HQ072720R0005.pdf

PDF 228 KB Posted

Attached to
Building 1 Electrical Replacement Contract
Solicitation number
HQ072720R0005
Issued by

About this file

This solicitation requests proposals for a building electrical replacement contract. The Defense Microelectronics Activity seeks to replace electrical systems in Building 1. Offerors must provide architectural and engineering design services, equipment replacement, generator and UPS replacement, and installation. Proposals are due by 12:00 PM local time on August 10, 2020. Pricing will be fixed price. The place of performance is the Defense Microelectronics Activity in McClellan, California. The NAICS code is 541330 and the contract type is negotiated RFP.

View the file

Other files

File Type Posted
Electrical Questions and Answers 5 Aug 20.xlsx XLSX spreadsheet
Amendment 0001.pdf PDF
Electrical Questions and Answers 30 Jul 20.xlsx XLSX spreadsheet
Electrical Questions and Answers 28 Jul 20.xlsx XLSX spreadsheet
Site Visit Attendees.docx DOCX document
CA30300007 24 Jul 20.pdf PDF
HQ072720R0005 Amendment 1.pdf PDF
INSTRUCTIONS TO OFFERORS.docx DOCX document
Site Visit Instructions.docx DOCX document
PWS 20-0F9 Bldg1 Electrical Upgrade PO Approved.docx DOCX document
Contract Data Requirements List.pdf PDF
WD 2015-5631.pdf PDF
EVALUATION FACTORS.docx DOCX document
NDA for Technical Exhibit.docx DOCX document
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CODE

(Hour)

PAGE(S)

until 12:00 PM local time 10 Aug 2020

X

A X B

C D

EX

X G F 45 - 51

52 - 54 X H 55 matthew.b.duane.civ@mail.mil

RATING PAGE OF PAGES

7. ISSUED BY

(Date)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA FAR (48 CFR) 53.214(c)

1 55

(If other than Item 7)

15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO

AND

ADDRESS

SIGN OFFER (Type or print)

OF

OFFEROR

AMENDMENT NO. DATE

15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

18. OFFER DATE

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

2. CONTRACT NO.

HQ0727 8. ADDRESS OFFER TO

See Item 7

9. Sealed offers in original and 0 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and

N/A conditions contained in this solicitation.

10. FOR INFORMATION

CALL:

A. NAME (NO COLLECT CALLS)

MATTHEW DUANE 916-999-2716

11. TABLE OF CONTENTS

SOLICITATION/ CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/ COSTS

2 - 4

X I CONTRACT CLAUSES

DESCRIPTION/ SPECS./ WORK STATEMENT X

PACKAGING AND MARKING

J LIST OF ATTACHMENTS

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

X K

REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

CONTRACT ADMINISTRATION DATA 7 - 9 X

SPECIAL CONTRACT REQUIREMENTS

OFFER (Must be fully completed by offeror) 10 - 16 X M

L INSTRS., CONDS., AND NOTICES TO OFFERORS

EVALUATION FACTORS FOR AWARD

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments

AMENDMENT NO. DATE

to the SOLICITATION for offerors and related documents numbered and dated):

FACILITY

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period

SOLICITATION, OFFER AND AWARD

X

(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

EMAIL:TEL: (Signature of Contracting Officer)

CODE CODE

B. TELEPHONE (Include area code) C. E-MAIL ADDRESS

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

PART IV - REPRESENTATIONS AND INSTRUCTIONS

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

17 - 43

PART II - CONTRACT CLAUSES

DEFENSE MICROELECTRONICS ACTIVITY (HQ)

DMEA/MEEC 4234 54TH STREET

MCCLELLAN CA 95652

FAX:

TEL:

FAX:

TEL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

6. REQUISITION/PURCHASE NO.5. DATE ISSUED

09 Jul 2020

4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

[ X ]

3. SOLICITATION NO.

HQ072720R0005

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Task Architectural & Engineering Design

FP-PPR

In accordance with Performance Work Statement 20-0F9 FOB: Destination

PSC CD: N061

NET AMT

CEILING PRICE

0002 1 Task Incoming Service Replacement

FP-PPR

In accordance with Performance Work Statement 20-0F9

0003 1 Lot Equipment Replacement

FP-PPR

In accordance with Performance Work Statement 20-0F9

0004 1 Lot Generator Replacement

FP-PPR

In accordance with Performance Work Statement 20-0F9

0005 1 Lot UPS Replacement

FP-PPR

In accordance with Performance Work Statement 20-0F9

0006 1 Lot Installation Fee

FP-PPR

In accordance with Performance Work Statement 20-0F9

0007 1 Lot Data

FP-PPR

In accordance with Performance Work Statement 20-0F9 and Exhibt A, Contract Data Requirements List.

Section E - Inspection and Acceptance

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government 0002 Destination Government Destination Government 0003 Destination Government Destination Government 0004 Destination Government Destination Government 0005 Destination Government Destination Government 0006 Destination Government Destination Government 0007 N/A N/A N/A Government

CLAUSES INCORPORATED BY REFERENCE

52.246-4 Inspection Of Services--Fixed Price AUG 1996

Section F - Deliveries or Performance

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 N/A N/A N/A N/A

0002 N/A N/A N/A N/A

0003 N/A N/A N/A N/A

0004 N/A N/A N/A N/A

0005 N/A N/A N/A N/A

0006 N/A N/A N/A N/A

0007 N/A N/A N/A N/A

52.242-15 Stop-Work Order AUG 1989 52.242-17 Government Delay Of Work APR 1984

Section G - Contract Administration Data

252.204-7006 Billing Instructions OCT 2005 252.232-7006 Wide Area WorkFlow Payment Instructions DEC 2018

CLAUSES INCORPORATED BY FULL TEXT

Payment Instructions (DMEA #X16-001)

(a) In accordance with DFARS PGI 204.7108, the payment office shall allocate and record the amounts paid to the accounting classification citations in the contract using the table below based on the type of payment request submitted (see DFARS 252.232-7006) and the type of effort.

