HSCETC-11-R-00001 Additional Contracting Questions-Answers 28 June 2011.pdf

PDF 72 KB Posted

Attached to
Network Cabling Services and Support
Solicitation number
HSCETC-11-R-00001
Issued by

About this file

HSCETC-11-R-00001 Additional Contracting Questions-Answers 28 June 2011

View the file

Other files

File Type Posted
HSCETC-11-R-00001 Amendment 00009.pdf PDF
FAR 52.212-3 Offeror Representations and Certifications-Commercial Items —
HSCETC-11-R-00001 Amendment 00008.pdf PDF
Attachment_8-IDIQ_Pricing_Revised2.xlsx XLSX spreadsheet
HSCETC-11-R-00001 Amendment 00002.pdf PDF
HSCETC-11-R-00001 Amendment 000001.pdf PDF
HSCETC-11-R-00001 Amendment 00007.pdf PDF
Attachment 8-IDIQ Pricing Revised2.xlsx XLSX spreadsheet
HSCETC-11-R-00001 Additional Wage Determinations.pdf PDF
HSCETC-11-R-00001 Amendment 00006.pdf PDF
Attachment 8-IDIQ Pricing Revised.xlsx XLSX spreadsheet
HSCETC-11-R-00001 Amendment 00005.pdf PDF
Attachment 11-Sample Design Request for Proposal revised.pdf PDF
HSCETC-11-R-00001 Contracting Questions and Responses FINAL.pdf PDF
SECTION E-SOLICITATION PROVISIONS revised.pdf PDF
SECTION C-CONTRACT CLAUSES revised.pdf PDF
Attachment 5-Statement of Work Revised.pdf PDF
HSCETC-11-R-00001 ACQUISITION QUESTIONS AND RESPONSES —
HSCETC-11-R-00001 Amendment 00004.pdf PDF
HSCETC-11-R-00001 Amendment 000003.pdf PDF
HSCETC-11-R-00001 Technical Questions and Responses FINAL 16JUNE2011.pdf PDF
HSCETC-11-R-00001 1449 Mod 1.pdf PDF
Attachment 2-Draft Quality Assurance Surveillance Plan.pdf PDF
SECTION D LIST.pdf PDF
HSCETC-11-R-00001 1449.pdf PDF
Attachment 11-Sample Design Request for Proposal.pdf PDF
Attachment 10-Sample Design Scenario Price Proposal.pdf PDF
Attachment 6-Evaluation of Contractor's TO Performance.pdf PDF
Attachment 12-Wage Determinations.pdf PDF
Attachment 8-IDIQ Pricing.pdf PDF
SECTION E-Provisions-Instructions-Evaluation Factors.pdf PDF
Attachment 4-Regional Map.pdf PDF
Attachment 3-ICE Attachment 3-Structured Cable Plant Standard 5192011.pdf PDF
SECTION C-CONTRACT CLAUSES.pdf PDF
Attachment 5-Statement of Work.pdf PDF
Attachment 1-Contractor Performance Evaluation Survey.pdf PDF
Attachment 13-Network Cabling Services and Support- ICE CONUSE and OCONUS locations.pdf PDF
Attachment 9-Sub-Contractor Consent Letter.pdf PDF
Attachment 7-ODC Travel Authorization Form.pdf PDF
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. J2 Records Management and Reporting (pg. 19) of Statement of Work: this section references IAW DHS/ICE Policies. Can the Government provide a copy of these policies or describe how they relate to Records Management and Reporting?

Answer: The records management and reporting requirements are referenced in

Attachment 5, Statement of Work .

2. Does the Government have a preferred manufacturer solution for cabling and connectivity?

Answer: Any requirements/preferences are stated in the solicitation and supporting documents.

3. Can the Program Manager oversee multiple regions?

Answer: This is part of the Offeror’s proposed solution and their approach will be evaluated as stated in Section E, page 33, Project Management Factor.

4. Are tabs included in the overall page count for each volume?

Answer: Tabs are not included in the overall page count.

5. What material and labor components should be included in per drop prices?

Should backbone, racks, cable tray, cable management be considered in per drop prices?

Answer: This is part of the Offerors proposal. See Attachment 5, Statement of Work, Section C.4.1.2, Site Survey Plan Package, Drop Termination.

6. Will the Government provide a list of Government owned site vs. privately owned sites?

Answer: No.

7. Is there a requirement for Made in America materials to be provided under the contract?

Answer: See Section C, page 5, Clause 52.225-1, Buy American Act-Supplies (Feb

2009).

8. Doe Homeland Security-ICE provide all major materials and minor materials/equipment/personnel/misc supplies by the contractor?

Answer: See Section 5, Statement of Work, Section C.2, Scope, Second paragraph that states, “The scope of this contract is to provide the Government all necessary management, supervision, materials, services, support, warranty repair, identification, and performance of the cabling activities required for approximately 500 geographically dispersed ICE locations, sites, and facilities”.

9. Are there specific manufacturers for materials required? If so, can this be provided?

Answer: Only if specified in solicitation documents. Also see Section C, page 5, Clause

52.225-1, Buy American Act-Supplies (Feb 2009).

10. Attachment 12 (Wage Determinations) does not contain wages for “Cable

Installation Technician”? What are the wage determinations for this labor category.

Answer: For purposes of submitting a proposal, the Offeror shall determine a labor category/rate included in the wage determination that is comparable to the Cable

Installation Technician.

File details come from the government source that posted it. Updated .