Attachment 11-Sample Design Request for Proposal.pdf

PDF 141 KB Posted

Attached to
Network Cabling Services and Support Federal contract opportunity
Solicitation number
HSCETC-11-R-00001
Issued by
Immigration and Customs Enforcement

About this file

Attachment 11-Sample Design Scenario Request for Proposal

View the file

Other files for this federal contract opportunity

Other files attached to Network Cabling Services and Support, newest first.
File Type Posted
FAR 52.212-3 Offeror Representations and Certifications-Commercial Items —
HSCETC-11-R-00001 Amendment 00009.pdf PDF
HSCETC-11-R-00001 Amendment 00008.pdf PDF
HSCETC-11-R-00001 Additional Contracting Questions-Answers 28 June 2011.pdf PDF
Attachment_8-IDIQ_Pricing_Revised2.xlsx XLSX spreadsheet
HSCETC-11-R-00001 Amendment 00007.pdf PDF
HSCETC-11-R-00001 Amendment 000001.pdf PDF
HSCETC-11-R-00001 Amendment 00002.pdf PDF
Attachment 8-IDIQ Pricing Revised2.xlsx XLSX spreadsheet
HSCETC-11-R-00001 Additional Wage Determinations.pdf PDF
HSCETC-11-R-00001 Amendment 00006.pdf PDF
SECTION C-CONTRACT CLAUSES revised.pdf PDF
Attachment 5-Statement of Work Revised.pdf PDF
HSCETC-11-R-00001 Contracting Questions and Responses FINAL.pdf PDF
SECTION E-SOLICITATION PROVISIONS revised.pdf PDF
HSCETC-11-R-00001 Amendment 00005.pdf PDF
Attachment 11-Sample Design Request for Proposal revised.pdf PDF
Attachment 8-IDIQ Pricing Revised.xlsx XLSX spreadsheet
HSCETC-11-R-00001 Amendment 00004.pdf PDF
HSCETC-11-R-00001 ACQUISITION QUESTIONS AND RESPONSES —
HSCETC-11-R-00001 Amendment 000003.pdf PDF
HSCETC-11-R-00001 Technical Questions and Responses FINAL 16JUNE2011.pdf PDF
HSCETC-11-R-00001 1449 Mod 1.pdf PDF
Attachment 8-IDIQ Pricing.pdf PDF
Attachment 12-Wage Determinations.pdf PDF
Attachment 6-Evaluation of Contractor's TO Performance.pdf PDF
Attachment 3-ICE Attachment 3-Structured Cable Plant Standard 5192011.pdf PDF
Attachment 2-Draft Quality Assurance Surveillance Plan.pdf PDF
Attachment 9-Sub-Contractor Consent Letter.pdf PDF
Attachment 13-Network Cabling Services and Support- ICE CONUSE and OCONUS locations.pdf PDF
Attachment 7-ODC Travel Authorization Form.pdf PDF
SECTION D LIST.pdf PDF
HSCETC-11-R-00001 1449.pdf PDF
SECTION C-CONTRACT CLAUSES.pdf PDF
Attachment 10-Sample Design Scenario Price Proposal.pdf PDF
SECTION E-Provisions-Instructions-Evaluation Factors.pdf PDF
Attachment 4-Regional Map.pdf PDF
Attachment 5-Statement of Work.pdf PDF
Attachment 1-Contractor Performance Evaluation Survey.pdf PDF
Show all 39

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 11-Sample Design Request for Proposal

Source Selection Sensitive-FAR 3.104

Sample Design Request for Proposal

Offerors are notified that the information provided in the following Sample Design Scenario 1 provides more information than would be provided in any task order (TO) request issued after award for a site visit. This Sample Design Scenario 1 provides additional information that would normally be gathered by the Contractor as part of CLIN XX01-Site Visit. As part of the evaluation for award, Offerors shall provide a Firm-Fixed Price (FFP) for Installation. All proposed travel costs included in the FFP for Installation shall be in accordance with (IAW) the

Joint Federal Travel Regulations.

Sample Design Scenario 1

Sample Design Scenario 1 is a 10 story building located in (Region 1-Buffalo, NY, Region 2-

Denver, CO, Region 3-Phoenix, AZ, Region 4-Orlando, FL, Region 5-Washington, D.C.).

ICE will occupy the entire building. Each floor is approximately 300 ft. by 150 ft. and will have

200 work stations and printers. All floors have two Remote Wiring Closets (RWC) with 100 drops each.

The Main Computer Room (MDF) is located on the 3 rd floor. All RWC’s will be connected to the MDF with a 12-strand multimode optical fiber cable. The two RWC’s on each floor will be connected to each other with a 12-strand multimode optical fiber cable. A 150 pair copper tie cable will be run from the MDF to each RWC. The RWC’s are stacked vertically throughout the building. The wiring closets are 150 feet apart. The 3 rd floor wiring closets are 50 feet and 150 feet from the MDF.

