Project Tailoring Plan Template.doc

DOC document 171 KB Posted

Attached to
Computer Aided Dispatch Information System FINAL RFP
Solicitation number
HSCETC-10-R-00010
Issued by

About this file

Applicable document PTP

View the file

Other files

File Type Posted
HSCETC-10-R-00010 Amendment 000004 - Cancellation.pdf PDF
SF33amd2.pdf PDF
SF33amd3.pdf PDF
CADIS_Sol_04192010amd3.doc DOC document
CADIS Questions amd2.doc DOC document
CADIS FRD 040810.doc DOC document
CADIS_Sol_04082010.doc DOC document
Preproposal conference briefing 0312 oaq full v3.ppt PPT presentation
sf33.pdf PDF
CADIS_Sol_QA 0317-oaq.doc DOC document
CAD Solic PPC QA 031610.xlsx XLSX spreadsheet
PPC_attendee_sign-in.pdf PDF
SF33.pdf PDF
OMB Circular A-11 Part 7.pdf PDF
NIBRS Standards.pdf PDF
Technical Reference Model 2010.pdf PDF
Labor Categories 03092010.doc DOC document
Baseline Security Requirements.doc DOC document
SLM Gate Review Document Delivery Expectations.pdf PDF
ICE_SLM_Handbook_1.2.pdf PDF
MCD CF19 Toughbook Specs.xls XLS spreadsheet
CADIS FRD 03092010.doc DOC document
Technical Architecture Guidebook.pdf PDF
Enterprise Systems Assurance Plan.pdf PDF
Architecture Test Evaluation Plan 2.0.pdf PDF
SLM Work Patterns.pdf PDF
CADIS Sol 03092010.doc DOC document
Draft_solicitation_questions_answers.doc DOC document
CF19 Toughbook Specs.xls XLS spreadsheet
14. FRD_2009_11 03a.doc DOC document
Section A.pdf PDF
CADIS Solicitation draft.doc DOC document
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Tailoring Plan

Date:

Project Name/Acronym:

Portfolio/Program:

Business Owner:

IT Project Manager:

Information System Security Officer (ISSO):

Architecture Assurance Manager:

Project Description:

Project Work Pattern:

SLM Documentation

Phase
Document Artifact
To be Provided (Yes/No)
Tailoring Description and Justification
Solution Engineering
Project Initiation Plan/Authorization Letter
Yes
Concept of Operations (ConOps)
Yes
Planning
Project Tailoring Plan (PTP)
Yes
This document
Project Fact Sheet
Yes
Project Management Plan (PMP)
Yes
Project Schedule
Yes
Separate from PMP
Acquisition Plan
Yes
Ensure Advanced Acquisition Plan or Statement of Work (SOW) is on file
Change Control Board (CCB) Charter
Yes
Required to establish the CCB
Requirements Definition
System Requirements Document (SRD)
Yes
Requirements Traceability Matrix (RTM)
Yes
System Workload Analysis Document (SWAD)
Yes
Data Management Plan (DMP)
Yes
Design
Interface Control Agreement (ICA)
Verify
Required for any interfacing systems
Information Technology Change Request (ITCR)
Verify
Submit ITCR and/or Information Technology Insertions (TI) as appropriate for any new technology not on the ICE TRM or Department TRM respectively
Design Document
Yes
SEB Service Level Agreements
Verify
Only if Web or DBA hosting is required
Data Migration Plan
Verify
If data is being migrated in production
Training Plan
Verify
If end user training is required
Development Test Plan (DTP)
Yes
Present the FQT strategy and approach
Disaster Recovery Plan
Yes
Required for all systems
Development
Development Test Analysis Report (DTAR)
Yes
Provide FQT results
Version Description Document (VDD)
Yes
List of CCB approved software changes, CM label and number of files, and installation instructions
User Guide
Verify
Based on Business Owner assessment of end user needs
Deployment Plan
Verify
Provide details about deployment of any software or hardware components
Integration and Test
System Administration and Operations Manual
Verify
If ongoing system management required by maintenance personnel and/or operations staff
Implementation
Transition to Production Operations
Verify
If transitioning from an engineering project to Operations Division support
Operations and Maintenance
Notice of Intent to Release (NIR)
Yes
Required for each release
Disposition
Disposition Plan
Verify
Required for any older system being replaced and retired as a result of the deployment of this system

Information Assurance Document Artifacts:

Planning
FIPS 199 Security Categorization Worksheet
Yes
System Security Plan (SSP)
Yes
Security Risk Assessment
Yes
e-Authentication Assessment
Yes
Requirements Definition
Contingency Plan
Yes
Design
Interconnection Security Agreement (ISA)
Verify
Required for any interfacing systems
Development Security Test and Evaluation (ST&E) Plan
Yes
Single Sign-On (SSO) Integration Plan
Yes
Describe how the system plans to integrate SSO

Privacy Office Document Artifacts:

Planning
Privacy Threshold Analysis (PTA)
Yes
Requirements Definition
Privacy Impact Analysis (PIA)
TBD
The Privacy Office will provide direction after reviewing the PTA
System of Record Notice (SORN)
TBD
The Privacy Office will provide direction after reviewing the PTA
Disposition
Privacy Threshold Analysis (PTA) for Dispositioning an ICE System
Verify
Separate disposition-specific PTA required for any older system being replaced and retired as a result of the deployment of this system

SLM Gate Reviews

Gate Review
To be Held (Yes/No)
Tailoring Description and Justification
Planning Review
Yes
Requirements Review
Yes
Preliminary Architecture and Design Review (PADR)
Yes
Final Architecture and Design Review (FADR)
Yes
Test Readiness Review (TRR)
Yes
Release Readiness Review (RRR)
Yes
Operational Readiness Review (ORR)
Yes
Held prior to hand-off to operations
Post-Deployment Review
Yes
Disposition Review
Verify
Required for any older system being replaced and retired as a result of the deployment of this system

Independent Testing

Independent Testing
To be Conducted (Yes/No)
Tailoring Description and Justification
System Acceptance Test
Yes
All applications will be tested independently
System Security Test
Yes
All applications will be tested independently
Web Code Review
Verify
As required by SEB for web enabled systems only
Interoperability Testing
Verify
If system introduces a software or hardware component that potentially conflicts with the existing implementation (could be a script downloaded to the desktop, a new peripheral device, or other)
Performance Testing
Verify
If system processing speed has a potential impact on business service delivery or if system resource usage potentially impacts other systems or the infrastructure
Section 508 Compliance Testing
Yes
All ICE systems with a user interface must be tested for Section 508 compliance

Project Tailoring Approval Certification

Certification Question
Yes
No
N/A
1. Is the Project Tailoring Plan attached to this certification?
X
2. Does the Project Tailoring Plan identify deliverables for the application appropriate for the system size, complexity, and risk and that fit the particular needs of the project?
X
3. Does the Project Tailoring Plan identify SLM gate reviews that will take place during the lifecycle?
X
4. Have justifications been provided for the inclusion, exclusion, or combination of deliverables and/or SLM gate reviews as specified in the Project Tailoring Plan?
X
5. Does the Project Tailoring Plan identify the types of independent testing that will take place during the lifecycle?
X
6. Do the IT Project Manager and Architecture Assurance Manager agree that the tailoring specified in the Project Tailoring Plan is appropriate for the project?
X

Comments:

Concurring stakeholder:

IT Project Manager
(Tab to Enter Name)

Approving stakeholder:

Architecture Assurance Manager
(Tab to Enter Name)

PAGE