PDF 7 MB Posted

Attached to
Security Guard Services Federal contract opportunity
Solicitation number
HSCEEC08R00002
Issued by
Immigration and Customs Enforcement

About this file

Amendment 000002

View the file

Other files for this federal contract opportunity

Other files attached to Security Guard Services, newest first.
File Type Posted
HSCEEC08R00002-000006.pdf PDF
HSCEEC08R00002-000005.pdf PDF
HSCEEC08R00002-000004.pdf PDF
HSCEEC08R00002-000003.pdf PDF
HSCEEC08R00002-000001.pdf PDF
HSCEEC08R00002.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 19

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

HSCEEC-08-R-00002/000002

Hours and Supervisors categories, regular and

TAS) inclusive of all 3 RFP sites. The wage and benefit requirements of the two CBAs and AWD required for the 3 sites vary significantly in compensation requirements. The contractor assumes a great deal of risk in having to bid one rate, for multiple locations, based on ESTIMATED hours (reference Section B, Item 03, Estimated

Quantities). The actual hour quantities and site locations for those hours could be significantly different than estimated, resulting in the offeror having to pay mandated compensation terms higher than the one "blended" unit rate, or even the Government paying higher costs if more hours are ordered at the lower compensation site(s).

This is further complicated by the fact the

Government may unilaterally change the ordered hours requirements (reference Section C, 1.5).

We request that the Section B, Schedule, be revised to require hourly pricing separately for each of the three sites, so that pricing can accurately reflect the CBA or AWD, and other specific performance requirements related to each site (such as relief officers).

1A. Section B, Schedule, reflects estimated annual hours. Both the line items on the SF 33 and Section M will be changed to reflect total hours per site, as the request for a "blended" or

"weighted" wage rate for the 3 locations is hereby removed. Section B of this amendment will reflect those changes.

2Q. What is the correct section to determine the

Post Hours? Form 33, pages 2 states the Post hours for the base year are 64,394.5. Section B pages 1 & 2 list 64,444 hours per year. Section

"J" when multiply out the hours per day by the given number of days the total is 69,692. We assume section "J" to be correct. From the basics established in section "J", we will compute the

Relief required and the reserve component required.

2A. The post hours per year are estimates.

However, SF33, Section B Schedule, and the post exhibit under Section J will be changed to reflect consistency. Section B of this amendment will reflect those changes.

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

3 19

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

HSCEEC-08-R-00002/000002

3Q. Section B, Section 02, refers to the contract type as indefinite delivery, indefinite quantity. Section C, 1.4, refers to a fixed-price requirements contract. Please clarify resulting contract type.

3A. The contract will be an Indefinite Delivery, Indefinite Quantity (IDIQ) with fixed price rates.

4Q. Section B, Section C, Option Pricing.

Paragraph 1 of this section states that the offeror shall price the options for the four (4) additional 12-month periods by assuming the minimum hourly wages and fringe benefits established for the initial performance period will apply to the 4 additional 12-month periods.

Please confirm that this means that the offeror shall price both the AWD and CBA sites under these conditions. That is, for the CBA sites, the "weighted" rate from the CBA compensation schedules for the corresponding base year term should also be priced for each subsequent option year.

4A. This questions refers to Paragraph C under

Section B of the solicitation. The request for

"blended" or "weighted" wage rate is hereby removed. Section B of this amendment will reflect those changes.

5Q. Section C, 7.3, Supervisor. Do the hours for the Supervisors stated in this section correspond to those for "Supervision" listed in

Section J, Exhibit I, or are these Supervisors in addition to the Section I requirements, and to be priced within the unit prices of the offeror?

5A. Yes, these hours correspond to the Exhibit.

6Q. Section C, 14.1, Training, General.

Paragraph C of this section states that the offeror is responsible for reimbursing employees for training attendance and expenses. Does this condition apply to personnel that are not yet company employees, but would be if they were to pass the required basic and other qualifications testing (such as firearms, CPR, AED, First Aid) required for this contract?

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

4 19

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

HSCEEC-08-R-00002/000002

6A. Contractor is responsible for the training.

7Q. Section F, Section 02, states work under this contract is expected to commence on or about

June 1, 2008. There is no mention of any

"transition period" for the resulting contract in the RFP.

a.Will the Government provide for a "transition period" prior to June 1st, or starting on June

1st?

b.If there will be a transition period, how long will it last?

c.If there will be a transition period, how should the offeror price associated costs?

d.If there is no transition period, how is the offeror to conduct any start-up training or other activities?

7A. There will be a 60 day transition period.

