REVISED CROCODILE SCHEDULE OF SUPPLIES SERVICES.xls

XLS spreadsheet 32 KB Posted

Attached to
DRYDOCK FOR DIST 7 MULTI CUTTER (CROCODILE, MARLIN, ALLIGATOR)
Solicitation number
HSCG80-12-Q-P45023
Issued by

About this file

CROCODILE REVISED SCHEDULE OF SUPPLIES/SERVICES

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

USCGC CROCODILE (WPB-87369) DRYDOCK AVAILABILITY 2012
ITEMDESCRIPTIONUNIT PRICEUNITQTYEXTENDED PRICE
D-001Perform Ultrasonic Thickness Measurements250 SHOTS1
O-002Perform Ultrasonic Thickness Measurements25 SHOTS10
D-003Forepeak, Modify (EC 087-A-33) (D)JOB1
D-004Dirty Oil Tank, Clean and InspectJOB1
D-005Oily Water Tank, Clean and InspectJOB1
D-006Tanks (MP Fuel Service), Clean and InspectJOB1
D-007Pilothouse Deck (Aluminum), Inspect, Preserve, and Renew Electrical MattingJOB1
O-008Depth Sounder, Capastic Fairing, RenewJOB1
O-009Main Engine/Reduction Gear, RealignEA2
D-010Propulsion Shafts, Remove, Inspect, and ReinstallJOB1
O-011Propulsion Shaft, RepairEA2
O-012Propulsion Shaft, StraightenEA2
O-013Intermediate Water-Lubricated Shaft Bearing, RenewEA2
O-014Aft Water-Lubricated Shaft Bearing, RenewEA2
O-015Intermediate Bearing Carrier, RenewEA2
O-016Aft Bearing Carrier, RenewEA2
O-017Stern Tube, Interior Surfaces, Preserve 100%EA2
O-018Stern Tube, Interior Surfaces, RepairEA2
D-019Propellers, Remove, Inspect, and ReinstallJOB1
O-020Propeller, Minor Repair and Recondition, PerformEA2
D-021Fathometer Transducer, RenewJOB1
D-022Speed Log, Skin Valve Assembly, Clean and InspectJOB1
D-023Sea Water System (Valves, Strainers, Piping), Clean, Inspect, and RepairJOB1
D-024Preserve Main Deck Surfaces (D)JOB1
D-025Rudder Assemblies, Remove, Inspect, and ReinstallJOB1
D-026RHIB Notch Skid Pads, InspectJOB1
O-027RHIB Notch Skid Pad Studs, Renew10 STUDS5
D-028Stern Launch Door, Remove, Inspect, and ReinstallJOB1
D-029Grey Water Holding Tank, Clean and InspectJOB1
D-030Sewage Holding Tank, Clean and InspectJOB1
D-031Grey Water Piping, Clean and FlushJOB1
D-032Sewage Piping, Clean and FlushJOB1
O-033U/W Body, Preserve (“100%”)JOB1
O-034U/W Body, Preserve (“Partial-33%”)JOB1NSP
D-035Hull Plating Freeboard, Preserve 100%JOB1
D-036Superstructure, Preserve, 100%JOB1
D-037Cathodic Protection / Zincs, RenewJOB1
D-038DrydockingJOB1
D-039Temporary Services, ProvideJOB1
D-040Telephone Service, ProvideJOB1
D-041AFFF Bilge Piping System, Install (EC 087-A-24) (D)JOB1
A-OComposite Labor RateHour300
B-DGFP ReportNSPEA1NSP
Z-OLaydaysDay5
Total Price of Definite Items
Total Price of Option Items
Total Price of Definite and Optional Items

Sheet2

Sheet3

File details come from the government source that posted it. Updated .