For Government Use Only

Contract/Order Payment Clause

Type of Payment Request

Supply Service Construction Payment Office Allocation Method

52.212-4 (Alt I), Contract Terms and Conditions— Commercial Items 52.216-7, Allowable Cost and Payment 52.232-7, Payments under Time-and- Materials and Labor-Hour Contracts

Cost Voucher

X X N/A Line item specific proration. If there is more than one ACRN within a deliverable line or deliverable subline item, the funds will be allocated in the same proportion as the amount of funding currently unliquidated for each ACRN on the deliverable line or deliverable subline item for which payment is requested.

52.232-1, Payments Navy Shipbuilding Invoice (Fixed Price)

X N/A N/A Line Item specific by fiscal year. If there is more than one ACRN within a deliverable line or deliverable subline item, the funds will be allocated using the oldest funds. In the event of a deliverable line or deliverable subline item with two ACRNs with the same fiscal year, those amounts will be prorated to the available unliquidated funds for that year.

52.232-1, Payments;

52.232-2, Payments under Fixed-Price Research and Development Contracts; 52.232-3, Invoice X X N/A Line Item Specific proration. If there is more than one ACRN within a deliverable line or deliverable subline item, the funds will be allocated in the same proportion as the amount of funding

Payments under Personal Services Contracts; 52.232-4, Payments under Transportation Contracts and Transportation- Related Services Contracts; and 52.232-6, Payments under Communication Service Contracts with Common Carriers currently unliquidated for each ACRN on the deliverable line or deliverable subline item for which payment is requested.

52.232-5, Payments Under Fixed-Price Construction Contracts

Construction Payment Invoice

N/A N/A X Line Item specific by fiscal year. If there is more than one ACRN within a deliverable line or deliverable subline item, the funds will be allocated using the oldest funds. In the event of a deliverable line or deliverable subline item with two ACRNs with the same fiscal year, those amounts will be prorated to the available unliquidated funds for that year.

52.232-16, Progress Payments

Progress Payment*

X X N/A Contract-wide proration. Funds shall be allocated in the same proportion as the amount of funding currently unliquidated for each ACRN. Progress Payments are considered contract level financing, and the “contract price” shall reflect the fixed price portion of the contract per FAR 32.501-3.

52.232-29, Terms for Financing of Purchases of Commercial Items;

52.232-30, Installment Payments for Commercial Items

Commercial Item Financing*

X X N/A Specified in approved payment.

The contracting officer shall specify the amount to be paid and the account(s) to be charged for each payment approval in accordance with FAR 32.207(b)(2) and 32.1007(b)(2).

52.232-32, Performance-Based Payments

Performance- Based Payments*

X X N/A Specified in approved payment.

The contracting officer shall specify the amount to be paid and the account(s) to be charged for each payment approval in accordance with FAR 32.207(b)(2) and 32.1007(b)(2).

252.232-7002, Progress Payments for Foreign Military Sales Acquisitions

Progress Payment*

X X N/A Allocate costs among line items and countries in a manner acceptable to the Administrative Contracting Officer.

*Liquidation of Financing Payments. Liquidation will be applied by the payment office against those ACRNs which are identified by the payment instructions for the delivery payment and in keeping with the liquidation provision of the applicable contract financing clause (i.e., progress payment, performance-based payment, or commercial item financing).

Section H - Special Contract Requirements

Cleanup (DMEA #S16-001)

The Contractor shall at all times keep the work area, free from accumulations of waste materials. Before completing the work, the Contractor shall remove from the work and premises any rubbish, tools, scaffolding, equipment, and materials that are not the property of the Government. Upon completing the work, the Contractor shall leave the work area in a clean, neat, and orderly condition satisfactory to the Contracting Officer. The contractor shall not use the DMEA dumpster. DMEA will provide a small staging area in the center lot for a contractor dumpster, if requested by the Contractor.

Safety (DMEA #S16-002)

(a) The Contractor shall provide and maintain work environments and procedures which will –

(1) Safeguard the public and Government personnel, property, materials, supplies, and equipment exposed to Contractor operations and activities;

(2) Avoid interruptions of Government operations and delays in project completion dates; and

(3) Control costs in the performance of this contract.

(b) For these purposes, the Contractor shall –

(1) Provide appropriate safety barricades, signs, and signal lights;

(2) Comply with the standards issued by the Secretary of Labor at 29 CFR Part 1926 and 29 CFR Part

1910; and

(3) Ensure that any additional measures the Contracting Officer determines to be reasonably necessary for the purposes are taken.

Lost and Found Property (DMEA #S16-005)

The Contractor shall ensure all items of personal or monetary value, found by the Contractor's employees, while working at DMEA, are turned over to the COR.

Conservation of Utilities (DMEA #S16-006)

The Contractor shall be directly responsible for instructing employees in utilities conservation practices. The Contractor shall be responsible for operating under conditions that preclude the waste of utilities.

