This document contains a template for an Emergent Requirements Package (TERP) under the TEAMS-Next contract. The TERP template is to be used for proposing additional work under the contract and includes blocks for identifying the requirement, deliverables, period of performance, cost estimate and approvals. If additional work is approved, the contractor would utilize an established pricing model to develop its cost proposal for that work. The Missile Defense Agency intends to competitively award a cost-plus-fixed-fee level of effort contract for Safety services to a single small business for a base period of three years and up to five and a half years if all options are exercised. Offerors must register in SAM and submit proposals by July 1, 2020 to be considered for the award.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HQ0858-20-R-0003
Section J, Attachment 4 TERP Form
TEAMS-Next Solicitation HQ0858-20-R-0003
TEAMS-Next Emergent Requirements Package (TERP) Form 19 February 2020 Approved for Public Release 20-MDA-10497 (29 May 20)
HQ0858-20-R-0003
TEAMS-Next Emergent Requirements Package (TERP)
This TERP is prepared pursuant to Section J, Attachment 3 “TERP Procedures”.
| 1. Contract Number: |
| 2. TERP Number: (sequential record # assigned by MDA) |
| HQ0858-20-C-00XX |
| TBD |
| 3. Agency Name/Program: |
| 4. Contractor Name: |
Missile Defense Agency (MDA) Consolidated Support Directorate
TBD
5. Period of Performance (see prescription below): Choose an item.
If PoP selection is short-term (e.g. not through end of contract (inclusive of options)), identify start and end dates below:
START: Click or tap to enter a date. END: Click or tap to enter a date.
6. Description of Effort (see prescription below); use Continuation Page if required):
7. Deliverables: (see prescription below): Choose an item.
Description of Deliverable(s):
Requ:
8. Additional Travel or ODC: (see prescription below): Choose an item.
Identify affected CLINs, whether increase is for Travel, ODC, or both. If ODC is anticipated, describe what’s required herein:
9. Cost Summary (see prescription below):
Total Hours (LOE):
Total Labor Cost (all Labor CLINs):
Total Travel:
Total ODC:
Subtotal Estimated Cost:
Total Fixed Fee:
Total Est. Cost Plus Fixed Fee (CPFF):
10. Contractor Approval
Signature:
Printed Name:
Date: Click or tap to enter a date.
11. Government Approval (Contracting Officer)
Signature:
Printed Name:
Date: Click or tap to enter a date.
Approved for Public Release 20-MDA-10497 (29 May 20)
The following provides an explanation for each block in the above template and directions for its completion:
Block 1: Contract Number. MDA/CSK will complete.
Block 2: TERP Number. MDA/CSK will designate a sequential record number for the effort (TERP-001, TERP-002, etc.)
Block 3: Agency/Program. MDA/CSK will complete.
Block 4: Contractor Name. MDA/CSK will complete.
Block 5: Period of Performance. MDA stakeholder will select from the orange drop-down menu, designating whether the duration of the effort is to be through the entire contract PoP (including all Option Periods) – OR – shorter term (e.g. completion date prior to the end of the contract expiration, inclusive of option periods). If shorter term is selected, use the orange PoP calendar fields to identify the Start and End dates, regardless of whether the dates cross between Base and Option periods. If PoP selection is through end of contract, you are not required to enter dates in the PoP calendar fields.
Block 6: Description of Effort. MDA stakeholder will complete. Directly cite the overarching SOW paragraph(s), applicable subparagraph number(s), and specific SOW language for which additional LOE is being added.
Block 7: Deliverables. MDA stakeholder shall select from orange drop-down menu whether the additional effort will also drive an additional CDRL deliverable or a modification to an existing CDRL. If either applies, click “Yes” and describe in general terms the additional CDRL or the modification to an existing CDRL, whether the CDRL submission requires Govt approval, and the delivery date and frequency of the deliverable. Example: “CDRL A000X is modified to add stakeholder GMB to the distribution list; frequency is unchanged; is not an “approval” CDRL”; or “CDRL A000Y is added to incorporate Data Item Description #XXX; frequency is monthly; deliverable submissions require Govt approval”. Include the approved CDRL (DD1423) as part of the TERP package.
Block 8: Additional Travel and/or ODC. MDA stakeholder shall select from orange drop-down menu whether the additional effort will also entail an increase to the estimated cost for the corresponding Travel/ODC CLIN for purposes of additional Travel and/or ODC. If adding both, identify in this field how much is for Travel and how much is for ODC. When adding a significant amount of labor (e.g. 10 FTE or more), consideration should be given to whether commensurate Travel should be added as well. NOTE: the travel increase is only for contract ceiling purposes; actual travel approval would still be handled through the Form 110 process. If ODC is being added, describe in Block 8 what ODC will be required and why; if possible, go ahead and complete the Form 70 process as part of the TERP approval.
Block 9: Cost Summary. Contractor will utilize Section J, Attachment 5, “TERP Pricing Model” to develop its TERP proposal; total summary values from the TERP Pricing Model will be added to Block 9. The contractor shall not modify the competitively-established rates set forth in Section J, Attachment 5. The TERP Pricing Model shall be completed as set forth in Section J Attachment 3 TERP Procedures. NOTE: if increasing ODC/Travel, the associated increase shall NOT be deducted from CLIN 0001; rather, the ODC/Travel adjustment will be a net increase in overall contract value. Additionally, increases in ODC/Travel are cost-only and carry not additional fixed fee.Approved for Public Release 20-MDA-10497 (29 May 20)
Block 10: Contractor Approval: This field is for the contractor’s approval. This field shall be signed by a person given the authority to commit the contractor. The individual’s name and title shall also be printed and the date of approval shall be provided.
Block 11: Government/Contracting Officer Approval: The TERP is not authorized until approved by the Contracting Officer.