Attachment I - SOW.doc
DOC document 523 KB Posted
- Attached to
- Welin Lambie Davits and Support Services Federal contract opportunity
- Solicitation number
- HSCG40-12-R-20001
About this file
Attachment I - SOW
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| J A Redacted.pdf | ||
| SF-30 IV.pdf | ||
| RFP A00004.doc | DOC document | |
| A00003 - Attachment I - SOW.doc | DOC document | |
| RFP A00003.doc | DOC document | |
| SF-30 III.pdf | ||
| Questions and Clarifications A00003.doc | DOC document | |
| A00002 SF-30.pdf | ||
| A00002 - Attachment I - SOW.doc | DOC document | |
| A00001 - Attachment I - SOW.doc | DOC document | |
| A00001 SF-30.pdf | ||
| RFP A00001.doc | DOC document | |
| Ombudsman Notice.doc | DOC document | |
| Attachment II - DHS Form 700-21.pdf | ||
| Attachment V - Payment Information.doc | DOC document | |
| Attachment IV - DR.doc | DOC document | |
| Attachment III - DHS_Form_700-5.pdf | ||
| RFP.pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIFICATION FOR WELIN-LAMBIE DUAL POINT DAVIT MODEL TW.PIV 5.0B SUPPORT
WMEC AND WHEC
SPECIFICATION FOR WELIN-LAMBIE DUAL POINT DAVIT SUPPORT
Developed By: Mike Soost (Rev-0, 15 Nov 2011) Commander (SFLC) Surface Forces Logistics Center 300 E. Main St. Suite 600 Norfolk, VA 23510
TABLE OF CONTENTS
viConsolidated List of Government-furnished Property
8WORK ITEM 1: Coast Guard-Dedicated Tech Rep, Provide
11WORK ITEM 2: Maintenance Kits Support, Provide
14WORK ITEM 3: Overhaul Kits, Provide
20WORK ITEM 4: Spare Parts Support, Provide
24WORK ITEM 5: Davit Hardware and Software Upgrades, Plan and Implement
27WORK ITEM 6: Davit Virtual Trainers, Provide
29WORK ITEM 7: Davit Training, Develop
31WORK ITEM 8: Davit Electrical Training (Cutter), Conduct
33WORK ITEM 9: Davit Mechanical Training (Cutter), Conduct
35WORK ITEM 10: Davit Operational Training (Cutter), Conduct
37WORK ITEM 11: Welin-Lambie Model TW.PIV 5.0B Dual Point Davit, Factory Inspect, Test, and Overhaul
48WORK ITEM 12: New Welin-Lambie Dual Point Davit Model TW.PIV 5.0A, Provide
51WORK ITEM 13: New Welin-Lambie Dual Point Davit Model TW.PIV 5.0B, Provide
Revisions Record This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.
| DATE |
| REV# |
| WORK ITEM# |
| CHANGES MADE |
NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.
Consolidated List of References The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at time of specification writing and during contract execution.
All Coast Guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free or charge. Other Government documents may be accessed – free of charge – as follows:
· MIL/DOD/CID Specifications: http://www.assistdocs.com/search/search_basic.cfm
· Commandant Instruction Manuals: http://www.uscg.mil/directives/default.asp
· Public Laws, Code of Federal Regulations, U.S Codes, and other Federal Government laws:: www.gpoaccess.gov The Government is aware of the following internet web links where contractors may procure commercial specifications:
· American Welding Society (AWS): http://www.awspubs.com/index.php
· ANSI, ASTM, IEEEE, NFPA, ASME, SAE Standards: http://www.techstreet.com/
· NFPA: http://www.nfpa.org
· SSPC Standards and pictorial guides: http://shopping.netsuite.com/sspcmarketplace
COAST GUARD DRAWINGS
· Coast Guard Drawing 618 WMEC 583-063, Rev F, OTHB Davit Arrangement
· Coast Guard Drawing 618 WMEC 583-064, Rev C, OTHB Davit Installation
· Coast Guard Drawing 627 WMEC 583-040, Rev H, OTHB Davit Arrangement
· Coast Guard Drawing 627 WMEC 583-041, Rev E, OTHB Davit Installation
· Coast Guard Drawing 901 WMEC 583-023, Rev E, OTHB Davit Arrangement
· Coast Guard Drawing 901 WMEC 583-024, Rev F, OTHB Davit Installation
· Coast Guard Drawing 905 WMEC 583-024, Rev F, OTHB Davit Arrangement
· Coast Guard Drawing 905 WMEC 583-025, Rev E, OTHB Davit Installation
· Coast Guard Drawing 378-FRAM-E 583-010, Rev D, Over the Horizon Boat Installation
· Coast Guard Drawing 378-FRAM-W 583-038, Rev K, Over the Horizon Boat Installation
· Coast Guard Drawing FL-2605-38, Rev A, Welin-Lambie 5.0b RHI Cradle End Pads
· Coast Guard Drawing FL-2605-39, Rev -, Zodiac H733 RHI – Wood Cradle Chocks
· Coast Guard Drawing FL-8201-107, Rev A, Welin Lambie Davit OTH Gripe Assemblies
COAST GUARD PUBLICATIONS
· Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), Jan 2009, Welding and Allied Processes
· Surface Forces Logistics Center Standard Specification 2351 (SFLC Std Spec 2351), Jan 2009, Overhaul DC Generators and Motors In-Shop
· Surface Forces Logistics Center Standard Specification 3020 (SFLC Std Spec 3020), Jan 2009, Overhaul AC Electrical Motors In-Shop
· Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), Jan 2009, Inspect, Repair, and Test Auxiliary Machine Systems
· Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Jun 2006, Coatings and Color Manual
· Coast Guard Technical Publication (TP) 3943, Apr 2008, Twin Pivot Arm Davit - Type Tw.Piv 5.0B - Ref. No. 5558-1 Thru 5558-15
OTHER REFERENCES
· ANSI/ NCSL Z540-1, Calibration Laboratories and Measuring and Test Equipment - General Requirements
· ASME BPV Code Section VIII, Division 1 & 2, Rules for the Construction of Pressure Vessels
· ASTM D3951, Standard Practice for Commercial Packaging
· British Standard (BS) BS EN 837-1, 03/1998, Pressure Gauges Part 1: Bourdon Tube Pressure Gauges – Dimensions, Metrology, Requirements and Testing Consolidated List of Government-furnished Property
The following is a list of property, which the Government will furnish for overhaul. This list supersedes any other material obligations indicated or implied by referenced drawings.
| Work item |
| MTI |
| Part number |
| ITEM DESCRIPTION |
| QTY |
| EST. Cost($)/unit |
| 11 |
| N |
| TW PIV 5.0B |
| Welin-Lambie Dual Point Davit |
| 1 |
| $475,000 |
| 11 |
| N |
| N/A |
| Conex Shipping Contatiner |
| 1 |
| $9,800 |
*Government-loaned property, which shall be returned to the vessel upon completion of the availability.
**New or refurbished equipment that the Government may provide for installation in place of existing equipment.
***Government-furnished property, which is to be supplied by either the vessel or the C4IT ServiceCenter
Consolidated List of Critical Inspection Items The following is a list of work items, which contain Critical Inspection Reports (CIR), which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000_STD, paragraph 3.2.6.5 (Inspection report particulars)):
Work Item Title
This section is not applicable to this package.
WORK ITEM 1: Coast Guard-Dedicated Tech Rep, Provide
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to provide a Coast Guard-dedicated Welin-Lambie Dual Point Davit Technical Representative (Tech Rep).
1.2 Government-furnished property.
None.
2. REFERENCES
Coast Guard Drawings
None.
COAST GUARD PUBLICATIONS
None.
Other References
None.
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
None.
3.1.2 Tech Rep. The Contractor shall provide a qualified, Coast Guard-dedicated Welin-Lambie Tech Rep, who is familiar with, and is competent to address, the hydraulic, mechanical and electrical aspects of the Welin-Lambie TW Piv davit.
