REVISED CROCODILE SCHEDULE OF SUPPLIES SERVICES.xls
XLS spreadsheet 32 KB Posted
- Solicitation number
- HSCG80-12-Q-P45023
About this file
CROCODILE REVISED SCHEDULE OF SUPPLIES/SERVICES
View the file
Other files
| File | Type | Posted |
|---|---|---|
| REVISED MARLIN SCHEDULE OF SUPPLIES SERVICE .xlsx.xls | XLS spreadsheet | |
| SF30 Amendment 02 D7 Crocodile_Marlin_Alligator.pdf | ||
| REVISED SCHEDULE OF SUPPLIES SERVICE ALLIGATOR.xlsx.xls | XLS spreadsheet | |
| SF30 Amendment 01 D7 Crocodile_Marlin_Alligator.pdf | ||
| MARLIN SCHEDULE OF SUPPLIES SERVICE .xlsx.xls | XLS spreadsheet | |
| SCHEDULE OF SUPPLIES SERVICE ALLIGATOR.xlsx.xls | XLS spreadsheet | |
| CROCODILE SCHEDULE OF SUPPLIES SERVICES.xls | XLS spreadsheet | |
| SPEC FOR CROCODILE | — | |
| SCHEDULE OF SUPPLIES SERVICE ALLIGATOR.xlsx.xls | XLS spreadsheet | |
| MARLIN SCHEDULE OF SUPPLIES SERVICE .xlsx.xls | XLS spreadsheet | |
| SPEC FOR MARLIN | — | |
| CROCODILE SCHEDULE OF SUPPLIES SERVICES.xls | XLS spreadsheet | |
| SPEC FOR ALLIGATOR | — | |
| SOLICITATION FOR D7 MULTI CONTRACTRFQ .doc | DOC document |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| USCGC CROCODILE (WPB-87369) DRYDOCK AVAILABILITY 2012 | |||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Perform Ultrasonic Thickness Measurements | 250 SHOTS | 1 | ||
| O-002 | Perform Ultrasonic Thickness Measurements | 25 SHOTS | 10 | ||
| D-003 | Forepeak, Modify (EC 087-A-33) (D) | JOB | 1 | ||
| D-004 | Dirty Oil Tank, Clean and Inspect | JOB | 1 | ||
| D-005 | Oily Water Tank, Clean and Inspect | JOB | 1 | ||
| D-006 | Tanks (MP Fuel Service), Clean and Inspect | JOB | 1 | ||
| D-007 | Pilothouse Deck (Aluminum), Inspect, Preserve, and Renew Electrical Matting | JOB | 1 | ||
| O-008 | Depth Sounder, Capastic Fairing, Renew | JOB | 1 | ||
| O-009 | Main Engine/Reduction Gear, Realign | EA | 2 | ||
| D-010 | Propulsion Shafts, Remove, Inspect, and Reinstall | JOB | 1 | ||
| O-011 | Propulsion Shaft, Repair | EA | 2 | ||
| O-012 | Propulsion Shaft, Straighten | EA | 2 | ||
| O-013 | Intermediate Water-Lubricated Shaft Bearing, Renew | EA | 2 | ||
| O-014 | Aft Water-Lubricated Shaft Bearing, Renew | EA | 2 | ||
| O-015 | Intermediate Bearing Carrier, Renew | EA | 2 | ||
| O-016 | Aft Bearing Carrier, Renew | EA | 2 | ||
| O-017 | Stern Tube, Interior Surfaces, Preserve 100% | EA | 2 | ||
| O-018 | Stern Tube, Interior Surfaces, Repair | EA | 2 | ||
| D-019 | Propellers, Remove, Inspect, and Reinstall | JOB | 1 | ||
| O-020 | Propeller, Minor Repair and Recondition, Perform | EA | 2 | ||
| D-021 | Fathometer Transducer, Renew | JOB | 1 | ||
| D-022 | Speed Log, Skin Valve Assembly, Clean and Inspect | JOB | 1 | ||
| D-023 | Sea Water System (Valves, Strainers, Piping), Clean, Inspect, and Repair | JOB | 1 | ||
| D-024 | Preserve Main Deck Surfaces (D) | JOB | 1 | ||
| D-025 | Rudder Assemblies, Remove, Inspect, and Reinstall | JOB | 1 | ||
| D-026 | RHIB Notch Skid Pads, Inspect | JOB | 1 | ||
| O-027 | RHIB Notch Skid Pad Studs, Renew | 10 STUDS | 5 | ||
| D-028 | Stern Launch Door, Remove, Inspect, and Reinstall | JOB | 1 | ||
| D-029 | Grey Water Holding Tank, Clean and Inspect | JOB | 1 | ||
| D-030 | Sewage Holding Tank, Clean and Inspect | JOB | 1 | ||
| D-031 | Grey Water Piping, Clean and Flush | JOB | 1 | ||
| D-032 | Sewage Piping, Clean and Flush | JOB | 1 | ||
| O-033 | U/W Body, Preserve (“100%”) | JOB | 1 | ||
| O-034 | U/W Body, Preserve (“Partial-33%”) | JOB | 1 | NSP | |
| D-035 | Hull Plating Freeboard, Preserve 100% | JOB | 1 | ||
| D-036 | Superstructure, Preserve, 100% | JOB | 1 | ||
| D-037 | Cathodic Protection / Zincs, Renew | JOB | 1 | ||
| D-038 | Drydocking | JOB | 1 | ||
| D-039 | Temporary Services, Provide | JOB | 1 | ||
| D-040 | Telephone Service, Provide | JOB | 1 | ||
| D-041 | AFFF Bilge Piping System, Install (EC 087-A-24) (D) | JOB | 1 | ||
| A-O | Composite Labor Rate | Hour | 300 | ||
| B-D | GFP Report | NSP | EA | 1 | NSP |
| Z-O | Laydays | Day | 5 | ||
| Total Price of Definite Items | |||||
| Total Price of Option Items | |||||
| Total Price of Definite and Optional Items |
Sheet2
Sheet3
File details come from the government source that posted it. Updated .