SCHEDULE OF SUPPLIES/SERVICE
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF30 Amendment 01 SOL FOR POMPANO.pdf | ||
| SPECIFICATION FOR CGC POMPANO R0.doc | DOC document | |
| BLANK SCHEDULE FOR POMPANO REV1.xls | XLS spreadsheet | |
| SOLICITATION FOR POMPANO1.doc | DOC document | |
| SPECIFICATION FOR CGC POMPANO R0.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| Rev 0 GOVERNMENT ESTIMATE FOR: | |||||
| USCGC POMPANO (WPB-87339) DRYDOCK AVAILABILITY 2011 | |||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| 1-D | Perform Ultrasonic Thickness Measurements (D) | $665 | 250 SHOTS | 1 | $665 |
| 2-O | Perform Ultrasonic Thickness Measurements (O) | $179 | 25 SHOTS | 10 | $1,790 |
| 3-O | Perform Hull and Structural Plating Repairs in Forepeak, Engine Room and Lazarette – Eroded Welds (Steel) (O) | $557 | 8 LF | 2 | $1,114 |
| 4-D | Clean and Inspect Dirty Oil Tank (D) | $2,950 | JOB | 1 | $2,950 |
| 5-D | Clean and Inspect Oily Water Tank (D) | $2,950 | JOB | 1 | $2,950 |
| 6-D | Clean and Inspect Fuel Service Tanks (D) | $4,820 | JOB | 1 | $4,820 |
| 7-D | Clean and Inspect Grey Water Tank (D) | $1,592 | JOB | 1 | $1,592 |
| 8-D | Clean and Inspect Sewage Tank (D) | $2,950 | JOB | 1 | $2,950 |
| 9-D | Clean Grey Water Piping System (D) | $2,518 | JOB | 1 | $2,518 |
| 10-D | Clean Sewage Piping System (D) | $3,740 | JOB | 1 | $3,740 |
| 11-D | Inspect RHIB Notch Skid Pads (D) | $4,405 | JOB | 1 | $4,405 |
| 12-O | Renew RHIB Notch Skid Pad Studs (O) | $2,657 | JOB | 1 | $2,657 |
| 13-O | Realign Main Engine/Reduction Gear (O) | $3,041 | 10 STUDS | 5 | $15,205 |
| 14-D | Remove, Inspect, and Reinstall Propeller Shafts (D) | $9,913 | EA | 2 | $19,826 |
| 15-O | Repair Shaft (O) | $3,865 | JOB | 1 | $3,865 |
| 16-O | Straighten Shaft (O) | $1,313 | EA | 2 | $2,626 |
| 17-O | Renew Intermediate Water-Lubricated Shaft Bearing (O) | $2,637 | EA | 2 | $5,274 |
| 18-O | Renew Aft Water-Lubricated Shaft Bearing (O) | $2,637 | EA | 2 | $5,274 |
| 19-O | Renew Intermediate Bearing Carrier (O) | $3,848 | EA | 2 | $7,696 |
| 20-O | Renew Aft Bearing Carrier (O) | $4,712 | EA | 2 | $9,424 |
| 21-D | Remove, Inspect, and Reinstall Propellers (D) | $5,541 | EA | 2 | $11,082 |
| 22-O | Perform Minor Repair and Recondition of Propeller (O) | $1,825 | JOB | 1 | $1,825 |
| 23-D | Renew Depth Indicating Transducer (D) | $2,285 | EA | 2 | $4,570 |
| 24-D | Renew Sea Valves and Inspect Associated Piping and Strainers (D) | $12,355 | JOB | 1 | $12,355 |
| 25-D | Remove, Inspect, and Reinstall Rudder Assemblies (D) | $9,003 | JOB | 1 | $9,003 |
| 26-D | Remove, Inspect and Reinstall Stern Launch Door, and Inspect Door Pivot Pins, Bushings, and Washers (D) | $5,684 | JOB | 1 | $5,684 |
| 27-O | Preserve Underwater Body – “Partial” (O) | $11,901 | JOB | 1 | NSP |
| 28-O | Preserve Underwater Body – “100%” (O) | $21,270 | JOB | 1 | $21,270 |
| 29-O | Preserve Stern Tubes (O) | $3,376 | JOB | 1 | $3,376 |
| 30-D | Modify and Renew Cathodic Protection System (D) | $4,776 | JOB | 1 | $4,776 |
| 31-O | Renew Transducer Fairing (O) | $2,673 | JOB | 1 | $2,673 |
| 32-D | Routine Drydocking (D) | $14,072 | EA | 2 | $28,144 |
| 33-D | Provide Temporary Logistics (D) | $11,513 | JOB | 1 | $11,513 |
| 34-D | Modify and Preserve the Forepeak (EC 087-A-033) (D) | $18,916 | JOB | 1 | $18,916 |
| 35-D | Preserve Mast (D) | $21,982 | JOB | 1 | $21,982 |
| A-O | Composite Labor Rate | $54 | Hour | 260 | $14,040 |
| B-D | GFP Report | NSP | EA | 1 | NSP |
| Z-O | Laydays | $500 | Day | 5 | $2,500 |
| Total Price of Definite Items | $174,441 | ||||
| Total Price of Option Items | $100,609 | ||||
| Total Price of Definite and Optional Items | $275,050 |
&C(&D)
Page &P of &N Generate Blank Est
Labor and Material Estimate
| Composite Labor Rate | 54 | |||||||||||||||||
| Assumed G&A Factor | 15% | |||||||||||||||||
| Assumed Profit Factor | 10% | Direct Labor | Direct Material/Subs Cost | |||||||||||||||
| Sub-Contracted (put a "1" in the blank) | Total Labor Hours | Total Material & Subs (cost + G&A + profit) | Eng Tech | Machinest/Pipe Fitter | Electrician | Shipfitter | Welder | Firewatch | Insulator/Lagger | Painter | Gen Labor/Helper/Rigger | Supt/QA/NDT | ||||||
| ITEM | DESCRIPTION | UNIT PRICE | ||||||||||||||||
| 1-D | Perform Ultrasonic Thickness Measurements (D) | $665 | 10 | $125 | 10 | $ 100 | ||||||||||||
| 2-O | Perform Ultrasonic Thickness Measurements (O) | $179 | 1 | $125 | 1 | $ 100 | ||||||||||||
| 3-O | Perform Hull and Structural Plating Repairs in Forepeak, Engine Room and Lazarette – Eroded Welds (Steel) (O) | $557 | 8 | $125 | 2 | 2 | 2 | 2 | $ 100 | |||||||||
| 4-D | Clean and Inspect Dirty Oil Tank (D) | $2,950 | 50 | $250 | 50 | $ 200 | ||||||||||||
| 5-D | Clean and Inspect Oily Water Tank (D) | $2,950 | 50 | $250 | 50 | $ 200 | ||||||||||||
| 6-D | Clean and Inspect Fuel Service Tanks (D) | $4,820 | 80 | $500 | 80 | $ 400 | ||||||||||||
| 7-D | Clean and Inspect Grey Water Tank (D) | $1,592 | 26 | $188 | 26 | $ 150 | ||||||||||||
| 8-D | Clean and Inspect Sewage Tank (D) | $2,950 | 50 | $250 | 50 | $ 200 | ||||||||||||
| 9-D | Clean Grey Water Piping System (D) | $2,518 | 42 | $250 | 42 | $ 200 | ||||||||||||
| 10-D | Clean Sewage Piping System (D) | $3,740 | 60 | $500 | 60 | $ 400 | ||||||||||||
| 11-D | Inspect RHIB Notch Skid Pads (D) | $4,405 | 70 | $625 | 30 | 40 | $ 500 | |||||||||||
| 12-O | Renew RHIB Notch Skid Pad Studs (O) | $2,657 | 33 | $875 | 5 | 4 | 4 | 5 | 5 | 5 | 5 | $ 400 | $ 150 | $ 150 | ||||
| 13-O | Realign Main Engine/Reduction Gear (O) | $3,041 | 54 | $125 | 14 | 28 | 12 | $ 100 | ||||||||||
| 14-D | Remove, Inspect, and Reinstall Propeller Shafts (D) | $9,913 | 172 | $625 | 46 | 84 | 42 | $ 500 | TechRep3000 | |||||||||
| 15-O | Repair Shaft (O) | $3,865 | 60 | $625 | 14 | 12 | 12 | 14 | 8 | $ 500 | ||||||||
| 16-O | Straighten Shaft (O) | $1,313 | 22 | $125 | 8 | 8 | 6 | $ 100 | ||||||||||
| 17-O | Renew Intermediate Water-Lubricated Shaft Bearing (O) | $2,637 | 36 | $693 | 18 | 18 | $ 554 | |||||||||||
| 18-O | Renew Aft Water-Lubricated Shaft Bearing (O) | $2,637 | 36 | $693 | 18 | 18 | $ 554 | |||||||||||
| 19-O | Renew Intermediate Bearing Carrier (O) | $3,848 | 52 | $1,040 | 26 | 26 | $ 832 | |||||||||||
| 20-O | Renew Aft Bearing Carrier (O) | $4,712 | 68 | $1,040 | 34 | 34 | $ 832 | |||||||||||
| 21-D | Remove, Inspect, and Reinstall Propellers (D) | $5,541 | 54 | $2,625 | 18 | 36 | $ 2,100 | |||||||||||
| 22-O | Perform Minor Repair and Recondition of Propeller (O) | $1,825 | 28 | $313 | 10 | 8 | 10 | $ 250 | ||||||||||
| 23-D | Renew Depth Indicating Transducer (D) | $2,285 | 40 | $125 | 14 | 12 | 14 | $ 100 | ||||||||||
| 24-D | Renew Sea Valves and Inspect Associated Piping and Strainers (D) | $12,355 | 120 | $5,875 | 36 | 84 | $ 4,400 | $ 300 | ||||||||||
| 25-D | Remove, Inspect, and Reinstall Rudder Assemblies (D) | $9,003 | 132 | $1,875 | 44 | 88 | $ 1,500 | |||||||||||
| 26-D | Remove, Inspect and Reinstall Stern Launch Door, and Inspect Door Pivot Pins, Bushings, and Washers (D) | $5,684 | 96 | $500 | 22 | 8 | 66 | $ 300 | $ 100 | |||||||||
| 27-O | Preserve Underwater Body – “Partial” (O) | $11,901 | 144 | $4,125 | 96 | 48 | $ 3,300 | |||||||||||
| 28-O | Preserve Underwater Body – “100%” (O) | $21,270 | 288 | $5,718 | 240 | 48 | $ 4,574 | |||||||||||
| 29-O | Preserve Stern Tubes (O) | $3,376 | 44 | $1,000 | 10 | 24 | 10 | $ 800 | ||||||||||
| 30-D | Modify and Renew Cathodic Protection System (D) | $4,776 | 44 | $2,400 | 18 | 8 | 18 | $ 1,920 | ||||||||||
| 31-O | Renew Transducer Fairing (O) | $2,673 | 36 | $729 | 18 | 18 | $ 583 | |||||||||||
| 32-D | Routine Drydocking (D) | $14,072 | 168 | $5,000 | 40 | 28 | 28 | 36 | 36 | $ 1,000 | $ 1,000 | $ 2,000 | ||||||
| 33-D | Provide Temporary Logistics (D) | $11,513 | 72 | $7,625 | 18 | 18 | 36 | $ 5,900 | $ 200 | |||||||||
| 34-D | Modify and Preserve the Forepeak (EC 087-A-033) (D) | $18,916 | 248 | $5,524 | 16 | 16 | 48 | 48 | 8 | 48 | 64 | $ 4,419 | ||||||
| 35-D | Preserve Mast (D) | $21,982 | 280 | $6,862 | 8 | 8 | 192 | 72 | $ 4,990 | $ 500 | ||||||||
| 36-D | ||||||||||||||||||
| 37-D | ||||||||||||||||||
| 38-D | ||||||||||||||||||
| 39-D | ||||||||||||||||||
| 40-D | ||||||||||||||||||
| 41-D | ||||||||||||||||||
| 42-O | ||||||||||||||||||
| 43-D | ||||||||||||||||||
| 44-O |
&C(09/28/2009) Page &P of &N jlward:
blocking miscl jlward:
insurance jlward:
divers
Blank SOS
| Rev 0 GOVERNMENT ESTIMATE FOR: | |||||
| USCGC POMPANO (WPB-87339) DRYDOCK AVAILABILITY 2011 | |||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| 1-D | Perform Ultrasonic Thickness Measurements (D) | 250 SHOTS | 1 | ||
| 2-O | Perform Ultrasonic Thickness Measurements (O) | 25 SHOTS | 10 | ||
| 3-O | Perform Hull and Structural Plating Repairs in Forepeak, Engine Room and Lazarette – Eroded Welds (Steel) (O) | 8 LF | 2 | ||
| 4-D | Clean and Inspect Dirty Oil Tank (D) | JOB | 1 | ||
| 5-D | Clean and Inspect Oily Water Tank (D) | JOB | 1 | ||
| 6-D | Clean and Inspect Fuel Service Tanks (D) | JOB | 1 | ||
| 7-D | Clean and Inspect Grey Water Tank (D) | JOB | 1 | ||
| 8-D | Clean and Inspect Sewage Tank (D) | JOB | 1 | ||
| 9-D | Clean Grey Water Piping System (D) | JOB | 1 | ||
| 10-D | Clean Sewage Piping System (D) | JOB | 1 | ||
| 11-D | Inspect RHIB Notch Skid Pads (D) | JOB | 1 | ||
| 12-O | Renew RHIB Notch Skid Pad Studs (O) | JOB | 1 | ||
| 13-O | Realign Main Engine/Reduction Gear (O) | 10 STUDS | 5 | ||
| 14-D | Remove, Inspect, and Reinstall Propeller Shafts (D) | EA | 2 | ||
| 15-O | Repair Shaft (O) | JOB | 1 | ||
| 16-O | Straighten Shaft (O) | EA | 2 | ||
| 17-O | Renew Intermediate Water-Lubricated Shaft Bearing (O) | EA | 2 | ||
| 18-O | Renew Aft Water-Lubricated Shaft Bearing (O) | EA | 2 | ||
| 19-O | Renew Intermediate Bearing Carrier (O) | EA | 2 | ||
| 20-O | Renew Aft Bearing Carrier (O) | EA | 2 | ||
| 21-D | Remove, Inspect, and Reinstall Propellers (D) | EA | 2 | ||
| 22-O | Perform Minor Repair and Recondition of Propeller (O) | JOB | 1 | ||
| 23-D | Renew Depth Indicating Transducer (D) 42 FUNDED | EA | 2 | ||
| 24-D | Renew Sea Valves and Inspect Associated Piping and Strainers (D) | JOB | 1 | ||
| 25-D | Remove, Inspect, and Reinstall Rudder Assemblies (D) | JOB | 1 | ||
| 26-D | Remove, Inspect and Reinstall Stern Launch Door, and Inspect Door Pivot Pins, Bushings, and Washers (D) | JOB | 1 | ||
| 27-O | Preserve Underwater Body – “Partial” (O) | JOB | 1 | NSP | |
| 28-O | Preserve Underwater Body – “100%” (O) | JOB | 1 | ||
| 29-O | Preserve Stern Tubes (O) | JOB | 1 | ||
| 30-D | Modify and Renew Cathodic Protection System (D) | JOB | 1 | ||
| 31-O | Renew Transducer Fairing (O) | JOB | 1 | ||
| 32-D | Routine Drydocking (D) | EA | 2 | ||
| 33-D | Provide Temporary Logistics (D) | JOB | 1 | ||
| 34-D | Modify and Preserve the Forepeak (EC 087-A-033) (D) | JOB | 1 | ||
| 35-D | Preserve Mast (D) 30 FUNDED | JOB | 1 | ||
| A-O | Composite Labor Rate | Hour | 260 | ||
| B-D | GFP Report | NSP | EA | 1 | NSP |
| Z-O | Laydays | Day | 5 | ||
| Total Price of Definite Items | |||||
| Total Price of Option Items | |||||
| Total Price of Definite and Optional Items |