Attachment I - SOW - with revisions

View the file

Other files for this federal contract opportunity

Other files attached to Welin Lambie Davits and Support Services, newest first.
File Type Posted
J A Redacted.pdf PDF
SF-30 IV.pdf PDF
RFP A00004.doc DOC document
RFP A00003.doc DOC document
SF-30 III.pdf PDF
Questions and Clarifications A00003.doc DOC document
A00002 SF-30.pdf PDF
A00002 - Attachment I - SOW.doc DOC document
A00001 - Attachment I - SOW.doc DOC document
A00001 SF-30.pdf PDF
RFP A00001.doc DOC document
Ombudsman Notice.doc DOC document
Attachment II - DHS Form 700-21.pdf PDF
Attachment V - Payment Information.doc DOC document
Attachment I - SOW.doc DOC document
Attachment IV - DR.doc DOC document
Attachment III - DHS_Form_700-5.pdf PDF
RFP.pdf PDF
Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPECIFICATION FOR WELIN-LAMBIE DUAL POINT DAVIT MODEL TW.PIV 5.0B SUPPORT

WMEC AND WHEC

SPECIFICATION FOR WELIN-LAMBIE DUAL POINT DAVIT SUPPORT

Developed By: Mike Soost (Rev-0, 15 Nov 2011) Commander (SFLC) Surface Forces Logistics Center 300 E. Main St. Suite 600 Norfolk, VA 23510

TABLE OF CONTENTS

viConsolidated List of Government-furnished Property

8WORK ITEM 1: Coast Guard-Dedicated Tech Rep, Provide

11WORK ITEM 2: Maintenance Kits Support, Provide

14WORK ITEM 3: Overhaul Kits, Provide

20WORK ITEM 4: Spare Parts Support, Provide

24WORK ITEM 5: Davit Hardware and Software Upgrades, Plan and Implement

27WORK ITEM 6: Davit Virtual Trainers, Provide

29WORK ITEM 7: Davit Training, Develop

31WORK ITEM 8: Davit Electrical Training (Cutter), Conduct

33WORK ITEM 9: Davit Mechanical Training (Cutter), Conduct

35WORK ITEM 10: Davit Operational Training (Cutter), Conduct

37WORK ITEM 11: Welin-Lambie Model TW.PIV 5.0B Dual Point Davit, Factory Inspect, Test, and Overhaul

48WORK ITEM 12: New Welin-Lambie Dual Point Davit Model TW.PIV 5.0A, Provide

51WORK ITEM 13: New Welin-Lambie Dual Point Davit Model TW.PIV 5.0B, Provide

Revisions Record This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.

DATE
REV#
WORK ITEM#
CHANGES MADE

NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.

Consolidated List of References The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at time of specification writing and during contract execution.

All Coast Guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free or charge. Other Government documents may be accessed – free of charge – as follows:

· MIL/DOD/CID Specifications: http://www.assistdocs.com/search/search_basic.cfm

· Commandant Instruction Manuals: http://www.uscg.mil/directives/default.asp

· Public Laws, Code of Federal Regulations, U.S Codes, and other Federal Government laws:: www.gpoaccess.gov The Government is aware of the following internet web links where contractors may procure commercial specifications:

· American Welding Society (AWS): http://www.awspubs.com/index.php

· ANSI, ASTM, IEEEE, NFPA, ASME, SAE Standards: http://www.techstreet.com/

· NFPA: http://www.nfpa.org

· SSPC Standards and pictorial guides: http://shopping.netsuite.com/sspcmarketplace

COAST GUARD DRAWINGS

· Coast Guard Drawing 618 WMEC 583-063, Rev F, OTHB Davit Arrangement

· Coast Guard Drawing 618 WMEC 583-064, Rev C, OTHB Davit Installation

· Coast Guard Drawing 627 WMEC 583-040, Rev H, OTHB Davit Arrangement

· Coast Guard Drawing 627 WMEC 583-041, Rev E, OTHB Davit Installation

· Coast Guard Drawing 901 WMEC 583-023, Rev E, OTHB Davit Arrangement

· Coast Guard Drawing 901 WMEC 583-024, Rev F, OTHB Davit Installation

· Coast Guard Drawing 905 WMEC 583-024, Rev F, OTHB Davit Arrangement

· Coast Guard Drawing 905 WMEC 583-025, Rev E, OTHB Davit Installation

· Coast Guard Drawing 378-FRAM-E 583-010, Rev D, Over the Horizon Boat Installation

· Coast Guard Drawing 378-FRAM-W 583-038, Rev K, Over the Horizon Boat Installation

· Coast Guard Drawing FL-2605-38, Rev A, Welin-Lambie 5.0b RHI Cradle End Pads

· Coast Guard Drawing FL-2605-39, Rev -, Zodiac H733 RHI – Wood Cradle Chocks

· Coast Guard Drawing FL-8201-107, Rev A, Welin Lambie Davit OTH Gripe Assemblies

COAST GUARD PUBLICATIONS

· Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), Jan 2009, Welding and Allied Processes

· Surface Forces Logistics Center Standard Specification 2351 (SFLC Std Spec 2351), Jan 2009, Overhaul DC Generators and Motors In-Shop

· Surface Forces Logistics Center Standard Specification 3020 (SFLC Std Spec 3020), Jan 2009, Overhaul AC Electrical Motors In-Shop

· Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), Jan 2009, Inspect, Repair, and Test Auxiliary Machine Systems

· Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Jun 2006, Coatings and Color Manual

· Coast Guard Technical Publication (TP) 3943, Apr 2008, Twin Pivot Arm Davit - Type Tw.Piv 5.0B - Ref. No. 5558-1 Thru 5558-15

OTHER REFERENCES

· ANSI/ NCSL Z540-1, Calibration Laboratories and Measuring and Test Equipment - General Requirements

· ASME BPV Code Section VIII, Division 1 & 2, Rules for the Construction of Pressure Vessels

· ASTM D3951, Standard Practice for Commercial Packaging

· British Standard (BS) BS EN 837-1, 03/1998, Pressure Gauges Part 1: Bourdon Tube Pressure Gauges – Dimensions, Metrology, Requirements and Testing Consolidated List of Government-furnished Property

The following is a list of property, which the Government will furnish for overhaul. This list supersedes any other material obligations indicated or implied by referenced drawings.

Work item
MTI
Part number
ITEM DESCRIPTION
QTY
EST. Cost($)/unit
11
N
TW PIV 5.0B
Welin-Lambie Dual Point Davit
1
$475,000
11
N
N/A
Conex Shipping Contatiner
1
$9,800

*Government-loaned property, which shall be returned to the vessel upon completion of the availability.

**New or refurbished equipment that the Government may provide for installation in place of existing equipment.

***Government-furnished property, which is to be supplied by either the vessel or the C4IT ServiceCenter

Consolidated List of Critical Inspection Items The following is a list of work items, which contain Critical Inspection Reports (CIR), which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000_STD, paragraph 3.2.6.5 (Inspection report particulars)):

Work Item Title

This section is not applicable to this package.

WORK ITEM 1: Coast Guard-Dedicated Tech Rep, Provide

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to provide a Coast Guard-dedicated Welin-Lambie Dual Point Davit Technical Representative (Tech Rep).

