USCGC AMBERJACK (WPB-87) DRYDOCK AVAILABILITY 2013
USCGC AMBERJACK (WPB 87315)
87 FOOT COASTAL PATROL BOAT (USCG)
SPECIFICATION FOR DRYDOCK REPAIRS
Developed By: Victoria M. Solak (Rev-1, 25 July 2012)
TABLE OF CONTENTS
ivRevisions Record vConsolidated List of References ixConsolidated List of Government-furnished Property xiConsolidated List of Critical Inspection Items xiiPrincipal Characteristics
1General Requirements
11WORK ITEM 1: Perform Ultrasonic Thickness Measurements (D)
14WORK ITEM 2: Perform Ultrasonic Thickness Measurements (O)
17WORK ITEM 3: Overhead and Bulkhead Surfaces (Port Lazarette), Preserve (D)
20WORK ITEM 4: Bilge Surfaces (Engine Room) , Preserve (100%) (D)
23WORK ITEM 5: Preserve Bilge Surfaces (100%), Renew Galley, Mess Deck & Forward Joiner Decks (D)
26WORK ITEM 6: Dirty Oil Tank, Clean and Inspect (D)
28WORK ITEM 7: Oily Water Tank, Clean, Inspect and Preserve (D)
31WORK ITEM 8: Tanks (MP Fuel Service), Clean and Inspect (D)
33WORK ITEM 9: Tanks (Potable Water), Clean and Inspect
35WORK ITEM 10: Forepeak, Inspect and Preserve (100%)
38WORK ITEM 11: Superstructure, Preserve (100%) (D)
41WORK ITEM 12: Pilothouse Deck (Aluminum), Inspect, Preserve, and Renew Electrical Matting (D)
44WORK ITEM 13: Depth Sounder, Capastic Fairing, Renew (O)
46WORK ITEM 14: Main Engine/Reduction Gear, Realign (O)
49WORK ITEM 15: Propulsion Shafts, Remove, Inspect, and Reinstall (D)
58WORK ITEM 16: Propulsion Shaft, Repair (O)
60WORK ITEM 17: Propulsion Shaft, Straighten (O)
62WORK ITEM 18: Intermediate Water-Lubricated Propulsion Shaft Bearing, Renew (O)
64WORK ITEM 19: Aft Water-Lubricated Propulsion Shaft Bearing , Renew (O)
66WORK ITEM 20: Intermediate Bearing Carrier, Renew (O)
67WORK ITEM 21: Aft Bearing Carrier, Renew (O)
68WORK ITEM 22: Stern Tube, Interior Surfaces, Preserve 100% (O)
70WORK ITEM 23: Stern Tube, Interior Surfaces, Repair (O)
72WORK ITEM 24: Propellers, Remove, Inspect, and Reinstall (D)
75WORK ITEM 25: Propeller, Minor Reconditioning and Repairs, Perform (O)
78WORK ITEM 26: Fathometer Transducer, Renew (D)
81WORK ITEM 27: Speed Log, Skin Valve Assembly, Clean and Inspect (D)
84WORK ITEM 28: Sea Water System (Sea Valves , Strainers, Piping), Clean, Inspect, and Repair (D)
87WORK ITEM 29: Rudder Assemblies, Remove, Inspect and Reinstall (D)
91WORK ITEM 30: RHIB Notch Skid Pads, Inspect (D)
93WORK ITEM 31: RHIB Notch Skid Pad Studs, Renew (O)
95WORK ITEM 32: Stern Launch Door, Remove, Inspect and Reinstall (D)
98WORK ITEM 33: Grey Water Holding Tank, Clean and Inspect (D)
100WORK ITEM 34: Sewage Holding Tank, Clean and Inspect (D)
102WORK ITEM 35: Grey Water Piping, Clean and Flush (D)
106WORK ITEM 36: Sewage Piping, Clean and Flush (D)
110WORK ITEM 37: Decks – Exterior (Main Deck), Preserve 100%
113WORK ITEM 38: U/W Body, Preserve (100%) (D)
116WORK ITEM 39: Hull Plating Freeboard, Preserve (100%)
120WORK ITEM 40: Cathodic Protection / Zincs, Renew (D)
122WORK ITEM 41: Drydocking (D)
127WORK ITEM 42: Temporary Services, Provide (D)
129WORK ITEM 43: Telephone Service, Provide (D)
130WORK ITEM 44: Watertight Doors, Renew
132WORK ITEM 45: HVAC System, Ducting, Clean (D)
134WORK ITEM 46: Wash Basin, Install (D)
136WORK ITEM 47: Main Diesel Engines, Port and Starboard, Renew
139WORK ITEM 48: Renew Office Laminate Deck
140WORK ITEM 49: Port Transom Ladder and Railing, Renew
142WORK ITEM 50: Joiner Bulkhead Panels and Sheathing, Repair (D)
144WORK ITEM 51: Gaylord Hood System, Ducting, Renew (D)
146WORK ITEM 52: Renew Pilothouse Balcony Deck (D)
148WORK ITEM 53: Install Stainless Steel Hull Inserts and Renew BMDE Concentric Rings
150WORK ITEM 54: Interior Deck Covering System, Renew
Revisions Record This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.
| DATE |
| REV# |
| WORK ITEM# |
| CHANGES MADE |
| 16 July 2012 |
| 1 |
| 18, 20 |
| Deleted para. 3.3 and sub paragraphs from Work Item 18 and relocated as para. 3.2 in Work Item 20 |
| 16 July 2012 |
| 1 |
| 19, 21 |
| Deleted para. 3.3 and sub paragraphs from Work Item 19 and relocated as para. 3.2 in Work Item 21 |
| 16 July 2012 |
| 1 |
| 24 |
| Deleted contents of para 3.3.1, as they do not apply. |
| 20 July 2012 |
| 1 |
| 5 |
| Removed deck renewal and created item 54 for more specific scope of work |
| 20 July 2012 |
| 1 |
| 54 |
| Relocated head and shower deck renewals from work item 5 to Work item 54 for scope clarification. |
| 24 July 2012 |
| 1 |
| 31 |
| Edited para 1.1 to match price schedule of up to 10 sets of 5 studs. |
| 24 July 2012 |
| 1 |
| 23 |
| Edited para 1.1 to quantify repair |
| 24 July 2012 |
| 1 |
| 47 |
| Added Coast Guard TP’s to list of references, and alignment personnel requirements. |
Added reduction gear inclusion note in notice for clarification
| July 25 2012 |
| 1 |
| 14 |
| deleted |
NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.
Consolidated List of References
The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at time of specification writing and during contract execution.