3.1.2.2 The Contractor shall ensure that the Tech Rep is a certified representative of Welin-Lambie.
3.1.2.3 Submit the Tech Rep’s name, resumé, and OEM letter of certification to the COTR.
3.1.3 Protective measures.
Not applicable.
3.1.4 Interferences.
None.
3.2 Work period. The Contractor shall provide an on-site Tech Rep for a period of 12 months during the base and each option, to work up to 40 hours weekly, within the core hours of 0600 and 1730, Monday through Friday, except Federal holidays. The number of hours and period of performance shall be delineated on the respective task order(s). Overtime may be required and shall be authorized in advance by the Contracting Officer. Travel to and from the work location will be the responsibility of the contractor. Core hours may change with prior arrangement and written authorization by the Contracting Officer. The primary place of performance shall be the U.S. Coast Guard - SFLC, 2401 Hawkins Point Rd, Baltimore, MD 21226, although travel to various cutter locations may be required.
3.3 Location. The Contractor shall locate the Tech Rep within the East Coast of the United States.
3.4 Travel. The Contractor shall ensure the Tech Rep is available for travel up to 200 days per year.
3.5 Employee conduct. Contractor Tech Reps shall comply with all applicable Government regulations, policies and procedures (e.g., fire, safety, sanitation, environmental protection, security, etc.) when visiting or working at Government facilities. The Contractor shall ensure the Tech Rep presents a professional appearance at all times and that their conduct shall not reflect discredit on the United States, the Department of Homeland Security, or the U.S. Coast Guard.
3.5.1 Tech Rep removal. The Government may, at its sole discretion, direct the Contractor to remove any Tech Rep from Coast Guard and Department of Homeland Security facilities for misconduct or security reasons. Removal does not relieve the Contractor of the responsibility to continue providing the services required in this work item. The Government will provide the Contractor with an immediate written explanation of the request to remove the Tech Rep through the Coast Guard Contracting Officer.
3.5.2 Conflict of Interest. The Contractor shall not employ any person who is an employee of the United States Government if that employment would cause, or appear to cause, a conflict of interest.
3.6 Tech Rep identification. Contractor employees working on-site at Government facilities shall wear a company issued identification badge. All Contractor employees shall identify themselves as Contractors when their status is not readily apparent and display their badge in plain view above the waist at all times.
3.7 Tech Rep performance monitoring. The Contractor shall be required to meet weekly with the COTR (or designee) during the first six weeks of the contractor, on a time and date as required per the COTR (or designee) to discuss Tech Rep performance.
3.8 Duties. The Tech Rep shall be responsible and expected to conduct the following:
· Perform casualty repairs on the Welin-Lambie TW Piv Series davits.
· Maintain the Coast Guard TW Piv Series davit overhaul and training programs.
· Acknowledge receipt of Coast Guard-generated Request(s) for Quote within 24 hours.
· Conduct visits to verify system configuration, conditions, and to make repairs as required.
· Develop and maintain serial-tracked davit configuration database.
· Alert Coast Guard and disseminate advisories and service bulletins related to the Welin-Lambie TW Piv -Series davits.
· Develop failure solutions for the TW Piv Series davits.
3.9 Monthly Report of Tech Rep Tasks and Costs. Provide a monthly report to the Contract Administrator and COTR of no more than four pages that identifies task order budget, costs, travel accomplished within the last month, travel planned for the next month, and hours charged for technical representative services (monthly total and cumulative). Travel receipts shall be provided with the report in accordance with the Contract regulations. The report shall also identify any issues that the contractor perceives as adversely impacting their ability to satisfy requirements. The monthly report shall be in a contractor developed format approved by the COTR.
4. NOTES
This section is not applicable to this work item.
WORK ITEM 2: Maintenance Kits, Provide
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to develop and make available Welin-Lambie Dual Point Davit maintenance parts kits for shipment to designated Coast Guard cutters.
1.2 Government-furnished property.
None.
2. REFERENCES
Coast Guard Drawings Coast Guard Drawing 618 WMEC 583-063, Rev F, OTHB Davit Arrangement Coast Guard Drawing 618 WMEC 583-064, Rev C, OTHB Davit Installation
Coast Guard Drawing 627 WMEC 583-040, Rev H, OTHB Davit Arrangement
Coast Guard Drawing 627 WMEC 583-041, Rev E, OTHB Davit Installation
Coast Guard Drawing 901 WMEC 583-023, Rev E, OTHB Davit Arrangement
Coast Guard Drawing 901 WMEC 583-024, Rev F, OTHB Davit Installation
Coast Guard Drawing 905 WMEC 583-024, Rev F, OTHB Davit Arrangement
Coast Guard Drawing 905 WMEC 583-025, Rev E, OTHB Davit Installation
Coast Guard Drawing 378-FRAM-E 583-010, Rev D, Over the Horizon Boat Installation
Coast Guard Drawing 378-FRAM-W 583-038, Rev K, Over the Horizon Boat Installation
Coast Guard Drawing FL-2605-38, Rev A, Welin-Lambie 5.0b RHI Cradle End Pads
Coast Guard Drawing FL-2605-39, Rev -, Zodiac H733 RHI – Wood Cradle Chocks
Coast Guard Drawing FL-8201-107, Rev A, Welin Lambie Davit OTH Gripe Assemblies
COAST GUARD PUBLICATIONS
Coast Guard Technical Publication (TP) 3943, Apr 2008, Twin Pivot Arm Davit - Type Tw.Piv 5.0B - Ref. No. 5558-1 thru 5558-15 Other References
ASTM D3951 (1990), Standard Practice for Commercial Packaging
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
None.
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures.
Not applicable.
3.1.4 Interferences.
None.
3.2 Maintenance part kit particulars. Using the drawings referenced in Section 2 and TP 3943 as guidance, the Contractor shall provide the following maintenance kits:
| Kit/Part Description |
| Kit/Part Number |
| NSN |
| Quantity |
| Wire Rope Renewal Kit |
| 892-02044 |
| 4010 01-F12-2483 |
| 7 |
| Check Winch Gearbox Oil Kit |
| 892-02045 |
| 3950 01-F12-2484 |
| 7 |
| Tension Winch Brake Inspection Kit |
| 892-02046 |
| 3950 01-F12-2485 |
| 7 |
| Hydraulic Fluid Renewal Kit |
| 892-02047 |
| 3040 01-F12-2486 |
| 7 |
| Hydraulic Fluid Filter Renewal Kit |
| 892-02048 |
| 4330 01-F12-2488 |
| 7 |
| Main Winch Brake and Centrifugal Brake Inspection Kit |
| 892-02049 |
| 4330 01-F12-2489 |
| 7 |
| Hydraulic Breather Replacement Kit |
| 892-02050 |
| 3040 01-F12-2490 |
| 7 |
| Hydraulic Hose Replacement Kit |
| 892-02051 |
| 4720 01-F12-2491 |
| 7 |
3.2.3 Preservation, Packaging and Marking (PP&M). Package each kit in accordance with ASTM D3951. Mark (stencil) the shipping/packaging container with the information provided in 4.1.
NOTE
Bar coding of kits or individual kit content packaging is not required.
3.2.4 Kits storage. The Contractor shall assemble, store, and maintain a stock of all kits at a Contractor-managed location.
3.3 Kit shipment. The Contractor shall ship the maintenance kits to the Coast Guard warehouse following Coast Guard request.