Section B of this amendment will reflect those changes.

a.The Government will provide a 60 day transition period prior to contract effective date. Work is expected to commence on or about

June 1, 2008.

b.Transition will last 60 days.

c.Transition costs shall be factored in as stated in the solicitation (see Section B, paragraph F of the solicitation).

d.Not applicable.

8Q. Section J, Exhibit 1. Is the offeror to price relief officers (for the positions stating

"yes" for relief) within its unit price rate?

8A. See Section B, paragraph F of the solicitation.

9Q. Section J, Exhibit 1. Is there any "walk time" to be factored into relief officer costs?

9A. See answer 8A.

10Q. Section J, Exhibit 1. Is guardmount included in the stated shift hours?

10A. See answer 8A.

11Q. Section J, Exhibit 1. If guardmount is not included in the stated shift hours, what

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

5 19

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

HSCEEC-08-R-00002/000002

guardmount time are offerors to include in their pricing?

11A. See answer 8A.

12Q. Section J, Exhibit 1. This schedule uses a calendar term of January-December for each contract period. According to Section F, the contract term is proposed to be June through May, which would change the number of days for the five contract years. Will DHS/ICE/FPS modify the

RFP to provide an updated Section J, Exhibit 1 for each contract year, reflecting the most current projected annual term, to be used for pricing?

12A. Although the post hours are estimated, an updated Section J will be provided. Section B of this amendment will reflect those changes.

13Q. Section J, Exhibit 8A, National Building

Museum CBA. Article XXIX of the CBA states it shall remain in effect until (and including) May

31, 2009. However, the Appendix provided with the CBA shows the last wage and H&W changes effective October 1, 2006 and the last uniform and pension changes effective October 1, 2005.

Please confirm these are the current compensation rates to be used for pricing this proposal, or provide the most current appendix with compensation data.

13A. An updated CBA for the National Building

Museum is attached.

14Q. Section L, Price Proposal. Is the returned solicitation document to include all pages of the solicitation - inclusive of attachments and amendments, or only certain portions of the document?

14A. Section L describes the required items needed for the proposal.

15Q. Section C.12.B indicates the government will not pay for overtime; however, if overtime is needed to fill a short-notice TAS requirement, will the government reimburse the contractor for the overtime expenses it incurs?

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

6 19

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

HSCEEC-08-R-00002/000002

15A. The government will not reimburse the contractor for the overtime expenses it incurs.

16Q. Section J, Exhibit 2C lists body armor, but does not list a quantity. If the contractor is required to provide body armor, please indicate the quantity (i.e., one for each person per shift or another quantity).

16A. Body armor not required for this effort.

17Q. The solicitation indicates that 40 hours of weapons training must be provided. In section J, Exhibit 4F it also says 40 hours of training but it is unclear as to whether this additional 40 hours refers to the annual weapons refresher training/qualification or to the initial firearms training. Please clarify whether the annual weapons training/qualification must also span 40 hours.

17A. Section C, 14.4 of solicitation, "Weapons

Training and Qualification", (page C-27) clarifies this question/concern.

18Q. The CBA for the National Building Museum reflects pay rates and H&W as of October 2006.

If these are not the current rates, could you provide them?

Item 13 on page I-20 indicates different sick leave, vacation, and wages than the CBAs.

Further, they do not conform to the cited Federal

Wage Schedule. Since these are items that greatly impact pricing, please indicate what the required employee sick leave, vacation, and wages are for each building.

18A. An updated CBA for the NAtional Building

Museum is attached.

19Q. Section M, Proposal Submittal. Please confirm that the DHS/ICE/FPS address listed in

Section M is the correct address for submission of offers.

19A. Mailing address remains unchanged.

20Q. Is the CM expected to be located on site at one of the facilities? Section C, sub paragraph

E, page C-20 describes the responsibilities and

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

7 19

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

HSCEEC-08-R-00002/000002

the qualifications, but is not specific as to whether or not this position is to be on site.

20A. As stated in Section C, CM is expected to be accessible.

21Q. Which building is considered the "Lead" for this project, and where will most of the interface and interaction between the Client & contractor occur?

21A. There is no "Lead" building.

22Q. Section 3.2 During Performance of Contract

E. Armed security guards must carry their firearm license/permits (and, where legally required, their concealed weapons permits) on their person while on duty, unless local or state law requires the Contractor to maintain the records. Failure by an armed security guard to carry a valid firearm certificate or permit while on duty shall result in the security guard being removed from the armed post until the certificate or permit is obtained.

In reference to section 3.2- E, In order for a security guard to be licensed in the District of

Columbia, they must be certified as Special

Police Officers (SPO) by the DC-MPD Security

Officers Management Branch and the only firearm they are licensed to carry is a .38 caliber revolver. The firearm requirement per the statement of work is for a 9mm handgun, please clarify.

