outside on the northwest side of the building, with discharge to the sanitary sewer.

Industrial activities include: fuel cell (gasoline tank) repairs, over-night storage of helicopters and C-130s, and product storage. There is a paint booth for helicopter parts located in the hangar. A diesel fuel pump is located outside on the retaining wall across the access road from the northeast corner of the building.

Types of material used or stored include diesel, used oils & fuels, solvents, paints, thinner, primer, and stripper.

IA-4 & IA-1 Routine Facility Inspection: Quarterly. At least one must be conducted during a period when a stormwater discharge is occurring.

Visual Assessment: Quarterly.

Comprehensive Site Inspection: Annual.

Benchmark Monitoring: Four samples annually during the deicing season

(October – March)

“A” “B” AIRSTA Apron/Taxiway 3-3 S.4 In 2015, the entire area south of Hangar 2 was paved, and the apron around Hangars 1 and 3 is being repaved. Stormwater from the pavement is collected and either flows directly into Womens Bay or flows from the vicinity of the fueling pits through the oil/water separator near Hangar 1. This water is discharged to Jewel Beach. Industrial activities include fueling of airplanes and helicopters. Fuel, JP-5, is stored in large aboveground storage tanks within the AIRSTA fuel farm.