SCHEDULE OF SUPPLIES SERVICE ALLIGATOR.xlsx.xls

XLS spreadsheet 33 KB Posted

Attached to
DRYDOCK FOR DIST 7 MULTI CUTTER (CROCODILE, MARLIN, ALLIGATOR)
Solicitation number
HSCG80-12-Q-P45023
Issued by

About this file

CGC ALLIGATOR SCHEDULE OF SUPPLIES/SERVICES

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

USCGC Alligator (WPB-87372) DRYDOCK AVAILABILITY 2012
ITEMDESCRIPTIONUNIT PRICEUNITQTYEXTENDED PRICE
D-001Perform Ultrasonic Thickness Measurements250 SHOTS1
O-002Perform Ultrasonic Thickness Measurements25 SHOTS10$0
D-003Forepeake, Modify (EC-87-A-330)JOB1
D-004Dirty Oil Tank, Clean and InspectJOB1$0
D-005Oily Water Tank, Clean and InspectJOB1
D-006Tanks (MP Fuel Service), Clean and InspectJOB1
D-007Pilothouse Deck (Aluminum), Inspect, Preserve, and Renew Electrical MattingJOB1
O-008Depth Sounder, Capastic Fairing, RenewJOB1$0
O-009Main Engine/Reduction Gear, RealignJOB1$0
D-010Propulsion Shafts, Remove, Inspect, and ReinstallJOB1$0
O-011Propulsion Shaft, RepairEA1$0
O-012Propulsion Shaft, StraightenEA1$0
O-013Intermediate Water-Lubricated Shaft Bearing, RenewEA1$0
O-014Aft Water-Lubricated Shaft Bearing, RenewEA2$0
O-015Intermediate Bearing Carrier, RenewEA2$0
O-016Aft Bearing Carrier, RenewEA2$0
O-017Stern Tubes, Interior Surfaces, Preserve 100%JOB2$0
O-018Stern Tubes, Interior Surfaces, RepairJOB2$0
O-019Propellers, Remove, Inspect, and ReinstallJOB2$0
O-020Propeller, Minor Repair and Recondition, PerformEA1$0
D-021Fathometer Transducer, RenewJOB1$0
D-022Speed Log, Transducer and Skin Valve, Clean and InspectJOB1$0
D-023Sea Water System (Valves, Strainers, Piping), Clean, Inspect, and RepairJOB2$0
D-024Rudder Assemblies, Remove, Inspect, and ReinstallJOB1$0
D-025RHIB Notch Skid Pads, InspectJOB1$0
O-026RHIB Notch Skid Pad Studs, Renew10 STUDS1$0
D-027Stern Launch Door, Remove, Inspect, and ReinstallJOB1$0
D-028Grey Water Holding Tank, Clean and InspectJOB1$0
D-029Sewage Holding Tank, Clean and InspectJOB5$0
D-030Grey Water Piping, Clean and FlushJOB1$0
D-031Sewage Piping, Clean and FlushJOB1$0
O-032U/W Body, Preserve (“100%”)JOB1
O-033U/W Body, Preserve (“Partial-33%”)JOB1NSP
D-034Cathodic Protection / Zincs, RenewJOB1$0
D-035DrydockingJOB1$0
D-036Temporary Services, ProvideJOB1$0
D-037Telephone Service, ProvideJOB1$0
A-OComposite Labor RateHour200$0
B-DGFP ReportNSPEA1NSP
Z-OLaydaysDay5
Total Price of Definite Items
Total Price of Option Items
Total Price of Definite and Optional Items

Sheet2

Sheet3

File details come from the government source that posted it. Updated .