· The following kits and quantities will be shipped to arrive no later than 10 January each year:
| Kit/Part Description |
| Kit/Part Number |
| NSN |
| Quantity |
| Wire Rope Renewal Kit |
| 892-02044 |
| 4010 01-F12-2483 |
| 4 |
| Check Winch Gearbox Oil Kit |
| 892-02045 |
| 3950 01-F12-2484 |
| 4 |
| Tension Winch Brake Inspection Kit |
| 892-02046 |
| 3950 01-F12-2485 |
| 4 |
| Hydraulic Fluid Renewal Kit |
| 892-02047 |
| 3040 01-F12-2486 |
| 4 |
| Hydraulic Fluid Filter Renewal Kit |
| 892-02048 |
| 4330 01-F12-2488 |
| 4 |
| Main Winch Brake and Centrifugal Brake Inspection Kit |
| 892-02049 |
| 4330 01-F12-2489 |
| 4 |
| Hydraulic Breather Replacement Kit |
| 892-02050 |
| 3040 01-F12-2490 |
| 4 |
| Hydraulic Hose Replacement Kit |
| 892-02051 |
| 4720 01-F12-2491 |
| 4 |
· The following kits and quantities will be shipped to arrive no later than 01 July each year:
| Kit/Part Description |
| Kit/Part Number |
| NSN |
| Quantity |
| Wire Rope Renewal Kit |
| 892-02044 |
| 4010 01-F12-2483 |
| 3 |
| Check Winch Gearbox Oil Kit |
| 892-02045 |
| 3950 01-F12-2484 |
| 3 |
| Tension Winch Brake Inspection Kit |
| 892-02046 |
| 3950 01-F12-2485 |
| 3 |
| Hydraulic Fluid Renewal Kit |
| 892-02047 |
| 3040 01-F12-2486 |
| 3 |
| Hydraulic Fluid Filter Renewal Kit |
| 892-02048 |
| 4330 01-F12-2488 |
| 3 |
| Main Winch Brake and Centrifugal Brake Inspection Kit |
| 892-02049 |
| 4330 01-F12-2489 |
| 3 |
| Hydraulic Breather Replacement Kit |
| 892-02050 |
| 3040 01-F12-2490 |
| 3 |
| Hydraulic Hose Replacement Kit |
| 892-02051 |
| 4720 01-F12-2491 |
| 3 |
3.4 Usage reports. The Contractor shall provide a maintenance kit ordering and shipment report to the contracting officer and COTR bi-annually. At a minimum, the report shall indicate 1) the kits and quantities shipped, 2) the ship dates and destination(s), and 3) the quantities currently in stock at the Contractor’s facility.
4. NOTES
4.1 Packaging marking:
· National Stock Number (NSN) – (as determined/ applicable)
· Item Name: (as determined)
· Part Number: (as determined)
· Shipping weight: (as determined)
· Government Contract Number: (as determined)
· MPC Number.
WORK ITEM 3: Overhaul Kits, Provide
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to make available Welin-Lambie Dual Point Davit overhaul parts kits for shipment to designated Coast Guard cutters.
1.2 Government-furnished property.
None.
2. REFERENCES
Coast Guard Drawings Coast Guard Drawing 618 WMEC 583-063, Rev F, OTHB Davit Arrangement Coast Guard Drawing 618 WMEC 583-064, Rev C, OTHB Davit Installation
Coast Guard Drawing 627 WMEC 583-040, Rev H, OTHB Davit Arrangement
Coast Guard Drawing 627 WMEC 583-041, Rev E, OTHB Davit Installation
Coast Guard Drawing 901 WMEC 583-023, Rev E, OTHB Davit Arrangement
Coast Guard Drawing 901 WMEC 583-024, Rev F, OTHB Davit Installation
Coast Guard Drawing 905 WMEC 583-024, Rev F, OTHB Davit Arrangement
Coast Guard Drawing 905 WMEC 583-025, Rev E, OTHB Davit Installation
Coast Guard Drawing 378-FRAM-E 583-010, Rev D, Over the Horizon Boat Installation
Coast Guard Drawing 378-FRAM-W 583-038, Rev K, Over the Horizon Boat Installation
Coast Guard Drawing FL-2605-38, Rev A, Welin-Lambie 5.0b RHI Cradle End Pads
Coast Guard Drawing FL-2605-39, Rev -, Zodiac H733 RHI – Wood Cradle Chocks
Coast Guard Drawing FL-8201-107, Rev A, Welin Lambie Davit OTH Gripe Assemblies
COAST GUARD PUBLICATIONS
Coast Guard Technical Publication (TP) 3943, Apr 2008, Twin Pivot Arm Davit - Type Tw.Piv 5.0B - Ref. No. 5558-1 thru 5558-15 Other References
ASTM D3951 (1990), Standard Practice for Commercial Packaging
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
None.
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures.
Not applicable.
3.1.4 Interferences.
None.
3.2 Overhaul parts kits particulars. The Contractor shall develop overhaul kits based on the following parts list using TP 3943 and applicable drawings as guidance:
| Part Number |
| Description |
| QTY |
| 892-02053 |
| 4 YEAR DAVIT IN-PLACE OVERHAUL KIT |
Boat Block Assembly Drawing 5650-5601
| 5201-8711 |
| Sheave Bush |
| 2 |
| 5201-8611 |
| Isolating Bush |
| 4 |
| 675-05035 |
| Tension Pin |
| 2 |
| 7300-0120 |
| Thrust washer |
| 2 |
| 7300-0121 |
| Sleeve Bearing |
| 2 |
| 651-10015 |
| External Circlip |
| 2 |
| 5440-5511 |
| Rubbing Strip |
| 8 |
| 5440-5611 |
| Rubbing Strip |
| 8 |
| 616-02056 |
| Slotted CSK HD Screw |
| 16 |
Davit Assembly Drawing 5631-4601
| 623-20075 |
| Hex HD Bolt |
| 86 |
| 647-00820 |
| Plain Washer |
| 118 |
| 629-00320 |
| Hex Nut |
| 86 |
| 5204-5211 |
| Arm Pivot Bush |
| 4 |
| 639-01070 |
| Locknut |
| 4 |
| 5202-8411 |
| Cylinder Pin Bush |
| 4 |
| 5191-4711 |
| Roller |
| 8 |
| 7500-1225 |
| Self-Lubricating Bearing |
| 32 |
| 679-40032 |
| Split Cotter Pin |
| 32 |
| 5191-4611 |
| Roller |
| 8 |
| 5418-1631 |
| Striker Arm |
| 2 |
| 679-38032 |
| Split Cotter Pin |
| 8 |
| 800-02033 |
| Main Rope - FWD |
| 1 |
| 800-02034 |
| Main Rope - AFT |
| 1 |
| 889-01048 |
| Grease Nipple |
| 2 |
| 889-01049 |
| Grease Nipple |
| 2 |
Winch Gearbox Assembly Drawing 5508-7002
| 5404-6911 |
| Gasket |
| 1 |
| 5062-0611 |
| Bearing Housing |
| 1 |
| 7967-0453 |
| Oil Seal |
| 1 |
| 5201-6111 |
| Sleeve |
| 1 |
| 7004-0045 |
| Deep Groove Ball Bearing |
| 1 |
| 889-02105 |
| Sealing Washer |
| 2 |
| 889-02006 |
| Flanged Plug |
| 2 |
| 859-01333 |
| Miniature Immersion Heater |
| 1 |
| 679-40030 |
| Split Cotter Pin |
| 2 |
| 647-00820 |
| Plain Washer |
| 2 |
| 7500-1220 |
| Self-Lubricating Bearing |
| 1 |
| 5727-0801 |
| Brake Cylinder |
| 1 |
| 677-40045F |
| Split Cotter Pin |
| 1 |
| 651-10065 |
| External Circlip |
| 2 |
| 7960-0603 |
| O-Ring |
| 1 |
| 7967-0401 |
| Oil Seal |
| 1 |
| 5520-6301 |
| Brake Shoe Assembly |
| 1 |
| 2520-1901 |
| Centrifugal Brake Shoe Assembly |
| 6 |
| 7960-0453 |
| O-Ring |
| 1 |
| 7967-0551 |
| Oil Seal |
| 1 |
| 652-10052 |
| Internal Circlip |
| 1 |
| 5425-6331 |
| Cylinder Plate |
| 1 |
| 5204-5011 |
| Bush |
| 1 |
| 679-38020 |
| Split Cotter Pin |
| 1 |
| 647-00810 |
| Plain Washer |
| 1 |
| 7500-0612 |
| Self-Lubricating Bearing |
| 2 |
| 5421-8011 |
| Pivot Plate |
| 1 |
| 629-00016 |
| Hex Nut |
| 1 |
| 609-16150 |
| Hex HD Setscrew |
| 1 |
| 894-01706 |
| Bonded Washer |
| 1 |
| 683-00327 |
| Compression Spring |
