SOLICITATION

1 MB Posted

Attached to
Marine Cranes
Solicitation number
HSCG40-08-R-50008
Issued by

About this file

Solicitation Package

Text of this file

PAGE

HSCG40-08-R-50008 PAGE 4

Page 1 - Insert SF 1449

NOTICE FOR FILING AGENCY PROTESTS

United States Coast Guard Ombudsman Program

It is the policy of the United States Coast Guard (USCG) to issue solicitations and make contract awards in a fair and timely manner. The Ombudsman Program for Agency Protests (OPAP) was established to investigate agency protest issues and resolve them without expensive and time-consuming litigation. OPAP is an independent reviewing authority that is empowered to grant a prevailing protester essentially the same relief as the General Accountability Office (GAO).

Interested parties are encouraged to seek resolution of their concerns within the USCG as an Alternative Dispute Resolution (ADR) forum, rather than filing a protest with the GAO or some external forum. Interested parties may seek resolution of their concerns informally or opt to file a formal agency protest with the contracting officer or Ombudsman.

Informal forum with the Ombudsman. Interested parties who believe a specific USCG procurement is unfair or otherwise defective should first direct their concerns to the cognizant contracting officer. If the contracting officer is unable to satisfy the concerns, the interested party is encouraged to contact the USCG Ombudsman for Agency Protests. Under this informal process, the agency is not required to suspend contract award performance. Use of an informal forum does not suspend any time requirement for filing a protest with the agency or other forum. In order to ensure a timely response, interested parties should provide the following information to the Ombudsman: solicitation/contract number, contracting office, contracting officer, and solicitation closing date (if applicable).

Formal Agency Protest with the Ombudsman. Prior to submitting a formal agency protest, protesters must first use their best efforts to resolve their concerns with the contracting officer through open and frank discussions. If the protester’s concerns are unresolved, an independent review is available by the Ombudsman. The protester may file a formal agency protest to either the contracting officer or as an alternative to that, the Ombudsman under the OPAP program. Contract award or performance will be suspended during the protest period unless contract award or performance is justified, in writing, for urgent and compelling reasons or is determined in writing to be in the best interest of the Government. The agency’s goal is to resolve protests in less than 35 calendar days from the date of filing. Protests shall include the information set forth in FAR 33.103. If the protester fails to submit the required information, resolution of the protest may be delayed or the protest may be dismissed. This will not preclude re-filing of the protest to meet the requirement. To be timely, protests must be filed within the period specified in FAR 33.103(e). Formal protests filed under the OPAP program should be submitted to:

Department of Homeland Security

United States Coast Guard (CG-9131)

Ombudsman Program for Agency Protests

1900 Half Street, SW, Room 11-0602

Washington, D. C. 20593-0001

FAX: 202.475.3904

The Ombudsman Hotline telephone number is 202.372.3695.

TABLE OF CONTENTS

Solicitation/Contract/Order for Commercial Items……………………………………1-6 Addendum to Standard Form 1449………………………………………………… 7 Supplies/Services and Price/Cost……………………………………………………

Contract Line Items (CLINs) Base Year…………………………………………9-17

Contract Line Items (CLINs) First Option Year…………………………………18-24 Contract Line Items (CLINs) Second Option Year………………………………25-31 Contract Line Items (CLINs) Third Option Year………………………………..32-38 Contract Line Items (CLINs) Fourth Option Year………………………………39-45 Addendum to Block 15……………………………………………………………46-50 Addendum to Block 16……………………………………………………………51 Addendum to Block 18a………………………………………………………… 52-53 FAR Clause 52.212-4, Contract Terms and Conditions…………………………… 54-58 Addendum to FAR 52.212-4………………………………………………………59-65 FAR Clause 52.212-5, Contract Terms & Conditions Required to Implement

Statues or Executive Orders…………………………………………………… 66-70 Addendum to FAR 52.212-5………………………………………………………71-77 FAR Clause 52.212-1, Instructions to Offerors………………………………………78 Addendum to FAR 52.212-1……………………………………………………… 79-87 FAR Clause 52.212-2, Evaluation-Commercial Items………………………………88-90 FAR Clause 52.212-3, Offeror Representations & Certifications……………………91-103 Attachment 1 Specification Number P-573-0518 Marine Crane & Hydraulic System Purchase Specification for 400’ Icebreakers…………………

Attachment 2 D-083-0351 Data For Provisioning……………………………………

Attachment 3 D-084-0481 Equipment Unit Preservation Packaging &

Marking………………………………………………………………..

Attachment 4 D-085-0482 Drawings for USCG ELC………………………………..

Attachment 5 D-085-0483 Technical Publications…………………………………..

Attachment 6 D-085-0484 MPC Development………………………………………….

Attachment 7 D-000-0100 Bar Coding for U.S. Coast Guard Engineering

Logistics Center Procured Material…………………………………………………… Attachment 8 Disclosure of Lobbying Activities (SF LLL)

Attachment 9 Standard Form LLLA Disclosure of Lobbying

Activities Continuation Sheet

Attachment 10 CGC drawings……………………………………………………………………..

Attachment 11 Past Performance Questionnaire

Attachments 1-7 are located in an attachment to this solicitation.

Attachments 8 and 9 can be obtained at www.gsa.gov/webforms.

Attachment 10 will be provided on a disc. In order to obtain this disc, contractor shall send an e-mail to Patricia.L.Dobbins@uscg.mil. Please provide your company name, address (no P.O. Box) point of contact and phone number.

Any contractor who would like to conduct a ship check can e-mail their request to Patricia Dobbins at Patricia.L.Dobbins@uscg.mil and LT. Jeffrey Jackson at Jeffrey.S.Jackson@uscg.mil. Upon receipt of your request, Lt. Jackson will contact you to schedule the visit. The Coast Guard will not pay the cost of the trip to ship check the cutters. The cost associated with the trip shall be borne by the contractor. Failure to perform a ship check will not be grounds for any claim against the government either during the pre-award stage or post award stage.

Contractors are encouraged to submit their request for ship checks immediately to eliminate any delays. Requests will not be honored after May 30, 2008. Any questions that may arise before, during or after the ship check shall be submitted in writing to Patricia Dobbins at Patricia.L.Dobbins@uscg.mil or faxed to (410) 762-6056 to the attention Patricia Dobbins. Contractors are advised that responses to questions will not be given verbally. All questions that are submitted will be answered in an amendment and posted at www.fedbizopps.gov. Contractors shall not rely on verbal information obtained during the ship checks. Contractors should only rely on information contained in the solicitation and any amendments issued.