1.2 Government-furnished property.

None.

2. REFERENCES

Coast Guard Drawings

None.

COAST GUARD PUBLICATIONS

None.

Other References

None.

3. REQUIREMENTS

3.1 General.

3.1.1 CIR.

None.

3.1.2 Tech Rep. The Contractor shall provide a qualified, Coast Guard-dedicated Welin-Lambie Tech Rep, who is familiar with, and is competent to address, the hydraulic, mechanical and electrical aspects of the Welin-Lambie TW Piv davit.

3.1.2.2 The Contractor shall ensure that the Tech Rep is a certified representative of Welin-Lambie.

3.1.2.3 Submit the Tech Rep’s name, resumé, and OEM letter of certification to the COTR.

3.1.3 Protective measures.

Not applicable.

3.1.4 Interferences.

None.

3.2 Work period. The Contractor shall provide an on-site Tech Rep for a period of 12 months during the base and each option, to work up to 40 hours weekly, within the core hours of 0600 and 1730, Monday through Friday, except Federal holidays. The number of hours and period of performance shall be delineated on the respective task order(s). Overtime may be required and shall be authorized in advance by the Contracting Officer. Travel to and from the work location will be the responsibility of the contractor. Core hours may change with prior arrangement and written authorization by the Contracting Officer. The primary place of performance shall be the U.S. Coast Guard - SFLC, 2401 Hawkins Point Rd, Baltimore, MD 21226, although travel to various cutter locations may be required.

3.3 Location. The Contractor shall locate the Tech Rep within the East Coast of the United States.

3.4 Travel. The Contractor shall ensure the Tech Rep is available for travel up to 200 days per year.

3.5 Employee conduct. Contractor Tech Reps shall comply with all applicable Government regulations, policies and procedures (e.g., fire, safety, sanitation, environmental protection, security, etc.) when visiting or working at Government facilities. The Contractor shall ensure the Tech Rep presents a professional appearance at all times and that their conduct shall not reflect discredit on the United States, the Department of Homeland Security, or the U.S. Coast Guard.

3.5.1 Tech Rep removal. The Government may, at its sole discretion, direct the Contractor to remove any Tech Rep from Coast Guard and Department of Homeland Security facilities for misconduct or security reasons. Removal does not relieve the Contractor of the responsibility to continue providing the services required in this work item. The Government will provide the Contractor with an immediate written explanation of the request to remove the Tech Rep through the Coast Guard Contracting Officer.

3.5.2 Conflict of Interest. The Contractor shall not employ any person who is an employee of the United States Government if that employment would cause, or appear to cause, a conflict of interest.

3.6 Tech Rep identification. Contractor employees working on-site at Government facilities shall wear a company issued identification badge. All Contractor employees shall identify themselves as Contractors when their status is not readily apparent and display their badge in plain view above the waist at all times.

3.7 Tech Rep performance monitoring. The Contractor shall be required to meet weekly with the COTR (or designee) during the first six weeks of the contract, on a time and date as required per the COTR (or designee) to discuss Tech Rep performance.

3.8 Duties. The Tech Rep shall be responsible and expected to conduct the following:

· Provide onsite commissioning support

· Perform casualty repairs on the Welin-Lambie TW Piv 5.0 A and B Series davits.

· Provide technical support either by phone or onsite.

· Maintain the Coast Guard TW Piv 5.0 A and B Series davit overhaul and training programs.

· Acknowledge receipt of Coast Guard-generated Request(s) for Quote within 24 hours.

· Conduct visits to verify system configuration, conditions, and to make repairs as required.

· Develop and maintain serial-tracked davit configuration database.

· Alert Coast Guard and disseminate advisories and service bulletins related to the Welin-Lambie TW Piv 5.0 A and B Series davits.

· Develop failure solutions for the TW Piv 5.0 A and B Series davits.

· Conduct onsite inspection and provide a written report of the davit prior to and upon completion of an in place overhaul.

3.9 Monthly Report of Tech Rep Tasks and Costs. Provide a monthly report to the Contract Administrator and COTR of no more than four pages that identifies task order budget, costs, travel accomplished within the last month, travel planned for the next month, and hours charged for technical representative services (monthly total and cumulative). Travel receipts shall be provided with the report in accordance with the Contract regulations. The report shall also identify any issues that the contractor perceives as adversely impacting their ability to satisfy requirements. The monthly report shall be in a contractor developed format approved by the COTR.

4. NOTES

This section is not applicable to this work item.

WORK ITEM 2: Maintenance Kits, Provide

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to develop and make available Welin-Lambie Dual Point Davit maintenance parts kits for shipment to designated Coast Guard cutters.

1.2 Government-furnished property.

None.

2. REFERENCES

Coast Guard Drawings Coast Guard Drawing 618 WMEC 583-063, Rev F, OTHB Davit Arrangement Coast Guard Drawing 618 WMEC 583-064, Rev C, OTHB Davit Installation

Coast Guard Drawing 627 WMEC 583-040, Rev H, OTHB Davit Arrangement

Coast Guard Drawing 627 WMEC 583-041, Rev E, OTHB Davit Installation

Coast Guard Drawing 901 WMEC 583-023, Rev E, OTHB Davit Arrangement

Coast Guard Drawing 901 WMEC 583-024, Rev F, OTHB Davit Installation

Coast Guard Drawing 905 WMEC 583-024, Rev F, OTHB Davit Arrangement

Coast Guard Drawing 905 WMEC 583-025, Rev E, OTHB Davit Installation

Coast Guard Drawing 378-FRAM-E 583-010, Rev D, Over the Horizon Boat Installation

Coast Guard Drawing 378-FRAM-W 583-038, Rev K, Over the Horizon Boat Installation

Coast Guard Drawing FL-2605-38, Rev A, Welin-Lambie 5.0b RHI Cradle End Pads

Coast Guard Drawing FL-2605-39, Rev -, Zodiac H733 RHI – Wood Cradle Chocks

Coast Guard Drawing FL-8201-107, Rev A, Welin Lambie Davit OTH Gripe Assemblies

COAST GUARD PUBLICATIONS

Coast Guard Technical Publication (TP) 3943, Apr 2008, Twin Pivot Arm Davit - Type Tw.Piv 5.0B - Ref. No. 5558-1 thru 5558-15 Other References

ASTM D3951 (1990), Standard Practice for Commercial Packaging

3. REQUIREMENTS

3.1 General.

3.1.1 CIR.

None.

3.1.2 Tech Rep.

Not applicable.

3.1.3 Protective measures.

Not applicable.

3.1.4 Interferences.

None.

