SCHEDULE B-03-06-12-Amend 2.xls

XLS spreadsheet 39 KB Posted

Attached to
Fabrication and Delivery of Foam-Filled Steel River Buoys
Solicitation number
HSCG84-12-R-BHQ003
Issued by

About this file

Replacement page 2 of 63

View the file

Other files

File Type Posted
REV SPEC 455-D - Amend 4.doc DOC document
Amend-4.doc DOC document
QA - SF30-Amend-3.doc DOC document
SCHEDULE B-03-16-12-Amend 3.xls XLS spreadsheet
Attachment 12 - PastPerformanceQuestionnaire - Amend 2.doc DOC document
QA - SF30-Amend-2.doc DOC document
AVERAGE ANNUAL SCRAP BUOYS - AMEND 2.xls XLS spreadsheet
QA - SF30-Amend-1.doc DOC document
Q A Amend-1-Replacement pages.pdf PDF
ATON River Buoys Annual Qtys Per Destination Mar 2012.xls XLS spreadsheet
SCHEDULE B-03-06-12-final.xls XLS spreadsheet
Attachment 1 - 455-D.pdf PDF
Attachment 14 - Delivery Locations.doc DOC document
Attachment 7 - 121121d.pdf PDF
RFP-MAR2012-PDF.pdf PDF
Attachment 13 - List of Contractors PPQ.doc DOC document
Attachment 12 - PastPerformanceQuestionnaire.doc DOC document
Attachment 4 - 121118d.pdf PDF
Attachment 3 - 121117c.pdf PDF
Attachment 6 - 121120d.pdf PDF
Attachment 10 - 393-A1.pdf PDF
Attachment 8 - DDFORM 250.doc DOC document
Attachment 5 - 121119d.pdf PDF
Attachment 2 - 121116c.pdf PDF
Attachment 11 EPA Table- Steel.doc DOC document
Attachment 9 - DD1423.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base YR

SCHEDULE B - ADDENDA – SCHEDULE OF SUPPLIES/SERVICES
Supplies: The Contractor shall provide all necessary, management and
administration, personnel, equipment, materials, supplies and transportation in accordance with the
Statement of Work (SOW).
PRICE ALL INCLUSIVE: The offer must include prices for the Base Period and all Option
Periods listed in section B.
BASE PERIOD: 01 June 2012 thru 31 May 2013
ITEMDESCRIPTIONESTESTIMATED
QTYUNITUNIT PRICETOTAL
0000Fabricate First Article Buoys
0000A4th Class Nun Radar Reflective10EA$ - 0$ - 0
Steel River Buoys (4NR)
0000B4th Class Can Radar Reflective10EA$ - 0$ - 0
Steel River Buoys (4CR)
0000C6th Class Nun Radar Reflective10EA$ - 0$ - 0
Steel River Buoys (6NR)
0000D6th Class Nun Radar Reflective10EA$ - 0$ - 0
Steel River Buoys (6CR)
0000E6th Class Nun Tall Steel River Buoys (6NT)10EA$ - 0$ - 0
0000F6th Class Nun Tall Steel River Buoys (6CT)10EA$ - 0$ - 0
0000GFirst Article Test Data Sheet and Report1JB$ - 0$ - 0
0000HFirst Article Test Quality Assurance and Control1JB$ - 0$ - 0
Plan (IAW F.5)
0000IFirst Article Test Report (IAW F.5)1JB$ - 0$ - 0
Total Estimated Price of Clins 0000A thru 0000I$ - 0
ITEMDESCRIPTIONEST.UNITUNIT PRICEESTIMATED
QTYTOTAL
0001Fabricate Production Buoys
0001A4th Class Nun Radar Reflective4000EA$ - 0$ - 0
Steel River Buoys (4NR)
0001B4th Class Can Radar Reflective4000EA$ - 0$ - 0
Steel River Buoys (4CR)
0001C6th Class Nun Radar Reflective1700EA$ - 0$ - 0
Steel River Buoys (6NR)
0001D6th Class Nun Radar Reflective1700EA$ - 0$ - 0
Steel River Buoys (6NR)
0001E6th Class Nun Tall Steel River Buoys (6NT)750EA$ - 0$ - 0
0001F6th Class Nun Tall Steel River Buoys (6CT)750EA$ - 0$ - 0
Total Estimated Price of Clins 0001A thru 0001F$ - 0
ITEMDESCRIPTIONEST.UNITUNIT PRICEESTIMATED
QTYTOTAL
0002Transportation
TRANSPORTATION COSTS: Includes costs related to shipping
1. 4NR/4CR - Lot Size = 50 Buoys - Estimated 160 trips Per Year
2. 6NR/6CR/6NT/6CT - Lot Size = 100 Buoys - Estimated 49 Trips Per Year
3. Out of Cycle Transportation for Recovery and Disposal of Buoys (Para C.6)
Lot Size = 1 Truck Load (Truck shall be of the same size and dimensions
as those used to deliver new 4NR/4CR and 6NR/6CR/6NT/6CT listed in the above CLINS
Estimated 6 Trips Per Year - Destination TBD - The Contractor shall be reimbursed
at the destination prices listed below under Transportation Cost CLINs. (Note: Estimated
6 Trips are not included in the estimated quantities listed below.)
0002ADemopolis, AL7LT$ - 0$ - 0
0002BEufala, AL3LT$ - 0$ - 0
0002CMobile, AL3LT$ - 0$ - 0
0002DSelma, AL2LT$ - 0$ - 0
0002EPine Bluff, AR13LT$ - 0$ - 0
0002FChattahooche, FL2LT$ - 0$ - 0
0002GDubuque, IA13LT$ - 0$ - 0
0002HKeokuk, IA9LT$ - 0$ - 0
0002IEast Peoria, IL13LT$ - 0$ - 0
0002JLevenworth, KS2LT$ - 0$ - 0
0002KHickman, KY15LT$ - 0$ - 0
0002LOwensboro, KY11LT$ - 0$ - 0
0002MColfax, LA2LT$ - 0$ - 0
0002NSt. Louis, MO14LT$ - 0$ - 0
0002OGreensville, MS11LT$ - 0$ - 0
0002PNatchez, MS16LT$ - 0$ - 0
0002QVicksburg, MS11LT$ - 0$ - 0
0002ROmaha, NE6LT$ - 0$ - 0
0002SSallisaw, OK11LT$ - 0$ - 0
0002TSewickley, PA5LT$ - 0$ - 0
0002UBuchanan, TN15LT$ - 0$ - 0
ITEMDESCRIPTIONEST.UNITUNIT PRICEESTIMATED
QTYTOTAL
0002VE. Chattanooga, TN12LT$ - 0$ - 0
0002WMemphis, TN13LT$ - 0$ - 0
Total Estimated Price of Clins 0002A thru 0002W$ - 0
0003COMPENSATION FOR STEEL COUNTERWEIGHT PLATES
The Contractor agrees to compensate the USCG for ALL Buoys
with usable Steel Counterweight Plates (Para. C.6)
0003A4TH class buoys$ - 0Per Buoy
0003B6TH class buoys$ - 0Per Buoy
0004Quarterly Compensation to the Government
0004AQuarterly Compensation for Useable Steel4EATBDTBD
Counterweight Plates
Total Estimated Value for Base Period$ - 0

&RHSCG84-12-R-BHQ003

Steel Foam-Filled River Buoys &P & of 63

File details come from the government source that posted it. Updated .