Licensing (DMEA #S16-007)

The Contractor shall provide their State Licensing Board number and evidence of its’ active status to the Contracting Officer (CO) initially within one day of the award of a contract/order for the contracted services. The Contractor shall, upon renewal of their license, provide evidence of renewal and its’ active status to the CO.

Security (DMEA #S16-008)

(a) Contractor Personnel Performing on-site shall be U.S. Citizens

(1) Contractor shall ensure employees have current, valid and appropriate driver’s licenses to service the DMEA facility.

(2) All personnel and vehicles entering the DMEA perimeter are subject to inspection.

(b) The contractor shall provide a listing of all authorized personnel prior to service, within 5 business days of award, issuance, to the DMEA Security Office. List will include:

(1) Each contractor’s full name;

(2) Proof of U.S. Citizenship upon finger printing appointment, please bring either a certified birth certificate, U.S. passport {current or expired}, or certificate of naturalization;

(3) If applicable: Driver’s license number to include state of issue and expiration date

(c) Personnel on the authorized list must come to DMEA within 5 days of contract award issuance or before the first official service day at DMEA to show proof of U.S. citizenship, be fingerprinted, and have their picture taken. Contractor will show driver’s license to validate against Contractor provided personnel list.

The DMEA Security Officer will review the results of the fingerprint background check, to determine suitability and issue contractor badge(s). Badges will be maintained at the Security Desk, contractor will report to Security booth upon arrival to DMEA and return badges prior to departing DMEA facility.

Temporary Badging Request Process (DMEA #S16-009)

The DMEA facility is access controlled and all personnel are required to have a minimum background check in advance of coming to the site in order to have unescorted access. There are several circumstances and variances that surround this background check.

(1) The DMEA sponsor will submit a Temporary Badge Request prior to the arrival of the visitor. Information required:

i. Contractor’s name;

ii. Company name;

iii. Contractor’s contact number;

iv. Acknowledge individual is a U.S. Citizen

(a) All access required should be identified by the sponsor in the Temporary Badge Request.

(b) Any change to access requires coordination through the security team via an email from the DMEA sponsor.

(2) Once the Temporary Badge Request has been submitted, the DMEA sponsor shall contact security to schedule a DMEA localized live scan background check (finger print) appointment. At the appointment, the individual will complete a DMEA Form 100 (Release From for National Crime Information Center (Live Scan) and Terrorism Screening Database Background Checks) and prove citizenship.

(a) Proof required/U.S. Citizen Mandatory: U.S. Passport (current or expired); OR Birth Certificate

(certified, no photocopies) AND Valid Driver’s License; OR Certificate of Naturalization. This proof is required at the time of the appointment and no exceptions will be made.

(3) The visitor shall be issued a badge each day while on site and shall return their badge to DMEA security personnel at the end of the day or when leaving the site.

(4) Any visitor personnel showing up at DMEA without a pre-arranged badge request and background check will not be allowed onto the DMEA facility.

Live Scan Finger Printing Appointments:

Monday through Friday 0730-1330 and 1430-1530 No appointments on Federal Holidays

DMEA Hours of Operation (DMEA #S16-010)

Work shall be accomplished during DMEA’s normal business hours are Monday – Friday, 0600-1600 hours except Federal holidays, including:

(a) New Year’s Day - 1 January

(b) Martin Luther King Day - 3rd Monday in January

(c) Washington’s Birthday - 3rd Monday in February

(d) Memorial Day - last Monday in May

(e) Independence Day - 4 July

(f) Labor Day – 1st Monday in September

(g) Columbus Day – 2nd Monday in October

(h) Veteran’s Day – 11 November

(i) Thanksgiving Day – 4th Thursday in November

(j) Christmas Day – 25 December

Note: If these holidays fall on Saturday, the preceding Friday will be observed, if these holidays fall on Sunday, the following Monday will be observed. If a holiday falls on a regular workday, the services shall be rescheduled in the same week to either the day preceding or following the holiday.

Contractor Manpower Reporting Application (CMRA) Instruction (DMEA #S16-011)

The contractor shall ensure ALL contractor labor hours (including subcontractor labor hours) required for the performance of services provided under this contract are reported via a secure data collection site.

The contractor (and all subcontractors providing direct labor under this contract) shall report complete and accurate data for the labor executed during the period of performance during each Government fiscal year (FY), which runs from October 1 to September 30. The contractor shall report electronically all contractor manpower (including subcontractor manpower) required for performance of this contract via the following website address:

http://www.ecmra.mil/. There are four separate eCMRA tools: Army, Air Force, Navy and All Other Defense Components. The appropriate eCMRA reporting tool to use is determined by the requiring activity being supported (e.g., if DMEA awards a contract for an Air Force requiring activity, the contractor shall load the required reporting data in the “Department of Air Force CMRA” tool). While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. The contractor shall completely fill in all required data fields. The contractor shall enter initial data into the appropriate eCMRA tool to establish the basic contract record no later than 15 working days after receipt of contract award or contract modification incorporating this clause. The contractor shall notify the COR when the basic contract record has been established in the appropriate eCMRA tool.

eCMRA User Manuals and Frequently Asked Questions (FAQs) are available at http://www.ecmra.mil/

Contractors may direct technical questions to the eCMRA help desk at dodcmra@pentagon.af.mil

Contractors are responsible for entering order, contact, and location data, the first three tabs on the order details screen of the website, as detailed in the tables below. The first column, “Required Field” identifies the required reporting fields and the second column, “Explanation of Required Field” either identifies a description of the required data (ex: total invoiced amount, city of installation or service, state, etc.) or the reportable data (ex: fiscal year, order number, requiring activity unit identification code, etc.).