Any and all questions or inquiries regarding this proposal SHALL be submitted in writing. Please e-mail your questions to Patricia.L.Dobbins@uscg.mil. No questions or inquiries shall be answered verbally!

GOVERNMENT NOTICE FOR HANDLING PROPOSALS

The proposal shall be used and disclosed for evaluation purposes only, and a copy of this Government notice shall be applied to any reproduction or abstract thereof.

Any authorized restrictive notices, which the submitter places on its proposal, shall also be strictly complied with. Disclosure of this proposal outside the Government for evaluation purposes shall be made only to the extent authorized by, and in accordance with, the procedures in Federal Acquisition Regulation and Homeland Security Acquisition Regulations.

Proposals submitted in response to this solicitation, must be received at the following address prior to the date and time established for receipt of proposals.

U.S. Coast Guard Engineering Logistics Center

Auxiliary Systems Acquisition Branch (Code 045)

Mail Stop 99, Bldg. 31, 2nd Floor

2401 Hawkins Point Road

Baltimore, MD 21226-5000

Attn: Patricia Dobbins Addendum to Standard Form 1449

ADDENDUM TO BLOCKS 19-24

THE SCHEDULE

SUPPLIES /SERVICES AND PRICES/COSTS

1) DELIVERY ORDER LIMITATIONS

· Individual delivery order limitations are defined in the Addendum to FAR 52.212-5, FAR 52.216-19, Order Limitations.

· Order quantities for option years shall be set at the same limits.

2) OPTIONS

· Each option extending the term of this contract shall be for a period of one (1) year from the effective date of each option.

3) ORDERING

· Services or supplies will be ordered by the issuance of individual task orders or delivery orders. Refer to the Addendum to FAR Clause 52.212-5, FAR Clause 52.216-18, Ordering.

· Any services or supplies to be furnished under this contract will be ordered by the following activity:

U.S. Coast Guard Engineering Logistics Center

2401 Hawkins Point Road, Bldg. 31, 2nd floor

Baltimore, MD 21226-5000

4) ORAL ORDERING

· Orders may be placed orally, by giving the Contractor an authorized task order or delivery order number, item number, and a funding limitation. Written confirmation of the oral order shall be forwarded to the Contractor no later than five (5) days after its issuance.

5) PRICING:

· Pricing shall be provided for all CLINs including the base year and each corresponding option year.

· The Contractor shall maintain configuration management, meaning all installs and equipment shall be identical. No changes to the install, equipment, manuals or other documents unless authorized by the Contracting Officer first. Failure to obtain approval of the Contracting Officer prior to any changes shall result in rejection.

· The Government may waive the requirement for first article approval test where supplies identical or similar to those called for in the schedule have been previously furnished by the offeror/contractor and have been accepted by the Government. The offeror/contractor may request a waiver.

THE SCHEDULE

SUPPLIES/SERVICES AND PRICE/COST/DELIVERY

BASE YEAR

CLIN
DESCRIPTION
EST. QTY.
UNIT PRICE
TOTAL PRICE
DELIVERY SCHEDULE
CONTRACTOR PROPOSED DELIVERY SCHEDULE

FAR 52.211-8 TIME OF DELIVERY

The government requires delivery to be made according to the following schedule:

The Government reserves the right to award under either the required delivery schedule or the proposed delivery schedule, when an offeror submits an earlier delivery schedule than required above. If the offeror proposes no other delivery schedule, the required delivery schedule above will apply.

