BLANK SCHEDULE FOR POMPANO REV1.xls

XLS spreadsheet 28 KB Posted

Attached to
DRYDOCK FOR USCGC POMPANO
Solicitation number
HSCG80-11-Q-P45010
Issued by

About this file

SCHEDULE OF SUPPLIES/SERVICES

View the file

Other files

File Type Posted
SPECIFICATION FOR CGC POMPANO R0.doc DOC document
SF30 Amendment 01 SOL FOR POMPANO.pdf PDF
SPECIFICATION FOR CGC POMPANO R0.doc DOC document
SCHEDULE OF SUPPLIES_SERVICES FOR POMPANO.xls XLS spreadsheet
SOLICITATION FOR POMPANO1.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOS&S

SUPPLIES/SERVICES AND PRICES/COSTS FOR:
USCGC POMPANO (WPB-87339) DRYDOCK AVAILABILITY 2011
ITEMDESCRIPTIONUNIT PRICEUNITQTYEXTENDED PRICE
1-DPerform Ultrasonic Thickness Measurements (D)250 SHOTS1
2-OPerform Ultrasonic Thickness Measurements (O)25 SHOTS10
3-OPerform Hull and Structural Plating Repairs in Forepeak, Engine Room and Lazarette – Eroded Welds (Steel) (O)8 LF2
4-DClean and Inspect Dirty Oil Tank (D)JOB1
5-DClean and Inspect Oily Water Tank (D)JOB1
6-DClean and Inspect Fuel Service Tanks (D)JOB1
7-DClean and Inspect Grey Water Tank (D)JOB1
8-DClean and Inspect Sewage Tank (D)JOB1
9-DClean Grey Water Piping System (D)JOB1
10-DClean Sewage Piping System (D)JOB1
11-DInspect RHIB Notch Skid Pads (D)JOB1
12-ORenew RHIB Notch Skid Pad Studs (O)10 STUDS5
13-ORealign Main Engine/Reduction Gear (O)EA2
14-DRemove, Inspect, and Reinstall Propeller Shafts (D)JOB1
15-ORepair Shaft (O)EA2
16-OStraighten Shaft (O)EA2
17-ORenew Intermediate Water-Lubricated Shaft Bearing (O)EA2
18-ORenew Aft Water-Lubricated Shaft Bearing (O)EA2
19-ORenew Intermediate Bearing Carrier (O)EA2
20-ORenew Aft Bearing Carrier (O)EA2
21-DRemove, Inspect, and Reinstall Propellers (D)JOB1
22-OPerform Minor Repair and Recondition of Propeller (O)EA2
23-DRenew Depth Indicating Transducer (D)JOB1
24-DRenew Sea Valves and Inspect Associated Piping and Strainers (D)JOB1
25-DRemove, Inspect, and Reinstall Rudder Assemblies (D)JOB1
26-DRemove, Inspect and Reinstall Stern Launch Door, and Inspect Door Pivot Pins, Bushings, and Washers (D)JOB1
27-OPreserve Underwater Body – “Partial” (O)JOB1
28-OPreserve Underwater Body – “100%” (O)JOB1
29-OPreserve Stern Tubes (O)JOB1
30-DModify and Renew Cathodic Protection System (D)JOB1
31-ORenew Transducer Fairing (O)EA2
32-DRoutine Drydocking (D)JOB1
33-DProvide Temporary Logistics (D)JOB1
34-DModify and Preserve the Forepeak (EC 087-A-033) (D)JOB1
35-DPreserve Mast (D)JOB1
A-OComposite Labor RateHour210
B-DGFP ReportNSPEA1NSP
Z-OLaydaysDay5
Total Price of Definite Items
Total Price of Option Items
Total Price of Definite and Optional Items

&C(&D)

Page &P of &N

File details come from the government source that posted it. Updated .