BLANK SCHEDULE FOR POMPANO REV1.xls
XLS spreadsheet 28 KB Posted
- Attached to
- DRYDOCK FOR USCGC POMPANO
- Solicitation number
- HSCG80-11-Q-P45010
About this file
SCHEDULE OF SUPPLIES/SERVICES
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SPECIFICATION FOR CGC POMPANO R0.doc | DOC document | |
| SF30 Amendment 01 SOL FOR POMPANO.pdf | ||
| SPECIFICATION FOR CGC POMPANO R0.doc | DOC document | |
| SCHEDULE OF SUPPLIES_SERVICES FOR POMPANO.xls | XLS spreadsheet | |
| SOLICITATION FOR POMPANO1.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| SUPPLIES/SERVICES AND PRICES/COSTS FOR: | |||||
| USCGC POMPANO (WPB-87339) DRYDOCK AVAILABILITY 2011 | |||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| 1-D | Perform Ultrasonic Thickness Measurements (D) | 250 SHOTS | 1 | ||
| 2-O | Perform Ultrasonic Thickness Measurements (O) | 25 SHOTS | 10 | ||
| 3-O | Perform Hull and Structural Plating Repairs in Forepeak, Engine Room and Lazarette – Eroded Welds (Steel) (O) | 8 LF | 2 | ||
| 4-D | Clean and Inspect Dirty Oil Tank (D) | JOB | 1 | ||
| 5-D | Clean and Inspect Oily Water Tank (D) | JOB | 1 | ||
| 6-D | Clean and Inspect Fuel Service Tanks (D) | JOB | 1 | ||
| 7-D | Clean and Inspect Grey Water Tank (D) | JOB | 1 | ||
| 8-D | Clean and Inspect Sewage Tank (D) | JOB | 1 | ||
| 9-D | Clean Grey Water Piping System (D) | JOB | 1 | ||
| 10-D | Clean Sewage Piping System (D) | JOB | 1 | ||
| 11-D | Inspect RHIB Notch Skid Pads (D) | JOB | 1 | ||
| 12-O | Renew RHIB Notch Skid Pad Studs (O) | 10 STUDS | 5 | ||
| 13-O | Realign Main Engine/Reduction Gear (O) | EA | 2 | ||
| 14-D | Remove, Inspect, and Reinstall Propeller Shafts (D) | JOB | 1 | ||
| 15-O | Repair Shaft (O) | EA | 2 | ||
| 16-O | Straighten Shaft (O) | EA | 2 | ||
| 17-O | Renew Intermediate Water-Lubricated Shaft Bearing (O) | EA | 2 | ||
| 18-O | Renew Aft Water-Lubricated Shaft Bearing (O) | EA | 2 | ||
| 19-O | Renew Intermediate Bearing Carrier (O) | EA | 2 | ||
| 20-O | Renew Aft Bearing Carrier (O) | EA | 2 | ||
| 21-D | Remove, Inspect, and Reinstall Propellers (D) | JOB | 1 | ||
| 22-O | Perform Minor Repair and Recondition of Propeller (O) | EA | 2 | ||
| 23-D | Renew Depth Indicating Transducer (D) | JOB | 1 | ||
| 24-D | Renew Sea Valves and Inspect Associated Piping and Strainers (D) | JOB | 1 | ||
| 25-D | Remove, Inspect, and Reinstall Rudder Assemblies (D) | JOB | 1 | ||
| 26-D | Remove, Inspect and Reinstall Stern Launch Door, and Inspect Door Pivot Pins, Bushings, and Washers (D) | JOB | 1 | ||
| 27-O | Preserve Underwater Body – “Partial” (O) | JOB | 1 | ||
| 28-O | Preserve Underwater Body – “100%” (O) | JOB | 1 | ||
| 29-O | Preserve Stern Tubes (O) | JOB | 1 | ||
| 30-D | Modify and Renew Cathodic Protection System (D) | JOB | 1 | ||
| 31-O | Renew Transducer Fairing (O) | EA | 2 | ||
| 32-D | Routine Drydocking (D) | JOB | 1 | ||
| 33-D | Provide Temporary Logistics (D) | JOB | 1 | ||
| 34-D | Modify and Preserve the Forepeak (EC 087-A-033) (D) | JOB | 1 | ||
| 35-D | Preserve Mast (D) | JOB | 1 | ||
| A-O | Composite Labor Rate | Hour | 210 | ||
| B-D | GFP Report | NSP | EA | 1 | NSP |
| Z-O | Laydays | Day | 5 | ||
| Total Price of Definite Items | |||||
| Total Price of Option Items | |||||
| Total Price of Definite and Optional Items |
&C(&D)
Page &P of &N
File details come from the government source that posted it. Updated .