| 4 |
| 647-00816 |
| Plain Washer |
| 4 |
| 651-10030 |
| External Circlip |
| 4 |
| 647-00830 |
| Plain Washer |
| 4 |
| 5492-6011 |
| Motor T.B. Gasket |
| 1 |
Falls Tension Winch Assembly Drawing 5503-3902
| 5142-6911 |
| Anchor Pin |
| 2 |
| 5590-1411 |
| Modified Nut |
| 2 |
| 679-39050 |
| Split Cotter Pin |
| 2 |
| 5492-6011 |
| Motor T.B. Gasket |
| 2 |
| 5293-2311 |
| Gasket |
| 2 |
| 7960-1543 |
| O-Ring |
| 2 |
| 891-05524 |
| Brake Lining |
| 2 |
Control Station Assembly Drawing 5694-4701
| 830-00110 |
| PVC Strip Seal |
| 1 |
| 5405-7111 |
| Gasket |
| 1 |
Hydraulic Assembly Drawing 5631-4602
| 5726-6101 |
| Pressure Hose Assembly |
| 2 |
| 5726-5901 |
| Pressure Hose Assembly |
| 2 |
| 5726-6001 |
| Pressure Hose Assembly |
| 4 |
Hydraulic Reservoir Assembly Drawing 5735-1001
| 5405-7911 |
| Reservoir Gasket |
| 1 |
| 894-00915 |
| Suction Strainer |
| 2 |
| 894-00836 |
| Oil Heater |
| 1 |
| 894-01709 |
| Bonded Washer |
| 1 |
| 894-00835 |
| Air Bag |
| 1 |
| 894-00913 |
| Pressure Filter |
| 2 |
| 894-00822 |
| Desiccant Breather |
| 1 |
| 894-00834 |
| Desiccant Breather Adaptor |
| 1 |
| 894-00813 |
| Breather |
| 1 |
| 894-00321 |
| Relief Valve |
| 2 |
| 891-00601 |
| Pressure Filter Element |
| 2 |
| 891-00449 |
| Water Filter Element |
| 1 |
| 894-00907 |
| Return Filter Element |
| 1 |
| 5492-6011 |
| Motor T.B. Gasket |
| 2 |
| 894-10213 |
| Male Stud Coupling |
| 2 |
| 894-11355 |
| Reducer |
| 2 |
| 5425-8911 |
| Bell Housing Gasket |
| 2 |
| 5433-7811 |
| Pump Gasket |
| 2 |
Hydraulic Panel Assembly Drawing 5733-1301
| 894-00319 |
| Solenoid Coil |
| 1 |
| 5406-4511 |
| Hydraulic Panel Gasket |
| 1 |
Misc.
| 885-02061 |
| Accumulator Gas Valve |
| 2 |
| 885-02059 |
| Accumulator Bladder Kit |
| 2 |
| 885-02072 |
| Accumulator Bleed Valve |
| 2 |
| 891-00460 |
| Accumulator Cushion Ring |
| 2 |
| 885-02025 |
| Accumulator Safety Valve |
| 1 |
| 892-01013 |
| Seal Kit (Hyd Cylinder) |
| 2 |
| 891-00451 |
| Overcentre Valve |
| 4 |
3.2.1 Kit assembly. Individually assemble and package each overhaul kit, with kit contents packaged individually within the kit.
3.2.2 Preservation, Packaging and Marking (PP&M). Package each kit in accordance with ASTM D3951. Mark (stencil) the shipping/packaging container with the information provided in 4.1.
NOTE
Bar coding of kits or individual kit content packaging is not required.
3.2.3 Kits storage. The Contractor shall assemble, store, and maintain an initial stock of all kits at a Contractor-managed location and make available for immediate shipment to the Coast Guard upon request.
3.3 Kit shipment. The Contractor shall ship the overhaul kits to a designated Coast Guard location within 72 hours of Coast Guard request for final delivery at destination within 14 calendar days.
3.4 Usage reports. The Contractor shall provide an overhaul kit ordering and shipment report to the COTR bi-annually. At a minimum, the report shall indicate 1) the kits/parts and quantities shipped, 2) the ship dates and destination(s), and 3) the quantities currently in stock at the Contractor’s facility.
4. NOTES
4.1 Packaging marking:
· National Stock Number (NSN) – (as determined/ applicable)
· Item Name: (as determined)
· Part Number: (as determined)
· Shipping weight: (as determined)
· Government Contract Number: (as determined)
· MPC Number.
WORK ITEM 4: Spare Parts Support, Provide
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to develop and maintain a Coast Guard-specific Welin-Lambie Dual Point Davit spare parts inventory.
1.2 Government-furnished property.
None.
2. REFERENCES
Coast Guard Drawings None.
COAST GUARD PUBLICATIONS
None.
Other References
ASTM D3951 (1990), Standard Practice for Commercial Packaging
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
None.
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures.
Not applicable.
3.1.4 Interferences.
None.
3.2 Spare part support particulars. The Contractor shall develop and make available spare parts in support of the Welin-Lambie dual point davit model TW.PIV 5.0B as discussed herein:
3.2.1 Spare parts inventory. Stock the following Coast Guard-approved spare parts at a Contractor-managed location and make available for immediate shipment to the Coast Guard upon request. The following items must be on hand and ready to ship within 72 hours. The Contractor shall provide a standard price list for items listed below.
| PART NUMBER |
| NSN |
| DESCRIPTION |
| QTY |
| 2520-1901 |
| 2530-99-750-0205 |
| Centrifugal Brake Shoe Set |
| 2 |
| 5520-6301 |
| 2530-99-430-0529 |
| Main Brake Shoe |
| 2 |
| 5590-0811 |
| 5930-99-983-1547 |
| Rotary Switch/Encoder |
| 1 |
| 5650-5601 |
| 2030-99-248-4992 |
| Aluminum Boat Block Assembly |
| 2 |
| 5721-8101E |
| 4820-99-322-5761 |
| Accumulator Safety Block |
| 2 |
| 5721-8611 |
| 4820-99-350-2344 |
| Lever Valve |
| 1 |
| 5726-5901 |
| 4720-99-479-6000 |
| Pressure Hose Kit (Brake Cyl) |
| 2 |
| 5726-6001 |
| 4720-99-797-4942 |
| Pressure Hose Kit (Luff Cyl) |
| 2 |
| 5726-6101 |
| 4720-99-616-8026 |
| Pressure Hose Assembly |
| 2 |
| 800-09948 |
| 4030-01-467-1005 |
| Release Hook |
| 2 |
| 859-01948 |
| 6625-99-902-4906 |
| LED Cluster (RED) |
| 2 |
| 859-01951 |
| 5980-99-814-5543 |
| LED Cluster (Blue) |
| 2 |
| 859-03343 |
| 5990-99-724-7525 |
| Incremental Rotary Encoder |
| 2 |
| 859-02903 |
| 6110-99-336-3268 |
| Telefast Input Block |
| 2 |
| 859-02905 |
| 6150-99-510-6792 |
| Telefast Cable |
| 2 |
| 859-02906 |
| 5998-14-507-3745 |
| Telefast Analog Cable |
| 2 |
| 859-02914 |
| 5998-01-575-1477 |
| Analog Converter |
| 1 |
| 859-02973 |
| 5998-01-574-7008 |
| Counter Card |
| 1 |
| 859-02971 |
| 5998-01-574-1477 |
| Counter Card |
| 2 |
| 859-02697 |
| 6685-99-813-1904 |
| Hygrostat |
| 1 |
| 859-03027 |
| 5945-99-189-2417 |
| Thermister, Motor Protection |
| 6 |
| 859-03033 |
| 6130-14-563-6751 |
| Power Supply Unit |
| 1 |
| 859-03772 |
| 5825-99-483-2504 |
| Incremental Rotary Encoder |
| 2 |
| 894-03800 |
| 6105-99-700-9690 |
| Filter Indicator Plug |
| 8 |
| 860-01037 |
| 6105-99-507-3047 |
| Electric Motor - Main Winch |
| 1 |
| 860-01038 |
| 5998-14-507-3745 |
| Electric Motor - Hydraulic Power Unit |
| 1 |
| 860-01039 |
| 6105-99-434-4140 |
| Electric Motor - Falls Tensioning Winch |
| 2 |
| 860-02014 |
| 6130-99-593-2248 |