Order Data

Required Field: Explanation of Required Field Fiscal Year FY that the contract work was performed.

Order Number The Order Number refers to the Task Order and/or Delivery Number of the Contract. For contracts without an Order Number, use “0000” as default.

Agency/Command HQ0727 - Defense Microelectronics Activity Requiring Activity Unit Identification Code (UIC)

DOD011

Total Invoiced Amount The total dollar amount invoice during the fiscal year, at the Delivery Order and/or Task Order level.

Contact Data

Required Field Explanation of Required Field

Contracting Officer

First Name:

Last Name:

Phone Number:

Email Address:

Contractor

First Name:

Last Name:

Phone Number:

Email Address:

Contracting Officer’s Representative/ Contracting

First Name:

Last Name:

Phone Number:

Officer’s Technical Representative

Email Address:

Location Data

Federal Service Code

To enter the Federal Service Code (FSC), select the Service Performed in the first dropdown field and click Search. A listing of possible FSCs will appear in the Results dropdown field. Select the correct FSC based on the list of results.

To narrow down these FSCs, filter the query by Code or Description after selecting the Service Performed. Enter a value in the Code or Description data cells and then click Search. Again, a listing of possible FSCs will appear in the Results dropdown field. Select the correct FSC based on the list of results.

City of Installation or Service

City or installation where the service is performed.

State State where the service is performed.

Zip Code Zip Code where the service is performed.

Country Country where the service is performed.

Contractor Type Indicate whether your user role is a Prime or Subcontractor.

Direct Labor Hours Total number of labor hours performed at this location for this Federal Service Code.

Direct Labor Dollars Total unburdened dollar amount for direct labor performed at this location for this FSC code. This is not the hourly rate.

Weapon System Support Indicate whether you are providing support to any Weapons Systems listed in the drop down field.

1. “None”

Questions about Contract Performance

Indicate if the contract and/or order includes the following services:

1. Clinical patient care in a DoD Medical Treatment facility.

2. N/A

3. Support to Defense Intel or Special Ops components OCONUS

Government Supervision Are the contractor personnel subject to relatively continuous supervision and control by a government employee or officer?

Government’s Tools and Equipment

Does the government furnish the principal tools and equipment needed for contract performance?

Government Facility Are some or all of the contractor employees provided with a workspace in a government facility for use on a regular basis?

Invoicing, Receipt, Acceptance and Property Transfer (iRAPT) Submittal Instructions (DMEA #S16-012)

a. The Invoicing, Receipt, Acceptance and Property Transfer (iRAPT) system via Wide Area Workflow (WAWF) is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

b. To access iRAPT, the Contractor shall—

i) Have a designated electronic business point of contact in the System for Award Management at https://www.acquisition.gov; and

ii) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.

c. WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through iRAPT. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/

d. WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.

e. The Contractor shall submit Item Unique Identification IUID data “as part of the Material Inspection and Receiving Report” (as required by DFARS 252.211-7003) on delivered end items during the acceptance process.

Access iRAPT via WAWF at https://wawf.eb.mil//

Table 1 - Vendors shall select “Send More Email Notifications” in iRAPT to:

Government Points of Contact Email address Contracting Officer Representative (COR)/Project Engineer/Manager and or Technician

(buyer fill-in)

Contract Specialist or Contracting Officer (buyer fill-in) iRAPT Administrator iRAPT@dmea.osd.mil WAWF MailBox contractingWAWF@dmea.osd.mil

(1) Definitions:

Acceptor: Contracting Officer’s Representative/Project Engineer/Program/Project Manager, or other government acceptance official.

Pay Official: DFAS payment - HQ0748

SHIP To/Service Acceptor DoDAAC: - HQ0727

(2) iRAPT Contractor Input Information. The contractor shall input the selected Document Type creating electronic payment requests in iRAPT:

____ “Invoice” __X_ “2-in-1 Invoice” (Services Only) ____ “Receiving Report” ____ “Invoice and Receiving Report” (Combo) for Materials and or Services ____ “Cost Voucher” (FAR 52.216-7, 52.216-13, 52.216-14, 52.232-7)

Table 2 - For iRAPT Routing Information based on Contract Type Description SF 26 SF 33 SF 1442 SF 1449 DD 1155 Located In Block /Section Contract Number 2 2 4 2 1

Delivery Order See Individual Order

See Individual Order

N/A 4 2

CAGE Code 7 15a 14 17a 9 Pay DoDAAC 12 HQ0748 25 HQ0748 27 HQ0748 18a HQ0748 15 HQ0748 Inspection/Accept ance

Section E or INSPECTION AND ACCEPTANCE

Issue Date 3 5 3 3 3 Issue by DoDAAC

5 HQ0727 7 HQ0727 7 HQ0727 9 HQ0727 6 HQ0727

Admin DoDAAC 6 HQ0727 24 HQ0727 26 HQ0727 16 HQ0727 7 HQ0727 Ship To/Service Acceptor DoDAAC

6 HQ0727 24 HQ0727 26 HQ0727 16 HQ0727 7 HQ0727

Ship to Extension Do Not Fill In Services or Supplies

Based on majority of requirement as determined by monetary value

Final Invoice? Do not change “N” (no) to “Y” (yes) unless this is the last invoice and the contract is ready for closeout

COR/Project Engineer

The point of contact for the ship to address in Section F – Delivery Information

(3) Invoices - Invoice 2-n-1 (Services Only) and Invoice and Receiving Report (Combo):

When submitting the final invoice for payment for a contract, select the “Y” selection from the “Final Invoice?”

drop-down box.

