DRYDOCK FOR USCGC POMPANO
Solicitation number
HSCG80-11-Q-P45010
Issued by

About this file

SCHEDULE OF SUPPLIES/SERVICE

View the file

Other files

File Type Posted
SF30 Amendment 01 SOL FOR POMPANO.pdf PDF
SPECIFICATION FOR CGC POMPANO R0.doc DOC document
BLANK SCHEDULE FOR POMPANO REV1.xls XLS spreadsheet
SOLICITATION FOR POMPANO1.doc DOC document
SPECIFICATION FOR CGC POMPANO R0.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOS&S

Rev 0 GOVERNMENT ESTIMATE FOR:
USCGC POMPANO (WPB-87339) DRYDOCK AVAILABILITY 2011
ITEMDESCRIPTIONUNIT PRICEUNITQTYEXTENDED PRICE
1-DPerform Ultrasonic Thickness Measurements (D)$665250 SHOTS1$665
2-OPerform Ultrasonic Thickness Measurements (O)$17925 SHOTS10$1,790
3-OPerform Hull and Structural Plating Repairs in Forepeak, Engine Room and Lazarette – Eroded Welds (Steel) (O)$5578 LF2$1,114
4-DClean and Inspect Dirty Oil Tank (D)$2,950JOB1$2,950
5-DClean and Inspect Oily Water Tank (D)$2,950JOB1$2,950
6-DClean and Inspect Fuel Service Tanks (D)$4,820JOB1$4,820
7-DClean and Inspect Grey Water Tank (D)$1,592JOB1$1,592
8-DClean and Inspect Sewage Tank (D)$2,950JOB1$2,950
9-DClean Grey Water Piping System (D)$2,518JOB1$2,518
10-DClean Sewage Piping System (D)$3,740JOB1$3,740
11-DInspect RHIB Notch Skid Pads (D)$4,405JOB1$4,405
12-ORenew RHIB Notch Skid Pad Studs (O)$2,657JOB1$2,657
13-ORealign Main Engine/Reduction Gear (O)$3,04110 STUDS5$15,205
14-DRemove, Inspect, and Reinstall Propeller Shafts (D)$9,913EA2$19,826
15-ORepair Shaft (O)$3,865JOB1$3,865
16-OStraighten Shaft (O)$1,313EA2$2,626
17-ORenew Intermediate Water-Lubricated Shaft Bearing (O)$2,637EA2$5,274
18-ORenew Aft Water-Lubricated Shaft Bearing (O)$2,637EA2$5,274
19-ORenew Intermediate Bearing Carrier (O)$3,848EA2$7,696
20-ORenew Aft Bearing Carrier (O)$4,712EA2$9,424
21-DRemove, Inspect, and Reinstall Propellers (D)$5,541EA2$11,082
22-OPerform Minor Repair and Recondition of Propeller (O)$1,825JOB1$1,825
23-DRenew Depth Indicating Transducer (D)$2,285EA2$4,570
24-DRenew Sea Valves and Inspect Associated Piping and Strainers (D)$12,355JOB1$12,355
25-DRemove, Inspect, and Reinstall Rudder Assemblies (D)$9,003JOB1$9,003
26-DRemove, Inspect and Reinstall Stern Launch Door, and Inspect Door Pivot Pins, Bushings, and Washers (D)$5,684JOB1$5,684
27-OPreserve Underwater Body – “Partial” (O)$11,901JOB1NSP
28-OPreserve Underwater Body – “100%” (O)$21,270JOB1$21,270
29-OPreserve Stern Tubes (O)$3,376JOB1$3,376
30-DModify and Renew Cathodic Protection System (D)$4,776JOB1$4,776
31-ORenew Transducer Fairing (O)$2,673JOB1$2,673
32-DRoutine Drydocking (D)$14,072EA2$28,144
33-DProvide Temporary Logistics (D)$11,513JOB1$11,513
34-DModify and Preserve the Forepeak (EC 087-A-033) (D)$18,916JOB1$18,916
35-DPreserve Mast (D)$21,982JOB1$21,982
A-OComposite Labor Rate$54Hour260$14,040
B-DGFP ReportNSPEA1NSP
Z-OLaydays$500Day5$2,500
Total Price of Definite Items$174,441
Total Price of Option Items$100,609
Total Price of Definite and Optional Items$275,050