| Main Winch Inverter |
| 2 |
| 860-02015 |
| 6130-01-F02-8885 |
| FWD Falls Tension Winch Inverter |
| 2 |
| 860-02029 |
| 6130-01-F12-2487 |
| AFT Falls Tension Winch Inverter |
| 2 |
| 860-02021 |
| 5998-99-226-1399 |
| HTTL Card |
| 4 |
| 885-02059 |
| 2090-99-667-2901 |
| Accumulator Bladder Kit |
| 6 |
| 891-00449 |
| 4330-01-459-3037 |
| Water Removal Filter Element |
| 10 |
| 891-00451 |
| 4810-99-459-7211 |
| Overcenter Valve |
| 4 |
| 891-00601 |
| 4330-99-549-9320 |
| Pressure Filter Element |
| 20 |
| 891-05515 |
| 6110-12-369-3494 |
| Falls Tension Brake |
| 2 |
| 894-00813 |
| 3040-01-563-3025 |
| Air Breather |
| 4 |
| 894-00822 |
| 3040-01-440-5669 |
| Dessicant Breather |
| 10 |
| 894-00835 |
| 2090-99-667-9545 |
| Air Bag |
| 4 |
| 894-00836 |
| 4520-99-938-5901 |
| Immersion Heater |
| 2 |
| 894-00907 |
| 2910-01-500-6910 |
| Return Filter Element |
| 10 |
| 894-00911 |
| 4330-99-501-0015 |
| Return Filter Assembly Complete |
| 4 |
| 894-00912 |
| 4330-99-503-3940 |
| Water Removal Filter Assy w/Element |
| 4 |
| 894-00913 |
| 4330-99-355-4796 |
| Pressure Filter Assembly |
| 4 |
| 894-00915 |
| 4730-99-867-9073 |
| Suction Strainer |
| 4 |
| 894-00905 |
| 4330-99-693-1238 |
| Blockage Indicator |
| 8 |
| 885-02012 |
| 2030-01-F11-2492 |
| Accumulator Bottles |
| 10 |
| 800-02033 |
| 4010-99-251-6631 |
| Wire Rope FWD |
| 10 |
| 800-02034 |
| 4010-99-665-8380 |
| Wire Rope AFT |
| 10 |
| 885-02076 |
| 4820-99-676-6124 |
| Gas Valve Assembly |
| 4 |
| 885-02073 |
| 4820-99-175-2966 |
| Burst Disc |
| 6 |
| 885-02061 |
| 4820-99-911-6206 |
| Gas Valve |
| 6 |
| 885-02072 |
| 4820-99-371-2109 |
| Accumulator Bleed Valve |
| 6 |
| 885-02077 |
| 4730-99-553-3464 |
| Fluid Port Adapter S.S. |
| 6 |
| 885-02078 |
| 4730-99-154-3214 |
| S/S Fluid end Connector |
| 4 |
| 892-02021 |
| 5920-99-750-5099 |
| Fuses, Set |
| 10 |
3.2.3 Spare parts packaging. Package spare parts individually in accordance with ASTM D3951. Mark (stencil) the shipping/packaging container with the information provided in 4.1.
NOTE
Bar coding of individual parts is not required.
3.3 Spare parts shipment. The Contractor shall ship the spare part to the designated Coast Guard location(s) within 72 hours of Coast Guard request for final delivery at destination within 14 calendar days.
3.4 Usage reports.
3.4.1 The Contractor shall provide a spare parts ordering and shipment report to the Contracting Officer and COTR bi-annually. 1) the parts and quantities shipped, 2) the ship dates and destination(s), and 3) the quantities currently in stock at the Contractor’s facility.
3.4.2 The Contractor shall make stocking adjustment(s) recommendations to the Contracting Officer and COTR in the bi-annual report.
4. NOTES
4.1 Packaging marking:
· National Stock Number (NSN) – (as determined/ applicable)
· Item Name: (as determined)
· Part Number: (as determined)
· Shipping weight: (as determined)
· Government Contract Number: (as determined) WORK ITEM 5: Davit Hardware and Software Upgrades, Plan and Implement
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to assess, plan, and upgrade all davit hardware and software to the latest cutter configuration.
1.2 Government-furnished property.
None.
2. REFERENCES
Coast Guard Drawings Coast Guard Drawing 618 WMEC 583-063, Rev F, OTHB Davit Arrangement Coast Guard Drawing 618 WMEC 583-064, Rev C, OTHB Davit Installation
Coast Guard Drawing 627 WMEC 583-040, Rev H, OTHB Davit Arrangement
Coast Guard Drawing 627 WMEC 583-041, Rev E, OTHB Davit Installation
Coast Guard Drawing 901 WMEC 583-023, Rev E, OTHB Davit Arrangement
Coast Guard Drawing 901 WMEC 583-024, Rev F, OTHB Davit Installation
Coast Guard Drawing 905 WMEC 583-024, Rev F, OTHB Davit Arrangement
Coast Guard Drawing 905 WMEC 583-025, Rev E, OTHB Davit Installation
Coast Guard Drawing 378-FRAM-E 583-010, Rev D, Over the Horizon Boat Installation
Coast Guard Drawing 378-FRAM-W 583-038, Rev K, Over the Horizon Boat Installation
Coast Guard Drawing FL-2605-38, Rev A, Welin-Lambie 5.0b RHI Cradle End Pads
Coast Guard Drawing FL-2605-39, Rev -, Zodiac H733 RHI – Wood Cradle Chocks
Coast Guard Drawing FL-8201-107, Rev A, Welin Lambie Davit OTH Gripe Assemblies
COAST GUARD PUBLICATIONS
Coast Guard Technical Publication (TP) 3943, Apr 2008, Twin Pivot Arm Davit - Type Tw.Piv 5.0B - Ref. No. 5558-1 thru 5558-15
Other References
None.
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
None.
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures.
Not applicable.
3.1.4 Interferences.
None.
3.2 Upgrade assessment and plan. The Contractor shall submit a CFR for the following:
3.2.1 Assessment. Using the drawings referenced in Section 2 and TP 3943, in conjunction with inspection herein, the Contractor shall establish the baseline configuration, make an assessment of the davit configuration, and determine all upgrades required.
3.2.2 Upgrade plan. The Contractor shall develop a plan for upgrading the davit and submit to the COTR for approval.
3.3 Upgrade particulars.
3.3.1 Hardware updates. The Contractor shall inspect and recommend upgrades as necessary for davit hardware to the Coast Guard-specific standard configuration. The following shall be considered at a minimum for upgrading:
· Fuse holders
· Metallic limit switches
· Low oil light (during luff and automatic mode)
· No oil level (screen indicator)
· Main motor pinion modification
3.3.2 Software updates. The Contractor shall inspect and recommend upgrades as necessary for davit hardware. The following shall be considered at a minimum for upgrading:
· Zelio software
· Zelio Logic Relay
· Fault indicators
· E-stop alarm
3.4 Upgrade. The Contractor shall make all approved upgrade recommendations described herein within 14 calendar days of Coast Guard approval.
3.5 Operational test – post repairs. After completion of work, the Contractor shall witness an operational test (by Coast Guard personnel) of the davit to prove satisfactory operating condition. Submit a trip report including all test results within 5 calendar days of completion.
4. NOTES
This section is not applicable to this work item.
WORK ITEM 6: Davit Virtual Trainers, Provide
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to provide twenty virtual davit training laptop computers to designated Coast Guard locations.
1.2 Government-furnished property.
None.
2. REFERENCES
Coast Guard Drawings None.
COAST GUARD PUBLICATIONS
None.
Other References
ASTM D3951 (1990), Standard Practice for Commercial Packaging
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
None.
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures.
Not applicable.
3.1.4 Interferences.
None.
3.2 Virtual trainer particulars.
3.2.1 Computers. The Contractor shall provide twenty Coast Guard- customized virtual training laptop computers, with protective cases, and software for the computers within 180 days of award.
3.2.2 Virtual training content. In addition to training content, the Contractor shall develop software to cover the following:
· Virtual training based on provided Coast Guard Maintenance Procedure Cards (MPCs).
· Troubleshooting Coast Guard commonly-encountered electrical problems (i.e., check HTTL card, tripped inverters – luff and winch).
· Electrical component identification and location.
3.2.3 Upgrades and replacements. The Contractor shall be responsible for correcting discrepancies via laptop upgrades during the performance period.
3.3 Delivery. The Contractor shall provide the Welin-Lambie davit virtual trainers via computer laptops to the Coast Guard as designated by the Coast Guard inspector within 180 days of award.
3.4 Preservation, Packaging and Marking (PP&M). The Contractor shall package each computer in accordance with ASTM D3951. Mark (stencil) the shipping/packaging container with the information provided in 4.1.
NOTE
Bar coding of kits or individual kit content packaging is not required.
4. NOTES
4.1 Packaging marking:
· National Stock Number (NSN) – (as determined/ applicable)
· Item Name: (as determined)
· Part Number: (as determined)
· Shipping weight: (as determined)
· Government Contract Number: (as determined) WORK ITEM 7: Davit Training, Develop
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to develop davit training to provide to Coast Guard personnel.
1.2 Government-furnished property.
None.
2. REFERENCES
Coast Guard Drawings None.
COAST GUARD PUBLICATIONS
None.
Other References
None.
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
None.
3.1.2 Tech Rep.
3.1.3 Protective measures.
Not applicable.
3.1.4 Interferences.
None.
3.2 Training particulars.
3.2.1 Training contents. Training shall cover the following three aspects as related to the davit:
· Electrical - maintenance and troubleshooting;
· Mechanical - maintenance and troubleshooting;
· Operations - Coast Guard specific operation.
3.2.2 Training plan. The Contractor shall submit a training plan and syllabus to the COTR for approval within 90 days of award.
4. NOTES
This section is not applicable to this work item.
WORK ITEM 8: Davit Electrical Training (Cutter), Conduct
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to provide davit electrical training to designated Coast Guard cutters.
1.2 Government-furnished property.
None.
2. REFERENCES
Coast Guard Drawings None.
COAST GUARD PUBLICATIONS
None.
Other References
None.
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
None.
3.1.2 Tech Rep. Training shall be conducted by the Coast Guard-dedicated Tech Rep.
3.1.3 Protective measures.
Not applicable.
3.1.4 Interferences.
None.
3.2 Training particulars. The Contractor shall provide davit electrical training sessions (3 days of training per session) and training tools to cutter crews, up to 8 training sessions per year.
3.3 Training materials. The Contractor shall be responsible for providing training materials for up to 10 students.
4. NOTES
This section is not applicable to this work item.
WORK ITEM 9: Davit Mechanical Training (Cutter), Conduct
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to provide davit mechanical training to designated Coast Guard cutters.
1.2 Government-furnished property.
None.
2. REFERENCES
Coast Guard Drawings None.
COAST GUARD PUBLICATIONS
None.
Other References
None.
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
None.
3.1.2 Tech Rep. Training shall be conducted by the Coast Guard-dedicated Tech Rep.
3.1.3 Protective measures.
Not applicable.
3.1.4 Interferences.
None.
3.2 Training particulars. The Contractor shall provide davit mechanical training sessions (3 days of training per session) and training tools to cutter crews, up to 8 training sessions per year.
3.3 Training materials. The Contractor shall be responsible for providing training materials for up to 10 students.
4. NOTES
This section is not applicable to this work item.
WORK ITEM 10: Davit Operational Training (Cutter), Conduct
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to provide davit operational training to designated Coast Guard cutters.
1.2 Government-furnished property.
None.
2. REFERENCES
Coast Guard Drawings None.
COAST GUARD PUBLICATIONS
None.
Other References
None.
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
None.
3.1.2 Tech Rep. Training shall be conducted by the Coast Guard-dedicated Tech Rep.
3.1.3 Protective measures.
Not applicable.
3.1.4 Interferences.
None.
3.2 Training particulars. The Contractor shall provide davit operational training (3 days of training per session) and training tools to cutter crews, up to 8 training sessions per year.
3.3 Training materials. The Contractor shall be responsible for providing training materials for up to 10 students.
4. NOTES
This section is not applicable to this work item.
58300_MWS_0510_FLT
WORK ITEM 11: Welin-Lambie Model TW.PIV 5.0B Dual Point Davit, Factory Inspect, Test, and Overhaul
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to inspect, test, and overhaul a Welin-Lambie TW.PIV 5.0B Dual Point Davit.
1.2 Partial List of Contractor-furnished property. The following is a list of parts/components the Coast Guard requires to be renewed, but may not be all-inclusive of parts that may need to be renewed. Additional, contingency parts recommended by the Contractor for renewal shall be done via CFR.
| MTI |
| Part number |
| ITEM DESCRIPTION |
| QTY |
Boat Block Assembly, Drawing No. 5650-5601
| N |
| 5120-8611 |
| Sheave pin |
| 2 |
| N |
| 7300-0120 |
| Thrust washer |
| 2 |
| N |
| 675-03012 |
| Tension pin |
| 2 |
| N |
| 675-05010 |
| Tension pin |
| 2 |
| N |
| 675-05035 |
| Tension pin |
| 2 |
| N |
| 5440-5511 |
| Rubbing Strip |
| 4 |
| N |
| 5440-5611 |
| Rubbing Strip |
| 4 |
| N |
| 5440-5711 |
| Rubbing Strip |
| 4 |
| N |
| 616-02056 |
| Slotted CSK HD Screw |
| 16 |
Davit Assembly, Drawing No. 5631-4601
| N |
| 5129-6711 |
| Arm pivot pin |
| 2 |
| N |
| 5142-7011 |
| Pivot pin |
| 2 |
| N |
| 5143-7911 |
| Sheave pin |
| 4 |
| N |
| 5143-8111 |
| Sheave pin |
| 3 |
| N |
| 5144-7611 |
| Sheave pin |
| 2 |
| N |
| 5145-4411 |
| Roller pin |
| 8 |
| N |
| 5145-4711 |
| Cylinder pin |
| 4 |
| N |
| 5146-2211 |
| Sheave pin |
| 4 |
| N |
| 5146-2311 |
| Roller pin |
| 8 |
| N |
| 5146-2411 |
| Sheave pin |
| 1 |
| N |
| 5191-4611 |
| Roller |
| 8 |
| N |
| 5191-4711 |
| Roller |
| 8 |
| N |
| 5202-7211 |
| Sleeve |
| 28 |
| N |
| 5203-9011 |
| Pivot bracket bushing |
| 4 |
| N |
| 892-01013 |
| Hydr cylinder seal kit |
| 2 |
| N |
