Technical_Exhibits_(TE)_1_through11_(11_Pages).pdf
PDF 3 MB Posted
- Attached to
- Grounds Maintenance Services Federal contract opportunity
- Solicitation number
- HSCG84-16-R-AA7505
About this file
Technical Exhibits (TE) 1 through 11 (11 Pages)
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| AMENDMENT_0002_dtd_7-5-16.pdf | ||
| AMENDMENT_0001_dtd_6-30-16_(Q-R_document).pdf | ||
| Question-Response_(5)_dtd_6-27-2016.pdf | ||
| Site-Visit_Participant_sign-in_sheet_6-21-16.pdf | ||
| site_visit_participants_(legible_copy).pdf | ||
| Question-Response_(3)_dtd_6-17-2016.pdf | ||
| (Attachment_1)_SCA_Wage_Determination_2005-2119_R18_dtd_12-29-2015_(10_Pages).pdf | ||
| Request_for_Proposal_(RFP)_HSCG84-16-R-AA7505_(63_Pages).pdf | ||
| (Attachment_2)_PPQ_document_(16-R-AA7505)_(3_Pages).pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TE-1 Base Miami Beach
Request for Proposal Number HSCG84-16-R-AA7505 Technical Exhibits (TE) 1 through 11 Page 1 of 11
TE- 2 Richmond Heights
Technical Exhibits (TE) 1 through 11 Page 2 of 11
TE-3 Civil Engineering Unit Building
Technical Exhibit-3
Technical Exhibits (TE) 1 through 11 Page 3 of 11
TE-4 Card Sound Rd
Technical Exhibit – 4 v .
Technical Exhibits (TE) 1 through 11 Page 4 of 11
TE-5 COMMSTA ROADS
Technical Exhibits (TE) 1 through 11 Page 5 of 11
TE-6 COMMSTA REC AREA PAVALLION
Technical Exhibits (TE) 1 through 11 Page 6 of 11
TE-7 COMMSTA REC AREA
Technical Exhibits (TE) 1 through 11 Page 7 of 11
TE- 8 TREELINE
Technical Exhibits (TE) 1 through 11 Page 8 of 11
TE-9 FENCE LINE
Technical Exhibits (TE) 1 through 11 Page 9 of 11
TE-10 COMMSTA BUILDINGS
Technical Exhibits (TE) 1 through 11 Page 10 of 11
TE-11 COMMSTA Exterior Fence Lines
Technical Exhibits (TE) 1 through 11 Page 11 of 11
| Grounds Maintenance Services at Coast Guard Base Miami Beach Miami Properties in the Greater Miami Area |
| 2.0. BACKGROUND. |
| 3.0. SCOPE. |
| 5.0. TECHNICAL REQUIREMENTS. |
| 6.0. DELIVERABLES. |
| 7.0. PERSONNEL. |
| 8.0. CONTRACTOR QUALITY CONTROL (QC) REQUIREMENTS. |
| 9.0. GOVERNMENT QUALITY ASSURANCE (QA) REQUIREMENTS. |
| TE-1 Base Miami Beach |
| TE-3 Civil Engineering Unit Building |
| TE-4 Card Sound Rd |
| TE-7 COMMSTA REC AREA |
File details come from the government source that posted it. Updated .