3.2 Maintenance part kit particulars. Using the drawings referenced in Section 2 and TP 3943 as guidance, the Contractor shall provide the following maintenance kits:

Kit/Part Description
Kit/Part Number
NSN
Quantity
Wire Rope Renewal Kit
892-02044
4010 01-F12-2483
7
Check Winch Gearbox Oil Kit
892-02045
3950 01-F12-2484
7
Tension Winch Brake Inspection Kit
892-02046
3950 01-F12-2485
7
Hydraulic Fluid Renewal Kit
892-02047
3040 01-F12-2486
7
Hydraulic Fluid Filter Renewal Kit
892-02048
4330 01-F12-2488
7
Main Winch Brake and Centrifugal Brake Inspection Kit
892-02049
4330 01-F12-2489
7
Hydraulic Breather Replacement Kit
892-02050
3040 01-F12-2490
7
Hydraulic Hose Replacement Kit
892-02051
4720 01-F12-2491
7

3.2.3 Preservation, Packaging and Marking (PP&M). Package each kit in accordance with ASTM D3951. Mark (stencil) the shipping/packaging container with the information provided in 4.1.

NOTE

Bar coding of kits or individual kit content packaging is not required.

3.2.4 Kits storage. The Contractor shall assemble, store, and maintain a stock of all kits at a Contractor-managed location.

3.3 Kit shipment. The Contractor shall ship the maintenance kits to the Coast Guard warehouse following Coast Guard request.

· The following kits and quantities will be shipped to arrive no later than 10 January each year:

Kit/Part Description
Kit/Part Number
NSN
Quantity
Wire Rope Renewal Kit
892-02044
4010 01-F12-2483
4
Check Winch Gearbox Oil Kit
892-02045
3950 01-F12-2484
4
Tension Winch Brake Inspection Kit
892-02046
3950 01-F12-2485
4
Hydraulic Fluid Renewal Kit
892-02047
3040 01-F12-2486
4
Hydraulic Fluid Filter Renewal Kit
892-02048
4330 01-F12-2488
4
Main Winch Brake and Centrifugal Brake Inspection Kit
892-02049
4330 01-F12-2489
4
Hydraulic Breather Replacement Kit
892-02050
3040 01-F12-2490
4
Hydraulic Hose Replacement Kit
892-02051
4720 01-F12-2491
4

· The following kits and quantities will be shipped to arrive no later than 01 July each year:

Kit/Part Description
Kit/Part Number
NSN
Quantity
Wire Rope Renewal Kit
892-02044
4010 01-F12-2483
3
Check Winch Gearbox Oil Kit
892-02045
3950 01-F12-2484
3
Tension Winch Brake Inspection Kit
892-02046
3950 01-F12-2485
3
Hydraulic Fluid Renewal Kit
892-02047
3040 01-F12-2486
3
Hydraulic Fluid Filter Renewal Kit
892-02048
4330 01-F12-2488
3
Main Winch Brake and Centrifugal Brake Inspection Kit
892-02049
4330 01-F12-2489
3
Hydraulic Breather Replacement Kit
892-02050
3040 01-F12-2490
3
Hydraulic Hose Replacement Kit
892-02051
4720 01-F12-2491
3

3.4 Usage reports. The Contractor shall provide a maintenance kit ordering and shipment report to the contracting officer and COTR bi-annually. At a minimum, the report shall indicate 1) the kits and quantities shipped, 2) the ship dates and destination(s), and 3) the quantities currently in stock at the Contractor’s facility.

4. NOTES

4.1 Packaging marking:

· National Stock Number (NSN) – (as determined/ applicable)

· Item Name: (as determined)

· Part Number: (as determined)

· Shipping weight: (as determined)

· Government Contract Number: (as determined)

· MPC Number.

WORK ITEM 3: Overhaul Kits, Provide

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to make available Welin-Lambie Dual Point Davit overhaul parts kits for shipment to designated Coast Guard cutters.

1.2 Government-furnished property.

None.

2. REFERENCES

Coast Guard Drawings Coast Guard Drawing 618 WMEC 583-063, Rev F, OTHB Davit Arrangement Coast Guard Drawing 618 WMEC 583-064, Rev C, OTHB Davit Installation

Coast Guard Drawing 627 WMEC 583-040, Rev H, OTHB Davit Arrangement

Coast Guard Drawing 627 WMEC 583-041, Rev E, OTHB Davit Installation

Coast Guard Drawing 901 WMEC 583-023, Rev E, OTHB Davit Arrangement

Coast Guard Drawing 901 WMEC 583-024, Rev F, OTHB Davit Installation

Coast Guard Drawing 905 WMEC 583-024, Rev F, OTHB Davit Arrangement

Coast Guard Drawing 905 WMEC 583-025, Rev E, OTHB Davit Installation

Coast Guard Drawing 378-FRAM-E 583-010, Rev D, Over the Horizon Boat Installation

Coast Guard Drawing 378-FRAM-W 583-038, Rev K, Over the Horizon Boat Installation

Coast Guard Drawing FL-2605-38, Rev A, Welin-Lambie 5.0b RHI Cradle End Pads

Coast Guard Drawing FL-2605-39, Rev -, Zodiac H733 RHI – Wood Cradle Chocks

Coast Guard Drawing FL-8201-107, Rev A, Welin Lambie Davit OTH Gripe Assemblies

COAST GUARD PUBLICATIONS

Coast Guard Technical Publication (TP) 3943, Apr 2008, Twin Pivot Arm Davit - Type Tw.Piv 5.0B - Ref. No. 5558-1 thru 5558-15 Other References

ASTM D3951 (1990), Standard Practice for Commercial Packaging

3. REQUIREMENTS

3.1 General.

3.1.1 CIR.

None.

3.1.2 Tech Rep.

Not applicable.

3.1.3 Protective measures.

Not applicable.

3.1.4 Interferences.

None.

3.2 Overhaul parts kits particulars. The Contractor shall develop overhaul kits based on the following parts list using TP 3943 and applicable drawings as guidance:

Part Number
Description
QTY
892-02053
4 YEAR DAVIT IN-PLACE OVERHAUL KIT

Boat Block Assembly Drawing 5650-5601

5201-8711
Sheave Bush
2
5201-8611
Isolating Bush
4
675-05035
Tension Pin
2
7300-0120
Thrust washer
2
7300-0121
Sleeve Bearing
2
651-10015
External Circlip
2
5440-5511
Rubbing Strip
4
5440-5611
Rubbing Strip
4
5440-5711
Rubbing Strip
4
616-02056
Slotted CSK HD Screw
16

Davit Assembly Drawing 5631-4601

623-20075
Hex HD Bolt
86
647-00820
Plain Washer
118
629-00320
Hex Nut
86
5204-5211
Arm Pivot Bush
4
639-01070
Locknut
4
5202-8411
Cylinder Pin Bush
4
5191-4711
Roller
8
7500-1225
Self-Lubricating Bearing
32
679-40032
Split Cotter Pin
32
5191-4611
Roller
8
5418-1631
Striker Arm
2
679-38032
Split Cotter Pin
8
800-02033
Main Rope - FWD
1
800-02034
Main Rope - AFT
1
889-01048
Grease Nipple
2
889-01049
Grease Nipple
2