Upon successful submission of the invoice, click on the Send More Email Notifications link to send to email addresses listed in Table 1 above.

(4) Defense Finance and Accounting Service (DFAS) information may be accessed using the DFAS website at http://www.dfas.mil/. Payment status information may be accessed using the myInvoice system in WAWF (myInvoice system requires registration in the WAWF system) or by calling the DFAS Columbus helpdesk at 800- 756-4571(Select Option 2, then Option 2 again). The contract number and shipment/invoice number will be required to check payment status.

Section I - Contract Clauses

52.202-1 Definitions JUN 2020 52.203-3 Gratuities APR 1984 52.203-5 Covenant Against Contingent Fees MAY 2014 52.203-6 Restrictions On Subcontractor Sales To The Government JUN 2020 52.203-7 Anti-Kickback Procedures JUN 2020 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or

Improper Activity

MAY 2014

52.203-10 Price Or Fee Adjustment For Illegal Or Improper Activity MAY 2014 52.203-12 Limitation On Payments To Influence Certain Federal

Transactions

JUN 2020

52.203-13 Contractor Code of Business Ethics and Conduct JUN 2020 52.203-19 Prohibition on Requiring Certain Internal Confidentiality

Agreements or Statements

JAN 2017

52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards

JUN 2020

52.204-12 Unique Entity Identifier Maintenance OCT 2016 52.204-13 System for Award Management Maintenance OCT 2018 52.204-18 Commercial and Government Entity Code Maintenance JUL 2016 52.204-19 Incorporation by Reference of Representations and

Certifications.

DEC 2014

52.204-21 Basic Safeguarding of Covered Contractor Information Systems

JUN 2016

52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities.

JUL 2018

52.204-24 Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment.

DEC 2019

52.204-24 Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment.

DEC 2019

52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment

AUG 2019

52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment

JUN 2020

52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters

OCT 2018

52.209-10 Prohibition on Contracting With Inverted Domestic Corporations

NOV 2015

52.210-1 Market Research JUN 2020 52.215-2 Audit and Records--Negotiation JUN 2020 52.215-8 Order of Precedence--Uniform Contract Format OCT 1997 52.215-14 Integrity of Unit Prices JUN 2020 52.219-4 (Dev) Notice of Price Evaluation Preference for HUBZone Small

Business Concerns (DEVIATION 2020-O0008)

MAR 2020

52.219-6 (Dev) Notice of Total Small Business Set-Aside (DEVIATION 2020-O0008).

MAR 2020

52.219-8 Utilization of Small Business Concerns OCT 2018 52.222-3 Convict Labor JUN 2003 52.222-4 Contract Work Hours and Safety Standards - Overtime

Compensation

MAY 2018

52.222-21 Prohibition Of Segregated Facilities APR 2015 52.222-26 Equal Opportunity SEP 2016 52.222-35 Equal Opportunity for Veterans JUN 2020 52.222-36 Equal Opportunity for Workers with Disabilities JUN 2020 52.222-37 Employment Reports on Veterans JUN 2020 52.222-40 Notification of Employee Rights Under the National Labor

Relations Act

DEC 2010

52.222-41 Service Contract Labor Standards AUG 2018 52.222-42 Statement Of Equivalent Rates For Federal Hires MAY 2014 52.222-44 Fair Labor Standards And Service Contract Labor Standards-

Price Adjustment

MAY 2014

52.222-50 Combating Trafficking in Persons JAN 2019 52.222-54 Employment Eligibility Verification OCT 2015 52.222-55 Minimum Wages Under Executive Order 13658 DEC 2015 52.222-62 Paid Sick Leave Under Executive Order 13706 JAN 2017 52.223-5 Pollution Prevention and Right-to-Know Information MAY 2011 52.223-6 Drug-Free Workplace MAY 2001 52.223-18 Encouraging Contractor Policies To Ban Text Messaging

While Driving

JUN 2020

52.225-13 Restrictions on Certain Foreign Purchases JUN 2008 52.227-1 Authorization and Consent JUN 2020 52.227-2 Notice And Assistance Regarding Patent And Copyright

Infringement

JUN 2020

52.227-3 Patent Indemnity APR 1984 52.228-5 Insurance - Work On A Government Installation JAN 1997 52.229-3 Federal, State And Local Taxes FEB 2013 52.229-11 Tax on Certain Foreign Procurements--Notice and

Representation

JUN 2020

52.229-11 Tax on Certain Foreign Procurements--Notice and Representation

JUN 2020

52.232-1 Payments APR 1984 52.232-8 Discounts For Prompt Payment FEB 2002 52.232-11 Extras APR 1984 52.232-17 Interest MAY 2014 52.232-23 Assignment Of Claims MAY 2014 52.232-25 Prompt Payment JAN 2017 52.232-33 Payment by Electronic Funds Transfer--System for Award

Management

OCT 2018

52.232-39 Unenforceability of Unauthorized Obligations JUN 2013 52.232-40 Providing Accelerated Payments to Small Business