INITIAL AWARD

0001
Aft Marine Crane System, to be manufactured, tested, packaged, preserved, and marked in accordance with Specification Number ELC-025-P-573-0518, sect. 3.4.
2
Each
First article 44 weeks after government approval of CLIN 0024 Design and Interface Report. Additional production units 26 weeks after receipt of each individual delivery order.
First article ___ weeks after government approval of CLIN 0024 Design and Interface Report. Additional production units ___ weeks after receipt of each individual delivery order.
0002
Fwd Marine Crane System, to be manufactured, tested, packaged, preserved, and marked in accordance with Specification Number ELC-025-P-573-0518, sect. 3.3.
1
Each
First article 44 weeks after government approval of CLIN 0026 Design and Interface Report. Additional production units 26 weeks after receipt of each individual delivery order.
First article ___ weeks after government approval of CLIN 0026 Design and Interface Report. Additional production units ___ weeks after receipt of each individual delivery order.
0003
Hydraulic and Control System, to be manufactured, tested, packaged, preserved, and marked in accordance with Specification Number ELC-025-P-573-0518, sect. 3.5.
1
Each
First article 44 weeks after government approval of CLIN 0026 Design and Interface Report.
First article ___ weeks after government approval of CLIN 0026 Design and Interface Report.
0004
Initial Spare Parts Kit, Aft Marine Crane System, in accordance with Specification Number ELC-025-P-573-0518, para. 3.6.3.3.
2
Each
First kit 44 weeks after government approval of CLIN 0026 Design and Interface Report. Additional units 26 weeks after receipt of each individual delivery order.
First kit __ weeks after government approval of CLIN 0026 Design and Interface Report. Additional units __ weeks after receipt of each individual delivery order.
0005
Initial Spare Parts Kit, Fwd Marine Crane System, in accordance with Specification Number ELC-025-P-573-0518, para. 3.6.3.3.
1
Each
First kit 44 weeks after government approval of CLIN 0026 Design and Interface Report. Additional units 26 weeks after receipt of each individual delivery order.
First kit __ weeks after government approval of CLIN 0026 Design and Interface Report. Additional units __ weeks after receipt of each individual delivery order.
0006
Initial Spare Parts Kit, Hydraulic System, in accordance with Specification Number ELC-025-P-573-0518, para. 3.6.3.3.
1
Each
First kit 44 weeks after government approval of CLIN 0026 Design and Interface Report.
First kit __ weeks after government approval of CLIN 0026 Design and Interface Report.
0007
Corrections and Revisions to Aft Marine Crane System Technical Manual, Maintenance Procedure Cards, Drawings, Software, and Data for Provisioning as required during life of the contract in accordance with Specification Number ELC-025-P-573-0518, paras. 3.6.4, 3.6.7, 3.6.6, 3.6.5, & 3.6.2. Supplementary to CLIN 0027.
As reqd
$NSP
$NSP
As required 12 weeks after delivery of each CLIN 0001 Aft Marine Crane System delivered which involves changes requiring corrections and revisions to these documents.
As required ___ weeks after delivery of each Aft Marine Crane System delivered which involves changes requiring corrections and revisions to these documents.
0008
Corrections and Revisions to Fwd Marine Crane System Technical Manual, Maintenance Procedure Cards, Drawings, Software, and Data for Provisioning as required during life of the contract in accordance with Specification Number ELC-025-P-573-0518, paras. 3.6.4, 3.6.7, 3.6.6, 3.6.5, & 3.6.2. Supplementary to CLIN 0028.
As reqd
$NSP
$NSP
As required 12 weeks after delivery of each CLIN 0002 Fwd Marine Crane System delivered which involves changes requiring corrections and revisions to these documents.
As required ___ weeks after delivery of each Fwd Marine Crane System delivered which involves changes requiring corrections and revisions to these documents.
0009
Corrections and Revisions to Hydraulic and Control System Technical Manual, Maintenance Procedure Cards, Drawings, Software, and Data for Provisioning as required during life of the contract in accordance with Specification Number ELC-025-P-573-0518, paras. 3.6.4, 3.6.7, 3.6.6, 3.6.5, & 3.6.2. Supplementary to CLIN 0029.
As reqd
$NSP
$NSP
As required 12 weeks after delivery of each CLIN 0003 Hydraulic and Control System delivered which involves changes requiring corrections and revisions to these documents.
As required ___ weeks after delivery of each Hydraulic and Control System delivered which involves changes requiring corrections and revisions to these documents.
0010
On Board Repair Parts for each Aft Marine Crane System delivered under this contract in accordance with Specification Number ELC-025-P-573-0518, para. 3.6.3.1.
2
Each
First kit 90 calendar days after receipt of government review of CLIN 0027 Aft Marine Crane System Technical Manual, Maintenance Procedure Cards, Software Backup and Description, Drawings, and Data for Provisioning. Additional units concurrent with delivery of CLIN 0001 Aft Marine Crane System.
First kit __ calendar days after receipt of government review of CLIN 0027 Aft Marine Crane System Technical Manual, Maintenance Procedure Cards, Software Backup and Description, Drawings, and Data for Provisioning. Additional units within __ weeks of delivery of CLIN 0001 Aft Marine Crane System.
0011
On Board Repair Parts for each Fwd Marine Crane System delivered under this contract in accordance with Specification Number ELC-025-P-573-0518, para. 3.6.3.1.
1
Each
First kit 90 calendar days after receipt of government review of CLIN 0028 Fwd Marine Crane System Technical Manual, Maintenance Procedure Cards, Software Backup and Description, Drawings, and Data for Provisioning. Additional units concurrent with delivery of CLIN 0002 Fwd Marine Crane System.
First kit __ 90 calendar days after receipt of government review of CLIN 0028 Fwd Marine Crane System Technical Manual, Maintenance Procedure Cards, Software Backup and Description, Drawings, and Data for Provisioning. Additional units within __ weeks of delivery of CLIN 0002 Fwd Marine Crane System.
0012
On Board Repair Parts for each Hydraulic and Control System delivered under this contract in accordance with Specification Number ELC-025-P-573-0518, para. 3.6.3.1.
1
Each
Kit 90 calendar days after receipt of government review of CLIN 0029 Hydraulic and Control System Technical Manual, Maintenance Procedure Cards, Software Backup and Description, Drawings, and Data for Provisioning.
First kit __ 90 calendar days after receipt of government review of CLIN 0029 Hydraulic and Control System Technical Manual, Maintenance Procedure Cards, Software Backup and Description, Drawings, and Data for Provisioning.
0013
Factory Testing and Report for each Aft Marine Crane System delivered under this contract in accordance with Specification Number ELC-025-P-573-0518, para. 3.4.12.2.
2
Job
$NSP
$NSP
Prior to delivery of each CLIN 0001 Aft Marine Crane System. Contractor shall provide 14 calendar days advance notice of testing.
Prior to delivery of each CLIN 0001 Aft Marine Crane System. Contractor shall provide __ calendar days advance notice of testing.

FLAT RATE PER DAY

per day

LOADED LABOR RATE – STRAIGHT TIME:

per hour

LOADED LABOR RATE – OVER TIME:

per hour

0014
Factory Testing and Report for each Fwd Marine Crane System delivered under this contract in accordance with Specification Number ELC-025-P-573-0518, para. 3.3.12.2.
1
Job
$NSP
$NSP
Prior to delivery of each CLIN 0002 Fwd Marine Crane System. Contractor shall provide 14 calendar days advance notice of testing.
Prior to delivery of each CLIN 0002 Fwd Marine Crane System. Contractor shall provide __ calendar days advance notice of testing.

FLAT RATE PER DAY

per day

LOADED LABOR RATE – STRAIGHT TIME:

per hour

LOADED LABOR RATE – OVER TIME:

per hour

0015
Factory Testing and Report for each Hydraulic and Control System delivered under this contract in accordance with Specification Number ELC-025-P-573-0518, paras. 3.3.12.2 & 3.4.12.2.
1
Job
$NSP
$NSP
Prior to delivery of each CLIN 0003 Hydraulic and Control System. Contractor shall provide 14 calendar days advance notice of testing.
Prior to delivery of each CLIN 0003 Hydraulic and Control System. Contractor shall provide __ calendar days advance notice of testing.

FLAT RATE PER DAY

per day

LOADED LABOR RATE – STRAIGHT TIME:

per hour

LOADED LABOR RATE – OVER TIME:

per hour

0016
Commissioning Services / Installation Testing for each Aft and Fwd Marine Crane System delivered under this contract in accordance with Specification Number ELC-025-P-573-0518, paras. 3.3.12.3, 3.4.12.3, & 3.7.5.
3
Job
To be determined after installation of each Aft or Fwd Marine Crane System. Coast Guard shall provide Contractor at least twenty-one (21) calendar days prior notice.
To be determined after installation of each Aft or Fwd Marine Crane System. Coast Guard shall provide Contractor at least ___ calendar days prior notice.