Winch Gearbox Assembly Drawing 5508-7002

5404-6911
Gasket
1
5062-0611
Bearing Housing
1
7967-0453
Oil Seal
1
5201-6111
Sleeve
1
7004-0045
Deep Groove Ball Bearing
1
889-02105
Sealing Washer
2
889-02006
Flanged Plug
2
859-01333
Miniature Immersion Heater
1
679-40030
Split Cotter Pin
2
647-00820
Plain Washer
2
7500-1220
Self-Lubricating Bearing
1
5727-0801
Brake Cylinder
1
677-40045F
Split Cotter Pin
1
651-10065
External Circlip
2
7960-0603
O-Ring
1
7967-0401
Oil Seal
1
5520-6301
Brake Shoe Assembly
1
2520-1901
Centrifugal Brake Shoe Assembly
6
7960-0453
O-Ring
1
7967-0551
Oil Seal
1
652-10052
Internal Circlip
1
5425-6331
Cylinder Plate
1
5204-5011
Bush
1
679-38020
Split Cotter Pin
1
647-00810
Plain Washer
1
7500-0612
Self-Lubricating Bearing
2
5421-8011
Pivot Plate
1
629-00016
Hex Nut
1
609-16150
Hex HD Setscrew
1
894-01706
Bonded Washer
1
683-00327
Compression Spring
4
647-00816
Plain Washer
4
651-10030
External Circlip
4
647-00830
Plain Washer
4
5492-6011
Motor T.B. Gasket
1

Falls Tension Winch Assembly Drawing 5503-3902

5142-6911
Anchor Pin
2
5590-1411
Modified Nut
2
679-39050
Split Cotter Pin
2
5492-6011
Motor T.B. Gasket
2
5293-2311
Gasket
2
7960-1543
O-Ring
2
891-05524
Brake Lining
2

Control Station Assembly Drawing 5694-4701

830-00110
PVC Strip Seal
1
5405-7111
Gasket
1

Hydraulic Assembly Drawing 5631-4602

5726-6101
Pressure Hose Assembly
2
5726-5901
Pressure Hose Assembly
2
5726-6001
Pressure Hose Assembly
4

Hydraulic Reservoir Assembly Drawing 5735-1001

5405-7911
Reservoir Gasket
1
894-00915
Suction Strainer
2
894-00836
Oil Heater
1
894-01709
Bonded Washer
1
894-00835
Air Bag
1
894-00913
Pressure Filter
2
894-00822
Desiccant Breather
1
894-00834
Desiccant Breather Adaptor
1
894-00813
Breather
1
894-00321
Relief Valve
2
891-00601
Pressure Filter Element
2
891-00449
Water Filter Element
1
894-00907
Return Filter Element
1
5492-6011
Motor T.B. Gasket
2
894-10213
Male Stud Coupling
2
894-11355
Reducer
2
5425-8911
Bell Housing Gasket
2
5433-7811
Pump Gasket
2

Hydraulic Panel Assembly Drawing 5733-1301

894-00319
Solenoid Coil
1
5406-4511
Hydraulic Panel Gasket
1

Misc.

885-02061
Accumulator Gas Valve
2
885-02059
Accumulator Bladder Kit
2
885-02072
Accumulator Bleed Valve
2
891-00460
Accumulator Cushion Ring
2
885-02025
Accumulator Safety Valve
1
892-01013
Seal Kit (Hyd Cylinder)
2
891-00451
Overcentre Valve
4

3.2.1 Kit assembly. Individually assemble and package each overhaul kit, with kit contents packaged individually within the kit.

3.2.2 Preservation, Packaging and Marking (PP&M). Package each kit in accordance with ASTM D3951. Mark (stencil) the shipping/packaging container with the information provided in 4.1.

NOTE

Bar coding of kits or individual kit content packaging is not required.

3.2.3 Kits storage. The Contractor shall assemble, store, and maintain an initial stock of all kits at a Contractor-managed location and make available for immediate shipment to the Coast Guard upon request.

3.3 Kit shipment. The Contractor shall ship the overhaul kits to a designated Coast Guard location within 72 hours of Coast Guard request for final delivery at destination within 14 calendar days.

3.4 Usage reports. The Contractor shall provide an overhaul kit ordering and shipment report to the COTR bi-annually. At a minimum, the report shall indicate 1) the kits/parts and quantities shipped, 2) the ship dates and destination(s), and 3) the quantities currently in stock at the Contractor’s facility.

4. NOTES

4.1 Packaging marking:

· National Stock Number (NSN) – (as determined/ applicable)

· Item Name: (as determined)

· Part Number: (as determined)

· Shipping weight: (as determined)

· Government Contract Number: (as determined)

· MPC Number.

WORK ITEM 4: Spare Parts Support, Provide

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to develop and maintain a Coast Guard-specific Welin-Lambie Dual Point Davit spare parts inventory.

1.2 Government-furnished property.

None.

2. REFERENCES

Coast Guard Drawings None.

COAST GUARD PUBLICATIONS

None.

Other References

ASTM D3951 (1990), Standard Practice for Commercial Packaging

3. REQUIREMENTS

3.1 General.

3.1.1 CIR.

None.

3.1.2 Tech Rep.

Not applicable.

3.1.3 Protective measures.

Not applicable.

3.1.4 Interferences.

None.

3.2 Spare part support particulars. The Contractor shall develop and make available spare parts in support of the Welin-Lambie dual point davit model TW.PIV 5.0B as discussed herein:

3.2.1 Spare parts inventory. Stock the following Coast Guard-approved spare parts at a Contractor-managed location and make available for immediate shipment to the Coast Guard upon request. The following items must be on hand and ready to ship within 72 hours. The Contractor shall provide a standard price list for items listed below.