&C(&D)

Page &P of &N Generate Blank Est

Labor and Material Estimate

Composite Labor Rate54
Assumed G&A Factor15%
Assumed Profit Factor10%Direct LaborDirect Material/Subs Cost
Sub-Contracted (put a "1" in the blank)Total Labor HoursTotal Material & Subs (cost + G&A + profit)Eng TechMachinest/Pipe FitterElectricianShipfitterWelderFirewatchInsulator/LaggerPainterGen Labor/Helper/RiggerSupt/QA/NDT
ITEMDESCRIPTIONUNIT PRICE
1-DPerform Ultrasonic Thickness Measurements (D)$66510$12510$ 100
2-OPerform Ultrasonic Thickness Measurements (O)$1791$1251$ 100
3-OPerform Hull and Structural Plating Repairs in Forepeak, Engine Room and Lazarette – Eroded Welds (Steel) (O)$5578$1252222$ 100
4-DClean and Inspect Dirty Oil Tank (D)$2,95050$25050$ 200
5-DClean and Inspect Oily Water Tank (D)$2,95050$25050$ 200
6-DClean and Inspect Fuel Service Tanks (D)$4,82080$50080$ 400
7-DClean and Inspect Grey Water Tank (D)$1,59226$18826$ 150
8-DClean and Inspect Sewage Tank (D)$2,95050$25050$ 200
9-DClean Grey Water Piping System (D)$2,51842$25042$ 200
10-DClean Sewage Piping System (D)$3,74060$50060$ 400
11-DInspect RHIB Notch Skid Pads (D)$4,40570$6253040$ 500
12-ORenew RHIB Notch Skid Pad Studs (O)$2,65733$8755445555$ 400$ 150$ 150
13-ORealign Main Engine/Reduction Gear (O)$3,04154$125142812$ 100
14-DRemove, Inspect, and Reinstall Propeller Shafts (D)$9,913172$625468442$ 500TechRep3000
15-ORepair Shaft (O)$3,86560$625141212148$ 500
16-OStraighten Shaft (O)$1,31322$125886$ 100
17-ORenew Intermediate Water-Lubricated Shaft Bearing (O)$2,63736$6931818$ 554
18-ORenew Aft Water-Lubricated Shaft Bearing (O)$2,63736$6931818$ 554
19-ORenew Intermediate Bearing Carrier (O)$3,84852$1,0402626$ 832
20-ORenew Aft Bearing Carrier (O)$4,71268$1,0403434$ 832
21-DRemove, Inspect, and Reinstall Propellers (D)$5,54154$2,6251836$ 2,100
22-OPerform Minor Repair and Recondition of Propeller (O)$1,82528$31310810$ 250
23-DRenew Depth Indicating Transducer (D)$2,28540$125141214$ 100
24-DRenew Sea Valves and Inspect Associated Piping and Strainers (D)$12,355120$5,8753684$ 4,400$ 300
25-DRemove, Inspect, and Reinstall Rudder Assemblies (D)$9,003132$1,8754488$ 1,500
26-DRemove, Inspect and Reinstall Stern Launch Door, and Inspect Door Pivot Pins, Bushings, and Washers (D)$5,68496$50022866$ 300$ 100
27-OPreserve Underwater Body – “Partial” (O)$11,901144$4,1259648$ 3,300
28-OPreserve Underwater Body – “100%” (O)$21,270288$5,71824048$ 4,574
29-OPreserve Stern Tubes (O)$3,37644$1,000102410$ 800
30-DModify and Renew Cathodic Protection System (D)$4,77644$2,40018818$ 1,920
31-ORenew Transducer Fairing (O)$2,67336$7291818$ 583
32-DRoutine Drydocking (D)$14,072168$5,0004028283636$ 1,000$ 1,000$ 2,000
33-DProvide Temporary Logistics (D)$11,51372$7,625181836$ 5,900$ 200
34-DModify and Preserve the Forepeak (EC 087-A-033) (D)$18,916248$5,5241616484884864$ 4,419
35-DPreserve Mast (D)$21,982280$6,8628819272$ 4,990$ 500
36-D
37-D
38-D
39-D
40-D
41-D
42-O
43-D
44-O

&C(09/28/2009) Page &P of &N jlward:

blocking miscl jlward:

insurance jlward:

divers

Blank SOS

Rev 0 GOVERNMENT ESTIMATE FOR:
USCGC POMPANO (WPB-87339) DRYDOCK AVAILABILITY 2011
ITEMDESCRIPTIONUNIT PRICEUNITQTYEXTENDED PRICE
1-DPerform Ultrasonic Thickness Measurements (D)250 SHOTS1
2-OPerform Ultrasonic Thickness Measurements (O)25 SHOTS10
3-OPerform Hull and Structural Plating Repairs in Forepeak, Engine Room and Lazarette – Eroded Welds (Steel) (O)8 LF2
4-DClean and Inspect Dirty Oil Tank (D)JOB1
5-DClean and Inspect Oily Water Tank (D)JOB1
6-DClean and Inspect Fuel Service Tanks (D)JOB1
7-DClean and Inspect Grey Water Tank (D)JOB1
8-DClean and Inspect Sewage Tank (D)JOB1
9-DClean Grey Water Piping System (D)JOB1
10-DClean Sewage Piping System (D)JOB1
11-DInspect RHIB Notch Skid Pads (D)JOB1
12-ORenew RHIB Notch Skid Pad Studs (O)JOB1
13-ORealign Main Engine/Reduction Gear (O)10 STUDS5
14-DRemove, Inspect, and Reinstall Propeller Shafts (D)EA2
15-ORepair Shaft (O)JOB1
16-OStraighten Shaft (O)EA2
17-ORenew Intermediate Water-Lubricated Shaft Bearing (O)EA2
18-ORenew Aft Water-Lubricated Shaft Bearing (O)EA2
19-ORenew Intermediate Bearing Carrier (O)EA2
20-ORenew Aft Bearing Carrier (O)EA2
21-DRemove, Inspect, and Reinstall Propellers (D)EA2
22-OPerform Minor Repair and Recondition of Propeller (O)JOB1
23-DRenew Depth Indicating Transducer (D) 42 FUNDEDEA2
24-DRenew Sea Valves and Inspect Associated Piping and Strainers (D)JOB1
25-DRemove, Inspect, and Reinstall Rudder Assemblies (D)JOB1
26-DRemove, Inspect and Reinstall Stern Launch Door, and Inspect Door Pivot Pins, Bushings, and Washers (D)JOB1
27-OPreserve Underwater Body – “Partial” (O)JOB1NSP
28-OPreserve Underwater Body – “100%” (O)JOB1
29-OPreserve Stern Tubes (O)JOB1
30-DModify and Renew Cathodic Protection System (D)JOB1
31-ORenew Transducer Fairing (O)JOB1
32-DRoutine Drydocking (D)EA2
33-DProvide Temporary Logistics (D)JOB1
34-DModify and Preserve the Forepeak (EC 087-A-033) (D)JOB1
35-DPreserve Mast (D) 30 FUNDEDJOB1
A-OComposite Labor RateHour260
B-DGFP ReportNSPEA1NSP
Z-OLaydaysDay5
Total Price of Definite Items
Total Price of Option Items
Total Price of Definite and Optional Items

&C(&D)

Page &P of &N

Data $ 209,121.00