Subcontractors

DEC 2013

52.233-1 Disputes MAY 2014 52.233-3 Protest After Award AUG 1996 52.233-4 Applicable Law for Breach of Contract Claim OCT 2004 52.237-2 Protection Of Government Buildings, Equipment, And

Vegetation

APR 1984

52.242-13 Bankruptcy JUL 1995

52.243-1 Changes--Fixed Price AUG 1987 52.244-6 Subcontracts for Commercial Items JUN 2020 52.246-25 Limitation Of Liability--Services FEB 1997 52.249-2 Termination For Convenience Of The Government (Fixed-

Price)

APR 2012

52.249-8 Default (Fixed-Price Supply & Service) APR 1984 252.201-7000 Contracting Officer's Representative DEC 1991 252.203-7000 Requirements Relating to Compensation of Former DoD

Officials

SEP 2011

252.203-7001 Prohibition On Persons Convicted of Fraud or Other Defense- Contract-Related Felonies

DEC 2008

252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013 252.203-7003 Agency Office of the Inspector General AUG 2019 252.203-7004 Display of Hotline Posters AUG 2019 252.204-7000 Disclosure Of Information OCT 2016 252.204-7002 Payment For Contract Line or Subline Items Not Separately

Priced

APR 2020

252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7012 Safeguarding Covered Defense Information and Cyber

Incident Reporting

DEC 2019

252.204-7015 Notice of Authorized Disclosure of Information for Litigation Support

MAY 2016

252.204-7018 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services

DEC 2019

252.205-7000 Provision Of Information To Cooperative Agreement Holders DEC 1991 252.209-7004 Subcontracting With Firms That Are Owned or Controlled By

The Government of a Country that is a State Sponsor of Terrorism

MAY 2019

252.222-7006 Restrictions on the Use of Mandatory Arbitration Agreements DEC 2010 252.223-7006 Prohibition On Storage, Treatment, and Disposal of Toxic or

Hazardous Materials

SEP 2014

252.223-7008 Prohibition of Hexavalent Chromium JUN 2013 252.225-7002 Qualifying Country Sources As Subcontractors DEC 2017 252.225-7012 Preference For Certain Domestic Commodities DEC 2017 252.225-7017 Photovoltaic Devices JAN 2020 252.225-7021 Trade Agreements--Basic SEP 2019 252.225-7048 Export-Controlled Items JUN 2013 252.226-7001 Utilization of Indian Organizations and Indian-Owned

Economic Enterprises, and Native Hawaiian Small Business Concerns

APR 2019

252.227-7013 Rights in Technical Data--Noncommercial Items FEB 2014 252.227-7016 Rights in Bid or Proposal Information JAN 2011 252.227-7022 Government Rights (Unlimited) MAR 1979 252.227-7023 Drawings and Other Data to become Property of Government MAR 1979 252.227-7025 Limitations on the Use or Disclosure of Government-

Furnished Information Marked with Restrictive Legends

MAY 2013

252.227-7030 Technical Data--Withholding Of Payment MAR 2000 252.227-7037 Validation of Restrictive Markings on Technical Data SEP 2016 252.227-7039 Patents--Reporting Of Subject Inventions APR 1990 252.232-7003 Electronic Submission of Payment Requests and Receiving

Reports

DEC 2018

252.232-7010 Levies on Contract Payments DEC 2006 252.243-7001 Pricing Of Contract Modifications DEC 1991 252.243-7002 Requests for Equitable Adjustment DEC 2012 252.244-7000 Subcontracts for Commercial Items JUN 2013 252.246-7003 Notification of Potential Safety Issues JUN 2013 252.246-7004 Safety of Facilities, Infrastructure, and Equipment for

Military Operations

OCT 2010

252.246-7008 Sources of Electronic Parts MAY 2018 252.247-7023 Transportation of Supplies by Sea FEB 2019

52.216-5 PRICE REDETERMINATION--PROSPECTIVE (OCT 1997)

(a) General. The unit prices and the total price stated in this contract shall be periodically redetermined in accordance with this clause, except that (1) the prices for supplies delivered and services performed before the first effective date of price redetermination (see paragraph (c) of this clause) shall remain fixed and (2) in no event shall the total amount paid under this contract exceed any ceiling price included in the contract.

(b) Definition. "Costs," as used in this clause, means allowable costs in accordance with Part 31 of the Federal Acquisition Regulation (FAR) in effect on the date of this contract.

(c) Price redetermination periods. For the purpose of price redetermination, performance of this contract is divided into successive periods. The first period shall extend from the date of the contract to the period of performance end date of line item 0001, [see Note (1)] and the second and each succeeding period shall extend for the period of performance end date of the line item from the end of the last preceding period, except that the parties may agree to vary the length of the final period. The first day of the second and each succeeding period shall be the effective date of price redetermination for that period.

(d) Data submission. (1) Not more than 365 days nor less than 30 days [see Note (2)] before the end of each redetermination period, except the last, the Contractor shall submit--

(i) Proposed prices for supplies that may be delivered or services that may be performed in the next succeeding period, and--

(A) An estimate and breakdown of the costs of these supplies or services in the format of Table 15-2, FAR 15.408, or in any other form on which the parties may agree;

(B) Sufficient data to support the accuracy and reliability of this estimate; and

(C) An explanation of the differences between this estimate and the original (or last preceding) estimate for the same supplies or services; and

(ii) A statement of all costs incurred in performing this contract through the end of the previous month [see Note (3)] before the submission of proposed prices, on Standard Form 1411, Contract Pricing Proposal Cover Sheet (or in any other form on which the parties may agree), with sufficient supporting data to disclose unit costs and cost trends for-

(A) Supplies delivered and services performed; and

(B) Inventories of work in process and undelivered contract supplies on hand (estimated to the extent necessary).

