DACA is Days After Base or Option Award
CLIN No. CLIN Name CDRL Name SOW Section CDRL's Draft Due (Calendar Days)
Government Comment Period (Calendar Days)
Contractor Comment Period (Calendar Days)
0001AA
Cost As an Independent Variable (CAIV) Assessment
3.2.1.1
3.3 A001, A002 60 DACA 15 15
A003 45 DACA ‐ Alt. A 90 DACA ‐ Alt. B
A005, A008, A010, A011, A013, A016, A017 All others 90 DACA
Option 1 ‐ Additional Industry Heavy Polar Icebreaker Baseline Design Study Support Information Study Support Information
3.2.1.2.2 3.3
A001, A006, A007, A009, A012, A014, A015, A018 30 DACA 15 15
1002 Option 2 ‐ Cost and Schedule for Baseline
Cost and Schedule Estimates for Design and Construction for Baseline Design Report
3.2.1.3
3.3 A001, A019 30 DACA 15 15
1003AA Hull Form and Structures Study Plan 3.2.1.4.3 A022 30 DACA 15 15
1003AB
Hull Form and Structures Report and Study Support Information
3.2.1.4.3
3.3 A001, A039, A040, A041, A042, A043, A044 90 DACA 15 15
1004AA Propulsion Plant / Power Train Study Plan 3.2.1.4.1 A020 30 DACA 15 15
1004AB
Propulsion Plant / Power Train Report and Study Support Information
3.2.1.4.1
3.3 A001, A023, A024, A025, A026, A027, A028 90 DACA 15 15
1005AA
Electric Plant Configuration / Topology Study Plan 3.2.1.4.2 A021 30 DACA 15 15
1005AB
Electric Plant Configuration / Topology Study Report and Study Support Information
3.2.1.4.2 3.3
A001, A029, A030, A031, A032, A033, A034, A035, A036, A037, A038 90 DACA 15 15
1006 Option 6 ‐ Areas of Further Study Proposed Areas of Further Study Report 3.2.1.4.4 A045 15 DACA 5 10
1007AA
Industry Heavy Polar Icebreaker Baseline Design (Rev. 1) Description Report. Study Support Information, Cost and Schedule Estimates
3.2.1.5 3.2.1.6 3.3
A001, A003, A005, A006, A007, A008, A009, A010, A011, A012, A013, A014, A015, A016, A017, A018, A019 30 DACA 15 15
1007AB Regulatory Design Impact Study 3.2.1.5 A004 30 DACA 15 15 1008AA Follow On Studies Plan 3.2.1.7 A046 30 DACA 15 15
1008AB Cold Weather and Remote Operations 3.2.1.7.1
3.3 A001, A047 90 DACA 15 15
1008AC Selected Spaces Arrangements 3.2.1.7.2
3.3 A001, A048, A049, A050, A051, A052, A053 90 DACA 15 15
1008AD Icebreaking Enhancements 3.2.1.7.3
3.3 A054 90 DACA 15 15
1009AA Integration Studies Report 3.2.1.8
3.3 A001, A055 90 DACA 15 15
1009AB CAIV Update 3.2.1.9 A002 60 DACA 15 15
Option 10 ‐ Updated Baseline Design with Cost and Schedule
Industry Heavy Polar Icebreaker Baseline Design (Rev. 2) Description Report. Study Support Information, Cost and Schedule Estimates
3.2.1.10 3.2.1.11 3.3
A001, A003, A005, A006, A007, A008, A009, A010, A011, A012, A013, A014, A015, A016, A017, A018, A019 30 DACA 15 15
1011 Option 11 ‐ Advanced Study Advanced Study Report 3.2.1.12 A056 60 DACA 15 15
0001AB
Initial Industry Heavy Polar Icebreaker Baseline Design (Rev. 0) Description
Report and Study Support Information 3.2.1.2.1 15 15
Option 4 ‐ Initial Study Plan and Propulsion Study
Option 9 ‐ Integration Studies and CAIV Update
Option 7 ‐ Updated Baseline Design with Cost and Schedule
Option 5 ‐ Initial Study Plan, Electric Study
Base ‐ CAIV and Initial Baseline Design
Option 8 ‐ Follow On Studies
Option 3 ‐ Initial Study Plan and Hull Form Study