PART NUMBER
NSN
DESCRIPTION
QTY
2520-1901
2530-99-750-0205
Centrifugal Brake Shoe Set
2
5520-6301
2530-99-430-0529
Main Brake Shoe
2
5590-0811
5930-99-983-1547
Rotary Switch/Encoder
1
5650-5601
2030-99-248-4992
Aluminum Boat Block Assembly
2
885-02025
4820-99-322-5761
Accumulator Safety Block
2
5721-8611
4820-99-350-2344
Lever Valve
1
5726-5901
4720-99-479-6000
Pressure Hose Kit (Brake Cyl)
2
5726-6001
4720-99-797-4942
Pressure Hose Kit (Luff Cyl)
2
5726-6101
4720-99-616-8026
Pressure Hose Assembly
2
800-09948
4030-01-467-1005
Release Hook
2
859-01948
6625-99-902-4906
LED Cluster (RED)
2
859-01951
5980-99-814-5543
LED Cluster (Blue)
2
859-03343
5990-99-724-7525
Incremental Rotary Encoder
2
859-02903
6110-99-336-3268
Telefast Input Block
2
859-02905
6150-99-510-6792
Telefast Cable
2
859-02906
5998-14-507-3745
Telefast Analog Cable
2
859-02914
5998-01-575-1477
Analog Converter
1
859-02973
5998-01-574-7008
Counter Card
1
859-02971
5998-01-574-1477
Counter Card
2
859-02697
6685-99-813-1904
Hygrostat
1
859-03027
5945-99-189-2417
Thermister, Motor Protection
6
859-03033
6130-14-563-6751
Power Supply Unit
1
859-03772
5825-99-483-2504
Incremental Rotary Encoder
2
894-03800
6105-99-700-9690
Filter Indicator Plug
8
860-01037
6105-99-507-3047
Electric Motor - Main Winch
1
860-01038
5998-14-507-3745
Electric Motor - Hydraulic Power Unit
1
860-01039
6105-99-434-4140
Electric Motor - Falls Tensioning Winch
2
860-02014
6130-99-593-2248
Main Winch Inverter
2
860-02015
6130-01-F02-8885
FWD Falls Tension Winch Inverter
2
860-02029
6130-01-F12-2487
AFT Falls Tension Winch Inverter
2
860-02021
5998-99-226-1399
HTTL Card
4
885-02059
2090-99-667-2901
Accumulator Bladder Kit
6
891-00449
4330-01-459-3037
Water Removal Filter Element
10
891-00451
4810-99-459-7211
Overcenter Valve
4
891-00601
4330-99-549-9320
Pressure Filter Element
20
891-05515
6110-12-369-3494
Falls Tension Brake
2
894-00813
3040-01-563-3025
Air Breather
4
894-00822
3040-01-440-5669
Dessicant Breather
10
894-00835
2090-99-667-9545
Air Bag
4
894-00836
4520-99-938-5901
Immersion Heater
2
894-00907
2910-01-500-6910
Return Filter Element
10
894-00911
4330-99-501-0015
Return Filter Assembly Complete
4
894-00912
4330-99-503-3940
Water Removal Filter Assy w/Element
4
894-00913
4330-99-355-4796
Pressure Filter Assembly
4
894-00915
4730-99-867-9073
Suction Strainer
4
894-00905
4330-99-693-1238
Blockage Indicator
8
885-02012
2030-01-F11-2492
Accumulator Bottles
10
800-02033
4010-99-251-6631
Wire Rope FWD
10
800-02034
4010-99-665-8380
Wire Rope AFT
10
885-02076
4820-99-676-6124
Gas Valve Assembly
4
885-02073
4820-99-175-2966
Burst Disc
6
885-02061
4820-99-911-6206
Gas Valve
6
885-02072
4820-99-371-2109
Accumulator Bleed Valve
6
885-02077
4730-99-553-3464
Fluid Port Adapter S.S.
6
885-02078
4730-99-154-3214
S/S Fluid end Connector
4
892-02021
5920-99-750-5099
Fuses, Set
10

3.2.3 Spare parts packaging. Package spare parts individually in accordance with ASTM D3951. Mark (stencil) the shipping/packaging container with the information provided in 4.1.

NOTE

Bar coding of individual parts is not required.

3.3 Spare parts shipment. The Contractor shall ship the spare part to the designated Coast Guard location(s) within 72 hours of Coast Guard request for final delivery at destination within 14 calendar days.

3.4 Usage reports.

3.4.1 The Contractor shall provide a spare parts ordering and shipment report to the Contracting Officer and COTR bi-annually. 1) the parts and quantities shipped, 2) the ship dates and destination(s), and 3) the quantities currently in stock at the Contractor’s facility.

3.4.2 The Contractor shall make stocking adjustment(s) recommendations to the Contracting Officer and COTR in the bi-annual report.

4. NOTES

4.1 Packaging marking:

· National Stock Number (NSN) – (as determined/ applicable)

· Item Name: (as determined)

· Part Number: (as determined)

· Shipping weight: (as determined)

· Government Contract Number: (as determined) WORK ITEM 5: Davit Hardware and Software Upgrades, Plan and Implement

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to assess, plan, and upgrade all davit hardware and software to the latest cutter configuration.

1.2 Government-furnished property.

None.

2. REFERENCES

Coast Guard Drawings Coast Guard Drawing 618 WMEC 583-063, Rev F, OTHB Davit Arrangement Coast Guard Drawing 618 WMEC 583-064, Rev C, OTHB Davit Installation

Coast Guard Drawing 627 WMEC 583-040, Rev H, OTHB Davit Arrangement

Coast Guard Drawing 627 WMEC 583-041, Rev E, OTHB Davit Installation

Coast Guard Drawing 901 WMEC 583-023, Rev E, OTHB Davit Arrangement

Coast Guard Drawing 901 WMEC 583-024, Rev F, OTHB Davit Installation

Coast Guard Drawing 905 WMEC 583-024, Rev F, OTHB Davit Arrangement

Coast Guard Drawing 905 WMEC 583-025, Rev E, OTHB Davit Installation

Coast Guard Drawing 378-FRAM-E 583-010, Rev D, Over the Horizon Boat Installation

Coast Guard Drawing 378-FRAM-W 583-038, Rev K, Over the Horizon Boat Installation

Coast Guard Drawing FL-2605-38, Rev A, Welin-Lambie 5.0b RHI Cradle End Pads

Coast Guard Drawing FL-2605-39, Rev -, Zodiac H733 RHI – Wood Cradle Chocks

Coast Guard Drawing FL-8201-107, Rev A, Welin Lambie Davit OTH Gripe Assemblies

COAST GUARD PUBLICATIONS

Coast Guard Technical Publication (TP) 3943, Apr 2008, Twin Pivot Arm Davit - Type Tw.Piv 5.0B - Ref. No. 5558-1 thru 5558-15

Other References

None.

3. REQUIREMENTS

3.1 General.

3.1.1 CIR.

None.

3.1.2 Tech Rep.

Not applicable.

3.1.3 Protective measures.

Not applicable.

3.1.4 Interferences.

None.

3.2 Upgrade assessment and plan. The Contractor shall submit a CFR for the following:

3.2.1 Assessment. Using the drawings referenced in Section 2 and TP 3943, in conjunction with inspection herein, the Contractor shall establish the baseline configuration, make an assessment of the davit configuration, and determine all upgrades required.

3.2.2 Upgrade plan. The Contractor shall develop a plan for upgrading the davit and submit to the COTR for approval.

3.3 Upgrade particulars.

3.3.1 Hardware updates. The Contractor shall inspect and recommend upgrades as necessary for davit hardware to the Coast Guard-specific standard configuration. The following shall be considered at a minimum for upgrading:

· Fuse holders

· Metallic limit switches

· Low oil light (during luff and automatic mode)

· No oil level (screen indicator)

· Main motor pinion modification

3.3.2 Software updates. The Contractor shall inspect and recommend upgrades as necessary for davit hardware. The following shall be considered at a minimum for upgrading:

· Zelio software

· Zelio Logic Relay

· Fault indicators

· E-stop alarm

3.4 Upgrade. The Contractor shall make all approved upgrade recommendations described herein within 14 calendar days of Coast Guard approval.

3.5 Operational test – post repairs. After completion of work, the Contractor shall witness an operational test (by Coast Guard personnel) of the davit to prove satisfactory operating condition. Submit a trip report including all test results within 5 calendar days of completion.

4. NOTES

This section is not applicable to this work item.

WORK ITEM 6: Davit Virtual Trainers, Provide

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to provide twenty virtual davit training laptop computers to designated Coast Guard locations.

1.2 Government-furnished property.

None.

2. REFERENCES

Coast Guard Drawings None.

COAST GUARD PUBLICATIONS

None.

Other References

ASTM D3951 (1990), Standard Practice for Commercial Packaging

3. REQUIREMENTS

3.1 General.

3.1.1 CIR.

None.

