MARLIN SCHEDULE OF SUPPLIES SERVICE .xlsx.xls

XLS spreadsheet 33 KB Posted

Attached to
DRYDOCK FOR DIST 7 MULTI CUTTER (CROCODILE, MARLIN, ALLIGATOR)
Solicitation number
HSCG80-12-Q-P45023
Issued by

About this file

AMEND A00001 MARLIN SCHEDULE OF SUPPLIES/SERVICES

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

USCGC Marlin (WPB-87304) DRYDOCK AVAILABILITY 2012
ITEMDESCRIPTIONUNIT PRICEUNITQTYEXTENDED PRICE
D-001Perform Ultrasonic Thickness Measurements250 SHOTS1
O-002Perform Ultrasonic Thickness Measurements25 SHOTS10
O-003Hull and Structural Plating - Degraded Weld (Steel), RepairJOB1
O-004Bilge Surfaces (Engine Room), Preserve (“Partial”)JOB1
O-005Bilge Surfaces (Galley and Mess Deck), Preserve ("Partial")JOB1
D-006Galley Deck/Passageway Bilge Access Covers, RenewJOB1
D-007Dirty Oil Tank, Clean and InspectJOB1
D-008Oily Water Tank, Clean and InspectJOB1
D-009Tanks (MP Fuel Service), Clean and InspectJOB1
D-010Pilothouse Deck (Aluminum), Inspect, Preserve, and Renew Electrical MattingJOB1
O-011Depth Sounder, Capastic Fairing, RenewJOB1
O-012Main Engine/Reduction Gear, RealignJOB1
D-013Propulsion Shafts, Remove, Inspect, and ReinstallJOB1
O-014Propulsion Shaft, RepairEA2
O-015Propulsion Shaft, StraightenEA2
O-016Intermediate Water-Lubricated Shaft Bearing, RenewEA2
O-017Aft Water-Lubricated Shaft Bearing, RenewEA2
O-018Intermediate Bearing Carrier, RenewEA2
O-019Aft Bearing Carrier, RenewEA2
O-020Stern Tube, Interior Surfaces, Preserve 100%JOB1
O-021Stern Tube, Interior Surfaces, RepairJOB1
D-022Propellers, Remove, Inspect, and ReinstallJOB1
O-023Propeller, Minor Repair and Recondition, PerformEA2
D-024Fathometer Transducer, RenewJOB1
D-025Speed Log, Transducer and Skin Valve, Clean and InspectJOB1
D-026Sea Water System (Valves, Strainers, Piping), Clean, Inspect, and RepairJOB1
D-027Rudder Assemblies, Remove, Inspect, and ReinstallJOB1
D-028RHIB Notch Skid Pads, InspectJOB1
O-029RHIB Notch Skid Pad Studs, Renew10 STUDS5
D-030Stern Launch Door, Remove, Inspect, and ReinstallJOB1
D-031Grey Water Holding Tank, Clean and InspectJOB1
D-032Sewage Holding Tank, Clean and InspectJOB1
D-033Grey Water Piping, Clean and FlushJOB1
D-034Sewage Piping, Clean and FlushJOB1
O-035U/W Body, Preserve (“100%”)JOB1
O-036U/W Body, Preserve (“Partial-33%”)JOB1NSP
D-037Superstructure, Preserve "100%"JOB1
D-038Cathodic Protection / Zincs, RenewJOB1
D-039DrydockingJOB1
D-040Temporary Services, ProvideJOB1
D-041Telephone Service, ProvideJOB1
D-042Decks - Exterior (Main Deck), PreserveJOB1
D-043Renew Office Laminate DeckJOB1
D-044Hull Plating Freeboard, Preserve (“100%”) (D)JOB1
A-OComposite Labor RateHour210$0
B-DGFP ReportNSPEA1NSP
Z-OLaydaysDay5
Total Price of Definite Items
Total Price of Option Items
Total Price of Definite and Optional Items

Sheet2

Sheet3

File details come from the government source that posted it. Updated .