(2) The Contractor shall also submit, to the extent that it becomes available before negotiations on redetermined prices are concluded--

(i) Supplemental statements of costs incurred after the date stated in subdivision (d)(1)(ii) of this section for--

(A) Supplies delivered and services performed; and

(B) Inventories of work in process and undelivered contract supplies on hand (estimated to the extent necessary);

and

(ii) Any other relevant data that the Contracting Officer may reasonably require.

(3) If the Contractor fails to submit the data required by subparagraphs (1) and (2) of this section, within the time specified, the Contracting Officer may suspend payments under this contract until the data are furnished. If it is later determined that the Government has overpaid the Contractor, the Contractor shall repay the excess to the Government immediately. Unless repaid within 30 days after the end of the data submittal period, the amount of the excess shall bear interest, computed from the date the data were due to the date of repayment, at the rate established in accordance with the Interest clause.

(e) Price redetermination. Upon the Contracting Officer's receipt of the data required by paragraph (d) of this section, the Contracting Officer and the Contractor shall promptly negotiate to redetermine fair and reasonable prices for supplies that may be delivered or services that may be performed in the period following the effective date of price redetermination.

(f) Contract modifications. Each negotiated redetermination of prices shall be evidenced by a modification to this contract, signed by the Contractor and the Contracting Officer, stating the redetermined prices that apply during the redetermination period.

(g) Adjusting billing prices. Pending execution of the contract modification (see paragraph (f) of this section), the Contractor shall submit invoices or vouchers in accordance with the billing prices stated in this contract. If at any time it appears that the then-current billing prices will be substantially greater than the estimated final prices, or if the Contractor submits data showing that the redetermined price will be substantially greater than the current billing prices, the parties shall negotiate an appropriate decrease or increase in billing prices. Any billing price adjustment shall be reflected in a contract modification and shall not affect the redetermination of prices under this clause. After the contract modification for price redetermination is executed, the total amount paid or to be paid on all invoices or vouchers shall be adjusted to reflect the agreed-upon prices, and any requested additional payments, refunds, or credits shall be made promptly.

(h) Quarterly limitation on payments statement. This paragraph (h) applies only during periods for which firm prices have not been established.

(1) Within 45 days after the end of the quarter of the Contractor's fiscal year in which a delivery is first made (or services are first performed) and accepted by the Government under this contract, and for each quarter thereafter, the Contractor shall submit to the contract administration office (with a copy to the contracting office and the cognizant contract auditor) a statement, cumulative from the beginning of the contract, showing--

(i) The total contract price of all supplies delivered (or services performed) and accepted by the Government and for which final prices have been established;

(ii) The total costs (estimated to the extent necessary) reasonably incurred for, and properly allocable solely to, the supplies delivered (or services performed) and accepted by the Government and for which final prices have not been established;

(iii) The portion of the total interim profit (used in establishing the initial contract price or agreed to for the purpose of this paragraph (h)) that is in direct proportion to the supplies delivered (or services performed) and accepted by the Government and for which final prices have not been established; and

(iv) The total amount of all invoices or vouchers for supplies delivered (or services performed) and accepted by the Government (including amounts applied or to be applied to liquidate progress payments).

(2) The statement required by subparagraph (1) of this section need not be submitted for any quarter for which either no costs are to be reported under subdivision (1)(ii) of this section, or revised billing prices have been established in accordance with paragraph (g) of this section, and do not exceed the existing contract price, the Contractor's price-redetermination proposal, or a price based on the most recent quarterly statement, whichever is least.

(3) Notwithstanding any provision of this contract authorizing greater payments, if on any quarterly statement the amount under subdivision (1)(iv) of this section exceeds the sum due the Contractor, as computed in accordance with subdivisions (1)(i), (ii), and (iii) of this section, the Contractor shall immediately refund or credit to the Government the amount of this excess. The Contractor may, when appropriate, reduce this refund or credit by the amount of any applicable tax credits due the Contractor under 26 U.S.C. 1481 and by the amount of previous refunds or credits affected under this clause. If any portion of the excess has been applied to the liquidation of progress payments, then that portion may, instead of being refunded, be added to the unliquidated progress payment account, consistent with the Progress Payments clause. The Contractor shall provide complete details to support any claimed reductions in refunds.

(4) If the Contractor fails to submit the quarterly statement within 45 days after the end of each quarter and it is later determined that the Government has overpaid the Contractor, the Contractor shall repay the excess to the Government immediately. Unless repaid within 30 days after the end of the statement submittal period, the amount of the excess shall bear interest, computed from the date the quarterly statement was due to the date of repayment, at the rate established in accordance with the Interest clause.

(i) Subcontracts. No subcontract placed under this contract may provide for payment on a cost-plus-a-percentage-of-cost basis. The Contractor shall--

(1) Insert in each price redetermination or incentive price revision subcontract the substance of paragraph (h) of this section, and of this paragraph (i), modified to omit mention of the Government and to reflect the position of the Contractor as purchaser and of the subcontractor as vendor, and to omit that part of subparagraph (h)(3) of this section relating to tax credits; and

(2) Include in each cost-reimbursement subcontract a requirement that each lower-tier price redetermination or incentive price revision subcontract contain the substance of paragraph (h) of this section, and this paragraph (i), modified as required by subparagraph (1) of this section.

