SECB3WCA08.pdf
PDF 14 KB Posted
- Solicitation number
- HSCG82-08-B-3WCA08
About this file
REVISED SECTION B
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Abatract.pdf | ||
| Amendment3A08STMARYSRANGES.pdf | ||
| Permits.pdf | ||
| REFPHOTOFORRFI10AND12.JPG | JPG image | |
| Amendment2A08STMARYSRANGES.pdf | ||
| Amendment1A08STMARYSRANGES.pdf | ||
| SUBMITTALREGISTER-4PAGES.pdf | ||
| 08IFB_CONST_OVER.pdf | ||
| APPENDIXE-ERRATASHEET.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HSCG82-08-B-3WCA08
HSCG82-08-C-3WCA__
AMENDMENT 0002
REVISED
SECTION B
SUPPLIES OR SERVICES AND PRICES/COSTS
BASE BID:
LINE ITEM 0001: SCOPE OF WORK SUMMARY: FURNISH ALL LABOR, EQUIPMENT,
MATERIALS, TOOLS AND SUPERVISION TO PROVIDE MAINTENANCE AND REPAIR TO
TWO INSHORE U.S.C.G. NAVIGATIONAL TOWERS AT THE ENTRANCE TO SAINT MARY’S
RIVER IN KINGS BAY, GA
ONE JOB $
OPTION ITEM:
LINE ITEM 0002: ITEM 0002 SCOPE OF WORK SUMMARY: FURNISH ALL LABOR,
EQUIPMENT, MATERIALS, TOOLS AND SUPERVISION TO PERFORM DEMOLISION ON
TWO U.S.C.G. NAVIGATIONSL TOWERS APPROXIMATELY THREE MILES OFFSHORE OF
THE SAINT MARY’S RIVER JETTIES, IN KINGA BAY, GA
ONE JOB $
TOTAL BID PRICE: (Line item 0001 and 0002) $_______________
ALL ITEMS ARE TO BE SEPARATELY PRICED. THE CONTRACTING OFFICER MAY EXERCISE
THE OPTION BY WRITTEN NOTICE AT THE TIME OF AWARD OR AT ANYTIME WITHIN 60
CALENDAR DAYS AFTER AWARD OF THE BASIC CONTRACT. SHOULD OPTION BE
AWARED, THE PERFORMANCE PERIOD CHANGES TO 240 CALENDAR DAYS.
GOVERNMENT FURNISHED MATERIAL
SEE SPECIFICATION “REPAIRS TO SAINT MARY’S AIDS TO NAVIGATION STRUCTURE”,
APENDIX B AND APENDIX C, FOR MATERIAL LIST AND THE ASSOCIATED VALUES.
File details come from the government source that posted it. Updated .