RFP-Page2.doc
DOC document 64 KB Posted
- Solicitation number
- HSCG38-08-R-H00006
About this file
RFP-Page 2
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amend1Q A(1)FORRFP.doc | DOC document | |
| RFP-Attachment8 FCF CGTO6CF.pdf | ||
| RFP-Attachment7 PaintRemovalGEN1308191.pdf | ||
| Amend1-ReplacePage56.doc | DOC document | |
| RFP-Attachment6 PlacardsCGTO.pdf | ||
| Amend1-Page1 SF30.pdf | ||
| RFP-Attachment5 Paint GEN130818B1.pdf | ||
| RFP-Attachment9 FlightandGround.doc | DOC document | |
| Amend1-ReplacePage33.doc | DOC document | |
| Amend1 AddendaB.xls | XLS spreadsheet | |
| RFP-Attachment2SNtrackedparts.xls | XLS spreadsheet | |
| RFP-Attachment1PSISpecNov2007.doc | DOC document | |
| RFP-AddendaB.xls | XLS spreadsheet | |
| RFPAddendaC-M.doc | DOC document | |
| RFP-Attachment4Notice.doc | DOC document | |
| RFP-Attachment3PastPerfQuest.rtf | RTF text file | |
| RFP-Page1SF1449.pdf |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HSCG38-08-R-H00006
ADDENDA A - SOLICITATION/CONTRACT FORM/GENERAL DATA
HC-130H Progressive Structural Inspection BasIC (PSI) Depot Level Maintenance Services A-1 Scope The contractor shall provide depot level maintenance services for one or more HC-130H aircraft at any one time. This solicitation and resulting contract will satisfy the structural overhaul requirements for USCG HC-130H aircraft only. The government anticipates a total estimated quantity of fifteen (15) aircraft inducted for these services for the entire 5-year contractual period. Services shall be divided into three distinct efforts: PSI Basic Inspection, Repair Phase, and Unscheduled Depot Level Maintenance (UDLM). See Figure A-1 below. The inspection effort will be accomplished in accordance with the USCG HC-130H Progressive Structural Inspection Basic (PSI) Specification, Revision M, dated 26 November 2007, which is provided as Attachment 1 under Section J. The Government anticipates inducting one or more aircraft under this effort at any given time. Some inductions initially may be limited to Center Wing Box inspection services under the UDLM clause of this contract. The determination to induct more than one aircraft at a time or future aircraft is dependent on the government’s assessment of on-going risk associated with additional aircraft inductions.
Offerors are advised that any aircraft inducted for Center Wing Box Inspection is subject to the government’s determination of the extent of work to follow. In order to be considered for Center Wing Box Inspection work, under the UDLM clause of this contract, contractors must be capable of performing a complete PSI Basic Inspection and Repair.
Figure A-1
UDLM
Drop-in heavy Maintenance, TCTOs, Center Wing Box Inspection
Repair
Correction of defects
Noted during PSI
Basic Inspection Phase
PSI Basic Inspection
As delineated in
The PSI Basic
Work Specification
As Fixed Priced
Basic
File details come from the government source that posted it. Updated .