(j) Disagreements. If the Contractor and the Contracting Officer fail to agree upon redetermined prices for any price redetermination period within 60 days (or within such other period as the parties agree) after the date on which the data required by paragraph (d) of this section are to be submitted, the Contracting Officer shall promptly issue a decision in accordance with the Disputes clause. For the purpose of paragraphs (f), (g), and (h) of this section, and pending final settlement of the disagreement on appeal, by failure to appeal, or by agreement, this decision shall be treated as an executed contract modification. Pending final settlement, price redetermination for subsequent periods, if any, shall continue to be negotiated as provided in this clause.

(k) Termination. If this contract is terminated, prices shall continue to be established in accordance with this clause for (1) completed supplies and services accepted by the Government and (2) those supplies and services not terminated under a partial termination. All other elements of the termination shall be resolved in accordance with other applicable clauses of this contract.

NOTES:

(1) Express in terms of units delivered, or as a date; but in either case the period should end on the last day of a month.

(2) Insert the numbers of days chosen so that the Contractor's submission will be late enough to reflect recent cost experience (taking into account the Contractor's accounting system), but early enough to permit review, audit (if necessary), and negotiation before the start of the prospective period.

(3) Insert "first," except that "second" may be inserted if necessary to achieve compatibility with the Contractor's accounting system.

(End of clause)

52.219-14 LIMITATIONS ON SUBCONTRACTING (DEVIATION 2020-O0008) (MAR 2020)

(a) This clause does not apply to the unrestricted portion of a partial set-aside.

(b) Definition. “Similarly situated entity,” as used in this clause, means a first-tier subcontractor, including an independent contractor, that—

(1) Has the same small business program status as that which qualified the prime contractor for the award (e.g., for a small business set-aside contract, any small business concern, without regard to its socioeconomic status); and

(2) Is considered small for the size standard under the North American Industry Classification System (NAICS) code the prime contractor assigned to the subcontract.

(c) Applicability. This clause applies only to—

(1) Contracts that have been set aside for small business concerns or 8(a) participants;

(2) Part or parts of a multiple-award contract that have been set aside for small business concerns or 8(a) participants;

(3) Contracts that have been awarded on a sole-source basis in accordance with subpart 19.8;

(4) Orders set aside for small business concerns under multiple-award contracts, as described in 8.405-5 and 16.505(b)(2)(i)(F), if the order amount is expected to exceed the simplified acquisition threshold;

(5) Orders competed among 8(a) participants in accordance with subpart 19.8 under multiple-award contracts, as described in 8.405-5 and 16.505(b)(2)(i)(F), regardless of dollar value;

(6) Contracts using the HUBZone price evaluation preference to award to a HUBZone small business concern unless the concern waived the evaluation preference; and

(7) Orders issued directly to small business concerns or 8(a) participants under multiple-award contracts as described in 19.504(c)(1)(ii).

(d) Independent contractors. An independent contractor shall be considered a subcontractor.

(e) Limitations on subcontracting. By submission of an offer and execution of a contract, the Contractor agrees that in performance of a contract assigned a NAICS code for—

(1) Services (except construction), it will not pay more than 50 percent of the amount paid by the Government for contract performance to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count toward the prime contractor’s 50 percent subcontract amount that cannot be exceeded. When a contract includes both services and supplies, the 50 percent limitation shall apply only to the service portion of the contract. Other direct costs are excluded to the extent they are not the principal purpose of the contract and cannot be obtained from small business concerns;

(2) Supplies (other than procurement from a nonmanufacturer of such supplies), it will not pay more than 50 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count toward the prime contractor’s 50 percent subcontract amount that cannot be exceeded. When a contract includes both supplies and services, the 50 percent limitation shall apply only to the supply portion of the contract;

(3) General construction, it will not pay more than 85 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count toward the prime contractor’s 85 percent subcontract amount that cannot be exceeded; or

(4) Construction by special trade contractors, it will not pay more than 75 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count toward the prime contractor’s 75 percent subcontract amount that cannot be exceeded.

(f) A joint venture agrees that, in the performance of the contract, the applicable percentage specified in paragraph

(e) of this clause will be performed by the aggregate of the joint venture participants.

(g) The Contractor shall comply with the limitations on subcontracting as follows:

(1) For contracts, in accordance with paragraphs (c)(1) and (2) of this clause— [Contracting Officer check as appropriate.] ___ By the end of the base term of the contract and then by the end of each subsequent option period; or X By the end of the performance period for each order issued under the contract.

(2) For orders, in accordance with paragraphs (c)(3) and (4) of this clause, by the end of the performance period for the order.

52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (MAY 2020)

(a) Definitions. As used in this clause--

Long-term contract means a contract of more than five years in duration, including options. However, the term does not include contracts that exceed five years in duration because the period of performance has been extended for a cumulative period not to exceed six months under the clause at 52.217-8, Option to Extend Services, or other appropriate authority.

Small business concern means a concern, including its affiliates, that is independently owned and operated, not dominant in the field of operation in which it is bidding on Government contracts, and qualified as a small business under the criteria in 13 CFR part 121 and the size standard in paragraph (d) of this clause. Such a concern is ``not dominant in its field of operation'' when it does not exercise a controlling or major influence on a national basis in a kind of business activity in which a number of business concerns are primarily engaged.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .