REV1 SCHEDULE OF SUPPLIES SERVICES AMBERJACK.xlsx
XLSX spreadsheet 18 KB Posted
- Solicitation number
- HSCG80-13-R-P45003
About this file
REV1 SCHEDULE OF SUPPLIES / SERVICES AMBERJACK
View the file
Other files
| File | Type | Posted |
|---|---|---|
| REV1 dtd 07_24_12 SCHEDULE OF SUPPLIES SERVICES STURGEON .xlsx | XLSX spreadsheet | |
| REV1 dtd 07_25_12 STURGEON_(WPB_87)_DD_VMS_12R1 | — | |
| REV1 dtd 07_25_12 AMBERJACK | — | |
| SF30 Amendment Amberjack_Sturgeon.pdf | ||
| REV0 STURGEON SPEC.doc | DOC document | |
| SCHEDULE OF SUPPLIES SERVICE - AMBERJACK REV0.xlsx | XLSX spreadsheet | |
| SCHEDULE OF SUPPLIES SERVICES - STURGEON REV0.xlsx | XLSX spreadsheet | |
| REV0 AMBERJACK SPEC.doc | DOC document | |
| SOLICITATION for CGC AMBERJACK_STURGEON FAC 2005-58.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
USCGC AMBERJACK (WPB-87315) DRYDOCK AVAILABILITY 2013
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Perform Ultrasonic Thickness Measurements | 250 SHOTS | 1 | ||
| O-002 | Perform Ultrasonic Thickness Measurements | 25 SHOTS | 10 | ||
| D-003 | Overhead Surfaces (Port Lazarette), Preserve, Insulate | JOB | 1 | ||
| D-004 | Bilge Surfaces (Engine Room), Preserve 100% | JOB | 1 | ||
| D-005 | Preserve Bilge Surfaces 100%, Renew Galley, Mess Deck & Forward Joiner Decks | JOB | 1 | ||
| D-006 | Dirty Oil Tank, Clean and Inspect | JOB | 1 | ||
| D-007 | Oily Water Tank, Clean, Inspect and Preserve | JOB | 1 | ||
| D-008 | Tanks (MP Fuel Service), Clean and Inspect | JOB | 1 | ||
| D-009 | Tanks (Potable Water), Clean and Inspect | JOB | 1 | ||
| D-010 | Forepeak, Inspect and Preserve 100% | JOB | 1 | ||
| D-011 | Superstructure, Preserve 100% | JOB | 1 | ||
| D-012 | Pilothouse Deck (Aluminum), Inspect, Preserve, and Renew Electrical Matting | JOB | 1 | ||
| O-013 | Depth Sounder, Capastic Fairing, Renew | JOB | 1 | ||
| O-014 | Main Engine/Reduction Gear, Realign | JOB | 1 | ||
| D-015 | Propulsion Shafts, Remove, Inspect, and Reinstall | JOB | 1 | ||
| O-016 | Propulsion Shaft, Repair | JOB | 1 | ||
| O-017 | Propulsion Shaft, Straighten | JOB | 1 | ||
| O-018 | Intermediate Water-Lubricated Shaft Bearing, Renew | JOB | 1 | ||
| O-019 | Aft Water-Lubricated Shaft Bearing, Renew | JOB | 1 | ||
| O-020 | Intermediate Bearing Carrier, Renew | JOB | 1 | ||
| O-021 | Aft Bearing Carrier, Renew | JOB | 1 | ||
| O-022 | Stern Tubes, Interior Surfaces, Preserve 100% | JOB | 1 | ||
| O-023 | Stern Tubes, Interior Surfaces, Repair | JOB | 1 | ||
| D-024 | Propellers, Remove, Inspect, and Reinstall | JOB | 1 | ||
| O-025 | Propeller, Minor Repair and Recondition, Perform | JOB | 1 | ||
| D-026 | Fathometer Transducer, Renew | JOB | 1 | ||
| D-027 | Speed Log, Skin Valve, Clean and Inspect | JOB | 1 | ||
| D-028 | Sea Water System (Valves, Strainers, Piping), Clean, Inspect, and Repair | JOB | 1 | ||
| D-029 | Rudder Assemblies, Remove, Inspect and Reinstall | JOB | 1 | ||
| D-030 | RHIB Notch Skid Pads, Inspect | JOB | 1 | ||
| O-031 | RHIB Notch Skid Pad Studs, Renew | STUDS | 5 | ||
| D-032 | Stern Launch Door, Remove, Inspect, and Reinstall | JOB | 1 | ||
| D-033 | Grey Water Holding Tank, Clean and Inspect | JOB | 1 | ||
| D-034 | Sewage Holding Tank, Clean and Inspect | JOB | 1 | ||
| D-035 | Grey Water Piping, Clean and Flush | JOB | 1 | ||
| D-036 | Sewage Piping, Clean and Flush | JOB | 1 | ||
| D-037 | Decks-Exterior (Main Deck), Preserve 100% | JOB | 1 | ||
| D-038 | U/W Body, Preserve 100% | JOB | 1 | ||
| D-039 | Hull Plating Freeboard, Preserve 100% | JOB | 1 | ||
| D-040 | Cathodic Protection / Zincs, Renew | JOB | 1 | ||
| D-041 | Drydocking | JOB | 1 | ||
| D-042 | Temporary Services, Provide | JOB | 1 | ||
| D-043 | Telephone Service, Provide | JOB | 1 | ||
| D-044 | Watertight Doors, Renew | JOB | 1 | ||
| D-045 | HVAC System, Ducting, Clean | JOB | 1 | ||
| D-046 | Wash Basin, Install | JOB | 1 | ||
| D-047 | Main Diesel Engines, Port and Starboard, Renew | JOB | 1 | ||
| D-048 | Renew Office Laminate Deck | JOB | 1 | ||
| D-049 | Port Transom Ladder and Railing, Renew | JOB | 1 | ||
| D-050 | Joiner Bulkhead Panels and Sheathing, Repair | JOB | 1 | ||
| D-051 | Gaylord Hood System, Ducting, Renew | JOB | 1 | ||
| D-052 | Renew Pilothouse Balcony Deck | JOB | 1 | ||
| D-053 | Install Stainless Steel Hull Inserts and Renew BMDE Concentric Rings | JOB | 1 | ||
| D-054 | Interior Deck Covering System, Renew | JOB | 1 | ||
| A-O | Composite Labor Rate | Hour | 720 | ||
| B-D | GFP Report | NSP | EA | 1 | NSP |
| Z-O | Laydays | Day | 5 | ||
| Total Price of Definite Items | |||||
| Total Price of Option Items | |||||
| Total Price of Definite and Optional Items |
Sheet2
Sheet3
File details come from the government source that posted it. Updated .