Text version
Computer Aided Dispatch Information System (CADIS)
HSCETC-10-R-00010
SECTION B: SUPPLIES/SERVICES PRICE/COST SCHEDULE
B.1 Price/Cost schedule
Offeror is to input hours, unit prices, CLIN total amounts, annual total contract value amounts, and a summary of all contract years with an estimated total value of the contract on an Excel spreadsheet.
B.2 ITEMS TO BE ACQUIRED
The Offeror shall furnish all personnel, facilities, equipment, material, supplies, and services (except as may be expressly set forth in this contract as furnished by the Government) and otherwise do all things necessary to, or incident to, performing and providing the following items of work: Computer Aided Dispatch Information System (CADIS)
B.3 ORDERING ACTIVITY
The Department of Homeland Security (DHS), Immigrations and Customs Enforcement is the sole authority to request services under this contract.
B.4 CONTRACT CEILING
The ceiling for this contract is $ ________________ (to be determined).
B.5 NAICS/PSC
NAICS Code: 541512, CAD Systems Integration Design Services
PSC Code: D313, Computer Aided Design/Mfg Services
SECTION C: STATEMENT OF WORK (SOW)
1.0 Project Title
Computer Aided Dispatch Information System (CADIS)
1.1 Introduction
This Statement of Work (SOW) document outlines the current high-level functional and technical requirements of the Department of Homeland Security (DHS), Immigration and Customs Enforcement (ICE), Federal Protective Services (FPS), and the Office of the Chief Information Officer’s (OCIO) integration, configuration and deployment utilizing an approved System Development Lifecycle methodology to implement CADIS.
2.0 BACKGROUND
ICE, FPS is responsible for providing security and law enforcement services for federal facilities. The role of CADIS is to support the FPS Law Enforcement Mission by:
Automating the FPS MegaCenter dispatch operation: The MegaCenters are the vital communications link between FPS Law Enforcement Officers (LEOs), federal facilities, contract guards at the entrance to the facilities, and emergency responders, providing 24 –hour security alarm monitoring and dispatch functions.
Currently, FPS manages dispatches and incidents from four MegaCenters located in Denver, Colorado; Battle Creek, Michigan; Suitland, Maryland; Philadelphia, Pennsylvania; and 11 regional offices. This dispatch and incident response solution was originally developed to support mission needs in a non-automated process. The Government Accountability Office (GAO) and FPS have determined that the current infrastructure no longer meets organizational requirements and does not adequately support the FPS Mission in the following ways:
· Manual Processes where automation is available to enhance performance
· Unreliable and non-standardized data management between MegaCenters
· Lack of a Geographic Information System (GIS)
· Lack of performance measurement capabilities
· Limited emergency fail-over and load sharing capabilities
· Dependence on individuals with domain knowledge Providing access to information and robust reporting functionality to FPS Law Enforcement Personnel: In order to eliminate the current deficiencies and to address the new law enforcement requirements, CADIS must replace the current Daily Operations Log (DOL) and Web Records Management (WebRMS) systems and include the following three components:
1) Computer Aided Dispatch (CAD) System
2) Records Management System (RMS)
3) Geographic Information System (GIS)
CADIS is aligned with the DHS and FPS Strategic Plans:
· DHS Strategic Goal of “Strengthen Our Nation's Preparedness and Emergency Response Capabilities”
· FPS Strategic Goal of “Collaborative Partnerships and Effective Communications and Efficient and Stakeholder-oriented Law Enforcement and Security Services”
2.1 EnVISIONED CAPABILITY
To eliminate current functionality gaps and to address new law enforcement requirements a new system is needed that will automate core FPS law enforcement business processes and will result in a more standardized, integrated, and efficient national information technology solution for FPS. The system must provide a level of scalability and compatibility with other DHS, ICE, and FPS systems and shall always be in compliance with emerging DHS enterprise architecture. Further, the system must reflect the seamless integration of the following three functional components:
1) CAD System for personnel dispatching in response to incidents
2) RMS to collect, share, and report incident information based on National Incident Based Reporting System (NIBRS) standards. A system to conduct efficient call center management, which includes automated data collection, calls routing, viewing call history, etc.
3) GIS to provide location information to assess dangerous sites, improving routing, vehicle tracking and to display other relevant neighborhood information The FPS CADIS will eliminate the deficiencies mentioned above and will return many critical hours of resources. CADIS shall have the capability to collect, modify, store, retrieve, and process record management and geographic information data via a report management function and a record management system. It will improve FPS officer safety, as the current manual processes will be automated; reducing the chances of critical errors by removing the extensive liability that currently exists with the dispatchers. Additionally, CADIS will provide intelligent resources in reporting information that is needed to make knowledgeable business decisions and aid in criminal analysis, helping FPS’ efforts in providing preventative security measures.