FLAT RATE PER DAY

per day

LOADED LABOR RATE – STRAIGHT TIME:

per hour

LOADED LABOR RATE – OVER TIME:

per hour

0017
Commissioning Services / Installation Testing for Hydraulic and Control System delivered under this contract in accordance with Specification Number ELC-025-P-573-0518, paras. 3.3.12.3, 3.4.12.3, & 3.7.5.
1
Job
To be determined after Hydraulic and Control System installation. Coast Guard shall provide Contractor at least twenty-one (21) calendar days prior notice.
To be determined after Hydraulic and Control System installation. Coast Guard shall provide Contractor at least ___ calendar days prior notice.

FLAT RATE PER DAY

per day

LOADED LABOR RATE – STRAIGHT TIME:

per hour

LOADED LABOR RATE – OVER TIME:

per hour

0018
Operational and Maintenance Training for each Aft and Fwd Marine Crane System delivered under this contract in accordance with Specification Number ELC-025-P-573-0518, para. 3.7.6.
3
Job
To be determined after installation of each Aft or Fwd Marine Crane System. Coast Guard shall provide Contractor at least 14 calendar days prior notice.
To be determined after installation of each Aft or Fwd Marine Crane System. Coast Guard shall provide Contractor at least ____ calendar days prior notice.

FLAT RATE PER DAY

per day

LOADED LABOR RATE – STRAIGHT TIME:

per hour

LOADED LABOR RATE – OVER TIME:

per hour

0019
Operational and Maintenance Training for Hydraulic System delivered under this contract in accordance with Specification Number ELC-025-P-573-0518, para. 3.7.6.
1
Job
To be determined after Hydraulic and Control System installation. Coast Guard shall provide Contractor at least 14 calendar days prior notice.
To be determined after Hydraulic and Control System installation. Coast Guard shall provide Contractor at least ____ calendar days prior notice.

FLAT RATE PER DAY

per day

LOADED LABOR RATE – STRAIGHT TIME:

per hour

LOADED LABOR RATE – OVER TIME:

per hour

0020
Non-Warranty Technical Services for each Aft and Fwd Marine Crane System delivered under this contract in accordance with Specification Number ELC-025-P-573-0518, para. 3.7.3. Assume 8 hrs. and no travel for proposal.
3
Job
As required. Contractor shall respond by telephone within 24 hours or shall attend vessel within 72 hours of being contacted by the KO or COTR. Routine technical support services shall be scheduled at least 14 calendar days in advance.
As required. Contractor shall respond by telephone within __ hours or shall attend vessel within __ hours of being contacted by the KO or COTR. Routine technical support services shall be scheduled at least __ calendar days in advance.

FLAT RATE PER DAY

per day

LOADED LABOR RATE – STRAIGHT TIME:

per hour

LOADED LABOR RATE – OVER TIME:

per hour

0021
Non-Warranty Technical Services for Hydraulic System delivered under this contract in accordance with Specification Number ELC-025-P-573-0518, para. 3.7.3. Assume 8 hrs. and no travel for proposal.
1
Job
As required. Contractor shall respond by telephone within 24 hours or shall attend vessel within 72 hours of being contacted by the KO or COTR. Routine technical support services shall be scheduled at least 14 calendar days in advance.
As required. Contractor shall respond by telephone within __ hours or shall attend vessel within __ hours of being contacted by the KO or COTR. Routine technical support services shall be scheduled at least __ calendar days in advance.

FLAT RATE PER DAY

per day

LOADED LABOR RATE – STRAIGHT TIME:

per hour

LOADED LABOR RATE – OVER TIME:

per hour

0022
First Article Testing for the first Aft Marine Crane System delivered under this contract in accordance with Specification Number ELC-025-P-573-0518, para. 3.4.12.1.
1
Each.
$NSP
$NSP
Prior to delivery of the first CLIN 0001 Aft Marine Crane System. Contractor shall provide 14 calendar days advance notice of testing.
Prior to delivery of the first CLIN 0001 Aft Marine Crane System. Contractor shall provide __ calendar days advance notice of testing.
0023
First Article Testing for the first Fwd Marine Crane System delivered under this contract in accordance with Specification Number ELC-025-P-573-0518, para. 3.3.12.1.
1
Each.
$NSP
$NSP
Prior to delivery of the first CLIN 0002 Fwd Marine Crane System. Contractor shall provide 14 calendar days advance notice of testing.
Prior to delivery of the first CLIN 0002 Fwd Marine Crane System. Contractor shall provide __ calendar days advance notice of testing.
0024
Design and Interface Report in accordance with Specification Number ELC-025-P-573-0518, para. 3.6.1 including API 2C Certification and Calculations, paras. 3.3.1 & 3.4.1.
1
Each.
$NSP
$NSP
Within 30 calendar days of contract award.
Within ____ calendar days of contract award.
0025
Aft Marine Crane System Technical Manual, Maintenance Procedure Cards, Software Backup and Description, Drawings, and Data for Provisioning: Initial Submission of each for review and resubmission addressing government comments on initial versions in accordance with Specification Number ELC-025-P-573-0518, paras. 3.6.4, 3.6.7, 3.6.5, 3.6.6 and 3.6.2.
1
Each.
$NSP
$NSP
Within 120 calendar days of contract award, revision within 60 days of Government response.
Within ____ calendar days of contract award, revision within ____ days of Government response.
0026
Fwd Marine Crane System Technical Manual, Maintenance Procedure Cards, Software Backup and Description, Drawings, and Data for Provisioning: Initial Submission of each for review and resubmission addressing government comments on initial versions in accordance with Specification Number ELC-025-P-573-0518, paras. 3.6.4, 3.6.7, 3.6.5, 3.6.6 and 3.6.2.
1
Each.
$NSP
$NSP
Within 120 calendar days of contract award, revision within 60 days of Government response.
Within ____ calendar days of contract award, revision within ____ days of Government response.
0027
Hydraulic System Technical Manual, Maintenance Procedure Cards, Software Backup and Description, Drawings, and Data for Provisioning: Initial Submission of each for review and resubmission addressing government comments on initial versions in accordance with Specification Number ELC-025-P-573-0518, paras. 3.6.4, 3.6.7, 3.6.5, 3.6.6 and 3.6.2.
1
Each.
$NSP
$NSP
Within 120 calendar days of contract award, revision within 60 days of Government response.
Within ____ calendar days of contract award, revision within ____ days of Government response.
0028
Calibration and Quality Assurance Plan: Initial Submission of each for review and acceptance in accordance with Specification Number ELC-025-P-573-0518, paras. 4.3 & 4.6.
1
Each.
$NSP
$NSP
Within 15 calendar days of contract award, revision within 60 days of Government response.
Within ____ calendar days of contract award, revision within ____ days of Government response.