22A. FPS was informed by DC-MPD that as long as the security officer remains on federal property and meets all other requirements, he/she is able to carry/use the 9mm. The 9mm is the required handgun.

23Q. Our research has determined that there are a very limited number of firearms that meet the statement of work criteria, will the government provide a list of approved 9mm firearms?

23A. Section B of the amendment shows updated exhibit 2E with the required information.

24Q. Can an instant communication 2-way device

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

8 19

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

HSCEEC-08-R-00002/000002

(like a Nextel radio) be utilized in place of an open frequency radio system?

24A. Under this solicitation, cell phones with two-way capability may be used in addition to the radio.

25Q. Reference Sample Section J, Exhibit 1.

Please verify that it is the government¿s intention that the contractor provides break relief for roving guards and supervisors at the

Franklin Court Building, as well as for the roving guards at the IRS building.

25A. The contractor is required to provide break relief as stated in the solicitation.

26Q. Reference Sample Section J, Exhibit 1. It appears that the supervision Hours Per Day and

Total Hours columns are incorrectly calculated given the duration of the required shifts.

Please provide clarification.

26A. An updated Section J will be provided.

Section B of this amendment will reflect those changes.

27Q. Reference Sample Section J, Exhibit 2E.

Please clarify if the current guard force is qualified on the 9MM pistol.

27A. FINAL ANSWER WILL BE PROVIDED IN SUBSEQUENT

AMENDMENT.

28Q. Reference Section C, Statement of Work, paragraph, 2, Contract Start-Up: What is the maximum number of days the Government will allow from contract award to the initial start of performance?

28A. Refer to 7A.

29Q. Reference Section J, Exhibit 2: Would the government consider allowing the contractor to use push-to-talk phones, i.e. Nextel Direct

Connect, in lieu of the specified mobile radios?

29A. Refer to 24A.

B.Changes based on the Question and Answer

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

9 19

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

HSCEEC-08-R-00002/000002

section above, are as follows:

1.As stated in Section A, 1A, 2A, 4A, and 12A of this amendment, form SF33, Section J and Section

M of the solicitation are hereby updated to reflect this change. (See attached.) The items on form SF33 are updated on this amendment.

2.As stated in Section A, 7A of this amendment, the following language us added to page C-63, under Section 24 of the solicitation:

E.The Government will allow a maximum of 60 day start up from time of the award of the base task to the initial start of performance.

3. As stated in Section A, 23 A of this amendment, exhibit 2E has been updated. (See attached.)

4. As stated in Section A, 13A and 18A of this amendment, the updated CBA for the National

Building Museum is attached.

C.All other terms and conditions remain unchanged.

Delivery Location Code: DC0030

NATIONAL BUILDING MUSEUM

5TH AND F STREETS, NW

WASHINGTON DC

FOB: Destination

Period of Performance: 06/01/2008 to 05/31/2013

Change Item 0001 to read as follows(amount shown is the obligated amount):

0001 National Building Museum - Base Period Productive 20060 HR

Hours

Period of Performance: 06/01/2008 to 05/31/2009

Change Item 0002 to read as follows(amount shown is the obligated amount):

0002 National Building Museum - Base Period 618 HR

Supervisory Hours

Period of Performance: 06/01/2008 to 05/31/2009

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

10 19

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

HSCEEC-08-R-00002/000002

Change Item 0003 to read as follows(amount shown is the obligated amount):

0003 National Building Museum - Base Period Temporary 50 HR

Additional Services (TAS) Productive Hours

Period of Performance: 06/01/2008 to 05/31/2009

Change Item 0004 to read as follows(amount shown is the obligated amount):

0004 National Building Museum - Base Period Temporary 50 HR

Additional Services (TAS) Supervisory Hours

Period of Performance: 06/01/2008 to 05/31/2009

Change Item 0005 to read as follows(amount shown is the obligated amount):

0005 National Building Museum - Option Period I 20060 HR

Productive Hours

(Option Line Item)

Period of Performance: 06/01/2009 to 05/31/2010

Change Item 0006 to read as follows(amount shown is the obligated amount):

0006 National Building Museum - Option Period I 618 HR

Supervisory Hours

(Option Line Item)

Period of Performance: 06/01/2009 to 05/31/2010

Change Item 0007 to read as follows(amount shown is the obligated amount):

0007 National Building Museum - Option Period I 50 HR

Temporary Additional Services (TAS) Productive

Hours

(Option Line Item)

Period of Performance: 06/01/2009 to 05/31/2010

Change Item 0008 to read as follows(amount shown is the obligated amount):

0008 National Building Museum - Option Period I 50 HR

Temporary Additional Services (TAS) Supervisory

Hours

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

11 19

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

HSCEEC-08-R-00002/000002

(Option Line Item)

Period of Performance: 06/01/2009 to 05/31/2010

Change Item 0009 to read as follows(amount shown is the obligated amount):

0009 National Building Muesum - Option Period II 20060 HR

Productive Hours

(Option Line Item)

Period of Performance: 06/01/2010 to 05/31/2011

Change Item 0010 to read as follows(amount shown is the obligated amount):

0010 National Building Museum - Option Period II 618 HR

Supervisory Hours

(Option Line Item)

Period of Performance: 06/01/2010 to 05/31/2011

Change Item 0011 to read as follows(amount shown is the obligated amount):

0011 National Building Museum - Option Period II 50 HR

Temporary Additional Services (TAS) Productive

Hours

(Option Line Item)

Period of Performance: 06/01/2010 to 05/31/2011

Change Item 0012 to read as follows(amount shown is the obligated amount):

0012 National Building Museum - Option Period II 50 HR

Temporary Additional Services (TAS) Supervisory

Hours

(Option Line Item)

Period of Performance: 06/01/2010 to 05/31/2011

Change Item 0013 to read as follows(amount shown is the obligated amount):

0013 National Building Museum - Option Period III 20060 HR

Productive Hours

(Option Line Item)

Period of Performance: 06/01/2011 to 05/31/2012

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

12 19

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

HSCEEC-08-R-00002/000002

Change Item 0014 to read as follows(amount shown is the obligated amount):

0014 National Building Museum - Option Period III 618 HR

Supervisory Hours

(Option Line Item)

Period of Performance: 06/01/2011 to 05/31/2012

Change Item 0015 to read as follows(amount shown is the obligated amount):

0015 National Building Museum - Option Period III 50 HR

Temporary Additional Services (TAS) Productive

Hours

(Option Line Item)

Period of Performance: 06/01/2011 to 05/31/2012

Change Item 0016 to read as follows(amount shown is the obligated amount):

0016 National Building Museum - Option Period III 50 HR

Temporary Additional Services (TAS) Supervisory

Hours

(Option Line Item)

Period of Performance: 06/01/2011 to 05/31/2012

Change Item 0017 to read as follows(amount shown is the obligated amount):

0017 National Building Museum - Option Period IV 20060 HR

Productive Hours

(Option Line Item)

Period of Performance: 06/01/2012 to 05/31/2013

Change Item 0018 to read as follows(amount shown is the obligated amount):

0018 National Building Museum - Option Period IV 618 HR

Supervisory Hours

(Option Line Item)

Period of Performance: 06/01/2012 to 05/31/2013

Change Item 0019 to read as follows(amount shown is the obligated amount):

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

13 19

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

HSCEEC-08-R-00002/000002

0019 National Building Museum - Option Period IV 50 HR

Temporary Additional Services (TAS) Productive

Hours

(Option Line Item)

Period of Performance: 06/01/2012 to 05/31/2013

Change Item 0020 to read as follows(amount shown is the obligated amount):

0020 national Building Musuem - Option Period IV 50 HR

Temporary Additional Services (TAS) Supervisory

Hours

(Option Line Item)

Period of Performance: 06/01/2012 to 05/31/2013

Add Item 0021 as follows:

0021 Franklin Court Building - Base Period Productive 26928 HR

Hours

Period of Performance: 06/01/2008 to 05/31/2009

Add Item 0022 as follows:

0022 Franklin Court Building - Base Period Supervisory 8784 HR

Hours

Period of Performance: 06/01/2008 to 05/31/2009

Add Item 0023 as follows:

0023 Franklin Court Building - Base Period Temporary 50 HR

Additional Services (TAS) Productive Hours

Period of Performance: 06/01/2008 to 05/31/2009

Add Item 0024 as follows:

0024 Franklin Court Building - Base Period Temporary 50 HR

Additional Services (TAS) Supervisory Hours

Period of Performance: 06/01/2008 to 05/31/2009

Add Item 0025 as follows:

0025 Franklin Court Building - Option Period I 26928 HR

Productive Hours

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

14 19

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

HSCEEC-08-R-00002/000002

(Option Line Item)

Period of Performance: 06/01/2009 to 05/31/2010

Add Item 0026 as follows:

0026 Franklin Court Building - Option Period I 8784 HR

Supervisory Hours

(Option Line Item)

Period of Performance: 06/01/2009 to 05/31/2010

Add Item 0027 as follows:

0027 Franklin Court Building - Option Period I 50 HR

Temporary Additional Services (TAS) Productive

Hours

(Option Line Item)

Period of Performance: 06/01/2009 to 05/31/2010

Add Item 0028 as follows:

0028 Franklin Court Building - Option Period I 50 HR

Temporary Additional Services (TAS) Supervisory

Hours

(Option Line Item)

Period of Performance: 06/01/2009 to 05/31/2010

Add Item 0029 as follows:

0029 Franklin Court Building - Option Period II 26928 HR

Productive Hours

(Option Line Item)

Period of Performance: 06/01/2010 to 05/31/2011

Add Item 0030 as follows:

0030 Franklin Court Building - Option Period II 8784 HR

Supervisory Hours

(Option Line Item)

Period of Performance: 06/01/2010 to 05/31/2011

Add Item 0031 as follows:

0031 Franklin Court Building - Option Period II 50 HR

Temporary Additional Services (TAS) Productive

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

15 19

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

HSCEEC-08-R-00002/000002

Hours

(Option Line Item)

Period of Performance: 06/01/2010 to 05/31/2011

Add Item 0032 as follows:

0032 Franklin Court Building - Option Period II 50 HR

Temporary Additional Services (TAS) Supervisory

Hours

(Option Line Item)

Period of Performance: 06/01/2010 to 05/31/2011

Add Item 0033 as follows:

0033 Franklin Court Building - Option Period III 26928 HR

Productive Hours

(Option Line Item)

Period of Performance: 06/01/2011 to 05/31/2012

Add Item 0034 as follows:

0034 Franklin Court Building - Option Period III 8784 HR

Supervisory Hours

(Option Line Item)

Period of Performance: 06/01/2011 to 05/31/2012

Add Item 0035 as follows:

0035 Franklin Court Building - Option Period III 50 HR

Temporary Additional Services (TAS) Productive

Hours

(Option Line Item)

Period of Performance: 06/01/2011 to 05/31/2012

Add Item 0036 as follows:

0036 Franklin Court Building - Option Period III 50 HR

Temporary Additional Services (TAS) Supervisory

Hours

(Option Line Item)

Period of Performance: 06/01/2011 to 05/31/2012

Add Item 0037 as follows:

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

16 19

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

HSCEEC-08-R-00002/000002

0037 Franklin Court Building - Option Period IV 26928 HR

Productive Hours

(Option Line Item)

Period of Performance: 06/01/2012 to 05/31/2013

Add Item 0038 as follows:

0038 Franklin Court Building - Option Period IV 8784 HR

Supervisory Hours

(Option Line Item)

Period of Performance: 06/01/2012 to 05/31/2013

Add Item 0039 as follows:

0039 Franklin Court Building - Option Period IV 50 HR

Temporary Additional Services (TAS) Productive

Hours

(Option Line Item)

Period of Performance: 06/01/2012 to 05/31/2013

Add Item 0040 as follows:

0040 Franklin Court Building - Option Period IV 50 HR

Temporary Additional Services (TAS) Supervisory

Hours

(Option Line Item)

Period of Performance: 06/01/2012 to 05/31/2013

Add Item 0041 as follows:

0041 IRS Building - Base Period Productive Hours 6048 HR

Period of Performance: 06/01/2008 to 05/31/2009

Add Item 0042 as follows:

0042 IRS Building - Base Period Supervisory Hours 2016 HR

Period of Performance: 06/01/2008 to 05/31/2009

Add Item 0043 as follows:

0043 IRS Building - Base Period Temporary Additional 50 HR

Services (TAS) Productive Hours

Period of Performance: 06/01/2008 to 05/31/2009

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

17 19

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

HSCEEC-08-R-00002/000002

Add Item 0044 as follows:

0044 IRS Building - Base Period Temporary Additional 50 HR

Services (TAS) Supervisory Hours

Period of Performance: 06/01/2008 to 05/31/2009

Add Item 0045 as follows:

0045 IRS Building - Option Period I Productive Hours 6048 HR

(Option Line Item)

Period of Performance: 06/01/2009 to 05/31/2010

Add Item 0046 as follows:

0046 IRS Building - Option Period I Supervisory Hours 2016 HR

(Option Line Item)

Period of Performance: 06/01/2009 to 05/31/2010

Add Item 0047 as follows:

0047 IRS Building - Option Period I Temporary 50 HR

Additional Services (TAS) Productive Hours

(Option Line Item)

Period of Performance: 06/01/2009 to 05/31/2010

Add Item 0048 as follows:

0048 IRS Building - Option Period I Temporary 50 HR

Additional Services (TAS) Supervisory Hours

(Option Line Item)

Period of Performance: 06/01/2009 to 05/31/2010

Add Item 0049 as follows:

0049 IRS Building - Option Period II Productive Hours 6048 HR

(Option Line Item)

Period of Performance: 06/01/2010 to 05/31/2011

Add Item 0050 as follows:

0050 IRS Building - Option Period II Supervisory Hours 2016 HR

(Option Line Item)

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

18 19

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

HSCEEC-08-R-00002/000002

Period of Performance: 06/01/2010 to 05/31/2011

Add Item 0051 as follows:

0051 IRS Building - Option Period II Temporary 50 HR

Additional Services (TAS) Productive Hours

(Option Line Item)

Period of Performance: 06/01/2010 to 05/31/2011

Add Item 0052 as follows:

0052 IRS Building - Option Period II Temporary 50 HR

Additional Services (TAS) Supervisory Hours

(Option Line Item)

Period of Performance: 06/01/2010 to 05/31/2011

Add Item 0053 as follows:

0053 IRS Building - Option Period III Productive Hours 6048 HR

(Option Line Item)

Period of Performance: 06/01/2011 to 05/31/2012

Add Item 0054 as follows:

0054 IRS Building - Option Period III Supervisory Hours 2016 HR

(Option Line Item)

Period of Performance: 06/01/2011 to 05/31/2012

Add Item 0055 as follows:

0055 IRS Building - Option Period III Temporary 50 HR

Additional Services (TAS) Productive Hours

(Option Line Item)

Period of Performance: 06/01/2011 to 05/31/2012

Add Item 0056 as follows:

0056 IRS Building - Option Period III Temporary 50 HR

Additional Services (TAS) Supervisory Hours

(Option Line Item)

Period of Performance: 06/01/2011 to 05/31/2012

Add Item 0057 as follows:

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

19 19

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

HSCEEC-08-R-00002/000002

0057 IRS Building - Option Period IV Productive Hours 6048 HR

(Option Line Item)

Period of Performance: 06/01/2012 to 05/31/2013

Add Item 0058 as follows:

0058 IRS Building - Option Period IV Supervisory Hours 2016 HR

(Option Line Item)

Period of Performance: 06/01/2012 to 05/31/2013

Add Item 0059 as follows:

0059 IRS Building - Option Period IV Temporary 50 HR

Additional Services (TAS) Productive Hours

(Option Line Item)

Period of Performance: 06/01/2012 to 05/31/2013

Add Item 0060 as follows:

0060 IRS Building - Option Period IV Temporary 50 HR

Additional Services (TAS) Supervisory Hours

(Option Line Item)

Period of Performance: 06/01/2012 to 05/31/2013

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

PROPERTY OF THE U.S. GOVERNMENT – FOR OFFICIAL USE ONLY

DO NOT REMOVE THIS NOTICE.

PROPERLY DESTROY DOCUMENT WHEN NO LONGER NEEDED

SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS

01. DESCRIPTION OF SERVICES

The Contractor shall furnish professional security services, defined by this solicitation as armed security guard services, at the National Building Museum, located at 5th and F Streets, NW, Washington D.C., the Franklin Court Building, located at 1099 14th Street, NW and 1750 Pennsylvania Avenue NW, Washington D.C., and the Internal Revenue Service (IRS) Building, located at 1750 Pennsylvania Avenue NW, Washington D.C.

In furnishing these services, the Contractor shall provide all necessary corporate management, supervision, personnel, materials, supplies, training, licenses, permits, certificates and equipment, and shall plan, schedule, coordinate and ensure effective performance of, and conformance to, all aspects of the work statement contained herein. Offerors are advised to read the solicitation carefully and in its entirety before preparing their technical and pricing proposal.

02. CONTRACT TYPE

An indefinite delivery, indefinite quantity contract will be awarded under this solicitation.

Services shall be furnished via task order against the contract. Fixed-price line item task orders shall be placed.

03. ESTIMATED QUANTITIES

The estimated annual labor hour quantities for providing professional security services under the subject requirement are as follows:

National Building Museum (Building # DC0030ZZ, 5th and F Streets, NW, Washington D.C.)

Basic Productive Guard Services: 20,060

Basic Supervisory Guard Services: 618

Temporary Additional Services (TAS) Productive Guard Services: 50

Temporary Additional Services (TAS) Supervisory Guard Services: 50

Franklin Court Building (Building # DC0404ZZ, 1099 14th Street, NW, Washington D.C.)

Basic Productive Guard Services: 26,928

Basic Supervisory Guard Services: 8,784

Solicitation Number: HSCEEC-08-R-00002

B-1

B-2

Temporary Additional Services (TAS) Productive Guard Services: 50

Temporary Additional Services (TAS) Supervisory Guard Services: 50

Internal Revenue Service (IRS) Building (Building # DC0506ZZ, 1750 Pennsylvania Avenue NW, Washington D.C.)

Basic Productive Guard Services: 6,048

Basic Supervisory Guard Services: 2,016

Temporary Additional Services (TAS) Productive Guard Services: 50

Temporary Additional Services (TAS) Supervisory Guard Services: 50

Note: Section J, Exhibit 1 is a listing of locations anticipated for coverage at the time of solicitation. Additional posts may be unilaterally added or deleted to the contract via a modification to either the contract and/or the task order.

04. PRICES

A. Pricing Required for All Services and Performance Periods

Offerors must quote prices for all services required during the initial performance period, as well as for each option period, in order to be considered for award. Offerors submitting partial pricing information shall be ineligible for award of the contract.

B. Department of Labor Wage Determination and/or Collective Bargaining Agreement

1. The minimum wage rates and fringe benefits applicable to the initial period of performance are outlined in the Department of Labor (DOL) Wage Determinations and/or Collective Bargaining Agreement (CBA) included within the request for proposal.

States: District of Columbia, Maryland, Virginia

Area: District of Columbia Statewide Maryland Counties of: Calvert, Charles, Frederick, Montgomery, Prince George's, St. Mary's Virginia Counties of: Alexandria, Arlington, Fairfax, Falls Church, Fauquier, King George, Loudoun, Prince William, Stafford

Wage Determination No: 2005-2103, Revision No. 4, dated 07/05/2007 applies to the Franklin Court Building (DC0404ZZ). This Wage Determination is contained in Section J, Exhibit 8C.

EXHIBIT 1

PRODUCTIVE AND SUPERVISORY REQUIREMENTS (GUARD II) INCLUDING

POST HOURS AND LOCATION

BASE PERIOD

J-2

OPTION PERIOD I

J-3

OPTION PERIOD II

J-4

OPTION PERIOD III

J-5

J-6

OPTION PERIOD IV

SECTION J, EXHIBIT 2E

CONTRACTOR FURNISHED FIREARMS AND AMMUNITION

The contractor will provide all security guards, including part-time and reserve guards with one (1) pistol each meeting the following requirements:

The overall size shall not exceed 7.5” long, 5.5” high, and 1.5” wide and weigh no more then 30

oz. excluding the magazine. The caliber authorized is 9MM and not any larger. The magazine shall hold a minimum of 10 rounds and not more then 17. The pistol must be able to be fired without a magazine inserted into the weapon. The magazine must fall free (unloaded) when the magazine catch is activated. The double action only trigger pull must not weigh more than 12 pounds and not less than 5 pounds. The pistol may be either a traditional double action only or a striker fired design.

The pistol shall have a dark corrosive resistant finish and must be must be capable of being fired without the manipulation of an external safety or cocking lever. The normal function of the pistol shall be double action only. The pistol must be operable by a right or left-handed user. The use of a polymer-framed pistol is acceptable. There is not a requirement for an all-metal firearm.

All safeties must be internal and passive. An inertial interlocked firing pin will be the primary safety to positively prevent movement of the firing pin unless the trigger is pulled completely through its entire length of travel.

The sights must be drift adjustable and be luminous night sights, one (1) dot on the front sight, and two (2) dots on the rear sight, which appear as three (3) illuminated dots when the weapon is held at arm’s length. The illuminated dots must not be visible when viewed from the muzzle end of the pistol. The color of the illuminated dots must be green. The illumination materials for the night sight must comply with Nuclear Regulatory Commission standards.

The following pistols are recommended:

Smith & Wesson M&P 9 MM; 5900 Series in DAO 9MM Glock 17 & 19 9MM SIGARMS Sigpro 9MM; P226 and P228 in 9MM Steyr M Series 9MM Springfield Armory XD in 9MM

Ammunition type is authorized:

124 grain Jacketed Hollow Points.

Recommended Brands

Federal Speer Winchester Remington

J-14

J-15

(Intentionally left blank)

SECTION M – EVALUATION FACTORS FOR AWARD

01. Method of Award

a. The Government will award an Indefinite Delivery/Indefinite Quantity (IDIQ) contract from which Fixed Price task orders for the services described herein, will be given to the Contractor whose proposal provides the best value to the Government in terms of price and technical merit. Source selection procedures will be used that allow for price/technical tradeoffs to achieve best value. The technical evaluation factors of Relevant Corporate Experience and Relevant Past Performance are of equal importance. When combined, these two technical evaluation factors are approximately equal to price.

b. It is the Government’s intent to award the contract without discussions.

Therefore, contractors should submit initial technical and price proposals that contain the contractor’s most favorable terms. However, the contracting officer does reserve the right to conduct negotiations with offerors, if it is later determined to be necessary.

c. Unnecessarily elaborate brochures, artwork, expensive paper and bindings, expensive visual aids or other presentations, beyond that sufficient to present an efficient and effective proposal, are not required or desired.

d Offers shall be submitted to:

DHS/ICE/Federal Protective Service Mellon Independence Center

Suite 4200 701 Market Street Philadelphia, PA 19106 Attn: Denise Morales

Proposals received after 1:00 PM, Eastern Standard Time on March 19, 2008 will be considered late submissions and may not be considered for award. The CO shall have the sole discretion whether to consider any late proposals.

02. Total Evaluated Price - (Quantities are estimates and are for evaluation purposes only):

A. National Building Museum – DC0030ZZ

PRODUCTIVE SUPERVISORY PROD - TAS SUP - TAS TERM HRS RATE TOTAL HRS RATE TOTAL HRS RATE TOTAL HRS RATE TOTAL

Base Year 20060 $ $ 618 $ $ 50 $ $ 50 $ $

Option I 20060 $ $ 618 $ $ 50 $ $ 50 $ $ Option

II 20060 $ $ 618 $ $ 50 $ $ 50 $ $

Option 20060 $ $ 618 $ $ 50 $ $ 50 $ $

M-1

III

Option

IV 20060 $ $ 618 $ $ 50 $ $ 50 $ $

Total for National Building Museum:$_________________________________________

B. Franklin Court Building – DC0404ZZ

PRODUCTIVE SUPERVISORY PROD - TAS SUP - TAS TERM HRS RATE TOTAL HRS RATE TOTAL HRS RATE TOTAL HRS RATE TOTAL

Year 26928 $ $ 8784 $ $ 50 $ $ 50 $ $

Option I 26928 $ $ 8784 $ $ 50 $ $ 50 $ $ Option

II 26928 $ $ 8784 $ $ 50 $ $ 50 $ $

Option

III 26928 $ $ 8784 $ $ 50 $ $ 50 $ $

IV 26928 $ $ 8784 $ $ 50 $ $ 50 $ $

Total for Franklin Court Building:$_______________________________________________

C. Internal Revenue Services (IRS) Building – DC0560ZZ

PRODUCTIVE SUPERVISORY PROD - TAS SUP - TAS TERM HRS RATE TOTAL HRS RATE TOTAL HRS RATE TOTAL HRS RATE TOTAL

Year 6048 $ $ 2016 $ $ 50 $ $ 50 $ $

Option I 6048 $ $ 2016 $ $ 50 $ $ 50 $ $ Option

II 6048 $ $ 2016 $ $ 50 $ $ 50 $ $

Option

III 6048 $ $ 2016 $ $ 50 $ $ 50 $ $

IV 6048 $ $ 2016 $ $ 50 $ $ 50 $ $

Total for Internal Revenue Services (IRS) Building:$________________________________

FPS will evaluate the price offered by extending the unit price by the estimated total units for each performance period (base and options, as appropriate). The total price for each period will be added to determine a total evaluated price.

Total security guard services estimated to be covered under this contract:$_____________________________________________________________________

M-2

M-3

03. Evaluation Criteria - Technical merit shall be determined by the technical evaluation panel’s assessment of the information submitted in the offeror's proposal.

The following evaluation criteria will be used in determining technical merit:

RELEVANT CORPORATE EXPERIENCE

RELEVANT PAST PERFORMANCE

Offerors shall be evaluated against the stated evaluation criteria using adjectival ratings.

Price proposals will be evaluated to determine the reasonableness of the offer. Evaluation may include analysis to determine the offeror’s comprehension of the requirements of the RFP as well as to assess the validity of the offeror’s approach. A price, which is found to be either unreasonably high or unrealistically low in relation to the proposed work, may result in the offer receiving a lower rating. Price analysis will be performed by one or more techniques to ensure a fair and reasonable price including, but not limited to:

Comparison of proposed prices received in response to the RFP Comparison of proposed prices with the Independent Government Estimate Comparison of proposed prices with available historical information

CORRECTED SECTION B.pdf
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
Temporary Additional Services (TAS) Supervisory Guard Services: 50
CORRECTED 2E.pdf
CONTRACTOR FURNISHED FIREARMS AND AMMUNITION
CORRECTED SECTION M.pdf
SECTION M – EVALUATION FACTORS FOR AWARD
Attn: Denise Morales
RELEVANT CORPORATE EXPERIENCE
RELEVANT PAST PERFORMANCE