All Coast Guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – as follows:
· MIL/DOD/CID Specifications: http://www.assistdocs.com/search/search_basic.cfm
· Commandant Instruction Manuals: http://www.uscg.mil/directives/default.asp
· Public Laws, Code of Federal Regulations, U.S Codes, and other Federal Government laws:: www.gpoaccess.gov The Government is aware of the following internet web links where contractors may procure commercial specifications:
· American Welding Society (AWS): http://www.awspubs.com/index.php
· ANSI, ASTM, IEEEE, NFPA, ASME, SAE Standards: http://www.techstreet.com/
· NFPA: http://www.nfpa.org
· SSPC Standards and pictorial guides: http://shopping.netsuite.com/sspcmarketplace
COAST GUARD DRAWINGS
Coast Guard Drawing 87 WPB 601-001, Rev F, Outboard Profile and General Arrangement
Coast Guard Drawing 101 WTGB 562-001, Rev N, Rudder
Coast Guard Drawing 101 WTGB 562-002, Rev R, Rudder Stock Bearing Details
Coast Guard Drawing 87 WPB 085-001, Rev-, Tank CAPACITY - 95% Curves
Coast Guard Drawing 87 WPB 085-010, Rev D, Docking Plan
Coast Guard Drawing 87 WPB 085-011, Rev B, Lifting Slings
Coast Guard Drawing 87 WPB 085-012, Rev -, Lifting Cradle
Coast Guard Drawing 87 WPB 111-001, Rev F, Shell Expansion Coast Guard Drawing 87 WPB 113-001, Rev E, Platform Plating & Framing
Coast Guard Drawing 87 WPB 113-002, Rev B, Galley/Messdeck Bilge Access
Coast Guard Drawing 87 WPB 116-001, Rev -, Longitudinal Girderss & Bulkheads
Coast Guard Drawing 87 WPB 122-001, Rev C, Watertight Bulkheads Coast Guard Drawing 87 WPB 131-001, Rev J, Deck Construction Plan
Coast Guard Drawing 87 WPB 151-001, Rev M, Superstructure Details
Coast Guard Drawing 87 WPB 161-001, Rev C, Skeg Construction
Coast Guard Drawing 87 WPB 163-001, Rev G, Sea Chest Details
Coast Guard Drawing 87 WPB 165-001, Rev D, Transducer Details Coast Guard Drawing 87 WPB 167-003, Rev G, Schedule of Doors, Manholes, Windows and Hatches Coast Guard Drawing 87 WPB 182-001, Rev A, Main Engine and Generator Foundations
Coast Guard Drawing 87 WPB 243-001, Rev M, Propulsion Shaft Details
Coast Guard Drawing 87 WPB 243-050, Rev -, Propulsion Shaft: Single Sheet Detail
Coast Guard Drawing 87 WPB 245-002, Rev-, Propeller Details
Coast Guard Drawing 87 WPB 245-003, Rev A, Propeller Details Coast Guard Drawing 87 WPB 259-001, Rev D, Engine Exhaust Piping Details Coast Guard Drawing 87 WPB 305-001, Rev -, Electrical Label Plates
Coast Guard Drawing 87 WPB 321-002, Rev U, Power & Lighting Circuit Details & V.D. Calculations
Coast Guard Drawing 87 WPB 331-001, Rev N, 87 WPB Coastal Patrol Boat Lighting System Deck Plan
Coast Guard Drawing 87 WPB 331-001, Rev N, Lighting System Deck Plan
Coast Guard Drawing 87 WPB 423-001, Rev U, Speed Log & Depth Sounder System
Coast Guard Drawing 87 WPB 514-001, Rev L, HVAC Duct and Piping Systems
Coast Guard Drawing 87 WPB 521-001, Rev G, Firemain Piping
Coast Guard Drawing 87 WPB 526-001, Rev H, Scuppers & Deck Drains Piping Coast Guard Drawing 87 WPB 533-001, Potable Water Piping
Coast Guard Drawing 87 WPB 555-002, Rev H, AFFF Engine Room Bilge Flooding System Arrangement & Detail
Coast Guard Drawing 87 WPB 561-001, Rev J, Steering System Details
Coast Guard Drawing 87 WPB 562-001, Rev A, Rudder Details
Coast Guard Drawing 87 WPB 582-001, Rev J, Mooring and Towing
Coast Guard Drawing 87 WPB 583-001, Rev T, RIB Deployment Structure
Coast Guard Drawing 87 WPB 593-001, Rev K, Sewage Piping
Coast Guard Drawing 87 WPB 601-001, Rev G, Outboard Profile & General Arrangements Coast Guard Drawing 87 WPB 621-001, Rev H, Joiner Work Details
Coast Guard Drawing 87 WPB 623-001, Rev J, Ladder Details Coast Guard Drawing 87 WPB 631-001, Rev M, Ship’s Painting Schedule
Coast Guard Drawing 87 WPB 634-001, Rev C, Deck Coverings and Details Coast Guard Drawing 87 WPB 635-001, Rev C, Linings and Insulation Plan & Details Coast Guard Drawing 87 WPB 651-001, Rev E, Galley Mess Equipment
Coast Guard Drawing FL 2804-15, Rev-, Draft Figs
Coast Guard Fleet Drawing FL 2804-11, Rev D, Visual ID Numeral & Letter for Ships
Coast Guard Fleet Drawing FL 2804-12, Rev-, U.S.C.G. Emblem
NAVSEA Drawing 803-921865, Rev R, Cathodic Protection Hull Zinc Anodes
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jun 2006, Coatings and Colors Manual
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Colors Manual
Coast Guard Commandant Instruction (COMDTINST) M10360.3, (series) Coatings and Color Manual Coast Guard Technical Publication (TP) 4531, Mar 2003, MAIN DIESEL ENGINE - DESCRIPTION & OPERATION MANUAL - MODEL 8V396TE94
Coast Guard Technical Publication (TP) 4532, Mar 2003, MAIN DIESEL ENGINE - PARTS CATALOG – MODEL 8V396TE94
Coast Guard Technical Publication (TP) 4533, Mar 2003, MAIN DIESEL ENGINE – MAINTENANCE MANUAL – MODEL 8V396TE94
Coast Guard Technical Publication (TP) 4535B, Mar 2003, MAIN DIESEL ENGINE – FLUIDS & LUBRICANTS SPECIFICATIONS
Coast Guard Technical Publication (TP) 4506, Wartsila TM-EL-68839, Issue A, Mar 2005, Rudderstock Seal Type EL
Coast Guard Technical Publication (TP) 4557, Manufacturer's Instruction Book – SWBS Group(s) 310
Coast Guard Technical Publication (TP) 4562, 15 FEB 2005, Heating, Ventilation, and Air Conditioning (HVAC) Sytem 87 WPB Class Vessels
Coast Guard Technical Publication (TP) 4593B, Mar 2003, SWBS 562, Rudderstock Seal-Type EJ
Coast Guard Technical Publication (TP) 4593C, Feb 2002, SWBS 243, Manufacturer's Instruction Book, 87' WPB Propulsion Shaft Seals, John Crane Type F.S.E.
Coast Guard Technical Publication (TP) 4593C, Jan 2008, Seal, Shaft – Type F.S.E.