| 885-02059 |
| Accumulator bladder kit |
| 2 |
| N |
| 885-02025 |
| Accumulator safety block |
| 1 |
| N |
| 859-01070 |
| Limit switch |
| 4 |
| N |
| 800-02033 |
| Forward wire rope |
| 1 |
| N |
| 800-02034 |
| Aft wire rope |
| 1 |
Winch Gearbox Assembly, Drawing No. 5508-7002
| N |
| 2520-1901 |
| Cent brake shoe assy |
| 6 |
| N |
| 5080-0101 |
| Magnetic plug |
| 1 |
| N |
| 5201-6111 |
| Sleeve |
| 1 |
| N |
| 5205-2111 |
| Sleeve |
| 2 |
| N |
| 5291-3611 |
| Retaining ring |
| 2 |
| N |
| 5392-3901 |
| Roller assembly |
| 1 |
| N |
| 5395-0711 |
| Sleeve |
| 1 |
| N |
| 5405-6911 |
| Gasket |
| 1 |
| N |
| 5431-7111 |
| Heater gasket |
| 1 |
| N |
| 5520-6301 |
| Brake shoe assy |
| 1 |
| N |
| 5727-0801 |
| Brake cylinder |
| 1 |
| N |
| 5492-6011 |
| Motor gasket |
| 1 |
| N |
| 680-14054 |
| Key |
| 1 |
| N |
| 680-18050 |
| Key |
| 1 |
| N |
| 859-01070 |
| Limit switch |
| 1 |
| N |
| 859-01333 |
| Immersion heater |
| 1 |
| N |
| 859-01334 |
| Thermostat |
| 1 |
| N |
| 889-02006 |
| Flanged plug |
| 2 |
| N |
| 889-02105 |
| Sealing washer |
| 2 |
Falls Tensioning Winch Assembly, Drawing No. 5503-3902
| N |
| 859-01070 |
| Limit switch |
| 2 |
| N |
| 5503-3904 |
| Heater |
| 2 |
| N |
| 891-05515 |
| Electro-magnetic brake |
| 2 |
Control Station Assembly, Drawing No. 5694-4701
| N |
| 830-00110 |
| PVC strip seal |
| 7.5 |
| N |
| 859-02103 |
| Thermostat |
| 1 |
| N |
| 859-02161 |
| Panel heater |
| 1 |
Drive Panel Assembly, Drawing No. 2780-2401
| N |
| 859-02697 |
| Hygrostat |
| 1 |
| N |
| 859-02696 |
| Heater |
| 1 |
| N |
| 860-03002 |
| Filter |
| 1 |
Control Panel Assembly, Drawing No. 2780-8401
| N |
| 859-02696 |
| Heater |
| 1 |
Hydraulic Assembly, Drawing No. 5631-4602
| N |
| 5726-5901 |
| Hose assembly |
| 2 |
| N |
| 5726-6001 |
| Hose assembly |
| 4 |
| N |
| 5726-6101 |
| Hose assembly |
| 2 |
Hydraulic Reservoir Assembly, Drawing No. 5735-1001
| N |
| 894-00913 |
| Pressure filter |
| 2 |
| N |
| 894-00915 |
| Suction strainer |
| 2 |
| N |
| 894-00813 |
| Breather |
| 1 |
| N |
| 894-00206 |
| Pump |
| 2 |
| N |
| 894-00207 |
| Pump coupling |
| 2 |
| N |
| 894-00822 |
| Dessicant breather |
| 1 |
| N |
| 894-00834 |
| Dessicant adapter |
| 1 |
| N |
| 894-00836 |
| Oil heater |
| 1 |
| N |
| 894-01703 |
| Bonded washer |
| 5 |
| N |
| 894-01709 |
| Bonded washer |
| 1 |
| N |
| 894-00837 |
| Float switch |
| 1 |
| N |
| 5492-6011 |
| Motor gasket |
| 2 |
TWPIV5.0B Hydraulic Panel Assembly, Drawing No. 5733-1301
| N |
| 894-00907 |
| 10 micron filter |
| 1 |
| N |
| 894-00912 |
| Water filter |
| 1 |
| N |
| 894-00319 |
| Solenoid Coil |
| 1 |
| N |
| 859-02611 |
| Heater |
| 1 |
| N |
| 859-02103 |
| Thermostat |
| 1 |
1.3 Government-furnished property.
| Work item |
| MTI |
| Part number |
| ITEM DESCRIPTION |
| QTY |
| EST. Cost($)/unit |
| 11 |
| N |
| TW PIV 5.0B |
| Welin-Lambie Dual Point Davit |
| 1 |
| $475,000 |
| 11 |
| N |
| N/A |
| Conex Shipping Contatiner |
| 1 |
| $9,800 |
2. REFERENCES
Coast Guard Drawings None.
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), Jan 2009, Welding and Allied Processes
Surface Forces Logistics Center Standard Specification 2351 (SFLC Std Spec 2351), Jan 2009, Overhaul DC Generators and Motors In-Shop
Surface Forces Logistics Center Standard Specification 3020 (SFLC Std Spec 3020), Jan 2009, Overhaul AC Electrical Motors In-Shop
Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), Jan 2009, Inspect, Repair, and Test Auxiliary Machine Systems
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Jun 2006, Coatings and Color Manual
Coast Guard Technical Publication (TP) 3943, Apr 2008, Twin Pivot Arm Davit - Type Tw.Piv 5.0B - Ref. No. 5558-1 Thru 5558-15
Other References
ANSI/ NCSL Z540-1, Calibration Laboratories and Measuring and Test Equipment - General Requirements ASME BPV Code Section VIII, Division 1 & 2, Rules for the Construction of Pressure Vessels
ASTM D3951, Standard Practice for Commercial Packaging
British Standard (BS) BS EN 837-1, 03/1998, Pressure Gauges Part 1: Bourdon Tube Pressure Gauges – Dimensions, Metrology, Requirements and Testing
3. REQUIREMENTS
3.1 General. The Contractor shall accomplish all work herein in accordance with SFLC Std Spec 5000, TP 3943.
3.1.1 Services. The Contractor shall provide all services required to accomplish the work herein on the Welin-Lambie TW.PIV 5.0B Dual Point Davit system at Welin-Lambie in the United Kingdom.
3.1.2 Protective measures - hydraulic system. The Contractor shall maintain existing hydraulic system cleanliness as specified herein; take all necessary precautions to prevent the introduction of contaminants into the hydraulic system. Whenever disconnecting or removing components from the hydraulic system, completely seal all openings to the rest of the system, immediately, using either caps (for externally threaded connection points), bolt-on blanks, or taped-on discs/covers (durable plastic or sheet-metal no less than 1/16-inch thick)
NOTE
Plastic bags may be used only when arrangement or configuration prevents the use of the other sealing methods specified above.
3.1.3 Non-structural fasteners and grease fittings. The Contractor shall renew all non-structural fasteners and grease fittings with 300-series stainless steel
3.1.4 Fasteners. The Contractor shall renew all fasteners with 300-series stainless steel fasteners
3.1.5 Receipt report. Within seven (7) days from receipt of the davit, the Contractor shall inspect and inventory the davit assembly and submit a receiving report on the following:
· General condition of the shipping container and davit assembly.
· Davit model and serial numbers.
· Missing or damaged parts/components with photographs of each.
3.1.6 Additional part renewal reports. The Contractor shall provide a report via CFR for all additional parts deemed necessary for renewal, other than those already specified herein, with supporting reasons for each renewal.
3.1.7 ABS/SOLAS Certification. All work that is conducted on the Welin-Lambie TW.PIV 5.0B Dual Point Davit system shall not invalidate the ABS/SOLAS certification status of the davit without successful renewal of such certification.
3.2 Inspections.
3.2.1 Clean and visually inspect. The Contractor shall clean and visually inspect the following and submit a CFR and cost proposalfor COTR and Contracting Officer approval within 60 calendar days of receipt of davit:
NOTE
Do not inspect any mandatory replacement parts.
· Davit assembly.
· Sheaves.
· Boat block assembly.
· Hydraulic reservoir(s).
· Exterior electrical cables, wiring, and conduit.
3.2.2 NDI. The Contractor shall perform NDI of the following in accordance with SFLC Std Spec 0740, Appendix C.
· All machinery foundation welds.
· Davit Frame.
· Winches.
· Forward davit arm.
· Aft davit arm.
3.3 Overhaul. Upon receipt of the Contracting Officer’s authorization to proceed, the Contractor shall overhaul and preserve (as applicable), the following components/assemblies and sub-components/assemblies:
3.3.1 Mechanical.
3.3.1.1 Structural and rigging gear, including:
· Cranston hook assemblies.
· Sheave assemblies.
· Sixteen top and bottom nylon roller assemblies.
· Fwd davit arm hinge pin assembly.
· Aft davit arm hinge pin assembly.
3.3.1.2 Main winch, including:
· Main winch brake assembly.
· Turning handle safety device.
· Winch mounted, luffing hydraulic cylinder directional control valve (lever valve)
3.3.2 Hydraulic.
3.3.2.1 Hydraulic actuators, including:
· Fwd luffing hydraulic cylinder.
· Aft luffing hydraulic cylinder.
3.3.2.2 HPU, including:
· Fwd luffing hydraulic cylinder over-center valve.
· Aft luffing hydraulic cylinder over-center valve.
· Fwd main system relief valve.
· Aft main system relief valve.
· Fwd hydraulic pump assembly.
· Aft hydraulic pump assembly.
· Fwd high-pressure hydraulic filter assembly.
· Aft high-pressure hydraulic filter assembly.
· Two return hydraulic filter assemblies.
· Rotary flow divider assembly.
· Brake directional control valve assembly.
· Brake hydraulic cylinder rod end flow control valve.
· Brake hydraulic cylinder cap end flow control valve.
· Fwd luffing cylinder 2-position directional control valve assembly.
· Aft luffing cylinder 2-position directional control valve assembly.
· Fwd luffing cylinder 3-position directional control valve assembly.
· Aft luffing cylinder 3-position directional control valve assembly.
· Two fwd luffing cylinder shuttle valves.
· Two aft luffing cylinder shuttle valves.
· Hydraulic sump tank assembly.
· Hydraulic fluid heater and thermostat assembly.
3.3.2.3 Accumulators, including:
NOTE
The Contractor shall test and certify the accumulators/cylinders using ASME BPV Code Section III as guidance.
· Fwd hydraulic accumulator assembly.
· Aft hydraulic accumulator assembly.
· Safety block and pressure gauge assembly.
· Poppet valve assembly.
· Renew Accumulator safety fuse plug with safety burst disc.
3.3.3 Electrical.
· Fwd tension winch assembly (assembly, brake assembly, and gearbox
· Aft tension winch assembly (assembly, brake assembly, and gearbox)
3.3.3.1 Sensors and controls, including:
· Fwd luffing arm encoder assembly.
· Aft luffing arm encoder assembly.
· Control stand assembly.
3.3.3.2 Electric motor overhauls. The Contractor shall overhaul, inspect, varnish, and rewind (both motor and stator) the following motors in accordance with SFLC Std Specs 2351 and 3020, as applicable:
· Main winch electric motor.
· Forward hydraulic pump electric motor.
· Aft hydraulic pump electric motor.
· Forward falls tension electric motor
· Aft falls tension electric motor.
3.3.4 Other:
· Sump tank level indicator.
· Fwd pump pressure transducer.
· Aft pump pressure transducer.
· Fwd hydraulic cylinder rod-end pressure transducer.
· Fwd hydraulic cylinder cap-end pressure transducer.
· Aft hydraulic cylinder cap-end pressure transducer.
3.3.5 Renewals.
3.3.5.1 Furnish and renew all hydraulic hose assemblies in accordance with SFLC Std Spec 5000, Appendix C, Paragraph C2.2 (Hose assemblies).
NOTE
The Contractor shall test and certify new hydraulic hose assemblies.
3.3.5.2 If required, the Contractor shall renew steel blocks with aluminum blocks via CFR.
3.3.6 Updates and upgrades. Update and/or upgrade the following, as required:
3.3.6.1 Operating system and electrical updates/ upgrades.
· Auto-launch, control & diagnostics software.
· Inverter, PLC & Magellis screen.
· Firmware and hardware (memory, counter cards, batteries).
· Zelio software / hardware replacement if required
· Fuse holders.
3.3.6.2 Component upgrades.
· Limit switches.
· Others, as necessary.
3.3.7 Pressure gauge calibration. Ensure all pressure gauges are in accordance with BS EN 837-1 and be calibrated and certified. Affix calibration labels to the faces of all gauges noting the calibration facility name and date tested
3.3.8 Accumulator and HPU relief valves setting. Properly set the accumulator and HPU relief valves and tag each with the date of calibration and set pressure.
3.4 Surface preservation. The Contractor shall preserve the davit in accordance with SFLC Std Spec 5000.
3.5 Groom and lubricate. The Contractor shall groom and lubricate the Welin-Lambie davit system in accordance with SFLC Std Spec 5000.
3.6 Hydraulic fluid. The Contractor shall flush the davit hydraulic system in accordance with SFLC Std Spec 5000, Appendix C, Paragraph C2.1 (Fluids) and submit a CFR:
3.7 Test requirements - post repairs.
3.7.1 Test plan. The Contractor shall submit a test plan to the KO for approval, to include the tests prescribed herein, 45 days prior to proposed start date
3.7.2 Test notification. The Contractor shall give Coast Guard personnel 45 days notice prior to testing.
3.7.3 Factory tests. After completion of work, in the presence of a Coast Guard Quality Assurance Representative, the Contractor shall conduct the following factory operational tests of the davit system, on a level plane, to prove satisfactory operating condition in accordance with SFLC Std Spec 5000 and as specified herein. Submit a Final Report summarizing all test results to the Contracting Officer, Quality Assurance Representative, and the COTR within 14 days.
3.7.3.1 No load test. Conduct an operational test of the davit using no load over the entire range of motion
3.7.3.2 Automatic and manual Brake Test Load (BTL). Conduct a static brake test using 150% of the Safe Working Load (SWL) of 11,000 lbs or (16,500 lbs) one drum revolution and hold the load for a minimum of 5 minutes. Allow sufficient time to inspect the brake for slippage or creep before a controlled-release of the load
3.7.3.3 Dynamic Test Load (DTL) tests. Conduct the following tests while the system is operated in the normal power mode and the hydraulically-stored energy mode (emergency operation). Conduct these tests with a 50-50 weight distribution and a 40% forward – 60% aft weight distribution for each operation mode
3.7.3.3.1 Luffing speed test at SWL. Record luffing speeds from the fully-retracted to the fully-extended positions and then from the fully-extended to fully-retracted positions at SWL (11,000 lbs
3.7.3.3.2 Luffing speed test at 125% SWL. Record luffing speeds from the fully-retracted to the fully-extended positions and then from the fully-extended to fully-retracted positions at 125% SWL (13,750 lbs
NOTE
Both luffing speed tests in normal operation mode shall meet a 30 to 33 second nominal luff-in and 41 to 43 second nominal luff-out time.
Both luffing speed tests in emergency operation adode shall meet a 24 to 28 second nominal luff-in and 24 to 28 second nominal luff-out time.
3.7.3.3.3 Dynamic test (at SWL) data recording. During the SWL dynamic test, record the following:
3.7.3.3.3.1 Main winch running speed test – gravity lower, measure and record the main winch speed
NOTE
The minimum speed shall be 69.9 RPM rope drum speed.
3.7.3.3.3.2 Main winch hoist test – demonstrate variable speed, measure and record fast and slow hoist under power.
NOTE
The minimum fast speed and low hoist speeds shall be 52 RPM and 17.5 RPM rope drum speed, respectively.
3.7.3.3.3.3 Main winch lower test – demonstrate variable speed, measure and record fast and slow lowering under power.
NOTE
The minimum fast speed and low lowering speeds shall be 52 RPM and 17.5 RPM rope drum speed, respectively.
3.7.3.3.4 Main brake overload test at 150% SWL (16,500 lbs). With a load suspended at 150% SWL (16,500 lbs), rotate the main winch drum one revolution, stop and hold for observation (minimum of 5 minutes)
3.7.3.3.5 Emergency hand hoisting at 110% SWL (12,100 lbs). The hand hoist shall be operated satisfactorily at 110% SWL (12,100 lbs)
3.7.3.4 Safety and emergency feature testing. Operate the davit and test all emergency stop(s), limit switch activation, brake turning handle, and emergency luffing mode (using accumulators)
3.7.3.5…