3.1.2 Tech Rep.

Not applicable.

3.1.3 Protective measures.

Not applicable.

3.1.4 Interferences.

None.

3.2 Virtual trainer particulars.

3.2.1 Computers. The Contractor shall provide twenty Coast Guard- customized virtual training laptop computers, with protective cases, and software for the computers within 180 days of award.

3.2.2 Virtual training content. In addition to training content, the Contractor shall develop software to cover the following:

· Virtual training based on provided Coast Guard Maintenance Procedure Cards (MPCs).

· Troubleshooting Coast Guard commonly-encountered electrical problems (i.e., check HTTL card, tripped inverters – luff and winch).

· Electrical component identification and location.

3.2.3 Upgrades and replacements. The Contractor shall be responsible for correcting discrepancies via laptop upgrades during the performance period.

3.3 Delivery. The Contractor shall provide the Welin-Lambie davit virtual trainers via computer laptops to the Coast Guard as designated by the Coast Guard inspector within 180 days of award.

3.4 Preservation, Packaging and Marking (PP&M). The Contractor shall package each computer in accordance with ASTM D3951. Mark (stencil) the shipping/packaging container with the information provided in 4.1.

NOTE

Bar coding of kits or individual kit content packaging is not required.

4. NOTES

4.1 Packaging marking:

· National Stock Number (NSN) – (as determined/ applicable)

· Item Name: (as determined)

· Part Number: (as determined)

· Shipping weight: (as determined)

· Government Contract Number: (as determined) WORK ITEM 7: Davit Training, Develop

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to develop davit training to provide to Coast Guard personnel.

1.2 Government-furnished property.

None.

2. REFERENCES

Coast Guard Drawings None.

COAST GUARD PUBLICATIONS

None.

Other References

None.

3. REQUIREMENTS

3.1 General.

3.1.1 CIR.

None.

3.1.2 Tech Rep.

3.1.3 Protective measures.

Not applicable.

3.1.4 Interferences.

None.

3.2 Training particulars.

3.2.1 Training contents. Training shall cover the following three aspects as related to the davit:

· Electrical - maintenance and troubleshooting;

· Mechanical - maintenance and troubleshooting;

· Operations - Coast Guard specific operation.

3.2.2 Training plan. The Contractor shall submit a training plan and syllabus to the COTR for approval within 90 days of award.

4. NOTES

This section is not applicable to this work item.

WORK ITEM 8: Davit Electrical Training (Cutter), Conduct

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to provide davit electrical training to designated Coast Guard cutters.

1.2 Government-furnished property.

None.

2. REFERENCES

Coast Guard Drawings None.

COAST GUARD PUBLICATIONS

None.

Other References

None.

3. REQUIREMENTS

3.1 General.

3.1.1 CIR.

None.

3.1.2 Tech Rep. Training shall be conducted by the Coast Guard-dedicated Tech Rep.

3.1.3 Protective measures.

Not applicable.

3.1.4 Interferences.

None.

3.2 Training particulars. The Contractor shall provide davit electrical training sessions (3 days of training per session) and training tools to cutter crews, up to 8 training sessions per year.

3.3 Training materials. The Contractor shall be responsible for providing training materials for up to 10 students.

4. NOTES

This section is not applicable to this work item.

WORK ITEM 9: Davit Mechanical Training (Cutter), Conduct

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to provide davit mechanical training to designated Coast Guard cutters.

1.2 Government-furnished property.

None.

2. REFERENCES

Coast Guard Drawings None.

COAST GUARD PUBLICATIONS

None.

Other References

None.

3. REQUIREMENTS

3.1 General.

3.1.1 CIR.

None.

3.1.2 Tech Rep. Training shall be conducted by the Coast Guard-dedicated Tech Rep.

3.1.3 Protective measures.

Not applicable.

3.1.4 Interferences.

None.

3.2 Training particulars. The Contractor shall provide davit mechanical training sessions (3 days of training per session) and training tools to cutter crews, up to 8 training sessions per year.

3.3 Training materials. The Contractor shall be responsible for providing training materials for up to 10 students.

4. NOTES

This section is not applicable to this work item.

WORK ITEM 10: Davit Operational Training (Cutter), Conduct

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to provide davit operational training to designated Coast Guard cutters.

1.2 Government-furnished property.

None.

2. REFERENCES

Coast Guard Drawings None.

COAST GUARD PUBLICATIONS

None.

Other References

None.

3. REQUIREMENTS

3.1 General.

3.1.1 CIR.

None.

3.1.2 Tech Rep. Training shall be conducted by the Coast Guard-dedicated Tech Rep.

3.1.3 Protective measures.

Not applicable.

3.1.4 Interferences.

None.

3.2 Training particulars. The Contractor shall provide davit operational training (3 days of training per session) and training tools to cutter crews, up to 8 training sessions per year.

3.3 Training materials. The Contractor shall be responsible for providing training materials for up to 10 students.

4. NOTES

This section is not applicable to this work item.

58300_MWS_0510_FLT

WORK ITEM 11: Welin-Lambie Model TW.PIV 5.0B Dual Point Davit, Factory Inspect, Test, and Overhaul

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to inspect, test, and overhaul a Welin-Lambie TW.PIV 5.0B Dual Point Davit.

1.2 Partial List of Contractor-furnished property. The following is a list of parts/components the Coast Guard requires to be renewed, but may not be all-inclusive of parts that may need to be renewed. Additional, contingency parts recommended by the Contractor for renewal shall be done via CFR.

MTI
Part number
ITEM DESCRIPTION
QTY

Boat Block Assembly, Drawing No. 5650-5601

N
5120-8611
Sheave pin
2
N
7300-0120
Thrust washer
2
N
675-03012
Tension pin
2
N
675-05010
Tension pin
2
N
675-05035
Tension pin
2
N
5440-5511
Rubbing Strip
4
N
5440-5611
Rubbing Strip
4
N
5440-5711
Rubbing Strip
4
N
616-02056
Slotted CSK HD Screw
16

Davit Assembly, Drawing No. 5631-4601

N
5129-6711
Arm pivot pin
2
N
5142-7011
Pivot pin
2
N
5143-7911
Sheave pin
4
N
5143-8111
Sheave pin
3
N
5144-7611
Sheave pin
2
N
5145-4411
Roller pin
8
N
5145-4711
Cylinder pin
4
N
5146-2211
Sheave pin
4
N
5146-2311
Roller pin
8
N
5146-2411
Sheave pin
1
N
5191-4611
Roller
8
N
5191-4711
Roller
8
N
5202-7211
Sleeve
28
N
5203-9011
Pivot bracket bushing
4
N
892-01013
Hydr cylinder seal kit
2
N
885-02059
Accumulator bladder kit
2
N
885-02025
Accumulator safety block
1
N
859-01070
Limit switch
4
N
800-02033
Forward wire rope
1
N
800-02034
Aft wire rope
1

