SCHEDULE OF SUPPLIES SERVICES - STURGEON REV0.xlsx

XLSX spreadsheet 17 KB Posted

Attached to
DRYDOCK & REPAIRS FOR CGC AMBERJACK AND CGC STURGEON
Solicitation number
HSCG80-13-R-P45003
Issued by

About this file

SCHEDULE OF SUPPLIES SERVICES FOR STURGEON

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

USCGC STURGEON (WPB-87336) DRYDOCK AVAILABILITY 2013

ITEMDESCRIPTIONUNIT PRICEUNITQTYEXTENDED PRICE
D-001Perform Ultrasonic Thickness Measurements250 SHOTS1
O-002Perform Ultrasonic Thickness Measurements25 SHOTS10
D-003Bigle Surfaces (Engine Room) Preserve, partialJOB1
D-004Dirty Oil Tank, Clean and InspectJOB1
D-005Oily Water Tank, Clean, Inspect and PreserveJOB1
D-006Tanks (MP Fuel Service), Clean and InspectJOB1
D-007Superstructure, Preserve 100%JOB1
D-008Pilothouse Deck (Aluminum), Inspect, Preserve, and Renew Electrical MattingJOB1
O-009Depth Sounder, Capastic Fairing, RenewJOB1
O-010Main Engine/Reduction Gear, RealignJOB1
D-011Propulsion Shafts, Remove, Inspect, and ReinstallJOB1
O-012Propulsion Shaft, RepairJOB1
O-013Propulsion Shaft, StraightenJOB1
O-014Intermediate Water-Lubricated Shaft Bearing, RenewJOB1
O-015Aft Water-Lubricated Shaft Bearing, RenewJOB1
O-016Intermediate Bearing Carrier, RenewJOB1
O-017Aft Bearing Carrier, RenewJOB1
O-018Stern Tubes, Interior Surfaces, Preserve 100%JOB1
O-019Stern Tubes, Interior Surfaces, RepairJOB1
D-020Propellers, Remove, Inspect, and ReinstallJOB1
O-021Propeller, Minor Repair and Recondition, PerformJOB1
D-022Fathometer Transducer, RenewJOB1
D-023Speed Log, Transducer and Skin Valve, Clean and InspectJOB1
D-024Sea Water System (Valves, Strainers, Piping), Clean, Inspect, and RepairJOB1
D-025Rudder Assemblies, Remove, Inspect and ReinstallJOB1
D-026RHIB Notch Skid Pads, InspectJOB1
D-027RHIB Notch Skid Pad Studs, RenewSTUDS5
D-028Stern Launch Door, Remove, Inspect, and ReinstallJOB1
D-029Grey Water Holding Tank, Clean and InspectJOB1
D-030Sewage Holding Tank, Clean and InspectJOB1
D-031Grey Water Piping, Clean and FlushJOB1
D-032Sewage Piping, Clean and FlushJOB1
O-033U/W Body, Preserve (“100%”)JOB1
O-034Hull Plating Freeboard, Preserve (Partial)JOB1
O-035Hull Plating Freeboard, Preserve (100%)JOB1
D-036Cathodic Protection / Zincs, RenewJOB1
D-037DrydockingJOB1
D-038Temporary Services, ProvideJOB1
D-039Telephone Service, ProvideJOB1
D-040Decks - Exterior (Main Deck), PreserveJOB1
D-041Main Diesel Engines, Port and Starboard, RenewJOB1
D-042Ships Service Diesel Generator Assembly, Port and Stbd, RenewJOB1
D-043Raw Water Piping, RepairJOB1
D-044Interior Deck Covering System, RenewJOB1
D-045Install Stainless Steel Hull Inserts and Renew BMDE Concentric RingsJOB1
A-OComposite Labor RateHour460
B-DGFP ReportNSPEA1NSP
Z-OLaydaysDay5
Total Price of Definite Items
Total Price of Option Items
Total Price of Definite and Optional Items

Sheet2

Sheet3

File details come from the government source that posted it. Updated .