FIRST OPTION YEAR

0101
Aft Marine Crane System, to be manufactured, tested, packaged, preserved, and marked in accordance with Specification Number ELC-025-P-573-0518, sect. 3.4.
1
Each
26 weeks after receipt of each individual delivery order.
___ weeks after receipt of each individual delivery order.
0102
Fwd Marine Crane System, to be manufactured, tested, packaged, preserved, and marked in accordance with Specification Number ELC-025-P-573-0518, sect. 3.3.
1
Each
26 weeks after receipt of each individual delivery order.
___ weeks after receipt of each individual delivery order.
0103
Hydraulic and Control System, to be manufactured, tested, packaged, preserved, and marked in accordance with Specification Number ELC-025-P-573-0518, sect. 3.5.
1
Each
26 weeks after receipt of each individual delivery order.
___ weeks after receipt of each individual delivery order.
0104
Initial Spare Parts Kit, Aft Marine Crane System, in accordance with Specification Number ELC-025-P-573-0518, para. 3.6.3.3.
1
Each
26 weeks after receipt of each individual delivery order.
___ weeks after receipt of each individual delivery order.
0105
Initial Spare Parts Kit, Fwd Marine Crane System, in accordance with Specification Number ELC-025-P-573-0518, para. 3.6.3.3.
1
Each
26 weeks after receipt of each individual delivery order.
___ weeks after receipt of each individual delivery order.
0106
Initial Spare Parts Kit, Hydraulic System, in accordance with Specification Number ELC-025-P-573-0518, para. 3.6.3.3.
1
Each
26 weeks after receipt of each individual delivery order.
___ weeks after receipt of each individual delivery order.
0107
Corrections and Revisions to Aft Marine Crane System Technical Manual, Maintenance Procedure Cards, Drawings, Software, and Data for Provisioning as required during life of the contract in accordance with Specification Number ELC-025-P-573-0518, paras. 3.6.4, 3.6.7, 3.6.6, 3.6.5, & 3.6.2. Supplementary to CLIN 0127.
As reqd
$NSP
$NSP
As required, 12 weeks after delivery of each CLIN 0101 Aft Marine Crane System delivered which involves changes requiring corrections and revisions to these documents.
As required, ___ weeks after delivery of each Aft Marine Crane System delivered which involves changes requiring corrections and revisions to these documents.
0108
Corrections and Revisions to Fwd Marine Crane System Technical Manual, Maintenance Procedure Cards, Drawings, Software, and Data for Provisioning as required during life of the contract in accordance with Specification Number ELC-025-P-573-0518, paras. 3.6.4, 3.6.7, 3.6.6, 3.6.5, & 3.6.2. Supplementary to CLIN 0128.
As reqd
$NSP
$NSP
As required, 12 weeks after delivery of each CLIN 0102 Fwd Marine Crane System delivered which involves changes requiring corrections and revisions to these documents.
As required, ___ weeks after delivery of each Fwd Marine Crane System delivered which involves changes requiring corrections and revisions to these documents.
0109
Corrections and Revisions to Hydraulic and Control System Technical Manual, Maintenance Procedure Cards, Drawings, Software, and Data for Provisioning as required during life of the contract in accordance with Specification Number ELC-025-P-573-0518, paras. 3.6.4, 3.6.7, 3.6.6, 3.6.5, & 3.6.2. Supplementary to CLIN 0129.
As reqd
$NSP
$NSP
As required 12 weeks after delivery of each CLIN 0103 Hydraulic and Control System delivered which involves changes requiring corrections and revisions to these documents.
As required ___ weeks after delivery of each Hydraulic and Control System delivered which involves changes requiring corrections and revisions to these documents.
0110
On Board Repair Parts for each Aft Marine Crane System delivered under this contract in accordance with Specification Number ELC-025-P-573-0518, para. 3.6.3.1.
1
Each
Concurrent with delivery of CLIN 0101 Aft Marine Crane System.
Within __ weeks of delivery of CLIN 0101 Aft Marine Crane System.
0111
On Board Repair Parts for each Fwd Marine Crane System delivered under this contract in accordance with Specification Number ELC-025-P-573-0518, para. 3.6.3.1.
1
Each
Concurrent with delivery of CLIN 0102 Fwd Marine Crane System.
Within __ weeks of delivery of CLIN 0102 Fwd Marine Crane System.
0112
On Board Repair Parts for each Hydraulic and Control System delivered under this contract in accordance with Specification Number ELC-025-P-573-0518, para. 3.6.3.1.
1
Each
Concurrent with delivery of CLIN 0103 Hydraulic and Controls System.
Within __ weeks of delivery of CLIN 0103 Hydraulic and Control System.
0113
Factory Testing and Report for each Aft Marine Crane System delivered under this contract in accordance with Specification Number ELC-025-P-573-0518, para. 3.4.12.2.
1
Job
$NSP
$NSP
Prior to delivery of each CLIN 0101 Aft Marine Crane System. Contractor shall provide 14 calendar days advance notice of testing.
Prior to delivery of each CLIN 0101 Aft Marine Crane System. Contractor shall provide __ calendar days advance notice of testing.

FLAT RATE PER DAY

per day

LOADED LABOR RATE – STRAIGHT TIME:

per hour

LOADED LABOR RATE – OVER TIME:

per hour

0114
Factory Testing and Report for each Fwd Marine Crane System delivered under this contract in accordance with Specification Number ELC-025-P-573-0518, para. 3.3.12.2.
1
Job
$NSP
$NSP
Prior to delivery of each CLIN 0102 Fwd Marine Crane System. Contractor shall provide 14 calendar days advance notice of testing.
Prior to delivery of each CLIN 0102 Fwd Marine Crane System. Contractor shall provide __ calendar days advance notice of testing.

FLAT RATE PER DAY

per day

LOADED LABOR RATE – STRAIGHT TIME:

per hour

LOADED LABOR RATE – OVER TIME:

per hour

0115
Factory Testing and Report for each Hydraulic and Control System delivered under this contract in accordance with Specification Number ELC-025-P-573-0518, paras. 3.3.12.2 & 3.4.12.2.
1
Job
$NSP
$NSP
Prior to delivery of each CLIN 0103 Hydraulic and Control System. Contractor shall provide 14 calendar days advance notice of testing.
Prior to delivery of each CLIN 0103 Hydraulic and Control System. Contractor shall provide __ calendar days advance notice of testing.