Winch Gearbox Assembly, Drawing No. 5508-7002

N
2520-1901
Cent brake shoe assy
6
N
5080-0101
Magnetic plug
1
N
5201-6111
Sleeve
1
N
5205-2111
Sleeve
2
N
5291-3611
Retaining ring
2
N
5392-3901
Roller assembly
2
N
5395-0711
Sleeve
1
N
5520-6301
Brake shoe assy
1
N
5727-0801
Brake cylinder
1
N
680-14054
Key
1
N
680-18050
Key
1
N
859-01070
Limit switch
1
N
859-01333
Immersion heater
1
N
859-01334
Thermostat
1
N
889-02006
Flanged plug
2
N
889-02105
Sealing washer
2

Falls Tensioning Winch Assembly, Drawing No. 5503-3902

N
859-01070
Limit switch
2
N
5503-3904
Heater
2
N
891-05515
Electro-magnetic brake
2

Control Station Assembly, Drawing No. 5694-4701

N
830-00110
PVC strip seal
7.5
N
859-02103
Thermostat
1
N
859-02161
Panel heater
1

Drive Panel Assembly, Drawing No. 2780-2401

N
859-02697
Hygrostat
1
N
859-02696
Heater
1
N
860-03002
Filter
1

Control Panel Assembly, Drawing No. 2780-8401

N
859-02696
Heater
1

Hydraulic Assembly, Drawing No. 5631-4602

N
5726-5901
Hose assembly
2
N
5726-6001
Hose assembly
4
N
5726-6101
Hose assembly
2

Hydraulic Reservoir Assembly, Drawing No. 5735-1001

N
894-00913
Pressure filter
2
N
894-00915
Suction strainer
2
N
894-00813
Breather
1
N
894-00835
Air Bag
1
N
894-00206
Pump
2
N
894-00207
Pump coupling
2
N
894-00822
Dessicant breather
1
N
894-00834
Dessicant adapter
1
N
894-00836
Oil heater
1
N
894-01703
Bonded washer
5
N
894-01709
Bonded washer
1
N
894-00837
Float switch
1

TWPIV5.0B Hydraulic Panel Assembly, Drawing No. 5733-1301

N
894-00907
10 micron filter
1
N
894-00912
Water filter
1
N
894-00319
Solenoid Coil
1
N
859-02611
Heater
1
N
859-02103
Thermostat
1

Miscellaneous Part Sets

N
Non-Structural Fasteners and Grease Fittings (Set)
1
N
Elastomer Renewal (Set)
1
N
Bearings and Bushings (Set)
1
N
Fasteners (Set)
1

1.3 Government-furnished property.

Work item
MTI
Part number
ITEM DESCRIPTION
QTY
EST. Cost($)/unit
11
N
TW PIV 5.0B
Welin-Lambie Dual Point Davit
1
$475,000
11
N
N/A
Conex Shipping Contatiner
1
$9,800

2. REFERENCES

Coast Guard Drawings None.

COAST GUARD PUBLICATIONS

Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), Jan 2009, Welding and Allied Processes

Surface Forces Logistics Center Standard Specification 2351 (SFLC Std Spec 2351), Jan 2009, Overhaul DC Generators and Motors In-Shop

Surface Forces Logistics Center Standard Specification 3020 (SFLC Std Spec 3020), Jan 2009, Overhaul AC Electrical Motors In-Shop

Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), Jan 2009, Inspect, Repair, and Test Auxiliary Machine Systems

Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Jun 2006, Coatings and Color Manual

Coast Guard Technical Publication (TP) 3943, Apr 2008, Twin Pivot Arm Davit - Type Tw.Piv 5.0B - Ref. No. 5558-1 Thru 5558-15

Other References

ANSI/ NCSL Z540-1, Calibration Laboratories and Measuring and Test Equipment - General Requirements ASME BPV Code Section VIII, Division 1 & 2, Rules for the Construction of Pressure Vessels

ASTM D3951, Standard Practice for Commercial Packaging

British Standard (BS) BS EN 837-1, 03/1998, Pressure Gauges Part 1: Bourdon Tube Pressure Gauges – Dimensions, Metrology, Requirements and Testing

3. REQUIREMENTS

3.1 General. The Contractor shall accomplish all work herein in accordance with SFLC Std Spec 5000, TP 3943.

3.1.1 Services. The Contractor shall provide all services required to accomplish the work herein on the Welin-Lambie TW.PIV 5.0B Dual Point Davit system at Welin-Lambie in the United Kingdom.

3.1.2 Protective measures - hydraulic system. The Contractor shall maintain existing hydraulic system cleanliness as specified herein; take all necessary precautions to prevent the introduction of contaminants into the hydraulic system. Whenever disconnecting or removing components from the hydraulic system, completely seal all openings to the rest of the system, immediately, using either caps (for externally threaded connection points), bolt-on blanks, or taped-on discs/covers (durable plastic or sheet-metal no less than 1/16-inch thick)

NOTE

Plastic bags may be used only when arrangement or configuration prevents the use of the other sealing methods specified above.

3.1.3 Non-structural fasteners and grease fittings. The Contractor shall renew all non-structural fasteners and grease fittings with 300-series stainless steel. Non Structural fasteners include roll pins circlips, cotter pins and other fasteners.

3.1.3.1 Elastomer renewal: The contractor shall renew all o-rings, oil seals, gaskets, and seals.

3.1.3.2 Bearings and Bushings: Contractor shall renew all bearings and bushings.

3.1.4 Fasteners. The Contractor shall renew all fasteners with 300-series stainless steel fasteners

3.1.5 Receipt report. Within seven (7) days from receipt of the davit, the Contractor shall inspect and inventory the davit assembly and submit a receiving report on the following:

· General condition of the shipping container and davit assembly.

· Davit model and serial numbers.

· Missing or damaged parts/components with photographs of each.

3.1.6 Additional part renewal reports. The Contractor shall provide a report via CFR for all additional parts deemed necessary for renewal, other than those already specified herein, with supporting reasons for each renewal.

3.1.7 ABS/SOLAS Certification. All work that is conducted on the Welin-Lambie TW.PIV 5.0B Dual Point Davit system shall not invalidate the ABS/SOLAS certification status of the davit without successful renewal of such certification.

3.2 Inspections.

3.2.1 Clean and visually inspect. The Contractor shall clean and visually inspect the following and submit a CFR and cost proposalfor COTR and Contracting Officer approval within 60 calendar days of receipt of davit:

NOTE

Do not inspect any mandatory replacement parts.

· Davit assembly.

· Sheaves.

· Boat block assembly.

· Hydraulic reservoir(s).

· Exterior electrical cables, wiring, and conduit.

3.2.2 NDI. The Contractor shall perform NDI of the following in accordance with SFLC Std Spec 0740, Appendix C.

· All machinery foundation welds.

· Davit Frame.

· Winches.

· Forward davit arm.

· Aft davit arm.

3.3 Overhaul. Upon receipt of the Contracting Officer’s authorization to proceed, the Contractor shall overhaul and preserve (as applicable), the following components/assemblies and sub-components/assemblies:

3.3.1 Mechanical.

3.3.1.1 Structural and rigging gear, including:

· Cranston hook assemblies.

· Sheave assemblies.

· Sixteen top and bottom roller assemblies.

· Fwd davit arm hinge pin assembly.

· Aft davit arm hinge pin assembly.

3.3.1.2 Main winch, including:

· Main winch brake assembly.

· Turning handle safety device.

· Winch mounted, luffing hydraulic cylinder directional control valve (lever valve)

3.3.2 Hydraulic.

3.3.2.1 Hydraulic actuators, including:

· Fwd luffing hydraulic cylinder.

· Aft luffing hydraulic cylinder.

3.3.2.2 HPU, including:

· Fwd luffing hydraulic cylinder over-center valve.

· Aft luffing hydraulic cylinder over-center valve.

· Fwd main system relief valve.

· Aft main system relief valve.

· Fwd hydraulic pump assembly.

· Aft hydraulic pump assembly.

· Fwd high-pressure hydraulic filter assembly.

· Aft high-pressure hydraulic filter assembly.

· Two return hydraulic filter assemblies.

· Rotary flow divider assembly.

· Brake directional control valve assembly.

· Brake hydraulic cylinder rod end flow control valve.

· Brake hydraulic cylinder cap end flow control valve.

· Fwd luffing cylinder 2-position directional control valve assembly.

· Aft luffing cylinder 2-position directional control valve assembly.

· Fwd luffing cylinder 3-position directional control valve assembly.

· Aft luffing cylinder 3-position directional control valve assembly.

· Two fwd luffing cylinder shuttle valves.

· Two aft luffing cylinder shuttle valves.

· Hydraulic sump tank assembly.

· Hydraulic fluid heater and thermostat assembly.

3.3.2.3 Accumulators, including:

NOTE

The Contractor shall test and certify the accumulators/cylinders using ASME BPV Code Section III as guidance.

· Fwd hydraulic accumulator assembly.

· Aft hydraulic accumulator assembly.

· Safety block and pressure gauge assembly.

· Poppet valve assembly.

· Renew Accumulator safety fuse plug with safety burst disc.

3.3.3 Electrical.

· Fwd tension winch assembly (assembly, brake assembly, and gearbox

· Aft tension winch assembly (assembly, brake assembly, and gearbox)

3.3.3.1 Sensors and controls, including:

· Fwd luffing arm encoder assembly.

· Aft luffing arm encoder assembly.

· Control stand assembly.

3.3.3.2 Electric motor overhauls. The Contractor shall overhaul, inspect, varnish, and rewind (both motor and stator) the following motors in accordance with SFLC Std Specs 2351 and 3020, as applicable:

· Main winch electric motor.

· Forward hydraulic pump electric motor.

· Aft hydraulic pump electric motor.

· Forward falls tension electric motor

· Aft falls tension electric motor.

3.3.4 Other:

· Sump tank level indicator.

· Fwd pump pressure transducer.

· Aft pump pressure transducer.

· Fwd hydraulic cylinder rod-end pressure transducer.

· Fwd hydraulic cylinder cap-end pressure transducer.

· Aft hydraulic cylinder cap-end pressure transducer.

3.3.5 Renewals.

3.3.5.1 Furnish and renew all hydraulic hose assemblies in accordance with SFLC Std Spec 5000, Appendix C, Paragraph C2.2 (Hose assemblies).

NOTE

The Contractor shall test and certify new hydraulic hose assemblies.

3.3.5.2 If required, the Contractor shall renew steel blocks with aluminum blocks via CFR.

3.3.6 Updates and upgrades. Update and/or upgrade the following, as required:

3.3.6.1 Operating system and electrical updates/ upgrades.

· Auto-launch, control & diagnostics software.

· Inverter, PLC & Magellis screen.

· Firmware and hardware (memory, counter cards, batteries).

· Zelio software / hardware replacement if required

· Fuse holders.

3.3.6.2 Component upgrades.

· Limit switches.

· Others, as necessary.

3.3.7 Pressure gauge calibration. Ensure all pressure gauges are in accordance with BS EN 837-1 and be calibrated and certified. Affix calibration labels to the faces of all gauges noting the calibration facility name and date tested

3.3.8 Accumulator and HPU relief valves setting. Properly set the accumulator and HPU relief valves and tag each with the date of calibration and set pressure.

3.4 Surface preservation. The Contractor shall preserve the davit in accordance with SFLC Std Spec 5000.

3.5 Groom and lubricate. The Contractor shall groom and lubricate the Welin-Lambie davit system in accordance with SFLC Std Spec 5000.

3.6 Hydraulic fluid. The Contractor shall flush the davit hydraulic system in accordance with SFLC Std Spec 5000, Appendix C, Paragraph C2.1 (Fluids) and submit a CFR:

3.7 Test requirements - post repairs.

3.7.1 Test plan. The Contractor shall submit a test plan to the KO for approval, to include the tests prescribed herein, 45 days prior to proposed start date

3.7.2 Test notification. The Contractor shall give Coast Guard personnel 45 days notice prior to testing.

3.7.3 Factory tests. After completion of work, in the presence of a Coast Guard Quality Assurance Representative, the Contractor shall conduct the following factory operational tests of the davit system, on a level plane, to prove satisfactory operating condition in accordance with SFLC Std Spec 5000 and as specified herein. Submit a Final Report summarizing all test results to the Contracting Officer, Quality Assurance Representative, and the COTR within 14 days.

3.7.3.1 No load test. Conduct an operational test of the davit using no load over the entire range of motion

3.7.3.2 Brake Test Load (BTL). Conduct a static brake test using 150% of the Safe Working Load (SWL) of 11,000 lbs or (16,500 lbs) one drum revolution and hold the load for a minimum of 5 minutes. Allow sufficient time to inspect the brake for slippage or creep before a controlled-release of the load

3.7.3.3 Dynamic Test Load (DTL) tests. Conduct the following tests while the system is operated in the normal power mode and the hydraulically-stored energy mode (emergency operation). Conduct these tests with a 50-50 weight distribution and a 40% forward – 60% aft weight distribution for each operation mode

3.7.3.3.1 Luffing speed test at SWL. Record luffing speeds from the fully-retracted to the fully-extended positions and then from the fully-extended to fully-retracted positions at SWL (11,000 lbs

3.7.3.3.2 Luffing speed test at 125% SWL. Record luffing speeds from the fully-retracted to the fully-extended positions and then from the fully-extended to fully-retracted positions at 125% SWL (13,750 lbs

NOTE

Both luffing speed tests in normal operation mode shall meet a 30 to 33 second nominal luff-in and 41 to 43 second nominal luff-out time.

Both luffing speed tests in emergency operation adode shall meet a 24 to 28 second nominal luff-in and 24 to 28 second nominal luff-out time.

3.7.3.3.3 Dynamic test (at SWL) data recording. During the SWL dynamic test, record the following:

3.7.3.3.3.1 Main winch running speed test – gravity lower, measure and record the main winch speed

NOTE

The minimum speed shall be 69.9 RPM rope drum speed.

3.7.3.3.3.2 Main winch hoist test – demonstrate variable speed, measure and record fast and slow hoist under power.

NOTE

The minimum fast speed and low hoist speeds shall be 52 RPM and 17.5 RPM rope drum speed, respectively.

3.7.3.3.3.3 Main winch lower test – demonstrate variable speed, measure and record fast and slow lowering under power.

NOTE

The minimum fast speed and low lowering speeds…