SF30Amdmt3.doc
DOC document 59 KB Posted
- Attached to
- Marine Cranes
- Solicitation number
- HSCG40-08-R-50008
About this file
Amendment No. 0003
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF30Amdmt8.doc | DOC document | |
| SF30Amdmt7.doc | DOC document | |
| SF30Amdmt6.doc | DOC document | |
| SF30Amdmt5.doc | DOC document | |
| Spec.REV2.P-573-0518.doc | DOC document | |
| SF30Amdmt4.doc | DOC document | |
| SpecificationRev1.doc | DOC document | |
| SF30Amdmt2.doc | DOC document | |
| SF30Amdmt1.doc | DOC document | |
| Attachments to Solicitation.pdf | ||
| SOLICITATION | — | |
| SF 1449 | — | |
| PastPerformance.doc | DOC document |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. CONTRACT ID CODE
| PAGE |
| OF PAGES |
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
| 1 |
| 2 |
2. AMENDMENT/MODIFICATION NO.
3. EFFECTIVE DATE
06/25/08
4. REQUISITION/PURCHASE REQ. NO.
2108408B7700LC002
5. PROJECT NO. (If applicable)
| 6. ISSUED BY |
| CODE |
| 045 |
| 7. ADMINISTERED BY (If other than Item 6) |
| CODE |
U.S.C.G. Engineering Logistic Center
Auxiliary Systems Contracting, M/S 99
2401 Hawkins Point Rd., B-31, 2nd Floor
Baltimore, MD 21226-5000 Email address: Patricia.L.Dobbins@uscg.mil
| 8. NAME AND ADRESS OF CONTRACTOR (no., street, county, State and ZIP Code) |
| ( |
| 9.A AMENDMENT OF SOLICITATION NO. |
| (TO BE COMPLETED BY CONTRACTOR) |
| X |
| HSCG40-08-R-50008 |
9B. DATE (SEE ITEM 11)
05/12/08
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
| CODE |
| FACILITY CODE |
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FORMCHECKBOX
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers FORMCHECKBOX is extended, FORMCHECKBOX is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning 2 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the Offer submitted: or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT/.ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc)
SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority).
E. IMPORTANT: Contractor FORMCHECKBOX is not, FORMCHECKBOX is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Amendment No.0003 is hereby issued to incorporate Specification No. P-573-0518, Revision 1, dated 6/23/08.
Revision 1 amends: Section 3,2.1.1, Paragraph 3 Page 10; Section 3.2.1.2 Paragraph 3, page 11; and Section 3.2.2, Paragraph 1, page 12.
In addition page 2 of this amendment reflects the questions and answers received in response to the Solicitation.
Solicitation closing date for receipt of offers until 07/08/08 @2:00 p.m.est.
API 2C Marine Crane Solicitation No. HSCG40-08-R-50008.
Point of contact for this solicitation is Patricia Dobbins (410) 762-6462 or email @ Patricia.L.Dobbins@uscg.mil .
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
| 15A. NAME AND TITLE OF SIGNER (Type or print) |
| 16A NAME AND TITLE OF CONTRACTING OFFICER (Type or print) |
NANCY DEAN, Contracting Officer
| 15B. CONTRACTOR/OFFEROR |
| 15C. DATE SIGNED |
| 16B. UNITED STATES OF AMERICA |
| 16C. DATE SIGNED |
BY
(Signature of person authorized to sign)
(Signature of Contracting Officer)
NSN 7540-01-152-8070
30-105
STANDARD FORM 30 (REV. 10-83)PREVIOUS EDITION UNUSABLE
Prescribed by GSA, FAR (48 CFR) 53.243
Solicitation No. HSCG40-08-R-50008 Amendment No. 0003
QUESTION AND ANSWERS.
QUESTION 1: When will the HPU components be bought?
ANSWER 1: This is partially described in Specification P-573-0518, Section 3.5, Paragraph 6, page 34. The hydraulic system will be purchased and installed either prior to or concurrent with the purchase and installation of the first AFT crane. Just prior to the installation of this hydraulic system, the existing central hydraulic system will be removed. Therefore, even though this will be installed along with the AFT crane, this hydraulic system will be required to support the exiting HAGGLUND crane systems and the Rucker Control System Anchor Windlasses. This hydraulic system will then support the FWD crane and second AFT crane upon their respective installations.
QUESTION 2: When will the forward and Second Aft crane be bought?
ANSWER 2: Refer to the estimated quantities listed in Schedule can be bought anytime during the five year period. See the bid factors addressed on page 88 of the solicitation.
QUESTION 3: Will we be able to realize any economies of scale?
ANSWER 3: The USCG can not identify at this time funding for new cranes for complete shipset(s).
QUESTION 4: Sea State 5 environment…Please confirm this is required.
ANSWER 4: Specification P-573-0518 reflects the updated requirement to be Sea
State 3 for normal operations.
File details come from the government source that posted it. Updated .