FLAT RATE PER DAY

per day

LOADED LABOR RATE – STRAIGHT TIME:

per hour

LOADED LABOR RATE – OVER TIME:

per hour

0116
Commissioning Services / Installation Testing for each Aft and Fwd Marine Crane System delivered under this contract in accordance with Specification Number ELC-025-P-573-0518, paras. 3.3.12.3, 3.4.12.3, & 3.7.5.
2
Job
To be determined after installation of each Aft or Fwd Marine Crane System. Coast Guard shall provide Contractor at least twenty-one (21) calendar days prior notice.
To be determined after installation of each Aft or Fwd Marine Crane System. Coast Guard shall provide Contractor at least ___ calendar days prior notice.

FLAT RATE PER DAY

per day

LOADED LABOR RATE – STRAIGHT TIME:

per hour

LOADED LABOR RATE – OVER TIME:

per hour

0117
Commissioning Services / Installation Testing for Hydraulic and Control System delivered under this contract in accordance with Specification Number ELC-025-P-573-0518, paras. 3.3.12.3, 3.4.12.3, & 3.7.5.
1
Job
To be determined after Hydraulic and Control System installation. Coast Guard shall provide Contractor at least twenty-one (21) calendar days prior notice.
To be determined after Hydraulic and Control System installation. Coast Guard shall provide Contractor at least ___ calendar days prior notice.

FLAT RATE PER DAY

per day

LOADED LABOR RATE – STRAIGHT TIME:

per hour

LOADED LABOR RATE – OVER TIME:

per hour

0118
Operational and Maintenance Training for each Aft and Fwd Marine Crane System delivered under this contract in accordance with Specification Number ELC-025-P-573-0518, para. 3.7.6.
2
Job
To be determined after installation of each Aft or Fwd Marine Crane System. Coast Guard shall provide Contractor at least 14 calendar days prior notice.
To be determined after installation of each Aft or Fwd Marine Crane System. Coast Guard shall provide Contractor at least ____ calendar days prior notice.

FLAT RATE PER DAY

per day

LOADED LABOR RATE – STRAIGHT TIME:

per hour

LOADED LABOR RATE – OVER TIME:

per hour

0119
Operational and Maintenance Training for Hydraulic System delivered under this contract in accordance with Specification Number ELC-025-P-573-0518, para. 3.7.6.
1
Job
To be determined after Hydraulic and Control System installation. Coast Guard shall provide Contractor at least 14 calendar days prior notice.
To be determined after Hydraulic and Control System installation. Coast Guard shall provide Contractor at least ____ calendar days prior notice.

FLAT RATE PER DAY

per day

LOADED LABOR RATE – STRAIGHT TIME:

per hour

LOADED LABOR RATE – OVER TIME:

per hour

0120
Non-Warranty Technical Services for each Aft and Fwd Marine Crane System delivered under this contract in accordance with Specification Number ELC-025-P-573-0518, para. 3.7.3. Assume 8 hrs. and no travel for proposal.
2
Job
As required. Contractor shall respond by telephone within 24 hours or shall attend vessel within 72 hours of being contacted by the KO or COTR. Routine technical support services shall be scheduled at least 14 calendar days in advance.
As required. Contractor shall respond by telephone within __ hours or shall attend vessel within __ hours of being contacted by the KO or COTR. Routine technical support services shall be scheduled at least __ calendar days in advance.

FLAT RATE PER DAY

per day

LOADED LABOR RATE – STRAIGHT TIME:

per hour

LOADED LABOR RATE – OVER TIME:

per hour

0121
Non-Warranty Technical Services for Hydraulic System delivered under this contract in accordance with Specification Number ELC-025-P-573-0518, para. 3.7.3. Assume 8 hrs. and no travel for proposal.
1
Job
As required. Contractor shall respond by telephone within 24 hours or shall attend vessel within 72 hours of being contacted by the KO or COTR. Routine technical support services shall be scheduled at least 14 calendar days in advance.
As required. Contractor shall respond by telephone within __ hours or shall attend vessel within __ hours of being contacted by the KO or COTR. Routine technical support services shall be scheduled at least __ calendar days in advance.

FLAT RATE PER DAY

per day

LOADED LABOR RATE – STRAIGHT TIME:

per hour

LOADED LABOR RATE – OVER TIME:

per hour

0122
First Article Testing for the first Aft Marine Crane System delivered under this contract in accordance with Specification Number ELC-025-P-573-0518, para. 3.4.12.1.
1
Each.
$NSP
$NSP
Prior to delivery of the first CLIN 0101 Aft Marine Crane System. Contractor shall provide 14 calendar days advance notice of testing.
Prior to delivery of the first CLIN 0101 Aft Marine Crane System. Contractor shall provide __ calendar days advance notice of testing.
0123
First Article Testing for the first Fwd Marine Crane System delivered under this contract in accordance with Specification Number ELC-025-P-573-0518, para. 3.3.12.1.
1
Each.
$NSP
$NSP
Prior to delivery of the first CLIN 0102 Fwd Marine Crane System. Contractor shall provide 14 calendar days advance notice of testing.
Prior to delivery of the first CLIN 0102 Fwd Marine Crane System. Contractor shall provide __ calendar days advance notice of testing.