A SCIF will be included on the 8 th floor. The SCIP will have 58 A-LAN, 58 C-LAN and 58

HSDN drops to accommodate workstations and printers within the area.

Each Remote Wiring Closet (20 Total)

1. Provide and install 100 drops locations with 3 Cat 6 cables identified as “A”, “B” and

“C”. All copper terminations shall be T568B. The average cable length is 175 feet.

2. Provide and install three open equipment racks in each RWC. Rack “A” will contain a fiber distribution panel, three 48-port Cat 6 patch panels for the “A” horizontal cables and the Ethernet switching equipment. Rack “B” will contain three 48-port Cat 6 patch panels for the “B” horizontal cables. Rack “C” will contain three 48-port Cat 6 patch panels for the “C” horizontal cables and three 48-port patch panels for the voice ties.

Each rack shall have all applicable vertical and horizontal wire management. Ladder rack shall be installed from the top of each rack to the rear wall to provide stability and a cable pathway to the racks. The racks shall be securely fastened to the floor and grounded to a certified building ground.

3. Provide and install a 12-strand armored multi-mode optical fiber cable from each RWC to the 3 rd floor MDF. All fiber strands shall be terminated using SC connectors.

4. Provide and install a 12-strand armored multi-mode optical fiber cable connecting RWC-

A and RWC-B on each floor. All fiber strands shall be terminated using SC connectors.

The estimated distance is 150 ft.

5. Provide and install a 150 pair voice tie cable termination on the wall mounted 110 blocks in the MDF to the “C” rack. The tie cable will terminate one pair per port on the three

48-port voice tie patch panels on the rack.

th

Floor SCIF

The SCIF has its own Computer Room located within the secure space. The SCIF MDF is located 50 feet from RWC-8B. All HSDN and C-LAN cabling will be run to the SCIF MDF.

All A-LAN cabling will be run to RWC-8B outside the SCIF. A-LAN, HSDN and C-LAN cabling will each terminate in separate faceplates.

1. Provide and install 58 drop locations each configured with 3 Cat 6 cables identified as

“A”, “B” and “C”. These drops will be run to RWC-8B and terminated on the patch panels located on the cabling rack. All copper terminations shall be T568B. The average cable length is 200 feet.

2. Provide and install 58 HSDN drops locations each configured with 2 strands of multimode optical fiber. The HSDN fibers shall be terminated using LC connectors on each end. The average cable length is 125 feet.

3. Provide and install 58 C-LAN drops locations each configured with 2 strands of multimode optical fiber. The C-LAN fibers shall be terminated using SC connectors on each end. The average cable length is 125 feet.

4. Provide and install a single open rack in the SCIP MDF. The rack shall contain two fiber distribution panels, one for HSDN and one for C-LAN and applicable vertical and horizontal wire management. Ladder rack will be installed from the top of the rack to the rear wall to provide stability and a cable pathway to the racks. The rack shall be securely fastened to the floor and grounded to a certified building ground.

5. Provide and install a 12-strand armored single mode optical fiber cable from the SCIF

MDF to the Main MDF. The estimated distance is 350 ft.

6. Provide and install 4 voice only cables from the RWC-8B to a single wall mounted faceplate near the rack in the SCIF MDF.

7. Provide 60 multimode, duplex fiber patch cords, SC to SC, 3 meters in length.

8. Provide 60 multimode, duplex fiber patch cords, LC to SC, 3 meters in length.

9. Provide 60 multimode, duplex fiber patch cords, SC to MTRJ, 5 meters in length.

10. Provide 60 multimode, duplex fiber patch cords, LC to MTRJ, 5 meters in length.

MDF

1. Provide and install two enclosed cabinets in the 3 rd floor MDF. One cabinet will have fiber distribution cabinets for the A Closets, Core Ethernet switching equipment and routers. The other cabinet will have fiber distribution cabinets for the B Closets, Core

Ethernet switching equipment and routers.

2. Provide 25 multimode, duplex fiber patch cords, LC to SC, 3 meters in length.

3. Provide 70 multimode, duplex fiber patch cords, SC to SC, 3 meters in length.

General

4. Provide and install a 200 pair copper voice tie cable from the building entrance facility to the MDF. The approximate distance is 700 ft. Both ends will terminate on wall mounted

110 blocks.

5. Provide 1,200 10 ft Cat 6 patch cables for connecting data devices to drops.

6. Provide 2,500 Cat 6 patch cables for patching “A”, “B” and “C” ports on the rack. All

“A” ports and “C” ports shall be patch on the racks. Sufficient patch cords shall be provided to patch “B” ports as required. Patch cords should be of varied lengths to maintain a neat appearance on the rack.

7. Others will provide cords for connecting telephone instruments to the wall jacks.

File details come from the government source that posted it. Updated .