Coast Guard Technical Publication (TP) 4657, Strobe Light, Model 371 DST-120B
Coast Guard Technical Publication (TP) E-424-0230, SWBS 424, June 2006, Electromagnetic Log User’s Manual MTU Maint Deisel Engine Installation Memo, 7 October 2010
Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 3101, Aug 2011 , Overhaul AC Synchronous Machines
Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 0000, Jan 2009, General Requirements
Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 0740, Jan 2009, Welding and Allied Processes
Surface Forces Logistics Center Standard Specification 5100 (SFLC Std Spec 5100), Jan 2009, Clean Shipboard Ventilation Systems
Surface Forces Logistics Center Standard Specification 6341 (SFLC STD SPEC 6341), Jan 2009, Install Interior Deck Covering Systems
Surface Forces Logistics Center Standard Specification 8634 (SFLC Std Spec 8634), Jan 2009, Drydocking
Surface Forces Logistics Center Standard Specification 8635 (SFLC Std Spec 8635), Jan 2009, Provide Temporary Services
OTHER REFERENCES
American Bureau of Shipping (ABS), 2, Rules for Survey After Construction, 2008, Part 7, Appendix Section 10, Guide for Bronze and Stainless Steel Propeller Castings
American National Standards Institute/American Water Works Association (ANSI/AWWA) C652, 2002, Disinfection of Water-Storage Facilities
American National Standards Institute/NSF International (ANSI/NSF) 61, 2008, Drinking Water System Components - Health Effects
American Society of Mechanical Engineers (ASME) B16.34, 2004, Valves-Flanged, Threaded, and Welding End
ASTM International (ASTM) D1330, 2004, Standard Specification for Rubber Sheet Gaskets
ASTM International (ASTM) D4417, 2003, Standard Test Methods for Field Measurement of Surface Profile of Blast Cleaned Steel
ASTM International (ASTM) D5363, 2008; Standard Specification for Anaerobic Single-Component Adhesives (An)
ASTM International (ASTM) F992, 2006, Standard Specification for Valve Label Plates
ASTM International (ASTM), D3951, Re-approved 2004, Standard Practice for Commercial Packaging
Bollinger Shipyard, USCG CPB Project MTU-FA 771903, 07 Feb 2000, Engine/Gearbox Plant Alignment Instructions 8V396 TE94/Flange mounted BW 255
Bollinger Shipyards Drawing D97-0829, Rev J, Installation Drawing, 87’ USCG CPB/MTU 8V396TE94
Code of Federal Regulations (CFR) Title 33 CFR, 2008, Navigation and Navigable Waters
Code of Federal Regulations (CFR) Title 40, Chapter I, 2008, Environmental Protection Agency
Code of Federal Regulations (CFR) Title 49, Chapter I, 2008, Pipeline and Hazardous Materials Safety Administration, Department Of Transportation
Commercial Item Description (CID) A-A-59313, Nov 2003, Thread Compound; Antiseize, Zinc Dust-Petrolatum
Commercial Item Description (CID) A-A-59316, Nov 2003, Abrasive Materials for Blasting
DOD-STD-2187, Aug 1987, Chemical Cleaning of Salt Water Piping Systems
Federal Specification (Fed Spec) QQ-N-281, Oct 1985, Nickel-Copper Alloy Bar, Rod, Plate, Sheet, Strip, Wire, Forgings, and Structural and Special Shaped Sections
Federal Standard (FED-STD) 595, 2008, Colors Used In Government Procurement
International Organization for Standardization (ISO), 484/2, First Edition, 1981, Shipbuilding - Ship Screw Propeller - Manufacturing tolerances - Part 2: Propellers of diameter between 0.80 and 2.50 m inclusive
International Standard For Organization (ISO) 484/2, 1981, Shipbuilding - Ship Screw Propeller - Manufacturing Tolerances - Part 2: Propellers of Diameter Between 0.80 and 2.50 m, Inclusive
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-61, 2003 Edition, Pressure Testing Of Steel Valves
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-67, 2002 Edition, Butterfly Valves
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-72, 1999 Edition, Ball Valves with Flanged or Butt-Welding Ends for General Service
Manufacturers' Standardization Society of the Valve and Fittings Industry (MSS) SP-80, 2008 Edition, Bronze Gate, Globe, Angle and Check Valves
MIL PRF-16173, Sep 2006, Corrosion Prevention Compound, Solvent Cut Back, Cold Application
MIL-A-22262, Mar 1996, Abrasive Blasting Media Ship Hull Blast Cleaning
MIL-DTL-15562, May 1996, Matting or Sheet, Floor Covering Insulating for High Voltage requirements
MIL-PRF-16173, 2006, Corrosive Preventive Compound, Solvent Cutback, Cold Application
MIL-PRF-23236, Aug 2003, Coating Systems for Ship Structures
MIL-PRF-24139, Mar 1987, Grease, Multipurpose, Water Resistant.
MIL-PRF-24635, 2009, Coating Systems, Weather-Resistant, Exterior Use
MIL-PRF-24647, Jun 2006, Paint System, Anticorrosive and Antifouling, Ship Hull
MIL-S-45180, 1998; Sealing Compound, Gasket, Hydrocarbon Fluid and Water Resistant
MIL-STD-167-1, Nov 2005, Mechanical Vibrations of Shipboard Equipment (Type I - Environmental and Type II - Internally Excited)
MIL-STD-1687, Sep 1994, Thermal Spray Processes For Naval Ship Machinery Application
MIL-STD-2191, Nov 1992, Repair Welding, Weld Cladding, Straightening, and Cold Rolling of Main Propulsion Shafting
NAVSEA Drawing 804-5773931, Rev A, Acoustic & Thermal Insulation For Compartments Installation Details
NAVSEA Technical Publication T9074-AD-GIB-010/1688, (TP 1688), May 1997, Requirements for Fabrication, Welding, and Inspection of Submarine Structure
Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C6183, 2007, Cork and Rubber Composition Sheet; For Aromatic Fuel And Oil Resistant Gaskets
Surface Forces Logistics Center Standard Specification 6341 (SFLC Std Spec 6341), Jan 2009, Install New Deck Covering Systems
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2004, Power Tool Cleaning to Bare Metal
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.3 (SSPC-SP 3), 2004, Power Tool Cleaning
The Society for Protective Coatings (SSPC) VIS 1, 2004, Guide and Reference Photographs for Steel Surfaces Prepared by Dry Abrasive Blast Cleaning
The Society for Protective Coatings (SSPC)/NACE International (NACE) 2004, Joint Surface Preparation Standard SSPC-SP 10/NACE No.2, Near-White Blast Cleaning
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 10/NACE No.2, 2004, Near-White Blast Cleaning
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 12/NACE No.5, 2004, Surface Preparation and Cleaning of Steel & Other Hard Materials by High and Ultrahigh Pressure Water Jetting
Consolidated List of Government-furnished Property
The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.
| WORK ITEM |
| MTI |
| ITEM DESCRIPTION |
| NSN/PN |
| QTY |
| ESTIMATED COST |
($/Unit)
| 14 |
| Y |
| Alignment Kit |
| N/A |
| 1 ea |
| 5000.00 |
| 15 |
| N |
| **Propeller shaft |
| NSN: 2010-01-458-9175 |
| 2 ea. |
| 9,566.14 |
| 15 |
| N |
| Type FSE Face (split) |
| PN: H75440-01-2-2 |
NSN: 5330-01-521-3559
| 2 ea. |
| 1,995.07 |
| 15 |
| N |
| Type FSE Seal (split) |
| PN: H75440-01-1-1 |
NSN: 2040-01-521-2654
| 2 ea. |
| 4,070.35 |
| 15 |
| N |
| Type FSE Seal Cup (split) |
| PN: H75440-01-1-3 |
NSN: 3120-01-521-2390
| 2 ea. |
| 188.24 |
| 15 |
| N |
| Type FSE O-Cord |
| PN: H75440-01-1-4 |
NSN: 3120-01-521-2268
| 2 ea. |
| 252.84 |
| 15 |
| N |
| Type FSE Emergency Seal |
| PN: H75440-01-3-6 |
NSN: 5330-01-521-4855
| 2 ea. |
| 260.92 |
| 15 |
| N |
| **Shaft Seal Bellow |
| PN: H75440-01-2-1 |
NSN: 5340-01-521-3573
| 2 ea. |
| 270.45 |
| 15 |
| N |
| *Compression Tool Assembly |
| N/A |
| 1 ea. |
| 200.00 |
| 15 |
| N |
| *Alignment Kit |
| N/A |
| 1 set |
| 3,000.00 |
| 18 |
| N |
| **Thordon bearing, Grade Orange |
(5.5" OD x 4" ID x 7.87" (200mm) LG)
PN: F54615-02-8-1
NSN: 3120-21-914-2012
| 2 ea. |
| 325.47 |
| 19 |
| N |
| **Thordon bearing, Grade Orange |
(5.5" OD x 4" ID x 11.41" (290mm) LG)
PN: F54615-02-8-0
NSN: 3120-21-914-2011
| 2 ea. |
| 399.50 |
| 24 |
| Y |
| **Starboard Propeller (RH) |
| PN: RH706-3350.00 |
NSN: 2010-01-457-0573
| 1 ea. |
| 12,498.00 |
| 24 |
| Y |
| **Port Propeller (LH) |
| PN: LH706-3350.00 |
NSN: 2010-01-459-0421
| 1 ea. |
| 12,498.00 |
| 24 |
| N |
| *Propeller Nut Wrench |
| N/A |
| 1 ea |
| 200.00 |
| 24 |
| N |
| **Propeller Nut |
| NSN: 2010-01-458-9217 |
| 2 ea. |
| 281.00 |
| 24 |
| N |
| **Propeller Nut, Locking |
| NSN: 5310-01-458-9125 |
| 2 ea. |
| 252.94 |
| 24 |
| N |
| Anode, Propeller Nut |
| NSN: 5342-01-481-8403 |
| 2 ea. |
| 272.00 |
| 26 |
| N |
| *** Fathometer transducer, shallow water, 50-200 kHz |
| NSN: 5845-01-531-2648 |
| 1 ea. |
| 441.70 |
| 27 |
| Y |
| Doppler Speed Log Measurement Rod |
| NSN: 6605-01-470-1266 |
| 1 ea. |
| 4645.09 |
| 29 |
| Y |
| **Rudder Assembly, port |
| NSN: 2040-01-461-1944 |
| 1 ea. |
| 2,000.00 |
| 29 |
| Y |
| **Rudder Assembly, starboard |
| NSN: 2040-01-461-1943 |
| 1 ea. |
| 2,000.00 |
| 29 |
| N |
| Upper Roller Bearing |
| NSN: 3110-01-512-5534 |
| 2 ea. |
| 244.62 |
| 29 |
| N |
| Wartsila EL Seals Kit |
| NSN: 2040-01-565-9776 |
| 2 ea. |
| 6300.00 |
| 30 |
| N |
| RHIB notch skid pad A |
| 2040-01-F11-2445 |
| 1 ea. |
| 790.00 |
| 30 |
| N |
| RHIB notch skid pad B |
| 2040-01-F11-2449 |
| 1 ea |
| 405.00 |
| 30 |
| N |
| RHIB notch skid pad C |
| 2040-01-F11-2446 |
| 1 ea |
790.00
| 30 |
| N |
| RHIB notch skid pad D |
| 2040-01-F11-2447 |
| 1 ea |
| 790.00 |
| 30 |
| N |
| RHIB notch skid pad G |
| 2040-01-F11-2448 |
| 1 ea |
| 406.00 |
| 37 |
| N |
| Slip Resistant Sheets |
| 7220-01-F11-2238 |
| 1 KT |
| 5,000.00 |
| 37 |
| N |
| Anchor Pad |
| 2040-01-F12-2761 |
| 1 |
| ??? |
| 41 |
| Y |
| *Transducer Cover Plate |
| N/A |
| 2 ea. |
| 50.00 |
| 44 |
| N |
| 52”x26” Clear Opening 6 Dog, Quick Action WTRTT DR, RH, Aluminum, Alum Frame, No portlight |
| 1 |
| $2608.31 |
| N |
| 52”x26” Clear Opening 6 Dog, Quick Action WTRTT DR, LH, Aluminum, Alum Frame Portlight |
| 1 |
| $2608.31 |
| 44 |
| N |
| 52”x26” Clear Opening 6 Dog, Quick Action WTRTT DR, RH, Aluminum, Steel Frame, Portlight |
| 1 |
| $2608.31 |
| 46 |
| N |
| ***Wash Basin |
| N/A |
| 1 ea |
| 200.00 |
| 47 |
| Y |
| Main Diesel Engine |
| 2815-12-348-2440 |
| 2 |
| 500,000.00 |
| 47 |
| N |
| Soft Patch Kit |
| 8040-01-601-2062 |
| 2 |
| 3,000.00 |
| 53 |
| N |
| MDE Exhaust Concentric Rings |
| NSN: 2990-01-537-5198 |
| 2 |
| 2850.00 |
*Government-loaned property, which shall be returned to the vessel upon completion of the availability.
**New or refurbished equipment that the Government may provide for installation in place of existing equipment.
***Government-furnished property, which is to be supplied by either the vessel or the C4IT ServiceCenter
Consolidated List of Critical Inspection Items The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000_STD, paragraph 3.2.6.5 (Inspection report particulars)):
Work Item Title
| 1 |
| Perform Ultrasonic Thickness Measurements (D) |
| 3 |
| Overhead and Bulkhead Surfaces (Port Lazarette), Preserve (D) |
| 4 |
| Bilge Surfaces (Engine Room) , Preserve (100%) (D) |
| 5 |
| Bilge Surfaces (Galley and Mess Deck) , Preserve (100%) (D) |
| 10 |
| Forepeak, Inspect and Preserve (100%) (D) |
| 12 |
| Pilothouse Deck (Aluminum), Inspect , Preserve, and Renew Electrical Matting (D) |
| 15 |
| Propulsion Shafts, Remove, Inspect, and Reinstall (D) |
| 28 |
| Sea Water System (Sea Valves , Strainers, Piping), Clean, Inspect, and Repair (D) |
| 29 |
| Rudder Assemblies, Remove, Inspect and Reinstall (D) |
| 30 |
| RHIB Notch Skid Pads, Inspect (D) |
| 41 |
| Drydocking (D) |
Principal Characteristics
PC_87_WPB_0511
87' WPB
Physical Characteristics
| Length Overall |
| 87' |
| Length between Perpendiculars |
| 81' 7" |
| Depth |
| 10' 11" |
| Maximum Beam |
| 19.4' |
| Draft, Mean to Design Waterline |
| 5' 9" |
| Height of Highest Projection |
| 50.2' |
| Full Load Displacement |
| 93.5 long tons |
| Minimum Operating Displacement |
| 83.9 long tons |
| Displacement, Light Ship |
| 77.9 long tons |
| Framing |
| Longitudinal |
| Bulkheads |
| Four watertight bulkheads located below the Main Deck |
| Anchor |
| 40 lb Fortress with 480 ft. 3 strand 5/8" dia. Line stayset |
Hull Characteristics
| Hull/Main Weatherdeck Material |
| ABS Grade AH 36 |
| Superstructure |
| 5086 Aluminum |
Machinery Characteristics
| Main Propulsion |
| Two MTU 8V396TE94, sequential turbo-charged diesels |
| Reduction Gears |
| Two ZF Type BW 255 |
| Propulsion Shaft |
| Two AQUAMET 22, 101.6mm |
| Shaft Diameter |
| 4" |
| Shaft Seal |
| Two John Crane mechanical seals |
| Shaft Bearing, Intermediate |
| Thordon Elastomeric Bearing |
| Shaft Bearing, Aft |
| Thordon Elastomeric Bearing |
| Number of Propellers |
| 2 |
| Number of Blades |
| 5 |
| Diameter of Propeller |
| 1040mm |
| Pitch |
| 1230 mm fixed |
| Shaft RPM |
| 828 |
| Rudders |
| Two 316L Stainless Steel |
| Ship's Service Generators |
| Two Man Model D08241F01 diesel with Stanford 60KW Generator |
Tank Capacities
| 3-9-1-F (Fuel Oil) |
| 1402 gal |
| 3-9-2-F (Fuel Oil) |
| 1402 gal |
| 3-12-2-F (Waste Oil) |
| 86 gal |
| 3-12-1-F (Oily Water) |
| 86 gal |
| 3-7-0-Q (Sewage Collection) |
| 352 gal |
| 3-7-1-Q (Grey Water) |
| 52 gal |
| 3-12-1-W (Fresh Water) |
| 200 gal |
| 3-12-2-W (Fresh Water) |
| 200 gal |
This page was left blank intentionally. Do not delete.
00000_PWB_1111_FLT
REC_0000_FLT_ Commercial Project @ Contractor’ Facility (0211) General Requirements
1. SCOPE
1.1 Intent. This item describes the general requirements to be followed by the Contractor while conducting this availability.
2. REFERENCES
Coast Guard Drawings None.
Coast Guard Publications Coast Guard Commandant Instruction (COMDTINST) M10360.3C, Change 1, Jun 2006, Coatings and Color Manual Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Jan 2009, General Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), Jan 2009, Welding and Allied Processes Other References ASTM International (ASTM) D4417, 2003, Standard Test Methods for Field Measurement of Surface Profile of Blast Cleaned Steel Commercial Item Description (CID) A-A-59316, Nov 2003, Abrasive Materials for Blasting Code of Federal Regulations (CFR) Title 33 CFR, 2008, Navigation and Navigable Waters Code of Federal Regulations (CFR) Title 40, Chapter I, 2008, Environmental Protection Agency Code of Federal Regulations (CFR) Title 49, Chapter I, 2008, Pipeline and Hazardous Materials Safety Administration, Department Of Transportation MIL-A-22262, Mar 1996, Abrasive Blasting Media Ship Hull Blast Cleaning NAVSEA Technical Publication T9074-AD-GIB-010/1688, (TP 1688), May 1997, Requirements for Fabrication, Welding, and Inspection of Submarine Structure The Society for Protective Coatings (SSPC) VIS 1, 2004, Guide and Reference Photographs for Steel Surfaces Prepared by Dry Abrasive Blast Cleaning
3. REQUIREMENTS
3.1 General. The Contractor shall conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability.
NOTE
The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and also to all other work subsequently authorized by changes, modifications, or extensions to the contract.
3.2 Contractor-provided fire watch personnel. The Contractor shall provide fire watch personnel and equipment.
3.3 Welding and brazing requirements. The Contractor shall perform all welding and allied processes, and NDI in accordance with SFLC Std Spec 0740.
3.4 HW disposal. The Contractor is considered as the generator of all contract-generated hazardous wastes and shall use its facility’s EPA generator ID number for management, transportation, and disposal of said hazardous wastes. Ensure the following:
3.4.1 Contractor’s hazardous waste handlers shall comply with applicable requirements of 40 CFR 262.
3.4.2 All contract generated hazardous wastes shall be packaged in 49 CFR-compliant containers.
3.4.3 The designated wastes shall be disposed of at a state or Federally-approved and permitted HW TSDF.
3.4.4 Name of destination TSDF shall be submitted to the KO at the Arrival Conference.
3.5 Pre-surface preparation test coupon. In order to ensure production of required surface profile, the Contractor shall accomplish the following tasks, whenever abrasive-blasting is required in a work item that is deemed a ”critical-coated’ surface:
3.5.1 Coupon material and test set-up particulars.
3.5.1.1 Conduct a performance test on all abrasive blasting operations on a Contractor- provided test coupon, prior to starting abrasive blasting operations on the vessel. Ensure the following:
· The coupon shall be a new metal plate, of the same metal type and material properties as the vessel area to be blasted - steel or aluminum plate, as applicable, and shall have no existing anchor profile - other than the surface irregularities from the manufacturing process.
· The test coupon shall be flat, with nothing welded to the side used for the anchor profile test, no thinner than a 1/8-inch plate and measuring no smaller than 1-foot by 1-foot.
· For steel substrates, the coupon shall have the mill scale intact, and be in a Rust Grade "A" condition, in accordance with SSPC-VIS 1.
· The test coupon shall be affixed so as to not permit excessive movement during the performance test, but shall not be affixed to the vessel.
3.5.1.2 Ensure that the abrasive-blasting operation for the test coupon is conducted with the identical setup and parameters that will be used blasting the designated vessel surfaces – including, but not limited to:
· The abrasive media type and media size selected to achieve the anchor profile range, as specified in the applicable work items.
· Nozzle size and type (straight bore, high velocity nozzle, angle nozzle...).
· Delivery rate and pressure settings.
3.5.1.3 Blast a one-square foot area on one side of the test coupon to the abrasive surface preparation standard specified in the work item, and perform an anchor profile test of the blasted surface in accordance with ASTM D4417, Method B or C. Notify the COTR in advance of the abrasive blasting operation test, to permit the witnessing of the test by the COTR. Submit a CFR documenting the results of the abrasive blasting operation test. The CFR shall include at a minimum, the following:
· Area of the vessel for which the verified setup will be used to abrasive blast.
· The selected abrasive media type and size.
· The nozzle size and type.
· The delivery rate and pressure.
· The test coupon starting properties (material type and surface conditions).
· The resultant anchor profile readings from the test (a minimum of 3 locations, separated by a minimum of 2 inches shall be recorded).
NOTES
1. A performance test of the abrasive blasting operations on a test coupon and measuring the resultant anchor profile prior to performing the abrasive blasting operation on the cutter is required. The test coupon will be used to evaluate the anchor profile produced by the equipment setup and selected abrasive media.
2. The reverse side of the test coupon may be used for the subsequent test, provided that the conditions in paragraph 3.5.1 (Coupon material and test set-up particulars) are met.
3. Ultra high pressure water jetting does not create an anchor profile and is exempt from the anchor profile test coupon check.
3.5.1.4 Repeat the abrasive blasting operation test in the following instances:
· The equipment setup, that was evaluated during the test coupon abrasive blasting performance test in paragraph 3.5.1 (Coupon material and test set-up particulars), has changed.
· The resultant anchor profile readings observed on the vessel are outside the specified anchor profile range.
· Media is changed from MIL-A-22262 to CID A-A-59316 or vice versa.
· The supplier of the abrasive blasting media changes, regardless if the new source for the media has the same specifications.
· When Directed by the COTR.
CAUTION!
Ensure that blast media from the performance test does not strike the vessel during the test.
3.6 Interim changes to SFLC Std Spec 0000. The Contractor shall be aware of the following interim changes to the SFLC Std Spec 0000:
3.6.1 Contents of paragraph 3.3.2.1.1 (Water depth) have been revised to read as follows:
“3.3.2.1.1 Water depth. Ensure that water depth is sufficient at the pier to allow the vessel's lowest underwater appendage to clear the bottom by at least two feet at:
· Ordinary low water mark on non-tidal rivers.
· At all tide conditions predicted during the availability for tidal rivers and other navigable waterways (Bay, Lake, etc.).”
3.6.2 Paragraph 3.2.11.1 (Sanitary facilities for vessel-personnel – due to disruption of grey water system) has been revised as follows:
“3.2.11.1 Sanitary facilities for vessel-personnel – due to disruption of grey water and sewage systems. When the shipboard grey water and sewage systems are disrupted due to repairs required by contract work, the Contractor shall provide vessel-personnel with a sanitary facility, within a five minute walking distance from the vessel, to include the amenities listed in Table II (Sanitary Facility Amenities). Ensure the following:
· Shower stalls are equipped with privacy screens.
· Sinks are provided with fresh hot and cold water.
· Electrical convenience GFI receptacles, in accordance with NFPA 70, National Electric Code (NEC), are located in vicinity of sinks.
· Toilets have doors or privacy dividers.
· Lockers are capable of being locked.”
4. NOTES
4.1 Access to COMDTINST M10360.3. The COMDTINST M10360.3 may be accessed at the following URL address: http://www.uscg.mil/directives/cim.asp
4.2 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 0000 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.
QA-1 - QUALITY ASSURANCE INSPECTION FORM
(PRESERVATION CHECKLIST)
| Vessel Name |
| Hull # |
| Work Item # |
| Work Item Title |
| Location of Work (incl. frame #’s) |
| Area (sqft) |
CHECKPOINT 1 – COATING SYSTEM COMPLIANCE
Ensure all coatings are in compliance with COMDTINST M10360.3, Appendix C.
CHECKPOINT 2 - PAINT STORAGE
Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfgr.
CHECKPOINT 3 - AMBIENT CONDITIONS
Ensure surface and surrounding temperatures are each between 50 and 90°F for water-based coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).
Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).
Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfgr.
CHECKPOINT 4 - PRE-SURFACE PREPARATION
Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.
Verify equipment setup, blast media, and surface preparation methods match designated test coupon.
CHECKPOINT 5 - SURFACE PREPARATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-12, SP-11, SP-10…).
Verify surface anchor profile using ASTM D4417-Methods B or C against COMDTINST M10360.3. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.
Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max. threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).
CHECKPOINT 6 - PRIMER COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Verify proper mixing and stand-in (induction) times.
Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.
Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).
Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.
Brush out all runs, sags, drips, and puddles.
Perform visual inspection for holidays and other defects.
CHECKPOINT 7 – STRIPE COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).
CHECKPOINT 8 – TOP COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
Verify proper mixing and stand-in (induction) times, as applicable.
Verify wet film thickness at random, to prevent under or over application.
Brush out all runs, sags, drips, and puddles.
CHECKPOINT 9 – FINAL INSPECTION
Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.
Ensure that system cure is in accordance with manufacturer's recommendation for intended service.
Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.
For immersion coatings (including tank U/W body), record date and time of the following events:
Final coat application: _____/_____; Return to service or removal from environment controls: _____/_____
CHECKPOINT 10 – RECORD KEEPING
Complete, sign, and submit all provided QA Inspection Forms.
| Name of QP-1/NACE Inspector |
| Signature |
| Cert. # |
| Date / Time |
QA-2 - QUALITY ASSURANCE INSPECTION FORM
(ENVIRONMENTAL READINGS)
| Vessel Name |
| Hull # |
| Work Item # |
| Work Item Title |
Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.
| DATE & TIME |
| ACTIVITY (Surface preparation, primer coat, barrier coat, top coat, etc…) |
| LOCATION (Frame & Deck, relation to equipment, etc.) |
| TEMPERATURE |
| % REL. HUMID-ITY |
| DEW PT. |
| SURFACE |
| AMBIENT |
| ΔT |
| DP - Surface |
| Name of QP-1/NACE Inspector |
| Signature |
| Cert. # |
| Date / Time |
QA-3a - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)
| Vessel Name |
| Hull # |
| Work Item # |
| Work Item Title |
| Location of Work (Frame References) |
| Area (sqft) |
| SURFACE PREPARATION METHOD |
| PROFILE ACHIEVED (mils) |
| Min |
| Max |
| Mean |
SSPC-SP-10/NACE No. 2
SSPC-SP-12/NACE No. 5
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area)
Brush-blasting (non-metallic substrate)
Abrasive Manufacturer and Sieve Size: _________________________________ Place surface profile replica tapes in the spaces provided below, to serve as permanent QA record. Maintain a separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.