SECOND OPTION YEAR

0201
Aft Marine Crane System, to be manufactured, tested, packaged, preserved, and marked in accordance with Specification Number ELC-025-P-573-0518, sect. 3.4.
1
Each
26 weeks after receipt of each individual delivery order.
___ weeks after receipt of each individual delivery order.
0202
Fwd Marine Crane System, to be manufactured, tested, packaged, preserved, and marked in accordance with Specification Number ELC-025-P-573-0518, sect. 3.3.
1
Each
26 weeks after receipt of each individual delivery order.
___ weeks after receipt of each individual delivery order.
0203
Hydraulic and Control System, to be manufactured, tested, packaged, preserved, and marked in accordance with Specification Number ELC-025-P-573-0518, sect. 3.5.
1
Each
26 weeks after receipt of each individual delivery order.
___ weeks after receipt of each individual delivery order.
0204
Initial Spare Parts Kit, Aft Marine Crane System, in accordance with Specification Number ELC-025-P-573-0518, para. 3.6.3.3.
1
Each
26 weeks after receipt of each individual delivery order.
___ weeks after receipt of each individual delivery order.
0205
Initial Spare Parts Kit, Fwd Marine Crane System, in accordance with Specification Number ELC-025-P-573-0518, para. 3.6.3.3.
1
Each
26 weeks after receipt of each individual delivery order.
___ weeks after receipt of each individual delivery order.
0206
Initial Spare Parts Kit, Hydraulic System, in accordance with Specification Number ELC-025-P-573-0518, para. 3.6.3.3.
1
Each
26 weeks after receipt of each individual delivery order.
___ weeks after receipt of each individual delivery order.
0207
Corrections and Revisions to Aft Marine Crane System Technical Manual, Maintenance Procedure Cards, Drawings, Software, and Data for Provisioning as required during life of the contract in accordance with Specification Number ELC-025-P-573-0518, paras. 3.6.4, 3.6.7, 3.6.6, 3.6.5, & 3.6.2. Supplementary to CLIN 0227.
As reqd
$NSP
$NSP
As required, 12 weeks after delivery of each CLIN 0201 Aft Marine Crane System delivered which involves changes requiring corrections and revisions to these documents.
As required, ___ weeks after delivery of each Aft Marine Crane System delivered which involves changes requiring corrections and revisions to these documents.
0208
Corrections and Revisions to Fwd Marine Crane System Technical Manual, Maintenance Procedure Cards, Drawings, Software, and Data for Provisioning as required during life of the contract in accordance with Specification Number ELC-025-P-573-0518, paras. 3.6.4, 3.6.7, 3.6.6, 3.6.5, & 3.6.2. Supplementary to CLIN 0228.
As reqd
$NSP
$NSP
As required, 12 weeks after delivery of each CLIN 0202 Fwd Marine Crane System delivered which involves changes requiring corrections and revisions to these documents.
As required, ___ weeks after delivery of each Fwd Marine Crane System delivered which involves changes requiring corrections and revisions to these documents.
0209
Corrections and Revisions to Hydraulic and Control System Technical Manual, Maintenance Procedure Cards, Drawings, Software, and Data for Provisioning as required during life of the contract in accordance with Specification Number ELC-025-P-573-0518, paras. 3.6.4, 3.6.7, 3.6.6, 3.6.5, & 3.6.2. Supplementary to CLIN 0229.
As reqd
$NSP
$NSP
As required 12 weeks after delivery of each CLIN 0203 Hydraulic and Control System delivered which involves changes requiring corrections and revisions to these documents.
As required ___ weeks after delivery of each Hydraulic and Control System delivered which involves changes requiring corrections and revisions to these documents.
0210
On Board Repair Parts for each Aft Marine Crane System delivered under this contract in accordance with Specification Number ELC-025-P-573-0518, para. 3.6.3.1.
1
Each
Concurrent with delivery of CLIN 0201 Aft Marine Crane System.
Within __ weeks of delivery of CLIN 0201 Aft Marine Crane System.
0211
On Board Repair Parts for each Fwd Marine Crane System delivered under this contract in accordance with Specification Number ELC-025-P-573-0518, para. 3.6.3.1.
1
Each
Concurrent with delivery of CLIN 0202 Fwd Marine Crane System.
Within __ weeks of delivery of CLIN 0202 Fwd Marine Crane System.
0212
On Board Repair Parts for each Hydraulic and Control System delivered under this contract in accordance with Specification Number ELC-025-P-573-0518, para. 3.6.3.1.
1
Each
Concurrent with delivery of CLIN 0203 Hydraulic and Controls System.
Within __ weeks of delivery of CLIN 0203 Hydraulic and Control System.
0213
Factory Testing and Report for each Aft Marine Crane System delivered under this contract in accordance with Specification Number ELC-025-P-573-0518, para. 3.4.12.2.
1
Job
$NSP
$NSP
Prior to delivery of each CLIN 0201 Aft Marine Crane System. Contractor shall provide 14 calendar days advance notice of testing.
Prior to delivery of each CLIN 0201 Aft Marine Crane System. Contractor shall provide __ calendar days advance notice of testing.

FLAT RATE PER DAY

per day

LOADED LABOR RATE – STRAIGHT TIME:

per hour

LOADED LABOR RATE – OVER TIME:

per hour

0214
Factory Testing and Report for each Fwd Marine Crane System delivered under this contract in accordance with Specification Number ELC-025-P-573-0518, para. 3.3.12.2.
1
Job
$NSP
$NSP
Prior to delivery of each CLIN 0202 Fwd Marine Crane System. Contractor shall provide 14 calendar days advance notice of testing.
Prior to delivery of each CLIN 0202 Fwd Marine Crane System. Contractor shall provide __ calendar days advance notice of testing.

FLAT RATE PER DAY

per day

LOADED LABOR RATE – STRAIGHT TIME:

per hour

LOADED LABOR RATE – OVER TIME:

per hour

0215
Factory Testing and Report for each Hydraulic and Control System delivered under this contract in accordance with Specification Number ELC-025-P-573-0518, paras. 3.3.12.2 & 3.4.12.2.
1
Job
$NSP
$NSP
Prior to delivery of each CLIN 0203 Hydraulic and Control System. Contractor shall provide 14 calendar days advance notice of testing.
Prior to delivery of each CLIN 0203 Hydraulic and Control System. Contractor shall provide __ calendar days advance notice of testing.

FLAT RATE PER DAY

per day

LOADED LABOR RATE – STRAIGHT TIME:

per hour

LOADED LABOR RATE – OVER TIME:

per hour

0216
Commissioning Services / Installation Testing for each Aft and Fwd Marine Crane System delivered under this contract in accordance with Specification Number ELC-025-P-573-0518, paras. 3.3.12.3, 3.4.12.3, & 3.7.5.
2
Job
To be determined after installation of each Aft or Fwd Marine Crane System. Coast Guard shall provide Contractor at least twenty-one (21) calendar days prior notice.
To be determined after installation of each Aft or Fwd Marine Crane System. Coast Guard shall provide Contractor at least ___ calendar days prior notice.

FLAT RATE PER DAY

per day

LOADED LABOR RATE – STRAIGHT TIME:

per hour

LOADED LABOR RATE – OVER TIME:

per hour

0217
Commissioning Services / Installation Testing for Hydraulic and Control System delivered under this contract in accordance with Specification Number ELC-025-P-573-0518, paras. 3.3.12.3, 3.4.12.3, & 3.7.5.
1
Job
To be determined after Hydraulic and Control System installation. Coast Guard shall provide Contractor at least twenty-one (21) calendar days prior notice.
To be determined after Hydraulic and Control System installation. Coast Guard shall provide Contractor at least ___ calendar days prior notice.

FLAT RATE PER DAY

per day

LOADED LABOR RATE – STRAIGHT TIME:

per hour

LOADED LABOR RATE – OVER TIME:

per hour

0218
Operational and Maintenance Training for each Aft and Fwd Marine Crane System delivered under this contract in accordance with Specification Number ELC-025-P-573-0518, para. 3.7.6.
2
Job
To be determined after installation of each Aft or Fwd Marine Crane System. Coast Guard shall provide Contractor at least 14 calendar days prior notice.
To be determined after installation of each Aft or Fwd Marine Crane System. Coast Guard shall provide Contractor at least ____ calendar days prior notice.

FLAT RATE PER DAY

per day

LOADED LABOR RATE – STRAIGHT TIME:

per hour

LOADED LABOR RATE – OVER TIME:

per hour

0219
Operational and Maintenance Training for Hydraulic System delivered under this contract in accordance with Specification Number ELC-025-P-573-0518, para. 3.7.6.
1
Job
To be determined after Hydraulic and Control System installation. Coast Guard shall provide Contractor at least 14 calendar days prior notice.
To be determined after Hydraulic and Control System installation. Coast Guard shall provide Contractor at least ____ calendar days prior notice.

FLAT RATE PER DAY

per day

LOADED LABOR RATE – STRAIGHT TIME:

per hour

LOADED LABOR RATE – OVER TIME:

per hour

0220
Non-Warranty Technical Services for each Aft and Fwd Marine Crane System delivered under this contract in accordance with Specification Number ELC-025-P-573-0518, para. 3.7.3. Assume 8 hrs. and no travel for proposal.
2
Job
As required. Contractor shall respond by telephone within 24 hours or shall attend vessel within 72 hours of being contacted by the KO or COTR. Routine technical support services shall be scheduled at least 14 calendar days in advance.
As required. Contractor shall respond by telephone within __ hours or shall attend vessel within __ hours of being contacted by the KO or COTR. Routine technical support services shall be scheduled at least __ calendar days in advance.

FLAT RATE PER DAY

per day

LOADED LABOR RATE – STRAIGHT TIME:

per hour

LOADED LABOR RATE – OVER TIME:

per hour

0221
Non-Warranty Technical Services for Hydraulic System delivered under this contract in accordance with Specification Number ELC-025-P-573-0518, para. 3.7.3. Assume 8 hrs. and no travel for proposal.
1
Job
As required. Contractor shall respond by telephone within 24 hours or shall attend vessel within 72 hours of being contacted by the KO or COTR. Routine technical support services shall be scheduled at least 14 calendar days in advance.
As required. Contractor shall respond by telephone within __ hours or shall attend vessel within __ hours of being contacted by the KO or COTR. Routine technical support services shall be scheduled at least __ calendar days in advance.

FLAT RATE PER DAY

per day

LOADED LABOR RATE – STRAIGHT TIME:

per hour

LOADED LABOR RATE – OVER TIME:

per hour

0222
First Article Testing for the first Aft Marine Crane System delivered under this contract in accordance with Specification Number ELC-025-P-573-0518, para. 3.4.12.1.
1
Each.
$NSP
$NSP
Prior to delivery of the first CLIN 0201 Aft Marine Crane System. Contractor shall provide 14 days calendar advance notice of testing.
Prior to delivery of the first CLIN 0201 Aft Marine Crane System. Contractor shall provide __ calendar days advance notice of testing.
0223
First Article Testing for the first Fwd Marine Crane System delivered under this contract in accordance with Specification Number ELC-025-P-573-0518, para. 3.3.12.1.
1
Each.
$NSP
$NSP
Prior to delivery of the first CLIN 0202 Fwd Marine Crane System. Contractor shall provide 14 calendar days advance notice of testing.
Prior to delivery of the first CLIN 0202 Fwd Marine Crane System. Contractor shall provide __ calendar days advance notice of testing.

THIRD OPTION YEAR

0301
Aft Marine Crane System, to be manufactured, tested, packaged, preserved, and marked in accordance with Specification Number ELC-025-P-573-0518, sect. 3.4.
1
Each
26 weeks after receipt of each individual delivery order.
___ weeks after receipt of each individual delivery order.
0302
Fwd Marine Crane System, to be manufactured, tested, packaged, preserved, and marked in accordance with Specification Number ELC-025-P-573-0518, sect. 3.3.
1
Each
26 weeks after receipt of each individual delivery order.
___ weeks after receipt of each individual delivery order.
0303
Hydraulic and Control System, to be manufactured, tested, packaged, preserved, and marked in accordance with Specification Number ELC-025-P-573-0518, sect. 3.5.
1
Each
26 weeks after receipt of each individual delivery order.
___ weeks after receipt of each individual delivery order.
0304
Initial Spare Parts Kit, Aft Marine Crane System, in accordance with Specification Number ELC-025-P-573-0518, para. 3.6.3.3.
1
Each
26 weeks after receipt of each individual delivery order.
___ weeks after receipt of each individual delivery order.
0305
Initial Spare Parts Kit, Fwd Marine Crane System, in accordance with Specification Number ELC-025-P-573-0518, para. 3.6.3.3.
1
Each
26 weeks after receipt of each individual delivery order.
___ weeks after receipt of each individual delivery order.
0306
Initial Spare Parts Kit, Hydraulic System, in accordance with Specification Number ELC-025-P-573-0518, para. 3.6.3.3.
1
Each
26 weeks after receipt of each individual delivery order.
___ weeks after receipt of each individual delivery order.
0307

This is the start of the file's text. The full file is on GovTribe.

Other files

File Type Posted
SF30Amdmt8.doc DOC document
SF30Amdmt7.doc DOC document
SF30Amdmt6.doc DOC document
SF30Amdmt5.doc DOC document
Spec.REV2.P-573-0518.doc DOC document
SF30Amdmt4.doc DOC document
SpecificationRev1.doc DOC document
SF30Amdmt3.doc DOC document
SF30Amdmt2.doc DOC document
SF30Amdmt1.doc DOC document
Attachments to Solicitation.pdf PDF
SF 1449 —
PastPerformance.doc DOC document
Show all 13

On GovTribe

Work with this file