CADIS will also integrate existing electronic security systems being monitored, including Intrusion Detection System (IDS) and Access Control System (ACS) alarms, and fire alarms. Future spirals or enhancements may follow this contract to provide additional functionality and will be identified later. CADIS will consolidate geographically and functionally alarm and 911 receptor sites, the dispatch decision-making and recordkeeping sites, and dispatch communications hub for FPS. Dispatchers will no longer be required at individual installations within a region, other than occasional Continuity of Operations (COOP) dispatching in the event of a systems failure, disconnect or catastrophic event that renders CADIS dispatching inoperable. The term “turnkey” means that the system shall be fully operational upon delivery, with all specified functionality, training, and maintenance.
Specifically, the system shall:
· Be fully NIBRS compliant.
· Implement a system availability of 99.999 percent when measured on a 24-hour per day, seven day a week basis for 365 days. Processor, disk storage, and power supply redundancy may be required in order to achieve the desired availability and protection of information. The system shall be configured such that operating a training component and/or running reports will not affect system response time.
· Interface with external applications and data sources such as the FPS Risk Assessment Management Program (RAMP), National Crime Information Center (NCIC), and other systems, as listed in section 5.9.
· Have the ability to push the client application via the DHS network to desktops and Mobile Computing Devices (MCD) utilizing Big Fix.
· Allow a user the ability to access the application, download appropriate information and forms relating to incidents, and submit the necessary information without re-keying information.
· Allow the capability to be directly expandable by adding hardware and Commercial-Off-The-Shelf (COTS) modules.
· Include a feature for backup, archival and recovery capability without taking CADIS out of service and with minimal impact on dispatch operations.
· Provide the capability for users to work offline in the event of connectivity failures, and the capability to continue to work off-line in the event the failure occurs in the middle of a session without any data loss, and to upload saved offline data when connectivity is re-established.
· Contain data exporting capabilities. CADIS must have the capability to export data in industry standard database formats to facilitate providing data to other databases controlled by DHS and/or other Government entities.
· Be able to generate standard automated forms and templates to be used by all regions; such as incident report, spot report, etc.
· Contain a wide variety of reports and statistical information for analysis and management reporting and/or reporting requirements in real time.
· Allow ad-hoc, dynamically generated reports such that code modifications are not required for each new report.
2.2 CADIS Deployment Considerations
The Contractor shall be aware of the following consideration as it relates to the deployment of CADIS:
2.2.1 The CADIS Servers will be installed in either of the following locations:
a) Suitland (Primary) and Battle Creek (Backup) MegaCenters
b) All servers located at the Rockville Data Center
The levels of support provided by the Contractor during deployment shall be the same at either location.
2.2.2 Geographic locations of clients:
a) Most of the clients are mobile clients and are located throughout the United States and its territories (Estimated 950 mobile clients)
b) Dispatch clients are located in the MegaCenters in Denver, Colorado; Battle Creek, Michigan; Suitland, Maryland; and Philadelphia, Pennsylvania
c) Regional/Reporting Clients are located nationwide but organized into eleven regions plus the Headquarters office in Washington, DC and the Federal Law Enforcement Training Center (FLETC)
2.2.3 Software deployments shall be arranged at various locations in each region, however, all clients, stationery and mobile, shall have the ability to install the required software, upgrades and patches using the existing DHS network and ICE-owned Big Fix utilities.
2.2.4 Mobile Computing Devices (MCDs):
The appropriate software shall be installed and configured on existing mobile computing devices used by the law enforcement users.
2.3 Best practice implementation of cadis product
It is the intent of FPS to adapt to the current industry best practices as it relates to the FPS operating procedures and the operating environment of CADIS. Implementing CADIS will enable key FPS stakeholders the opportunity to assess current operating procedures against any productivity gains that can be realized through the introduction of automation. Consequently, neither a blanket “technology driving the process,” nor a “process driving the technology” approach will be embraced, but a balanced approach that seriously evaluates the cost/benefit trade-off in moving from current to new operating procedures.
3.0 SCOPE OF WORK
The Contractor shall perform work in accordance with this SOW and exercise a methodical approach to planning, organizing and managing resources to procure and provide all labor, software licenses and materials to successfully integrate, provide training, deliver and deploy a robust, expandable, and scalable enterprise-level COTS based system. This product shall have CAD capability along with an RMS and GIS capability and satisfies the functional requirements identified in the CADIS Functional Requirements Document (FRD).
The contract shall execute Project Management Institute (PMI) best practices from the Project Management Body of Knowledge (PMBoK) methodology to support the CADIS project. The Contractor shall provide the best business processes as prescribed by industry and the selected product to identify the as-is and to-be business processes, and to the extent possible implement those selected best practices.
The Contractor shall adhere to the guidance and standards outlined in Section 4.3. The effort shall follow a pre-defined ICE Architecture Division System Lifecycle Management (SLM) work pattern for COTS/GOTS (Government Off The Shelf) products that incorporates a reduction of design and development activities.
4.0 APPLICABLE DOCUMENTS
4.1 Technical Documents and Resources for References
The technical documents below are applicable to this SOW and will be made available as part of Government Furnished Information (GFI) via CD or Government Furnished Website.
· The Architecture Test and Evaluation Plan. August 2005, Version 2.0
· DHS/ICE Baseline Security Requirements for Automated Information Systems, July 18, 2003
· DHS Technical Architecture Guidebook April 2004, Version 1.1
· Enterprise Systems Assurance Plan December 2004, Version 1.2
· ICE Approved Software and Hardware List
· ICE Security Requirements, printed October 30, 2003
· Information Technology Infrastructure Library (ITIL) Version 3
· IT Security Program Handbook (Management Directive 4300A). December 2003, Version 2
· National Incident-Based Reporting System (NIBRS)
· Office of Management and Budget (OMB) Circular A-11, Part 7
· System Lifecycle Management (SLM) Handbook, Pre-defined Work Patterns. April 2008, Version 2.2
4.2 OTHER SUPPORTING DOCUMENTATION AND GUIDANCE
The documents listed below will be made available as part of GFI via CD or Government Furnished Website. Additional references are listed in the FRD.
· CADIS FRD
· Law Enforcement Information Technology Standard Council (LEITSC)
· Post Tracking System FRD
· RAMP
4.3 COMPliance with STANDARDS AND PROCESSES
The Contractor shall ensure that the system is in full compliance with all DHS and ICE Enterprise Architecture (EA), SLM and security guidelines and regulation. The Contractor must comply with all technology standards and architecture policies, processes, and procedures defined in ICE OCIO Architecture Division publications and DHS Architecture Division publications. These publications include, but are not limited to, the following:
· DHS/ICE Architecture Test and Evaluation Plan
· DHS/ICE Enterprise Systems Assurance Plan
· DHS/ICE SLM Handbook, Pre-defined Work Patterns
· DHS/ICE Technical Architecture Guidebook
· DHS/ICE Technical Reference Model
· DHS/ICE Web Standards and Guidelines
The Contractor shall not deviate from the technology standards that are specified in the above documents, without express approval granted by the Government via the formal Technology Change Process. If a deviation from the technology standards is desired, the Government Project Manager must submit a formal request to the Architecture Division for adjudication. The Contractor shall not proceed with the deviation unless the Architecture Division approves the formal request and grants a waiver to deviate from the Technology Standards. If the Architecture Division approves the technology change request, the Contractor shall comply with all stipulations specified within the approval notification.
The Contractor shall not deviate from the SLM Process (including any tailored SLM work pattern) without express approval granted by the Government via the formal Request for Deviation (RFD) Process. If a deviation from the SLM Process is desired, the Government Project Manager must submit a formal RFD to the Architecture Division for adjudication. The Contractor shall not proceed with the deviation unless the Architecture Division approves the formal request and grants a waiver to deviate from the SLM Process. If the Architecture Division approves the RFD, the Contractor shall comply with all stipulations specified within the approval notification.
5.0 SPECIFIC TASKS
The requirements listed in this section are a representative sample of the complete requirements, which may be found in the CADIS FRD.
5.1 Program Management support
The Contractor shall establish and implement the operating procedures and oversight activities necessary for project planning, Work Breakdown Structure (WBS), quality assurance, and risk assessment. Centralized administrative, clerical, and documentation support shall be provided. The Contractor shall manage project metrics, risk, and schedule items.
The Contractor shall comply with Capability Maturity Model Integration (CMMI) Level 2 Process Areas, including Requirements Management, Project Planning, Project Monitoring and Control, Supplier Agreement Management, Measurement and Analysis, Process and Product Quality Assurance, and Configuration Management.
The Contractor shall develop and deliver a Project Management Plan (PMP). Reporting cycles begin with Government acceptance of the PMP. The PMP shall describe the management, technical, and organizational approach, resources, and controls to be employed to meet CADIS cost, accomplish project planning, and schedule requirements. The PMP shall include a WBS with associated dictionary to reflect actual activities. The WBS shall trace all work; serve as framework for defining and planning project work segments; be constructed as a logic-network employing Critical Path Methodology (CPM) representing all proposed activities, milestones, and major deliverables for the project period of performance; shall be sufficiently detailed to mitigate risk and measure performance; shall be delivered using an MS Office Suite product.
The Contractor shall participate in weekly teleconference or video teleconference meetings to report progress toward contract deliverables, update status from the previous reporting period, advise current objectives, problems or delay issues, proposed corrections and responsible parties; Meeting minutes that capture discussions held and key action items shall be provided within two business days following each meeting, and include minutes from all significant meetings in a Weekly Project Status Reports to the Contracting Officers Technical Representative (COTR).
5.2 Commercial Off-The-Shelf (COTS) CAD SYSTEM
The Contractor shall provide a COTS CAD system that shall have the capability to collect, modify, store, retrieve, and process record management and geographic information data. The system shall provide a level of scalability and compatibility with other DHS, ICE, and FPS systems and shall always be in compliance with emerging DHS enterprise architecture.
This system shall:
· Be fully NIBRS compliant.
· Implement a system availability of 99.999 percent when measured on a 24-hour per day, seven day a week basis for 365 days. Processor, disk storage, and power supply redundancy may be required in order to achieve the desired availability and protection of information. The system shall be configured such that operating a training component and/or running reports will not affect system response time.
· Allow a user the ability to access the application, download appropriate information and forms relating to incidents, and submit the necessary information without re-keying information.
· Provide a means to optimize network traffic.
· Allow the capability to be directly expandable by adding hardware and COTS modules.
· Include an option for a backup, archival, and recovery capability without taking CAD out of service and with minimal impact on dispatch operations.
· Interface with external applications and data sources outlined in the FRD (see section 5.9).
· Contain data exporting capabilities. CADIS must have the capability to export information to other databases controlled by DHS and/or other Government entities.
· Be able to generate standard automated forms and templates to be used by all FPS personnel in all regions, and headquarters.
· Allow for future incorporation of additional modules (evidence/property control, scheduling court appearance, etc).
· Contain a wide variety of reports and statistical information for analysis and management reporting and/or reporting requirements in real time.
· Allow ad-hoc, dynamically generated reports such that code modifications are not required for each new report.
The Contractor shall:
· Provide a development and integration environment with Government supplied equipment as needed.
· Add backup processes and contingency plan which shall include manual process of data during controlled outrages and in case of disaster.
· Provide a development, testing, and documentation infrastructure to support the CADIS efforts.
5.3 SOFTWARE Configuration and Implementation support
The Contractor shall deploy and integrate a COTS system that provides a level of scalability and compatibility with other DHS, ICE, and FPS systems and is in compliance with current DHS/ICE enterprise architecture.
Within 45 business days after contract award, the Contractor shall provide an initial report detailing their architectural and COTS based system configuration approach, implementation strategy, COTS/GOTS SLM documentation/review approach, and their ability to reinforce other ICE mission applications.
The Contractor shall provide software and hardware implementation in compliance with the CMMI Level 2 standards. The Government estimates that a minimum of 600 concurrent users shall be able to access all CADIS applications at regional offices, from dispatch workstations, and MCDs. An Enterprise license is required to support the minimum projected user base. Consider that CADIS has a maximum potential projected user base of about 1250 users across the 50 states and territories. When costing CADIS client licenses, the Government anticipates licenses will be priced based on user roles. The Government currently anticipates that of the 600 concurrent users, 100 would be dispatchers and 500 would be LEOs.
The Contractor shall:
· Provide implementation support of the CADIS at all four MegaCenters located in Denver, Colorado; Battle Creek, Michigan; Suitland, Maryland; Philadelphia, Pennsylvania; and 11 regional offices.
· Incorporate workflow capability and flexibility; Support FPS in their development of operational procedures to support the new CADIS capabilities.
· Integrate software that will allow users to view available historical data for each individual.
· Integrate software that will allow for broader search/query capabilities, avoiding and/or eliminating the need to continually require ad-hoc code writing.
· Integrate software that will provide interactive training sessions for users at MegaCenter sites. The training should be accessed directly from CADIS, as opposed to a separate website. A yearly refresher course will also be required.
· Design and support the integration, testing and production environments at the Contractor’s facility or a Government designated site if required.
· Design the software with internal flagging capability based on incident reporting. These flags would permit prioritizing leads to be pursued by the FPS Inspectors or other Federal law enforcement entities.
· Allow users to access and interact with the CADIS application.
· Conduct the necessary testing in accordance with the ICE SLM Pre-defined Work Pattern for COTS/GOTS products to ensure functional capability and ease of use.
· Maintain software development libraries to facilitate the development, testing, and implementation of software.
· Follow detailed guidance contained within the FRD regarding system functional requirements and timing for delivery of functionality.
· Design the application and development and test environments in compliance with ICE OCIO Application Hosting Services (AHS) such that it can be hosted at the DHS data center and/or one of the MegaCenters, if needed.
The Contractor shall prepare for and participate in SLM reviews to ascertain progress in defining system technical requirements; determine systems engineering direction and progress, and the degree of convergence on a balanced, complete configuration.
5.4 DATA MIGRATION and transition
The Contractor shall plan and execute a successful data migration and transition effort, migrating about 800,000 records from the current legacy DOL and about 33,000 records from WebRMS systems to CADIS. Prepare a detailed Data Migration and Transition Plan making use of a structured multi-phase methodology that includes multiple (a) Data Discovery; (b) Analysis, Mapping and Planning; (c) Data Extraction, Translation and Load (ETL) Strategy and Planning; (d) Mock Conversions, Cleansing and Validation; and (e) Full Migration and Deployment phases.
5.5 OPERATIONS AND MAINTENANCE (O&M)
The Contractor shall fully maintain the CADIS application system and software developed under this task. Tasks include, but are not limited to the following:
· Maintain the application to identify and correct software application, performance and implementation failures for all CADIS components. Maintenance includes emergency repairs performed when immediate correction is necessary to continue user service corrective work [includes System Change Requests (SCRs)] or to reflect requirements/specifications, and updating and maintaining the required SLM documentation, as necessary.
· Perform maintenance tasks to meet changes in requirements of the users or user environment; enhance the system to provide additional or changed functionality; adapt the system to changes in business processes; or extend software to new users.
· Maintain the current external CADIS interfaces as identified in section 5.9. Provide adaptive support in instances where external connection requirements change.
· Provide coordination with FPS and field personnel, including assistance with getting potential users into CADIS, and preparation of information to be disseminated to customers, including brochures and informational sheets.
· Implement IT management concepts and policies consistent with the Information Technology Infrastructure Library (ITIL) version 3.
· Assist FPS in developing the initial Standard Operating Procedures (SOPs) for the CADIS system and maintain them throughout the period of performance.
· Provide updated SOP scripts and procedures to staff when new information, releases or changes regarding CADIS have been distributed and/or implemented.
· Perform all system administration activities associated with ICE application processes under this SOW, as specified. These activities shall include monitoring and compilation of data statistics for batch and interface production processing; identification of corrupt files or processes; and system archiving and data archiving when applicable.
· Staff a full-time (24 x 7 x 365) Tier 2/3 experienced national CADIS Help Desk to provide COTS product support. Tasks shall include but are not limited to the following:
· Maintain the current external CADIS interfaces as identified in the final FRD.
· Meet with the COTR on the technical issues on an as needed basis at the discretion of the Government Project Lead.
· Produce Help Desk Support documentation as required. This documentation will include information on Frequently Asked Questions and protocols for such common tasks as password resets, call routing, and hardware support and maintenance.
5.6 Configuration MANAGEMENT
The Contractor shall conduct configuration management for all development and maintenance tasks under the guidelines set forth by the ICE OCIO Architecture Division; conduct project-level configuration management for all development and maintenance work for the applications/database; execute all approved requests for changes to establish baselines via the approved SCR process, assist with chartering and conducting Change Control Board (CCB) meetings; assign proper identification of all configuration items in accordance with agreed on conventions. This includes the proper labeling of all software releases, regardless of content; and, submitting an electronic version of all deliverables to the ICE’s Electronic Library Management System (ELMS) library.
5.6.1 MANAGEMENT SYSTEM CHANGE REQUIREMENTS
Software changes to applications are based upon the submission and Government approval of an SCR. The Contractor shall be responsible for carrying out all application maintenance requirements projects according to open SCRs and entering the data in the ICE approved management tracking tool. Currently, ICE uses Serena Tracker. Prior to commencing a system modification, the OCIO and FPS Project Managers will determine the degree of the modification as minor, moderate, or major; prioritize execution of SCR efforts and direct the Contractor to perform activities to address SCR emergency maintenance will be performed at the direction of the Government. The respective OCIO Project Manager must approve all SCRs in writing.
The Contractor, at a minimum, shall perform the following activities in support of executing SCR activities:
· Align activities to conform to ICE SLM requirements
· Collect, validate and document SCRs
· Define, analyze, plan and document the full scope of the SCRs
· Determine external factors and interdependencies related to SCRs
· Assigning roles and responsibilities to contract personnel supporting the SCR effort
· Execute authorized activities in support of SCR efforts
· Review and analyze time history of SCRs
· Evaluation of outcomes of SCRs (Quarterly)
· Reporting on changes on the project, and deviation from change management plan
· Maintain an archive (history) of changes in the system
| Change Classification |
| Estimated Effort Required |
| Number of SCRs to be Conducted - Base Year |
| Number of SCRs to be Conducted - Option Year 1 |
| Number of SCRs to be Conducted - Option Year 2 |
| Number of SCRs to be Conducted - Option Year 3 |
| Number of SCRs to be Conducted - Option Year 4 |
| Minor Change |
| 1 – 40 Hours |
| Moderate Change |
| 41 – 160 Hours |
| Major Change |
| 160 – 500 Hours |
| Change Classification |
| Estimated Effort Required |
| Number of SCRs to be Conducted – Option Year 5 |
| Number of SCRs to be Conducted - Option Year 6 |
| Minor Change |
| 1 – 40 Hours |
| Moderate Change |
| 41 – 160 Hours |
| Major Change |
| 160 – 500 Hours |
5.7 TRAINING
The Contractor shall develop a training plan leveraging existing COTS based system training material for all three user categories, dispatchers, FPS LEOs and System Administrator. The training approach should take into account overall cost and operational requirements, and should have a minimal impact on day-to-day operations. The Government anticipates that training shall cover approximately 16 system administrators and 125 dispatchers located at the four MegaCenters, and about 900 LEOs throughout the U.S. and its territories.
Specifically, the Contractor shall:
· Coordinate and conduct user training. CADIS users shall be provided a general overview of the operating procedures with detailed training focused on their unique user role.
· Provide updated training when major releases/additions to documentation have occurred; and provide training material and sessions for personnel approved by the COTR. Each user shall be trained in operating procedures changes affected by the implementation of CADIS. The Contractor shall use the most cost effective user based system and system administrator training materials and equipment, if applicable.
· Maintain and update existing training documentation as well as provide an electronic copy of all training material whenever an update is developed.
· Develop and submit a CADIS Integrated Training Plan for Government approval, and subsequent Contractor execution. The plan should emphasize the business processes and new standard operating procedures relating to the new system to provide a broader scope to users and enhance understanding with all users.
· Maintain and update existing technical and end-user training documentation.
· Be accessible to all applicable FPS users – both Government and Contractors - and FLETC
5.8 certification and accreditation
The Contractor shall develop, implement, and maintain a Certification and Accreditation (C&A) program that complies with DHS and other Federal requirements, and supports the ICE enterprise. The Contractor shall provide support activities that enable the establishment and maintenance of a C&A status of Authority to Operate (ATO). Specific tasks include:
5.8.1 The Contractor shall provide security artifacts in support of the CADIS ICE Security requirements and governance.
5.8.2 The Contractor shall support the CADIS Information Systems Security Officer (ISSO) in the development of the following and related security documents:
5.8.2.1 Privacy Threshold Assessment (PTA) and resultant Privacy Impact Assessment (PIA)
5.8.2.2 System Security Plan (SSP)
5.8.2.3 Risk Assessment (RA)
5.8.2.4 Security Test and Evaluation (ST&E)
5.8.2.5 Security Assessment Report (SAR)
5.8.2.6 Vulnerability Scanning Assessment
5.8.2.7 Other Security Related documents
5.8.3 The Contractor shall provide technical expertise on C&A, Federal Information Security Management Act (FISMA), and other information assurance activities
5.8.4 The Contractor shall verify that information assurance is being addressed throughout the SLM process;
5.8.5 The Contractor shall prepare specified CADIS Major Applications (MA) C&A documentation to include the C&A artifacts listed above in accordance with the appropriate NIST and other Federal guidance;
5.8.6 The Contractor shall provide guidance, recommendations, manage and execute activities in support of CADIS:
5.8.6.1 Risk assessment and management activities;
5.8.6.1.1 Identify, monitor and manage risks based upon the 19 OMB Risk Facets
5.8.6.2 Evaluation and management of CADIS Plan of Action and Milestones (POA&M) criteria and the assured completion of; and
5.8.6.3 Quality assurance reviews of IA-related documented processes and procedures, as it pertains to C&A activities.
5.9 INTERFACES:
CADIS will have the capability to interface with the systems below. Separately propose costs to interface CADIS with each of the following third-party systems. It is the intent of the Government to incorporate some of the interfaces for implementation and delivery with the initial contract award, and others at a later date. Regardless, the Government may unilaterally exercise any, all, or none of these interfaces.
5.9.1 Interfaces Expected Upon Initial Deployment
The following interfaces are expected to be operational upon the initial deployment of CADIS.
INTERFACE A: Risk Assessment Management Program (RAMP)
CADIS components shall integrate with and automate data received from the FPS RAMP system. RAMP is the centralized source of information used by FPS for risk assessment and management including all information on federal facilities, contact information, and much more. RAMP is the system of record for FPS. CADIS will access building information, including building number, address, contact information and other general information from RAMP. The CADIS-RAMP interface must be able to parse the data, update call records in the CAD, populate the CAD screens, update RMS, and provide address data to GIS. The final deliverable product will be the successful integration of CADIS and RAMP through integration, certification, and “live” demonstrated operation.
interface B: Post Tracking System (PTS)
CADIS components shall integrate with and automate data received from the FPS PTS. PTS is the centralized source of information used by FPS for guard post tracking. PTS’s purpose is to ensure that the Contractors are meeting the requirements of their contracts, such as ensuring that guard posts are staffed with guards that meet the Government’s training and certification requirements. PTS information is used to compare, reconcile, and certify the invoices submitted by the Contractors prior to payment.
The CADIS-PTS interface must be able to provide CADIS with guard post information such as guard post location, the name of the guard manning the post, and the guard post contact information. The final deliverable product will be the successful integration of CADIS and PTS through integration, certification, and “live” demonstrated operation.
INTERFACE C: National Crime Information Center System (NCIC) CADIS shall interface with the NCIC. The interface must include interfaces for NCIC database queries meeting state and federal specifications. The CADIS – NCIC interface must meet each state’s regulations. The NCIC database inquiry or query will give the user pre-defined entry fields to aid in entering data into those fields. This capability must provide the user with interactive tools informing the user of specific query fields requiring data entry for each state in the regions, and inform the user of the format and exact number and structure of data characters required. The CADIS–NCIC interface must authenticate users’ Social Security numbers by automatically including it in the ‘sent query’, and must provide secure connection to each state meeting state and local security regulations. All NCIC query returns must be presented, accessed for display, and/or printed in a simple manner by the user, and stored in the CADIS RMS database subject to random access for review based on user privileges and security. The final deliverable product will be the successful interface between CADIS and NCIC through integration, certification, and “live” demonstrated operation.
INTERFACE D: National Law Enforcement Tracking System (NLETS) CADIS shall interface with the NLETS database and perform NLETS database inquiries. The interface must include interfaces for NLETS database queries meeting state and federal specifications. The CADIS-NLETS interface must meet NLETS regulations. The NLETS database inquiry or query will give pre-defined entry fields to aid the user in entering data into those fields. This capability must provide the user with interactive tools that inform the user of the specific query fields requiring data entry, and inform the user of the format and exact number and structure of data characters required. The CADIS–NLETS interface must authenticate users’ Social Security numbers by automatically including the number in the ‘sent query’, and must provide secure connection to NLETS meeting, NLETS security regulations. All NLETS query returns must be presented, accessed for display, and/or printed in a simple manner by the user, and stored in the CADIS RMS database, subject to random access for review, based on user privileges and security. The final deliverable product will include the successful interface of CADIS and NLETS through integration, certification, and “live” demonstrated operation.
interface E: Security information system (SIS)
CADIS components shall integrate with and automate receiving information from the SIS. SIS is a central station for automatic alarm monitoring. The CADIS interface accepts the data feed over a serial link formatted using XML. The CADIS interface must parse the data and create a call record to notify the system that there is an alarm. The final deliverable product will be the successful integration of CADIS and SIS through integration, certification, and “live” demonstrated operation.
5.9.2 Interfaces Expected After Initial Deployment
The following interfaces are expected to be operational options after the initial deployment of CADIS, as directed by the Government
INTERFACE F: State Crime Information Center SYSTEMS (optional)
In addition to NCIC, CADIS shall provide the same interface functionality of NCIC for each state’s and territory Crime Information Center. In light of recent regional efforts to better share information, the Contractor shall investigate whether interfaces are required with each state jurisdiction where CADIS is deployed, or whether regional interfaces may be more appropriate.
INTERFACE G: DHS/ICE geospatial database (optional)
CADIS GIS component shall integrate, and interface with the DHS / ICE existing geodatabase repository for the purpose of importing base maps and map layers. The interface must adhere to DHS/ICE standards, and existing Geospatial Repository (GRR) datasets that use the Environmental Systems Research Institute (ESRI) product suite. CADIS Geospatial interface must provide local base map and map layer data access for use by the CADIS system.
interface H: ICEPIC (OPTIONAL)
CADIS components shall integrate with and automate report input to the ICE Pattern Analysis and Information Collection System (ICEPIC). The interface must include interfaces for CADIS database queries meeting state and federal specifications. The CADIS database inquiry or query will provide pre-defined entry fields to aid the user in entering data into those fields. This capability must provide the user with interactive tools that inform the user of specific query fields requiring data, and inform the user of the format and exact number and structure of data characters required. The CADIS– ICEPIC interface must authenticate users’ Social Security numbers by automatically including the number in the sent query. The interface must provide secure connection to ICEPIC that meets ICEPIC security regulations. All ICEPIC query returns must be presented, accessed for display, and/or printed in a simple manner by the user and stored in the CADIS RMS database subject to random access for review based on user privileges and security. The final deliverable product will be the successful integration of ICEPIC and CADIS through integration, certification, and “live” demonstrated operation. The CADIS RMS module must be capable of interfacing with the ICEPIC to allow for a CADIS user to enter a query and receive results that are stored in CADIS.
5.10 Phase In
The Contractor shall identify all their Key staff and have critical project management support staff and other critical positions and subcontractors on-board and through the ICE Security process within 90 days after the contract is awarded. The Contractor shall be able to accept and successfully accomplish assigned tasks as identified by the CLIN on Day 91 after the contract has been awarded. To successfully complete this CLIN the Contractor shall:
· Provide an accurate list of all key personnel that have their Enter On Duty (EOD) dates.
· Assign a position description for each employee and subcontractor employee supporting the contract.
· Provide an employee listing demonstrating that 90% of staffing (including subcontractors) is on-board and ready to work immediately after the Phase-in.
· Obtain or provide a COTS tracking system that is a secure web-based system that can be accessed by both the Government and the Contractor.
· The Contractor shall ensure the tracking system is tested and ready to be fully utilized immediately upon completion of the 90 day phase-in period.
· Upon completion of this contract any Government owned licenses and maintenance agreements must be transferred to DHS/ICE. The Contractor is responsible for ensuring ICE is fully aware of the expiration dates for licenses 90 days prior to the expiration date.
· Participate in the Kick-off Meeting.
5.11 PHASE OUT
The Contractor shall submit a Phase-out plan 120 days prior to the expiration of the contract. The Contractor shall:
· Provide the COTR a listing of any Government furnished equipment in its possession or under its control.
· Transfer the COTS tracking system used within the ICE computer systems to the Government and the follow on Contractor’s staff and provide detailed instructions for accessing the system.
· Provide any reference material and information on administration of the tracking system to the COTR.
· Upon completion of this contract the Government provided licenses and maintenance must be transferred to DHS/ICE. The Contractor is responsible for ensuring ICE is fully aware of the expiration dates for licenses 90 days prior to the expiration date.
· Participate in any transition meetings.
6.0 KEY PERSONNEL
The Government has determined that a management team consisting of a Program Manager and project leads with subject matter expertise within various disciplines are key personnel for this requirement. The Contractor has the flexibility to structure its management team as necessary to ensure the successful integration and deployment of CADIS. The management team shall have the appropriate emphasis and balance of the various programmatic and technical disciplines to result in a successful project implementation.
Program Manager – shall be PMP certified, and have 8-10 years of IT-related program management experience and have experience managing law enforcement dispatch systems, call center databases, radio controlled systems and/or enterprise-wide systems as well as knowledge of implementing a CAD system.
Project Leads – shall possess 5-7 years of IT-related management experience and have experience managing law enforcement dispatch systems, call center databases, radio controlled systems and/or enterprise-wide systems, knowledge of law enforcement dispatch systems and /or enterprise-wide systems. Some knowledge of the DHS/ICE SLM process is desired.
7.0 DELIVERABLES AND DELIVERY SCHEDULE
All templates shall be pre-approved by the Government. All deliverables for the CADIS effort shall be delivered to the COTR, FPS PMs, and/or CO as outlined in the table at the end of this section.
7.1 PROJECT management PLAN AND SCHEDULE
The Contractor shall develop and deliver a Project Management Plan (PMP) outlining resources, implementation strategies, activities, and milestones necessary to accomplish work specified in the SOW. Technical activities in the schedule shall be at a level of detail sufficient for the Contractor to manage the task. The Contractor shall update the Project Management Plan schedule whenever a modification to the project occurs.
7.2 PROGRESS REPORTS, QUARTERLY STATUS REPORTS, WEEKLY Reports & PROGRAM REVIEWS, PROJECT PLAN & SCHEDULES All reporting shall be delivered via electronic mail (e-mail) unless otherwise requested by COTR or Contracting Officer. Additionally, the CO and/or the COTR may request impromptu meetings to discuss status or issues.
7.2.1 PROGRESS REPORTS
The Contractor shall prepare a monthly progress report which will summarize performance during the period of performance and provide the status of any planned transition activity. The monthly report shall contain the following:
· Description of work planned
· Description of work accomplished
· Analysis of the difference between planned and accomplished work
· Work planned for the following month
· Open issues
7.2.2 QUARTERLY STATUS REPORTS
The Contractor shall prepare a quarterly status report for the Contracting Officer (CO) and the COTR. Generally, these reports should include accomplishments, any deviations from planned activities, field related issues, other issues, and planned activities for the next period.
7.2.3 WEEKLY REPORTS
The Contractor shall prepare a weekly status report for the COTR. Generally, these reports should include accomplishments, any deviations from planned activities, field related issues, other issues, and planned activities for the next week. The format and delivery of the report shall be at the discretion of the COTR.
7.2.4 PROGRAM REVIEWS
The Contractor shall provide a quarterly program review to the COTR and CO to review program tasks. The purpose of this meeting is to ensure the state of production processing; and, that all application software efforts are coordinated, consistent, and not duplicative. Budgets, schedules and other program related issues shall also be brief by the Contractor to the COTR and CO.
7.3 COST SCHEDULE & EARNED VALUE MANAGEMENT SYSTEM (EVMS) REPORTS
The Contractor shall submit monthly reports to the COTR. The reports must be prepared in sufficient detail to support OMB A-11 reporting requirements. The initial report is due 45 calendar days after contract kick off meeting and shall cover the first 30 days of contract performance. Subsequent reports will be provided monthly and shall cover the 30-day period that began at the conclusion of the last reported period.
7.4 FINANCIAL REPORT
The Contractor shall submit monthly reports to the COTR that must be prepared in sufficient detail to support OMB A-11 reporting requirements. The initial report is due 45 calendar days after Kick off meeting and shall cover the first 30 calendar days of performance. Subsequent reports will be provided monthly and shall cover the 30 period that began at the conclusion of the last reported period. The Contractor shall provide the required reports in accordance with the format provided by the COTR.
The Contractor shall prepare a monthly Excel workbook containing one sheet per task and a summary sheet. The Contractor shall provide the following information on each sheet:
· Cost Ceiling, Proposal Burn rate, Proposal Cumulative, Funding Ceiling
· Monthly Incurred, Cumulative Incurred
· Monthly Outlook, Total Estimated Cost
· Monthly Invoiced, Cumulative Invoiced
Monthly and summary data shall be provided for the above information. An imbedded chart shall also be included on the sheet with a primary axis containing the monthly incurred and the monthly outlook; and a secondary axis containing the remaining information.
7.5 SYSTEM LIFE CYCLE MANAGEMENT (SLM) DELIVERABLES
The Contractor shall review the Project Tailoring Plan developed for the CADIS effort and provide recommendations for any additional tailoring based upon the maturity of their product, with supporting rationale. In accordance with SLM guidelines, COT/GOTS work pattern document artifacts shall include, but not be limited to the following documentation:
· Interface Control Documents/Agreements
· Requirements Traceability Matrix
· Design Document
· Data Migration/Conversion/Transition Plan
· Training Plan and associated Training Materials
· Development Test Plan and associated Development Test Analysis Reports
· Version Description Document
· Users Plan
· Systems Administration and Operations Manual
· Deployment Plan
· Other documents as necessary to support SLM Gate Review requirements
7.6 QUALITY ASSURANCE REPORTS
The Contractor shall deliver Quality Assurance Reports on or before the 15th of each month at the end of each quarter.
7.7 Training documentation
The Contractor shall provide an integrated training plan as well as user based and system administrator training materials and equipment, if applicable.
7.8 Certification and Accreditation (C&A)
The Contractor shall prepare and maintain a Certification and Accreditation (C&A) plan that complies with DHS and other Federal requirements, and supports the ICE enterprise as required.
7.9 PRODUCT ACCEPTANCE
Information technology products delivered under this SOW shall be accepted when they meet all requirements, which include: validating objectives, processes and…