Attachment_4_Open_and_Inspect_report.pdf
PDF 632 KB Posted
- Solicitation number
- HSCG44-19-Q-N0001
About this file
Attachment 4 Open and Inspect report
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Question_5.docx | DOCX document | |
| FINALC~3.DOC | DOC document | |
| Question_4.docx | DOCX document | |
| Question_and_Answer_1_through_3.docx | DOCX document | |
| ATTACH~1.XLS | XLS spreadsheet | |
| ATTACH~2.DOC | DOC document | |
| ATTACH~1.PDF | ||
| Synopsis_Solicitation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OPEN AND INSPECTION/TEST TEARDOWN EVALUATION REPORT
From: (POC: name and phone number)
INCOMING INSPECTION:
Contract Number: HSCG40-___________________________ CLIN: _________
NIIN/NSN: ___________________________ S/N: _____________________
P/N: _______________________________ Revision: _________ Problem(s) found: ________________________________________________________ Recommended solution (List Material/Parts): __________________________________ Anticipated Material Cost: ___________Anticipated Labor Hrs: ___________ Total Anticipated Repair Cost: _____________
OR
REPAIR:
Contract Number: HSCG40-___________________________ CLIN: _________
NIIN/NSN: ___________________________ S/N: _____________________
P/N: _______________________________ Revision: _________ Problem(s) found: ________________________________________________________ Recommended solution (List Material/Parts): __________________________________ Anticipated Material Cost: ___________Anticipated Labor Hrs: ___________ Total Anticipated Repair Cost: _____________ Cost includes Open/Inspect fee? YES NO
OR
BEYOND ECONOMICAL REPAIR (BER):
Contract Number: HSCG40-___________________________ CLIN: _________
NIIN/NSN: ___________________________ S/N: _____________________
P/N: _______________________________ Revision: _________ Problem(s) found: ________________________________________________________ Obsolete Material/Parts: _____________________________________________ Labor Hrs: ______ Cost (if any): __________ Cost includes Open/Inspect fee? YES NO
OR
NO FAULT FOUND:
Contract Number: HSCG40-___________________________ CLIN: _________
NIIN/NSN: ___________________________ S/N: _____________________
P/N: _______________________________ Revision: _________ Effort made to determine item was operational (Include any programming, alignment, set-up or material changes):
Labor Hours: ______ Cost (if any):_________ Cost includes Open/Inspect fee? YES NO
Attachment 4 Open and Inspect Report
File details come from the government source that posted it.