Place Surface Profile Replica Tape Here Reading:__________ mils Place Surface Profile Replica Tape Here Reading:__________ mils Place Surface Profile Replica Tape Here Reading:__________ mils
Place Surface Profile Replica Tape Here Reading:__________ mils Place Surface Profile Replica Tape Here Reading:__________ mils Place Surface Profile Replica Tape Here Reading:__________ mils
Place Surface Profile Replica Tape Here Reading:__________ mils Place Surface Profile Replica Tape Here Reading:__________ mils Place Surface Profile Replica Tape Here Reading:__________ mils
Place Surface Profile Replica Tape Here Reading:__________ mils Place Surface Profile Replica Tape Here Reading:__________ mils Place Surface Profile Replica Tape Here Reading:__________ mils
Place Surface Profile Replica Tape Here Reading:__________ mils Place Surface Profile Replica Tape Here Reading:__________ mils Place Surface Profile Replica Tape Here Reading:__________ mils
Mean Mil Reading (IAW ASTM D4417-Method C) for above 15 readings: ______________
| Name of QP-1/NACE Inspector |
| Signature |
| Cert. # |
| Date / Time |
QA-3b - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)
| Vessel Name |
| Hull # |
| Work Item # |
| Work Item Title |
| Location of Work (incl. frame #’s) |
| Area (sqft) |
| SURFACE PREPARATION METHOD |
| PROFILE ACHIEVED (mils) |
| Min |
| Max |
| Mean |
SSPC-SP-10/NACE No. 2
SSPC-SP-12/NACE No. 5
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area)
Brush-blasting (non-metallic substrate)
Abrasive Manufacturer and Sieve Size: _________________________________ Record measurements taken in the spaces provided below, to serve as permanent QA record. Maintain separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.
| Reading: |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| Reading: |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| Reading: |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| Reading: |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| Reading: |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| Reading: |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| Reading: |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| Reading: |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| Reading: |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| Reading: |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
Mean Mil Reading (IAW ASTM D4417-Method B) for above 10 readings (by column):
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| Name of QP-1/NACE Inspector |
| Signature |
| Cert. # |
| Date / Time |
QA-4 - QUALITY ASSURANCE INSPECTION FORM
(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)
| Vessel Name |
| Hull # |
| Work Item # |
| Work Item Title |
| Location of Work (incl. frame #’s) |
| Area (sqft) |
SOLUBLE SALT CONDUCTIVITY Measurements IAW SSPC-GUIDE 15
| DATE |
| TEST LOCATIONS |
| CONDUCTIVITY |
(microsiemens/cm)
| Name of QP-1/NACE Inspector |
| Signature |
| Cert. # |
| Date / Time |
QA-5 - QUALITY ASSURANCE DATA FORM
(COATING THICKNESS)
(Use one sheet for each sequence)
| Vessel Name |
| Hull # |
| Work Item # |
| Work Item Title |
| Coating Mfg |
| Product Name |
| Batch # |
| Induction Time |
| Coating System Sequence (Primer/Touchup/3rd Coat, etc.) |
Dry Film Thickness (DFT) Measurements IAW SSPC-PA 2
| SPOT |
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
| AVERAGE VALUE |
*BASE METAL READING (BMR)
*Required, If Magnetic Pull-Off (Type I/Banana) Gauge Is Used.
Location (Frame Reference): ___________________
| SPOT |
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
Overall Avg. DFT
ADJUSTMENTS
| Avg. BMR |
| Deviation |
| Before Adjustments |
| After Adjustments |
Avg.
| SPOT |
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
Overall Avg. DFT
ADJUSTMENTS
| Avg. BMR |
| Deviation |
| Before Adjustments |
| After Adjustments |
Avg.
| SPOT |
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
Overall Avg. DFT
ADJUSTMENTS
| Avg. BMR |
| Deviation |
| Before Adjustments |
| After Adjustments |
Avg.
| Application Method (Airless, Conventional Spray, Rolled) |
| Average DFT |
| Name of QP-1/NACE Inspector |
| Signature |
| Cert. # |
| Date / Time |
11000 _JLW_1210_87WPB
WORK ITEM 1: Perform Ultrasonic Thickness Measurements (D)
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to perform up to 250 thickness measurements (UT shots) of hull plating and frames, by ultrasonic methods.
1.2 Government-furnished property.
None.
2. REFERENCES
Coast Guard Drawings Coast Guard Drawing 87 WPB 085-010, Rev D, Docking Plan Coast Guard Drawing 87 WPB 111-001, Rev F, Shell Expansion Coast Guard Publications None.
Other References None.
3. REQUIREMENTS
3.1 General.
3.1.1 CIR. The Contractor shall submit a CIR for the inspections listed in the following paragraph(s):
· 3.2 (UT measurements).
3.1.2 Technical Representative.
Not applicable.
3.1.3 Protective measures.
Not applicable.
3.1.4 Interferences.
3.1.4.1 If UT measurements cannot be obtained due to interferences, the Contractor shall submit a CFR that details all necessary interference removal/reinstallation work. After the KO has released a CR, remove the interferences and reinstall after completion of associated work.
3.2 UT measurements. The Contractor shall perform up to 250 UT measurements in locations designated by the Coast Guard Inspector, in accordance with SFLC Std Spec 0740, Appendix C. Create a sketch to show all locations selected for measurement and record all measurements in Table 1 (UT Measurements Summary Sheet - Port/Stbd Shell) provided at the end of this item. Submit a CIR that contains the sketch and completed Table I.
4. NOTES
This section is not applicable to this work item.
Table I - UT MEASUREMENTS SUMMARY SHEET PORT/STBD SHELL
| SHOT # |
| STRAKE # |
| FWD/MID/AFT |
| ORIG PL |
| MEASURED PL |
| PERCENT |
| PLATE # |
| TOP/MID/BOT |
| THICKNESS |
| THICKNESS |
| WASTAGE |
11001 _JLW_1210_87WPB
WORK ITEM 2: Perform Ultrasonic Thickness Measurements (O)
1.1 Intent. This work item describes the requirements for the Contractor to perform up to 250 thickness measurements (UT shots) of hull plating and frames, by ultrasonic methods, in 10 lots of 25 measurements.
1.2 Government-furnished property.
None.
2. REFERENCES
Coast Guard Drawings Coast Guard Drawing 87 WPB 085-010, Rev D, Docking Plan Coast Guard Drawing 87 WPB 111-001, Rev F, Shell Expansion Coast Guard Publications None.
Other References None.
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
Not applicable.
3.1.2 Technical Representative.
Not applicable.
3.1.3 Protective measures.
Not applicable.
3.1.4.1 If UT measurements cannot be obtained due to interferences, the Contractor shall submit a CFR that details all necessary interference removal/reinstallation work. After the KO has released a CR, remove the interferences and reinstall after completion of associated work.
3.2 UT measurements. The Contractor shall perform up to 250 UT measurements in locations designated by the Coast Guard Inspector, in accordance with SFLC Std Spec 0740, Appendix C. Create a sketch to show all locations selected for measurement and record all measurements in Table 1 (UT Measurements Summary Sheet - Port/Stbd Shell) provided at the end of this item. Submit a CFR that contains the sketch and completed Table I.
4. NOTES
This section is not applicable to this work item.
Table I - UT MEASUREMENTS SUMMARY SHEET PORT/STBD SHELL
| SHOT # |
| STRAKE # |
| FWD/MID/AFT |
| ORIG PL |
| MEASURED PL |
| PERCENT |
| PLATE # |
| TOP/MID/BOT |
| THICKNESS |
| THICKNESS |
| WASTAGE |
11301_JLW_1110_87WPB
WORK ITEM 3: Overhead and Bulkhead Surfaces (Port Lazarette), Preserve (D)
1.1 Intent. This work item describes the requirements for the Contractor to preserve and reinsulate the port lazarette overhead and bulkhead surfaces designated in the table below.
| Location |
| Approximate Area |
(SQFT)
Standard
| Lazarette (2-22-0-E) |
| 200 |
| SSPC-10/NACE-2 |
1.2 Government-furnished property.
None.
2. REFERENCES
Coast Guard Drawings Coast Guard Drawing 87 WPB 601-001, Rev G, Outboard Profile & General Arrangements Coast Guard Drawing 87 WPB 635-001, Rev C, Linings and Insulation Plan & Details
Coast Guard Publications Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Jan 2009, General Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), Jan 2009, Welding and Allied Processes Other References The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 10/NACE No.2, 2007, Near-White Blast Cleaning
3. REQUIREMENTS
3.1 General. The Contractor shall refer to Coast Guard Drawing and 87 WPB 601-001.
3.1.1 CIR. The Contractor shall submit a CIR for the inspections listed in the following paragraph(s):
· 3.4 (Substrate inspection).
3.1.2 Interferences. The Contractor shall be aware that interferences in way of work include, but are not limited to the below-listed. Handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences):
· Electrical wiring.
· Hydraulic hoses.
· Rudder assemblies
· Insulation
· HPU.
· Control and junction boxes.
3.1.3 Temporary access openings. Due to limited access to work areas, the Contractor may, with express permission of the KO (via submission of a CFR), cut access holes to facilitate accomplishment of the work specified herein. Perform all work required to open and close the access openings in accordance with SFLC Std Spec 8636.
3.2 Protective measures. The Contractor shall furnish and install suitable covering to seal off and protect all non-affected surfaces/equipment and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, remove protective material and inspect for the presence of contamination. Clean all equipment and spaces, contaminated due to improper protection, to original condition of cleanliness.
NOTE
Grit blasting or waterjetting required.
3.3 Surface preservation. The Contractor shall prepare and coat the compartment bilge surfaces (as designated in paragraph 1.1 (Intent)), including all adjacent structural members, using the system specified for “Bilges, Cofferdams, and Forepeaks, Option I”, in COMDTINST M10360.3, Appendix B (Cutters and Boat Interior Painting Systems). Select color Light Gray (26373) as the finish/top coat color.
NOTE
Application of the topcoat specified herein may require the use of plural-component spray equipment, or other suitable methods, to compensate for the coating system’s relatively short pot life.
3.4 Substrate inspection. After completion of surface preparation and before primer coat application, the Contractor shall perform a visual inspection of all prepared surfaces. Submit a CIR.
3.5 In-process quality control measures. The Contractor shall abide by all the safety, preservation, and quality control requirements specified in SFLC Std Spec 0000, paragraph 3.2.4.2 (In-process QC measures for “critical-coated surfaces).
NOTE
Surfaces being preserved are considered “critical-coated surfaces”.
4. NOTES
This section is not applicable to this work item.
11301_JLW_1110_87WPB
WORK ITEM 4: Bilge Surfaces (Engine Room) , Preserve (100%) (D)
1.1 Intent. This work item describes the requirements for the Contractor to 100% preserve the bilge surfaces in the Engine Room (2-14-0-E) designated in the table below.
| Location |
| Approximate Area |
(SQFT)
Standard
| Engine Room (2-14-0-E) |
| 2000 |
| SSPC-10/NACE-2 |
2. REFERENCES
Coast Guard Drawings Coast Guard Drawing 87 WPB 601-001, Rev G, Outboard Profile & General Arrangements Coast Guard Drawing 87 WPB 116-001, Rev -, Longitudinal Girderss & Bulkheads Coast Guard Drawing 87 WPB 122-001, Rev C, Watertight Bulkheads Coast Guard Publications Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Jan 2009, General Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), Jan 2009, Welding and Allied Processes Other References The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 10/NACE No.2, 2007, Near-White Blast Cleaning
3. REQUIREMENTS
WARNING!
“Euronavy Eurobasic” bilge epoxy coatings are no longer authorized for application onboard Coast Guard vessels, due to contents of hazardous material, including, but not limited to lead (in excess of allowable limit). See Appendix C of COMDTINST M10360.3 for authorized substitute products.
3.1 General. The Contractor shall refer to Coast Guard Drawings 87 WPB 601-001, 87 WPB 116-001, and 87 WPB 122-001.
3.1.1 CIR. The Contractor shall submit a CIR for the inspections listed in the following paragraph(s):
· 3.4 (Substrate inspection).
3.1.2 Interferences. The Contractor shall be aware that interferences in way of work include, but are not limited to the below-listed. Handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences):
· Bilge piping.
· Electrical wiring.
· Emergency helm pump.
· Valves.
· Control and junction boxes.
· Emergency steering column.
· Bilge alarm float switch.
· Zinc.
· Strainer
· Insulation
· Grating
· Grating Hardware
3.2 Protective measures. The Contractor shall furnish and install suitable covering to seal off and protect all non-affected surfaces/equipment and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, remove protective material and inspect for the presence of contamination.
This is the start of the file's text. The full file is on GovTribe.
Other files
| File | Type | Posted |
|---|---|---|
| REV1 dtd 07_24_12 SCHEDULE OF SUPPLIES SERVICES STURGEON .xlsx | XLSX spreadsheet | |
| REV1 dtd 07_25_12 STURGEON_(WPB_87)_DD_VMS_12R1 | — | |
| REV1 SCHEDULE OF SUPPLIES SERVICES AMBERJACK.xlsx | XLSX spreadsheet | |
| SF30 Amendment Amberjack_Sturgeon.pdf | ||
| REV0 STURGEON SPEC.doc | DOC document | |
| SCHEDULE OF SUPPLIES SERVICE - AMBERJACK REV0.xlsx | XLSX spreadsheet | |
| SCHEDULE OF SUPPLIES SERVICES - STURGEON REV0.xlsx | XLSX spreadsheet | |
| REV0 AMBERJACK SPEC.doc | DOC document | |
| SOLICITATION for CGC AMBERJACK_STURGEON FAC 2005-58.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .