MARLIN SCHEDULE OF SUPPLIES SERVICE .xlsx.xls
XLS spreadsheet 33 KB Posted
- Solicitation number
- HSCG80-12-Q-P45023
About this file
AMEND A00001 MARLIN SCHEDULE OF SUPPLIES/SERVICES
View the file
Other files
| File | Type | Posted |
|---|---|---|
| REVISED MARLIN SCHEDULE OF SUPPLIES SERVICE .xlsx.xls | XLS spreadsheet | |
| REVISED CROCODILE SCHEDULE OF SUPPLIES SERVICES.xls | XLS spreadsheet | |
| SF30 Amendment 02 D7 Crocodile_Marlin_Alligator.pdf | ||
| REVISED SCHEDULE OF SUPPLIES SERVICE ALLIGATOR.xlsx.xls | XLS spreadsheet | |
| SF30 Amendment 01 D7 Crocodile_Marlin_Alligator.pdf | ||
| SCHEDULE OF SUPPLIES SERVICE ALLIGATOR.xlsx.xls | XLS spreadsheet | |
| CROCODILE SCHEDULE OF SUPPLIES SERVICES.xls | XLS spreadsheet | |
| SPEC FOR CROCODILE | — | |
| SCHEDULE OF SUPPLIES SERVICE ALLIGATOR.xlsx.xls | XLS spreadsheet | |
| MARLIN SCHEDULE OF SUPPLIES SERVICE .xlsx.xls | XLS spreadsheet | |
| SPEC FOR MARLIN | — | |
| CROCODILE SCHEDULE OF SUPPLIES SERVICES.xls | XLS spreadsheet | |
| SPEC FOR ALLIGATOR | — | |
| SOLICITATION FOR D7 MULTI CONTRACTRFQ .doc | DOC document |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| USCGC Marlin (WPB-87304) DRYDOCK AVAILABILITY 2012 | |||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Perform Ultrasonic Thickness Measurements | 250 SHOTS | 1 | ||
| O-002 | Perform Ultrasonic Thickness Measurements | 25 SHOTS | 10 | ||
| O-003 | Hull and Structural Plating - Degraded Weld (Steel), Repair | JOB | 1 | ||
| O-004 | Bilge Surfaces (Engine Room), Preserve (“Partial”) | JOB | 1 | ||
| O-005 | Bilge Surfaces (Galley and Mess Deck), Preserve ("Partial") | JOB | 1 | ||
| D-006 | Galley Deck/Passageway Bilge Access Covers, Renew | JOB | 1 | ||
| D-007 | Dirty Oil Tank, Clean and Inspect | JOB | 1 | ||
| D-008 | Oily Water Tank, Clean and Inspect | JOB | 1 | ||
| D-009 | Tanks (MP Fuel Service), Clean and Inspect | JOB | 1 | ||
| D-010 | Pilothouse Deck (Aluminum), Inspect, Preserve, and Renew Electrical Matting | JOB | 1 | ||
| O-011 | Depth Sounder, Capastic Fairing, Renew | JOB | 1 | ||
| O-012 | Main Engine/Reduction Gear, Realign | JOB | 1 | ||
| D-013 | Propulsion Shafts, Remove, Inspect, and Reinstall | JOB | 1 | ||
| O-014 | Propulsion Shaft, Repair | EA | 2 | ||
| O-015 | Propulsion Shaft, Straighten | EA | 2 | ||
| O-016 | Intermediate Water-Lubricated Shaft Bearing, Renew | EA | 2 | ||
| O-017 | Aft Water-Lubricated Shaft Bearing, Renew | EA | 2 | ||
| O-018 | Intermediate Bearing Carrier, Renew | EA | 2 | ||
| O-019 | Aft Bearing Carrier, Renew | EA | 2 | ||
| O-020 | Stern Tube, Interior Surfaces, Preserve 100% | JOB | 1 | ||
| O-021 | Stern Tube, Interior Surfaces, Repair | JOB | 1 | ||
| D-022 | Propellers, Remove, Inspect, and Reinstall | JOB | 1 | ||
| O-023 | Propeller, Minor Repair and Recondition, Perform | EA | 2 | ||
| D-024 | Fathometer Transducer, Renew | JOB | 1 | ||
| D-025 | Speed Log, Transducer and Skin Valve, Clean and Inspect | JOB | 1 | ||
| D-026 | Sea Water System (Valves, Strainers, Piping), Clean, Inspect, and Repair | JOB | 1 | ||
| D-027 | Rudder Assemblies, Remove, Inspect, and Reinstall | JOB | 1 | ||
| D-028 | RHIB Notch Skid Pads, Inspect | JOB | 1 | ||
| O-029 | RHIB Notch Skid Pad Studs, Renew | 10 STUDS | 5 | ||
| D-030 | Stern Launch Door, Remove, Inspect, and Reinstall | JOB | 1 | ||
| D-031 | Grey Water Holding Tank, Clean and Inspect | JOB | 1 | ||
| D-032 | Sewage Holding Tank, Clean and Inspect | JOB | 1 | ||
| D-033 | Grey Water Piping, Clean and Flush | JOB | 1 | ||
| D-034 | Sewage Piping, Clean and Flush | JOB | 1 | ||
| O-035 | U/W Body, Preserve (“100%”) | JOB | 1 | ||
| O-036 | U/W Body, Preserve (“Partial-33%”) | JOB | 1 | NSP | |
| D-037 | Superstructure, Preserve "100%" | JOB | 1 | ||
| D-038 | Cathodic Protection / Zincs, Renew | JOB | 1 | ||
| D-039 | Drydocking | JOB | 1 | ||
| D-040 | Temporary Services, Provide | JOB | 1 | ||
| D-041 | Telephone Service, Provide | JOB | 1 | ||
| D-042 | Decks - Exterior (Main Deck), Preserve | JOB | 1 | ||
| D-043 | Renew Office Laminate Deck | JOB | 1 | ||
| D-044 | Hull Plating Freeboard, Preserve (“100%”) (D) | JOB | 1 | ||
| A-O | Composite Labor Rate | Hour | 210 | $0 | |
| B-D | GFP Report | NSP | EA | 1 | NSP |
| Z-O | Laydays | Day | 5 | ||
| Total Price of Definite Items | |||||
| Total Price of Option Items | |||||
| Total Price of Definite and Optional Items |
Sheet2
Sheet3
File details come from the government source that posted it. Updated .